A crane for pickling workshop

By designing a crane for the pickling workshop, using the combination of spreader and pickling sink frame, the automated pickling of bolts is realized, solving the problems of low efficiency and accuracy of bolt pickling process in the prior art, and improving processing Efficiency and stability.

CN110371851BActive Publication Date: 2024-11-12HENAN ZHENGDA CRANE EQUIP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201910797696.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-08-27
Publication Date
2024-11-12
Estimated Expiration
2039-08-27

AI Technical Summary

Technical Problem

The prior art lacks special equipment for the bolt pickling process, resulting in low processing efficiency and low accuracy, which affects the processing quality of bolts.

Method used

A crane for pickling workshops is designed, including spreaders, bridges, upper derricks, lower derricks and pickling tank racks. The bolts are automatically picked up by bolts and hanging parts, combining pressure sensors and lifting. mechanism to realize automatic control and stability of the pickling process.

Benefits of technology

It significantly improves the efficiency and accuracy of bolt processing, avoids harm to the human body by the pickling process, and improves the stability of the cleaning process through space optimization and positioning mechanism.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110371851B_ABST
    Figure CN110371851B_ABST
Patent Text Reader

Abstract

The present invention provides a crane for a pickling workshop, comprising a sling, a pickling tank frame, a bridge frame arranged on the pickling tank frame, an upper derrick extending upward along the bridge frame, and a lower derrick extending downward along the bridge frame; the sling comprises a pull rope, a suspension rod, a lifting mechanism arranged on the upper surface of the bridge frame, and a guide wheel arranged on the top of the upper derrick; a lower pulley is arranged at the upper end of the suspension rod, an upper fixed lifting point is arranged below the guide wheel, one end of the pull rope is fixed to the upper fixed lifting point, and is connected to the lifting mechanism after passing through the lower pulley and the guide wheel in sequence, and a hanging line portion is arranged at the lower end of the suspension rod. The crane for a pickling workshop can be used for the bolt processing process, which is the pickling process, greatly improving the bolt processing efficiency, facilitating the control of the pickling process, and effectively improving the processing accuracy of the bolts, and has important application value.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to bolt production equipment, in particular to a crane used in a pickling workshop. Background Art

[0002] Bolts are one of the most commonly used fastening parts. They use the physical and mathematical principles of the circular rotation of the inclined surface of an object and the friction force to gradually fasten objects and parts. In the processing of bolts, pickling is often required. First, hydrochloric acid is used to remove the oxide film on the surface of the wire, and then phosphate is used to form an insoluble compound film to avoid wear of the mold in the subsequent processing process and protect the processing equipment.

[0003] However, there is currently no special equipment for the pickling process of the bolt processing process. The bolt wire is often placed in a hanging frame or directly poured into the pickling tank for pickling. Not only is the bolt processing efficiency low, but it is also not conducive to the control of the pickling process, which greatly affects the bolt processing accuracy.

[0004] In order to solve the above problems, people have been seeking an ideal technical solution. Summary of the invention

[0005] The purpose of the present invention is to provide a crane for a pickling workshop in view of the deficiencies in the prior art.

[0006] In order to achieve the above object, the technical solution adopted by the present invention is:

[0007] A crane for a pickling workshop comprises a sling, a bridge, an upper derrick extending upward along the bridge, and a lower derrick extending downward along the bridge; the sling comprises a pull rope, a suspension rod, a lifting mechanism arranged on the upper surface of the bridge, and a guide wheel arranged on the top of the upper derrick; a lower pulley is arranged at the upper end of the suspension rod, an upper fixed lifting point is arranged below the guide wheel, one end of the pull rope is fixed to the upper fixed lifting point, and is connected to the lifting mechanism after passing through the lower pulley and the guide wheel in sequence, and a hanging line portion is arranged at the lower end of the suspension rod.

[0008] Based on the above, it also includes a pickling tank frame, which includes two groups of parallel support frames, the bridge frame is a frame-shaped structure, and the bottom of the two opposite sides of the bridge frame are provided with walking wheels, and the upper end surface of the support frame is provided with guide rails corresponding to the walking wheels.

[0009] Based on the above, the upper derrick is a conical bracket that is wider at the bottom and narrower at the top. The bridge frame, the upper derrick, the lower derrick and the suspension rod are coaxially arranged. The lower derrick passes through the bridge frame. The lower derrick is also a frame-shaped structure. The upper end of the suspension rod passes through the lower derrick and extends into the lower part of the upper derrick.

[0010] Based on the above, the lower derrick is provided with a plurality of positioning mechanisms corresponding to the boom, and the positioning mechanisms include an arc surface arranged around the boom and tangent to the boom, so that the boom can move up and down along the arc surface.

[0011] Based on the above, a safety fence is provided at the edge of the bridge frame, and a maintenance platform is provided at the edge of the lower derrick.

[0012] Based on the above, the line hanging part includes a hook and a pressure sensor arranged at the lower end of the hook, and the pressure sensor is associated with the lifting mechanism.

[0013] The present invention has outstanding substantive features and significant progress compared to the prior art. Specifically, the crane for the pickling workshop provided by the present invention can be used for the bolt processing technology, which is the pickling process, greatly improving the bolt processing efficiency, facilitating the control of the pickling process, effectively improving the processing accuracy of the bolts, and avoiding damage to the human body during the pickling process. Furthermore, the crane for the pickling workshop is designed to be coaxial with the pickling tank frame, bridge, upper derrick, lower derrick and boom, and the bridge, upper derrick and lower derrick partially overlap, which effectively reduces the space they occupy and is convenient for indoor use. Furthermore, a positioning mechanism is set on the lower derrick corresponding to the boom to avoid the boom from shifting during the cleaning operation and improve the stability of the cleaning process. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a structural schematic diagram of the present invention.

[0015] Figure 2 yes Figure 1 Schematic diagram of the side structure.

[0016] In the figure: 1. Bridge; 2. Upper derrick; 3. Guide wheel; 4. Hoisting mechanism; 5. Upper fixed lifting point; 6. Lower pulley; 7. Lower derrick; 8. Positioning mechanism; 9. Hanging rod; 10. Safety fence; 11. Maintenance platform; 12. Maintenance platform. DETAILED DESCRIPTION

[0017] The technical solution of the present invention is further described in detail below through specific implementation methods.

[0018] like Figure 1-2As shown, a crane for a pickling workshop includes a hoist, a pickling tank frame, a bridge 1 arranged on the pickling tank frame, an upper derrick 2 extending upward along the bridge 1, and a lower derrick 7 extending downward along the bridge 1; the hoist includes a pull rope, a suspension rod 9, a lifting mechanism 4 arranged on the upper surface of the bridge 1, and a guide wheel 3 arranged on the top of the upper derrick 2; a lower pulley 6 is arranged at the upper end of the suspension rod 9, and an upper fixed lifting point 5 is arranged below the guide wheel 3, one end of the pull rope is fixed to the upper fixed lifting point 5, and is connected to the lifting mechanism 4 after passing through the lower pulley 6 and the guide wheel 3 in sequence, and a hanging line portion is arranged at the lower end of the suspension rod 9.

[0019] When in use, the pickling tank frame is set at the edge of the pickling tank, the wire rod used to prepare the bolts is hung on the wire hanging part, and the lifting mechanism is started to reel or unreel the pull rope to adjust the height of the wire rod for pickling; at the same time, the lifting mechanism is located on the bridge frame, and the guide wheel is set at the top of the upper derrick to save space and facilitate indoor use. Specifically, the lifting mechanism can use a winch to reel or unreel.

[0020] Furthermore, the pickling tank frame includes two sets of support frames arranged in parallel, the bridge frame 1 is a frame-shaped structure, and the bottom of the two opposite sides of the bridge frame 1 is provided with running wheels, and the upper end surface of the support frame is provided with guide rails corresponding to the running wheels, so that the bridge frame can move along the guide rails to adjust the relative position of the hanger and the pickling tank, and specifically, the two sets of support frames are placed on the opposite sides of the pickling tank.

[0021] In order to further save space, the upper derrick 2 is a tapered bracket that is wide at the bottom and narrow at the top, the bridge 1, the upper derrick 2, the lower derrick 7, and the suspension rod 9 are coaxially arranged, the lower derrick 7 is arranged through the bridge 1, and the lower derrick 7 is also a frame-shaped structure, and the upper end of the suspension rod 9 passes through the lower derrick 1 and extends into the lower part of the upper derrick 7. Specifically, the bridge can be a rectangular frame, and the suspension rod moves up and down along the central axis of the bridge during the lifting process.

[0022] Furthermore, the lower derrick 7 is provided with a plurality of positioning mechanisms 8 corresponding to the boom 9 to prevent the boom from shifting during the process of rising or falling, and the positioning mechanism includes an arc surface arranged around the boom 9 and tangent to the boom 9, so that the boom can move up and down along the arc surface. Specifically, the boom is cylindrical, the lower derrick can be a rectangular or circular frame structure, and the positioning mechanism can be a plurality of rollers or pulleys directly arranged inside the lower derrick and tangent to the boom, and at least four rollers or pulleys are arranged symmetrically with the boom as the central axis. In this embodiment, the four rollers of the positioning mechanism are respectively arranged at the upper and lower ends of the lower derrick (two at the upper end and two at the lower end).

[0023] For the convenience of safety and maintenance, a safety fence 10 is provided at the edge of the bridge frame 1 , and a maintenance platform 11 and a maintenance platform 12 are provided at the edge of the lower derrick 7 .

[0024] Furthermore, the wire hanging part includes a hook and a pressure sensor arranged at the lower end of the hook, and the pressure sensor is associated with the lifting mechanism 4. During use, when the hook is lowered to place the wire rod in the pickling tank, the pressure value measured by the pressure sensor will change with the depth of the hook. When the pressure measured by the pressure sensor is greater than the set pressure value P1 (indicating that the hook is at a certain depth H1 in the pickling tank), the lifting mechanism 4 performs a winding operation, and when the pressure measured by the pressure sensor is less than the set pressure value P2 (indicating that the hook is at a certain depth H2 in the pickling tank), the lifting mechanism 4 performs an unwinding operation; P1 and P2 are both greater than the indoor air pressure and P1 is greater than P2. Through continuous winding and unwinding, the wire rod is made to reciprocate up and down in the pickling tank for pickling. Specifically, the association between the pressure sensor and the lifting mechanism can be achieved by a controller (PLC) in the prior art.

[0025] Furthermore, a controller with a counter may be selected, and when the winding and unwinding cycle of the lifting mechanism reaches a set value n times, the controller controls the lifting mechanism to rewind and stop the cycle.

[0026] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, ordinary technicians in the field should understand that the specific implementation methods of the present invention can still be modified or some technical features can be replaced by equivalents without departing from the spirit of the technical solution of the present invention, which should be included in the scope of the technical solution for protection of the present invention.

Claims

1. A crane for a pickling workshop, characterized in that: It comprises a sling, a bridge, an upper derrick extending upward along the bridge, and a lower derrick extending downward along the bridge; the sling comprises a pull rope, a suspension rod, a lifting mechanism arranged on the upper surface of the bridge, and a guide wheel arranged on the top of the upper derrick; an upper fixed lifting point is arranged below the guide wheel, a lower pulley is arranged at the upper end of the suspension rod, one end of the pull rope is fixed to the upper fixed lifting point, and is connected to the lifting mechanism after passing through the lower pulley and the guide wheel in sequence, and a wire hanging part is arranged at the lower end of the suspension rod; the wire hanging part comprises a hook and a pressure sensor arranged at the lower end of the hook, and the pressure sensor is associated with the lifting mechanism; When the hook descends to place the wire rod in the pickling tank, the pressure value measured by the pressure sensor will change with the depth of the hook. When the pressure measured by the pressure sensor is greater than the set pressure value P1, the lifting mechanism performs a winding operation. When the pressure measured by the pressure sensor is less than the set pressure value P2, the lifting mechanism performs an unwinding operation. P1 and P2 are both greater than the indoor air pressure and P1 is greater than P2. Through continuous winding and unwinding, the wire rod is made to reciprocate up and down in the pickling tank for pickling.

2. The crane for pickling workshop according to claim 1 is characterized in that: It also includes a pickling tank frame, which includes two sets of parallel supporting frames, the bridge frame is a frame-shaped structure, and the bottoms of the two opposite sides of the bridge frame are provided with running wheels, and the upper end surface of the supporting frame is provided with guide rails corresponding to the running wheels.

3. The crane for pickling workshop according to claim 1 or 2, characterized in that: The upper derrick is a tapered bracket that is wider at the bottom and narrower at the top. The bridge, the upper derrick, the lower derrick and the suspension rod are coaxially arranged. The lower derrick passes through the bridge. The lower derrick is also a frame-shaped structure. The upper end of the suspension rod passes through the lower derrick and extends into the lower part of the upper derrick.

4. The crane for pickling workshop according to claim 3 is characterized in that: The lower derrick is provided with a plurality of positioning mechanisms corresponding to the boom, and the positioning mechanisms include an arc surface which is arranged around the boom and is tangent to the boom, so that the boom can move up and down along the arc surface.

5. The crane for pickling workshop according to claim 4 is characterized in that: A safety fence is arranged at the edge of the bridge frame, and a maintenance platform is arranged at the edge of the lower derrick.