A composite component and concrete technology, applied in the direction of building components, structural elements, building reinforcements, etc., can solve the problems of large wall thickness, high cost, and poor fire resistance of steel pipes, and achieve small thermal conductivity, large heat capacity, and improved The effect of strength and ductility
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Publication Date
- 2019-10-11
- Estimated Expiration
- Not applicable · inactive patent
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention relates to an assembled strut prestressed sandwich tube concrete composite member. Background technique
[0002] The bracing and prestress in the strut-type prestressed column can provide lateral support points for the column, thereby reducing the calculated length of the column and greatly improving the stable bearing capacity of the column with a large slenderness ratio, so that the strength of the steel can be fully utilized. However, in order to prevent premature local buckling, the diameter-to-thickness ratio (or width-to-thickness ratio) limit of the steel pipe is small. Therefore, the wall thickness of the steel pipe is large and the cost is high. In addition, the steel column heats up quickly under fire and has poor fire resistance. Contents of the invention
[0003] In order to overcome the deficiencies of the prior art, the invention provides an assembled strut prestressed sandwich tube-concrete composite member, which has the...
Examples
Embodiment Construction
[0015] refer to Figure 1-Figure 3 As shown, an assembled strut prestressed sandwich tubular concrete composite member of this embodiment includes a sandwich tubular concrete column 1, a prestressed cable 2, a strut 3, a cableway 4 and a cable head 5; a sandwich tubular concrete column 1 N pairs of struts 3 are fixedly connected to the two sides of each pair of struts 3, and each pair of struts 3 is symmetrically arranged and perpendicular to the sandwich concrete column 1, and the ends of the struts 3 are fixedly connected to the cableway 4; wherein, N≥1 is a positive integer;
[0016] The prestressed cable 2 is threaded in the cableway 4, and its two ends are respectively fixed on the cable head 5 installed at the two ends of the sandwich concrete column 1, and the axes of the strut 3, the cableway 4 and the sandwich concrete column 1 are located on the same plane Inside, the two prestressed cables 2 on both sides of the sandwich tube concrete column 1 are symmetrically arra...