A method for manufacturing a gearbox in a ship or marine equipment

By performing accurate calibration and multiple inspections during the machining process of the gear box, combined with different types of milling cutters and drills, the problems of gear box processing error and long cycle are solved, and efficient machining accuracy and quality control are achieved.

CN110181229BActive Publication Date: 2024-12-03CHINA MERCHANTS HEAVY IND JIANGSU
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN201910442855.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-05-25
Publication Date
2024-12-03
Estimated Expiration
2039-05-25

AI Technical Summary

Technical Problem

The gearbox has large error accumulation during machining, long processing cycles, and unscientific traditional processes make it difficult to control the quality.

Method used

By detecting the actual size of the workpiece, setting the calibration position, using machine tool tracks and columns for calibration, installing different types of milling cutters and drill bits, gradually replacing the drill bit size, adjusting the processing process according to the detection data, and ensuring that the outer plane and plate thickness meet the conformity of the outer plane and plate thickness. Required, and fine milling and polishing.

Benefits of technology

It effectively reduces error accumulation, shortens processing cycle, improves the machining accuracy and quality of the gearbox, and achieves efficient machining on the T6920D floor boring and milling machine.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110181229B_ABST
    Figure CN110181229B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for manufacturing a gearbox in a ship and marine equipment. The gearbox is a cylindrical lifting mechanism for ships, marine equipment and platforms. In the machining process of the gearbox, there are always problems such as too large a gear opening, uneven plate thickness, and excessive accumulation of machining errors. In addition, there are problems such as too long a machining cycle, unreasonable machining process, uneven working hours, and too much manpower involved. This invention is a mechanical machining (machining) process manufacturing method that solves these problems.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of ship mechanical processing technology, and in particular to a method for manufacturing a platform cylindrical lifting mechanism in ships and marine engineering equipment. Background Art

[0002] Gearbox machining is a key step in the processing technology of ships, offshore equipment, and platform cylindrical lifting mechanisms. Before machining, gearboxes are mostly load-bearing components, and most of them are welded from larger structural parts. After welding between structural parts, aging treatment is required, and then machining is completed according to the accuracy requirements of the gearbox machining drawings. The structure of the gearbox is relatively complex, and the shape of the gearbox structure is easily changed during welding, so a large floor-standing boring machine, such as T6920D, is required to machine it to ensure installation accuracy.

[0003] Traditional gearbox machining technology usually uses one end of the gearbox as the machining process benchmark, which leads to large errors in the gearbox machining process and makes it difficult to control the quality. In addition, due to the unscientific arrangement of the current gearbox machining process, the gearbox machining cycle is long, and the traditional gearbox machining cycle is more than 40 days. Summary of the invention

[0004] The present invention provides a method for manufacturing a cylindrical lifting mechanism (i.e., a gearbox) for ships, offshore equipment, and platforms, so as to solve the problems of excessive cumulative errors and long machining cycles during machining of milling surfaces and boring holes of such large structural parts of the gearbox, and well expands the machining capabilities of the existing T6920D floor-standing boring and milling machine.

[0005] The manufacturing method of the gearbox in the ship and offshore equipment provided by the present invention comprises the following steps: Step 1: before the workpiece is put on the machine tool, the actual rough material size of each position that needs to be machined is detected, wherein 24 points are measured on each surface of the rough material, and whether there is a machining allowance left at each position that needs to be machined, the detection data of each size in the rough material is marked, and whether the vertical line, waistline, and hole spacing center line are obviously marked, the inner range of the upper and lower holes is detected to be 423 mm, and the difference in the flatness size of the outer range is detected to be no more than 4 mm, and the above data is recorded;

[0006] Step 2: Place the upper tire frame parallel to the middle of the machine tool track, arrange the workpiece so that it is stored at a distance of about 1.35 meters from the machine tool column, and fasten the workpiece on the machine tool platform;

[0007] Step 3: Straighten and level the upper workpiece as much as possible, set the 50T jack at the position that needs to be calibrated, use the machine tool track and column feed to calibrate according to the riveter center line, use the drum center wire to run the machine tool to ensure that both ends are 2160±1.5, set the proofing and punching position, place the level meter at a position where the triangular point of the workpiece can be observed, and the other corner of the workpiece is determined by the running machine. Set jacks at the four corners of the workpiece to calibrate the parallelism of the workpiece, proof-punch, record data, report for inspection after calibration, tighten the workpiece with angle iron, and recheck after completion. After all calibration dimensions are qualified, calibrate the first surface of the workpiece to 2160±1.5 rack center line, return the instrument to the unprocessed surface and indicate the position, and punch the proofing and punching position;

[0008] Step 4: Install the angle milling head and dial indicator, run the machine tool to re-pull the center line, punch the sample, grind off the sample mark of the riveter center line, according to the center of the upper hole on both sides, and refer to the center of the lower hole, within 3~5 mm, use three groups of six holes to reduce the accumulated error, draw 1150, 1500 hole spacing and 2160 cross lines, punch the sample, and punch the sample on the unprocessed surface; then re-table according to the inspection data on the workpiece, detect the highest and lowest points of the plate surface of the workpiece that needs to be machined on the upper and lower outer files, mark on the plate surface of the workpiece that needs to be machined, detect the 345 equal-division size adjustment on both sides of the upper and lower holes and lock the coordinates, record the coordinates, and then calculate whether the outer file 495.3±3 can be ensured after processing according to the actual outer file size data of the workpiece, and whether the plate thickness can be ensured to be not less than 36; when the above size cannot be ensured, the outer file is repaired or baked; after the above size is confirmed, the data are mutually checked and the records are kept;

[0009] Step 5: Install the Φ200 milling cutter disc, weld a milling head correction and coordinate detection block on the tire frame, and then use a 2 mm smooth knife to process the highest point of the upper and lower plate surfaces of the workpiece, calculate and use a thickness gauge to detect the actual size of the plate thickness to ensure that the outer block 495.3±3 and the plate thickness 36 can be processed, mark the thinnest points of the upper and lower plate surfaces of the workpiece on the corresponding plate surface, keep the record, perform rough milling, and then detect whether the plate thickness reaches the minimum limit of 35.25, and whether the outer block size reaches the maximum limit of 498.3. After the above dimensions are detected, the outer block plane is finely milled to reach 495.3±3 while ensuring that the plate thickness is 36, and the hole shape box is 930+0.6x972+0.8. The feed edge needs to be measured during fine milling to ensure that the flatness meets ±0.5 mm, parallelism ±1 mm, and roughness 12.5;

[0010] Step 6: After finishing milling a surface according to the above step 5, replace the Φ40 milling cutter and finish mill the upper and lower plate frame of the workpiece at the outer R20 angle, and then according to the center line and cross line obtained in the above step 4, respectively process the upper and lower holes so that the single-side dimensions on both sides reach 345±0.44;

[0011] Step 7: Install the drill chuck, control the upper and lower plate surfaces of the workpiece to run the digital display uniformly, uniformly offset 18.5 to one end according to the coordinates according to the cross line and the center of the upper and lower holes to punch the grooves of the center distance of each hole, inspect the processed workpiece according to the template, record the digital display data, and after the mutual inspection is completed, replace the drill bit for drilling and fine milling; after the fine milling is completed, polish, grind, and deburr to ensure the roughness of 12.5, mutual inspection, inspection, and adjustment of the lower tire frame;

[0012] Step 8: After the lower tire frame is adjusted, the center line and hole spacing point line on the plate surface of the processed workpiece are used as the reference to install and adjust the processing procedures, and detection, measurement, mutual inspection and inspection are carried out according to the methods of steps 1 to 7 to finally obtain the required gearbox.

[0013] Optionally, in the above manufacturing method, in step 4, refer to the center of the lower hole, reduce the accumulated error within 3 to 5 mm with three groups of six holes on the left and right, and when drawing the cross lines of 1150, 1500 and 2160 hole spacings, calculate the lower hole deviation according to the Ф307 radius.

[0014] Optionally, in the above manufacturing method, in step 4, the equally divided size of 345 on both sides of the upper and lower holes does not exceed 2 mm. When the equally divided size of 345 on both sides of the upper and lower holes exceeds 2 mm, the center lines 1150 and 1500 are moved within the range of ±3 mm.

[0015] Optionally, in the above manufacturing method, in step 6, if the single-side processing size is smaller, a negative value is taken, and if it is larger, a positive value is taken.

[0016] Optionally, in the above manufacturing method, in step 6, it is necessary to ensure that the processing lengths of both sides reach 278 / 145.3.

[0017] Optionally, in the above-mentioned manufacturing method, in step 6, when the processing length of both sides reaches 278 / 145.3, the following steps need to be performed: replace the customized long milling head and Ф40 milling cutter to clean and mill the upper and lower plate surface frames to form the inner R20 angle, grind off the burrs, and check each other.

[0018] Optionally, in the above-mentioned manufacturing method, in step 7, after the mutual inspection is completed, the specific steps of replacing the drill bit for drilling and fine milling include: replacing the waist hole drill bit, using a Φ43 drill bit for the Φ49 hole, a Φ40 drill bit for the Φ46 hole, and a Φ15 drill bit for the Φ19 hole, drilling a single-sided bottom hole, and using a template and a positioning pin for inspection; after the mutual inspection is completed, replacing the drill bit again, among which a Φ46 milling cutter is used for the Φ49 hole, a Φ44 milling cutter is used for the Φ46 hole, and a Φ16 sprocket milling cutter is used for the Φ19 hole, and rough milling of each waist hole in the length direction is left with 0.5 mm on one side; after completion, replace them with Φ48.8, Φ45.8, and Φ18.8 milling cutters in turn, and lengthen the milling cutter cutting edge by 45 to fine mill the waist holes to sizes of 49±0.3X86±0.3, 46±0.3X83±0.3, and 19±0.2X56±0.3.

[0019] Optionally, in the above manufacturing method, in step 7, when aligning the tool at the edge of the hole, first step back a few millimeters and then feed it into place to avoid tool alignment errors.

[0020] Optionally, in the above manufacturing method, the total working hours for processing the gearbox is 336 hours.

[0021] Beneficial Effects

[0022] Aiming at the problems of too large a gap, uneven plate thickness, especially too small a plate thickness, and too large accumulated errors in machining during the machining process of the gearbox, the present invention optimizes the gearbox machining process. After the workpiece is machined and adjusted, the present invention uses the center line and hole spacing point line on the plate surface of the machined workpiece as a reference to install and adjust the machining process, and gradually replaces the drill bit size according to the machining size during the machining process. Therefore, the present invention can solve the contradiction between large gap and small plate thickness, so that the workpiece machining accuracy meets the requirements. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 A schematic diagram of the installation position of a lifting device between a machine tool during processing;

[0024] Figure 2 A front view of the installation position between a lifting device and a machine tool during processing;

[0025] Figure 3 This is a top view of the installation position between a lifting device and a machine tool during processing. DETAILED DESCRIPTION

[0026] In order to make the purpose and technical solution of the embodiment of the present invention clearer, the technical solution of the embodiment of the present invention will be clearly and completely described below in conjunction with the drawings of the embodiment of the present invention. Obviously, the described embodiment is a part of the embodiment of the present invention, not all of the embodiments. Based on the described embodiment of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0027] It will be understood by those skilled in the art that, unless otherwise defined, all terms (including technical and scientific terms) used herein have the same meaning as generally understood by those skilled in the art in the field to which the present invention belongs. It should also be understood that terms such as those defined in common dictionaries should be understood to have meanings consistent with the meanings in the context of the prior art, and will not be interpreted with idealized or overly formal meanings unless defined as herein.

[0028] The present invention provides a method for manufacturing a gearbox in a ship or marine equipment, the steps of which include:

[0029] Step 1: Before the workpiece is put on the machine, check the actual rough material size of each position to be machined, measure 24 points on each side to see if there is any machining allowance, write the size detection data on the workpiece, and check whether the vertical line, waistline, and hole center line have obvious marks, especially the upper and lower hole inner size 423 mm and outer size flatness size cannot exceed 4 mm, and keep records; (This step requires 1 shift) 2 people

[0030] Step 2: Reference Figures 1 to 3 As shown in the figure, the upper frame is placed parallel to the middle of the machine track of the T6920D floor-standing boring and milling machine. Considering that the workpiece is stored, there is a distance of about 1.35 meters from the machine column to facilitate the disassembly and assembly of the angle milling head, and it is fixed firmly on the platform; (This step requires 1 shift) 4 people

[0031] Step 3: The upper workpiece should be straightened and leveled as far as possible, and a 50T jack should be placed for calibration. The machine tool track and column feed should be used to calibrate according to the riveter center line. The center wire of the barrel should be used to run the machine tool to ensure that the two ends are 2160±1.5 equal and proof-mark the position. The level should be placed at the observable triangulation point, and the other corner should be run on the machine tool to confirm. The four corners should be used to calibrate the parallelism of the workpiece, and punch the foreign punch and keep records to facilitate the workpiece adjustment and secondary clamping to find parallelism. After the calibration is completed, the inspection should be reported, and the workpiece should be tightened with angle iron. After completion, it should be checked again. After the calibration dimensions are qualified, the center line of the rack calibrated at 2160±1.5 on the first surface should be returned to the unprocessed surface by the quality department with an instrument and the position should be marked and proof-marked for the convenience of secondary clamping; (This step requires 1 and a half shifts) 6 people

[0032] Step 4: Install the angle milling head and dial indicator, run the machine to re-draw the center line (machined line) and punch in, grind off the riveting punch to facilitate the assembly of the pile legs, and then refer to the center of the lower hole according to the center of both sides of the upper hole, try to ensure that it is within 3~5 mm (the deviation of the lower hole is calculated based on the Ф307 radius), and use three groups on the left and right of the six holes to reduce the accumulated error to draw cross lines of 1150, 1500 and 2160 hole spacing (to facilitate each process in the next step to use this cross line as a reference) and punch in (the punch is hit on the non-machined surface). Then, according to the inspection data on the workpiece, re-check the highest and lowest points of the plate surface that need to be machined on the upper and lower outer gears (at least 24 points on each side), write with a pen on the workpiece where it needs to be machined, and check the equally divided size of 345 on both sides of the hole (not exceeding 2 mm. If the tolerance is exceeded, the 1150 and 1500 center lines can be moved (within ±3 mm allowed by technology) to adjust, and lock the coordinates and make records. Then, according to the actual outer gear size data of the workpiece, calculate whether the outer gear can be ensured to be 495.3±3 after processing, and the plate thickness is not less than 36 (otherwise, please ask the welder to repair the outer gear or bake it). After completion, check the data mutually and keep records; (This step requires 1 and a half shifts) 2 people

[0033] Step 5: Install the Φ200 milling cutter disc, find a place on the tire frame, weld a milling head correction and coordinate detection block, and then process the upper and lower plate surfaces with a 2mm smooth knife at the highest point. Calculate and use a thickness gauge to detect the actual size of the plate thickness to ensure that the outer gear 495.3±3 and the plate thickness 36 can be processed, and mark the thinnest points of the upper and lower surfaces on each plate surface, and keep a record before proceeding to the next step. After rough milling, thoroughly check the plate thickness, the minimum limit is 35.25 (the thicker the plate, the better), the outer gear size, the maximum limit is 498.3, after ensuring, then fine mill the plane outer gear 495.3±3 and try to take the upper difference to ensure the plate thickness 36, and the hole shape box 930+0.6x972+0.8. The feed edge needs to be measured during fine milling to ensure flatness ±0.5 mm, parallelism ±1 mm and roughness 12.5. Complete, mutual inspection, and inspection. (This step requires 5 shifts) 2 people

[0034] Step 6: After finishing each surface, replace the Ф40 milling cutter to mill the upper and lower plate surface boxes to the outer R20 corners, and then use the center cross point line to process the single side of the hole at 345±0.44. Note that if the single side processing size is too small, take a negative value, and if it is too large, take a positive value. Try to ensure that the processing length of both sides is 278 / 145.3. Then replace the customized long milling head and Ф40 milling cutter to mill the upper and lower plate surface boxes to the inner R20 corners, grind the burrs after completion, and check each other; (This step requires 3 and a half shifts) 2 people

[0035] Step 7: Install the drill chuck, run the digital display up and down, and press the coordinates according to the center of the cross-line hole. Uniformly offset 18.5 to one end to punch the center distance groove of each hole (and mark the processing direction with a pen), and then use the template of the quality department for inspection, remember the digital display data and keep a record. After the mutual inspection is completed, replace various waist hole drill bits, Φ43 drill bit for Φ49 hole, Φ40 drill bit for Φ46 hole, Φ15 drill bit for Φ19 hole, punch single-sided bottom hole, and use templates and positioning pins for inspection. After the mutual inspection is completed, replace the Φ46 milling cutter for Φ49 hole, Φ44 milling cutter for Φ46 hole, and Φ16 sprocket milling cutter for Φ19 hole. Rough milling of each waist hole in the length direction leaves 0.5 mm on one side. After completion, Replace Φ48.8, Φ45.8, Φ18.8 (edge ​​lengthened 45) milling cutters, finish milling waist holes to size 49±0.3X86±0.3, 46±0.3X83±0.3, 19±0.2X56±0.3 (note that when finishing each hole, measure the actual length of the rough milling hole first to have a good idea), be careful when setting the tool, and do not rely entirely on the digital display. You need someone to help with the tool setting. It is recommended that when the tool is set at the edge of the hole, it is best to step back a few millimeters and then feed it into place to avoid tool setting errors. Finish milling, polish, grind, and deburr to ensure the roughness is 12.5, mutual inspection, inspection, and lower tire frame adjustment; (This step requires 9.5 shifts) 2 people

[0036] Step 8: After adjusting the surface, take the center line of the processed surface and the hole distance point line as the reference, and perform all the processes such as installation and adjustment, inspection, measurement, mutual inspection, inspection, working hours, etc. as before; (this step requires 21 shifts) 168 hours. The unit of the above processing process is millimeter.

[0037] The working hours required for machining the gearbox using the above-mentioned machining method are recorded as follows:

[0038] 1. Calibrate and modify the center line. (12 hours)

[0039] 2. Detect plate thickness 36, outer stop 495.3±3 and high and low points on the machine tool. (6 hours) Then install the angle milling head to measure the bottom first and then the top for 1 hour for mutual inspection, tracking and recording.

[0040] 3. Draw 12 cross lines on the board surface. (4.5 hours). After the upper line is drawn, switch the milling head to draw the lower line for half an hour for mutual inspection, tracking and recording. (A total of 24 hours is required for calibration and marking)

[0041] 4. Polish the lower 6-hole surface (5 hours, 50 minutes / side), of which, polish the lower surface and convert the milling head to polish the upper surface (half an hour)

[0042] 5. Polish the 6 holes on the top (3 hours, 30 minutes / side)

[0043] 6. Inspect the upper and lower 6 groups of hole surfaces and the outer block machining allowance (3.5 hours, 35 minutes / group) Mutual inspection, tracking and recording.

[0044] 7. Rough and fine milling of 6 holes, including inspection (6 hours, 60 minutes / face), followed by mutual inspection, tracking and recording.

[0045] 8. Mill the upper plane with a cutter for R20-12 corners (2.5 hours, 12.5 minutes / corner), and you can also finish the 120 waist hole grooves on the upper side. After milling the upper side, switch the milling head to mill the lower side (half an hour).

[0046] 9. Mill 12 surfaces on both sides of the upper hole (single side 345±0.44), (8 hours, 40 minutes / surface), mutual inspection, tracking and recording.

[0047] 10. Rough and fine milling of 6 hole surfaces, including inspection (9 hours, 90 minutes / surface), followed by mutual inspection, tracking, and upper and lower surface inspection records.

[0048] 11. Mill the lower plane with cutter and mill the outer R20-12 corners (3 hours, 15 minutes / corner), replace the milling head after cutting (1 hour)

[0049] 12. Mill the lower plane with the cutter inside R20-12 corners (4 hours, 20 minutes / corner). After the conversion is completed, use the milling head to mill the upper side (half an hour).

[0050] 13. Connect the cutter to mill the inner R20-12 corners of the upper plane (3.5 hours, 17.5 minutes / corner), then replace the milling head after connecting the cutter (1 hour)

[0051] The total time required for the 6 groups of holes, including milling and corner cleaning, is 51 hours)

[0052] 14. Point waist hole spacing grooves 240, (11 hours, 2.75 minutes / piece) Among them, can the bottom groove be drilled by point straight line coordinate running), after drilling the upper part, switch the milling head to drill the lower part (half an hour) for mutual inspection and tracking.

[0053] 15. Drill 240 base holes (25 hours, 6.25 minutes / hole). Among them, manual base hole drilling on the upper plate surface can save machine tool operation (12 hours). After drilling the lower surface, switch the milling head to drill the upper surface (half an hour). Mutual inspection, tracking and inspection reporting.

[0054] 16. Use Ф16 milling cutter to rough mill 48 Ф19 waist holes (10 hours, 12.5 minutes / hole, 3 cuts). Among them, Ф19, Ф46, Ф49 waist holes, rough, semi-finishing, and finishing milling, first complete all processes on one side and then switch the milling head to process the other side) Switch milling head (half an hour)

[0055] 17. Rough milling of 96 Φ46 waist holes with Φ44 milling cutter (8.30 hours, 5.3 minutes / hole)

[0056] 18. Rough milling of 96 Φ49 waist holes with Φ46 milling cutter (9.30 hours, 6 minutes / hole)

[0057] 19. Fine milling of 48 Ø19 waist holes on the upper and lower surfaces (6 hours, 7.5 minutes / hole)

[0058] 20. Fine milling of 96 Ф49 waist holes on the top (11.30 hours, 7.18 minutes / hole); fine milling of 96 Ф46 waist holes on the bottom (9.30 hours, 6 minutes / hole); after milling the bottom, switch the milling head to mill the top (half an hour); it takes a total of 93 hours from the point of groove to the completion of fine milling of waist holes, and then self-inspection, mutual inspection, tracking, grinding and polishing, inspection, record keeping, and declaration for external inspection.

[0059] In the processing method of the present invention, the processing technology of the B side of the gearbox structure is the same as that of the A side, and the total processing time of the two is 336 hours. If a three-shift method is adopted, one shift is arranged for 8 hours, and the first lifting device as a whole requires a total of 42 shifts. The actual operation of the machine tool in three shifts only takes 14 days to complete the processing, which saves 65% of the processing cycle compared to the existing processing method.

Claims

1. A method for manufacturing a gearbox for ships and offshore equipment, characterized in that the steps include: Step 1: Before the workpiece is put on the machine tool, the actual rough material size of each position that needs to be machined is detected, wherein 24 points are measured on each surface of the rough material to detect whether there is a machining allowance at each position that needs to be machined, and the detection data of each size in the rough material is marked, and the vertical line, waistline, and hole center line are detected to have obvious marks, and the inner size of the upper and lower holes is detected to be 423 mm, and the difference in the flatness size of the outer size is detected to be no more than 4 mm, and the above data are recorded; Step 2: Place the upper tire frame parallel to the middle of the machine tool track, arrange the workpiece so that it is stored at a distance of about 1.35 meters from the machine tool column, and fasten the workpiece on the machine tool platform; Step 3: Straighten and level the upper workpiece as much as possible, set the 50T jack at the position that needs to be calibrated, use the machine tool track and column feed to calibrate according to the riveter center line, use the drum center wire to run the machine tool to ensure that both ends are 2160±1.5, set the proofing and punching position, place the level meter at a position where the triangular point of the workpiece can be observed, and the other corner of the workpiece is determined by the running machine. Set jacks at the four corners of the workpiece to calibrate the parallelism of the workpiece, proof-punch, record data, report for inspection after calibration, tighten the workpiece with angle iron, and recheck after completion. After all calibration dimensions are qualified, calibrate the first surface of the workpiece to 2160±1.5 rack center line, return the instrument to the unprocessed surface and indicate the position, and punch the proofing and punching position; Step 4: Install the angle milling head and dial indicator, run the machine tool to re-pull the center line, punch the sample, grind off the sample mark of the riveter center line, according to the center of the upper hole on both sides, and refer to the center of the lower hole, within 3~5 mm, use three groups of six holes to reduce the accumulated error, draw 1150, 1500 hole spacing and 2160 cross lines, punch the sample, and punch the sample on the unprocessed surface; then re-table according to the inspection data on the workpiece, detect the highest and lowest points of the plate surface of the workpiece that needs to be machined on the upper and lower outer files, mark on the plate surface of the workpiece that needs to be machined, detect the 345 equal-division size adjustment on both sides of the upper and lower holes and lock the coordinates, record the coordinates, and then calculate whether the outer file 495.3±3 can be ensured after processing according to the actual outer file size data of the workpiece, and whether the plate thickness can be ensured to be not less than 36; when the above size cannot be ensured, the outer file is repaired or baked; after the above size is confirmed, the data are mutually checked and the records are kept; Step 5: Install the Φ200 milling cutter disc, weld a milling head correction and coordinate detection block on the tire frame, and then use a 2 mm smooth knife to process the highest point of the upper and lower plate surfaces of the workpiece, calculate and use a thickness gauge to detect the actual plate thickness to ensure that the outer stop 495.3±3 and plate thickness 36 can be obtained by processing. Mark the thinnest points of the upper and lower plate surfaces of the workpiece on the corresponding plate surfaces, keep the record, perform rough milling, and then check whether the plate thickness reaches the minimum limit of 35.25, and check whether the outer stop size reaches the maximum limit of 498.

3. After the above dimensions are detected, fine mill the outer stop plane to make it reach 495.3±3 while ensuring that the plate thickness is 36 and the hole shape box is 930 + 0.6 x972 +0.8 , the cutting edge needs to be measured during fine milling to ensure that the flatness meets ±0.5 mm, parallelism ±1 mm, and roughness 12.5; Step 6: After finishing milling a surface according to the above step 5, replace the Φ40 milling cutter and finish mill the upper and lower plate frame of the workpiece at the outer R20 angle, and then according to the center line and cross line obtained in the above step 4, respectively process the upper and lower holes so that the single-side dimensions on both sides reach 345±0.44; Step 7: Install the drill chuck, control the upper and lower plate surfaces of the workpiece to run the digital display uniformly, uniformly offset 18.5 to one end according to the coordinates according to the cross line and the center of the upper and lower holes to punch the grooves of the center distance of each hole, inspect the processed workpiece according to the template, record the digital display data, and after the mutual inspection is completed, replace the drill bit for drilling and fine milling; after the fine milling is completed, polish, grind, and deburr to ensure the roughness of 12.5, mutual inspection, inspection, and adjustment of the lower tire frame; Step 8: After the lower tire frame is adjusted, the center line and hole spacing point line on the plate surface of the processed workpiece are used as the reference to install and adjust the processing procedures, and detection, measurement, mutual inspection and inspection are carried out according to the methods of steps 1 to 7 to finally obtain the required gearbox.

2. The method for manufacturing a gearbox for a ship or marine equipment according to claim 1, characterized in that: In step 4, refer to the center of the lower hole, reduce the accumulated error within 3 to 5 mm with three groups of six holes on the left and right, and when drawing the cross lines of 1150, 1500 and 2160 hole spacings, calculate the lower hole deviation according to the Ф307 radius.

3. The method for manufacturing a gearbox for a ship or marine equipment according to claim 1, characterized in that: In step 4, the equally divided size of 345 on both sides of the upper and lower holes does not exceed 2 mm. When the equally divided size of 345 on both sides of the upper and lower holes exceeds 2 mm, the center lines 1150 and 1500 are moved within the range of ±3 mm.

4. The method for manufacturing a gearbox for a ship or marine equipment according to any one of claims 1 to 3, characterized in that: In step 6, if the single-side processing size is too small, a negative value is taken, and if it is too large, a positive value is taken.

5. The method for manufacturing a gearbox in a ship or marine equipment according to claim 4, characterized in that: In step 6, it is necessary to ensure that the processing length of both sides reaches 278 / 145.

3.

6. The method for manufacturing a gearbox in a ship or marine equipment according to any one of claims 4 to 5, characterized in that: In step 6, when the processing length of both sides reaches 278 / 145.3, the following steps are required: replace the customized long milling head and Ф40 milling cutter to clean the upper and lower plate surface frames by the inner R20 angle, polish the burrs, and check each other.

7. The method for manufacturing a gearbox for a ship or marine equipment according to any one of claims 4 to 6, characterized in that: In step 7, after the mutual inspection is completed, the specific steps of replacing the drill bit for drilling and fine milling include: replacing the waist hole drill bit, using a Φ43 drill bit for the Φ49 hole, a Φ40 drill bit for the Φ46 hole, and a Φ15 drill bit for the Φ19 hole, drilling a single-sided bottom hole, and using a template and a positioning pin for detection; after the mutual inspection is completed, replacing the drill bit again, wherein a Φ46 milling cutter is used for the Φ49 hole, a Φ44 milling cutter is used for the Φ46 hole, and a Φ16 sprocket milling cutter is used for the Φ19 hole, and 0.5 mm is left on one side of the length direction of each waist hole for rough milling; after completion, replace them with Φ48.8, Φ45.8, and Φ18.8 milling cutters in turn, and lengthen the milling cutter edge by 45 to fine mill the waist holes to sizes of 49±0.3X86±0.3, 46±0.3X83±0.3, and 19±0.2X56±0.

3.

8. The method for manufacturing a gearbox for a ship or marine equipment according to claim 7, characterized in that: In step 7, when aligning the tool at the edge of the hole, first step back a few millimeters and then feed it into place to avoid tool alignment errors.

9. The method for manufacturing a gearbox for a ship or marine equipment according to any one of claims 1 to 8, characterized in that: The total working hours for machining the gearbox are 336 hours.

Citation Information

Patent Citations

  • Method for capturing and processing large frame structural member using coordinate boring machine locksmith-boring procedure coperation to scribe

    CN101069948A

  • Process for manufacturing serial, double-seat and integrated cockpit canopy framework of airplane

    CN101695768A