A support structure for a low cast-in-place cap beam and a construction method thereof
By using a combined structure of concrete cushion, sand box, plastic film and bottom formwork in the construction of cast-in-place cap beams, the problems of large construction space and large soil disturbance in the existing technology are solved, and efficient and safe construction in a small space is achieved. The construction of low cast-in-place cap beams simplifies the operation of the support structure and ensures the flatness and structural stability of the cap beams.
Patent Information
- Application Number
- CN201910722483.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-08-06
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2039-08-06
AI Technical Summary
The construction of existing cast-in-place cap beams requires a large construction space and large earth excavations, resulting in greater disturbance to the soil structure, and the construction and disassembly of the support structure is complicated.
A support structure of concrete cushion, sand box, plastic film and bottom formwork is used from bottom to top. By filling the sand box with fine sand filler and covering it with plastic film, combined with the design of pull bolts and bottom formwork, the cover is realized. The beams are poured flat and stably supported, and the frame is pulled out horizontally and the formwork is pulled out by crane and wire rope during disassembly.
Construction of low cast-in-place cap beams in a small space reduces disturbance to the soil, simplifies the erection and disassembly operations of the support structure, ensures the flatness and structural stability of the bottom surface of the cap beams, and reduces construction space occupation and soil impact.
Smart Images

Figure CN110424251B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of bridge construction, and more particularly to a supporting structure of a low cast-in-place cap beam and a construction method thereof. Background Art
[0002] At present, the conventional cast-in-place cap beam requires the construction of a cast-in-place cap beam support, and the cast-in-place cap beam support needs to occupy a large construction space, which requires a large amount of earth excavation, disturbs the original soil, and has a great impact on the structure below the soil. Summary of the invention
[0003] The problem to be solved by the present invention is to provide a support structure for a low cast-in-place cap beam and a construction method thereof, which can construct a low cast-in-place cap beam in a narrow space, is not affected by the construction space, has little disturbance to the underlying soil, and is simple to erect and disassemble the support structure without affecting the safety of the structure beneath the soil.
[0004] In order to solve the above technical problems, the present invention provides a support structure for a low cast-in-place cap beam, which includes a concrete cushion layer, a sand box, a plastic film and a bottom formwork arranged in sequence from bottom to top, the sand box includes a frame, tension bolts and dry fine sand filler, the frame includes two longitudinal frame bars and two transverse frame bars, the longitudinal frame bars are fixedly connected and sealed to the transverse frame bars, a plurality of through holes matching the tension bolts are respectively opened at corresponding positions of the two longitudinal frame bars, the through holes are arranged at equal intervals along the length direction of the longitudinal frame bars, the tension bolts include a tension screw and two nuts, the tension bolts Both ends of the tension screw are provided with threaded portions, the tension screw passes through the frame and its threaded portion extends out of the longitudinal frame bar through the through hole, the nut is sleeved on the threaded portion and tightened until the nut is pressed against the longitudinal frame bar, the bottom surface area of the frame is smaller than the top surface area of the concrete cushion layer, the fine sand filler fills the inner cavity of the frame, and the fine sand filler is in a compressed state, the top surface of the fine sand filler is flush with the top surface of the frame, the plastic film covers the top surface of the sand box, the bottom formwork is arranged on the plastic film, and the cap beam is cast on the bottom formwork.
[0005] As a preferred solution of the present invention, a gasket is provided between the nut and the longitudinal frame bar.
[0006] As a preferred solution of the present invention, two gaskets are provided between the nut and the longitudinal frame bar.
[0007] As a preferred solution of the present invention, the longitudinal frame bars are fixed to the transverse frame bars by welding.
[0008] As a preferred solution of the present invention, the longitudinal frame bars and the transverse frame bars are both steel sections.
[0009] As a preferred solution of the present invention, the bottom template is composed of a plurality of unit templates, and transparent adhesive is pasted on the joints between adjacent unit templates.
[0010] As a preferred solution of the present invention, the width of the unit template is equal to the net width of the sand box, the total length of all the unit templates is equal to the net length of the sand box, and the bottom template is located directly above the fine sand in the sand box.
[0011] As a preferred solution of the present invention, the thickness of the concrete cushion layer is 15 cm to 25 cm.
[0012] As a preferred solution of the present invention, the diameter of the through hole is 3 mm to 8 mm larger than the outer diameter of the tension screw.
[0013] The present invention also provides a construction method for a support structure of a low cast-in-place cap beam, comprising the following steps:
[0014] Step 1: Dig a foundation pit on the ground according to the installation height of the cap beam, and pour a 20cm thick concrete cushion on the foundation pit;
[0015] Step 2: A plurality of through holes are opened on the two longitudinal frame bars along the length direction thereof, and the two longitudinal frame bars and the two transverse frame bars are welded into a rectangular sand box frame. After the concrete cushion layer in step 1 reaches the design strength, the frame is placed on the concrete cushion layer, and the tension screw rods are passed through the through holes and penetrate the frame. The threaded parts at both ends of the tension screw rods extend out of the longitudinal frame bars, and washers and nuts are sequentially sleeved on the threaded parts at both ends of the tension screw rods and the nuts are tightened to press the washers onto the longitudinal frame bars; wherein the longitudinal frame bars and the transverse frame bars are both steel sections, and the bottom surface area of the frame is smaller than the top surface area of the concrete cushion layer;
[0016] Step 3, filling the inner cavity of the frame with dry fine sand, and compacting the fine sand in the inner cavity of the frame so that the top surface of the fine sand filling is flush with the top surface of the frame;
[0017] Step 4: Cover the top surface of the sand box with a plastic film, splice multiple unit templates to form a bottom template, and stick them to the joints between adjacent unit templates with transparent adhesive; wherein the width of the unit template is equal to the net width of the sand box, and the total splicing length of all the unit templates is equal to the net length of the sand box;
[0018] Step 5, pouring a cap beam on the bottom formwork;
[0019] Step six, after the cap beam in step five reaches the designed strength, loosen and remove all the nuts at both ends of the tension screws, knock the tension screws loose with a hammer and pull them out of the sand box, take out the fine sand filler in the sand box from the through hole, pass a steel wire rope through the through hole and tie the frame and the crane hook, then use the crane to drag the frame horizontally, and finally tap the unit formwork with a hammer to pull out the unit formwork.
[0020] Compared with the prior art, the support structure of a low cast-in-place cap beam and the construction method thereof according to the present invention have the following beneficial effects:
[0021] The present invention provides sufficient bearing capacity and flatness for the cap beam through a concrete cushion layer, fills the frame of the sand box with fine sand filler, and covers the fine sand filler with a plastic film to facilitate the removal of the fine sand filler and prevent cement slurry from seeping into the fine sand filler and affecting the removal of the fine sand filler when casting the cap beam. The bottom template is arranged on the plastic film to ensure the flatness of the bottom surface of the cap beam; and the tension bolts on the frame can balance the load of the upper cap beam and generate an outward extrusion force on the fine sand filler through the bottom template, thereby improving the structural stability of the frame; when the sand box is disassembled, the nuts on the tension bolts are loosened, and the tension screws are pulled out to take out the fine sand filler through the through holes of the frame; the present invention can construct a low cast-in-place cap beam in a narrow space, is not affected by the construction space, has little disturbance to the soil below, and is simple to erect and disassemble the support structure, does not affect the safety of the structure below the soil, and occupies less space. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] In order to more clearly illustrate the technical solution of the embodiment of the present invention, the drawings of the embodiment are briefly introduced below.
[0023] Figure 1 It is a structural schematic diagram of a support structure of a low cast-in-place cap beam provided by the present invention;
[0024] Among them, 1 is a concrete cushion layer; 2 is a frame; 3 is fine sand filler; 4 is a tension screw; 5 is a nut; 6 is a gasket; 7 is a plastic film; 8 is a bottom formwork; and 9 is a cap beam. DETAILED DESCRIPTION
[0025] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0026] In the description of the present invention, it should be noted that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance.
[0027] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0028] like Figure 1 As shown, a preferred embodiment of the present invention is a supporting structure for a low cast-in-place cap beam, which includes a concrete cushion layer 1, a sand box, a plastic film 7 and a bottom formwork 8 arranged in sequence from bottom to top, the sand box includes a frame 2, tension bolts and dry fine sand filler 3, the frame 2 includes two longitudinal frame bars and two transverse frame bars, the longitudinal frame bars are fixedly connected and sealed to the transverse frame bars, and a plurality of through holes matching the tension bolts are respectively opened at corresponding positions of the two longitudinal frame bars, the through holes are arranged at equal intervals along the length direction of the longitudinal frame bars, the tension bolts include a tension screw rod 4 and two nuts 5, and the two ends of the tension screw rod 4 They are all provided with a threaded portion, the tension screw 4 passes through the frame 2 and its threaded portion extends out of the longitudinal frame bar through the through hole, the nut 5 is sleeved on the threaded portion and tightened until the nut 5 is pressed against the longitudinal frame bar, the bottom surface area of the frame 2 is smaller than the top surface area of the concrete cushion layer 1, the fine sand filler 3 fills the inner cavity of the frame 2, and the fine sand filler 3 is in a compressed state, the top surface of the fine sand filler 3 is flush with the top surface of the frame 2, the plastic film 7 covers the top surface of the sand box, the bottom formwork 8 is arranged on the plastic film 7, and the cap beam 9 is cast on the bottom formwork 8.
[0029] The present invention provides sufficient bearing capacity and flatness for the cap beam 9 through the concrete cushion layer 1, fills the frame 2 of the sand box with fine sand filler 3, and covers the fine sand filler 3 with a plastic film 7 to facilitate the removal of the fine sand filler 3 and prevent cement slurry from seeping into the fine sand filler 3 and affecting the removal of the fine sand filler 3 when casting the cap beam 9. The bottom template 8 is set on the plastic film 7 to ensure the flatness of the bottom surface of the cap beam 9; and the tension bolts on the frame 2 can balance the load of the upper cap beam 9 and generate an outward extrusion force on the fine sand filler 3 through the bottom template 8, thereby improving the structural stability of the frame 2; when the sand box is disassembled, loosen the nuts 5 on the tension bolts, pull out the tension screws 4, and then take out the fine sand filler 3 through the through holes of the frame 2; the present invention can construct a low cast-in-place cap beam 9 in a narrow space, is not affected by the construction space, has little disturbance to the soil below, and is simple to build and disassemble the support structure, does not affect the safety of the structure below the soil, and occupies less space.
[0030] Exemplarily, a gasket 6 is provided between the nut 5 and the longitudinal frame bar. Preferably, two gaskets 6 are provided between the nut 5 and the longitudinal frame bar to increase the load that the tension bolt can withstand.
[0031] Exemplarily, the longitudinal frame bars are fixed to the transverse frame bars by welding, and the welds should be full to prevent the fine sand from leaking out.
[0032] Exemplarily, the longitudinal frame bars and the transverse frame bars are both steel sections, which can ensure the structural stability of the frame 2 and have a light weight, thereby reducing material costs.
[0033] Exemplarily, the bottom formwork 8 is composed of multiple unit formworks, the joints between the two unit formworks are tight, and transparent glue is pasted on the joints between adjacent unit formworks to ensure that cement slurry will not penetrate from the joints to the bottom when the cap beam 9 is poured. The unit formwork can be a wooden formwork, which can be knocked off the cap beam by a hammer. The unit formwork can also be a steel formwork, and the surface of the steel formwork and the cap beam that fits together is smooth and coated with lubricating oil, which can ensure that the steel formwork and the cap beam are not stuck together.
[0034] Exemplarily, the width of the unit template is equal to the net width of the sand box, the total length of all the unit templates is equal to the net length of the sand box, and the bottom template is located directly above the fine sand filler in the sand box, that is, the projection of the bottom template is located in the frame, which facilitates the removal of the supporting structure.
[0035] Exemplarily, the diameter of the through hole is 3 mm to 8 mm larger than the outer diameter of the tension screw 4 to facilitate the extraction of the tension screw 4 .
[0036] like Figure 1As shown, the present invention further provides a construction method of a support structure of a low cast-in-place cap beam based on the support structure of the low cast-in-place cap beam, comprising the following steps:
[0037] Step 1: dig a foundation pit on the ground according to the installation height of the cap beam 9, and pour a concrete cushion layer 1 with a thickness of 20 cm on the foundation pit;
[0038] Step 2: A plurality of through holes are opened on the two longitudinal frame bars along their length direction, and the two longitudinal frame bars and the two transverse frame bars are welded into a rectangular sand box frame 2. After the concrete cushion layer 1 in step 1 reaches the design strength, the frame 2 is placed on the concrete cushion layer 1, and the tension screw 4 passes through the through holes and penetrates the frame 2. The threaded parts at both ends of the tension screw 4 extend out of the longitudinal frame bar, and the gasket 6 and the nut 5 are sequentially sleeved on the threaded parts at both ends of the tension screw 4 and the nut 5 is tightened to press the gasket 6 onto the longitudinal frame bar; wherein the longitudinal frame bar and the transverse frame bar are both steel sections, and the bottom surface area of the frame 2 is smaller than the top surface area of the concrete cushion layer 1;
[0039] Step three, fill the inner cavity of the frame 2 with dry fine sand, and compact the fine sand in the inner cavity of the frame 2 so that the top surface of the fine sand filler 3 is flush with the top surface of the frame 2;
[0040] Step 4: Cover the top surface of the sand box with a plastic film 7, splice multiple unit templates to form a bottom template 8, and stick them to the joints between adjacent unit templates with transparent adhesive; wherein the width of the unit template is equal to the net width of the sand box, and the total splicing length of all the unit templates is equal to the net length of the sand box;
[0041] Step 5, casting a cap beam 9 on the bottom formwork 8;
[0042] Step six, after the cap beam 9 in step five reaches the designed strength, loosen and remove all the nuts 5 at both ends of the tension screw 4, knock the tension screw 4 loose with a hammer and pull the tension screw 4 out of the sand box, take out the fine sand filler 3 in the sand box from the through hole, pass a steel wire rope through the through hole and tie the frame 2 and the hook of the crane, then use the crane to drag the frame 2 horizontally, finally tap the unit formwork lightly with a hammer, manually pull out the unit formwork, and stack the unit formwork.
[0043] The present invention provides sufficient bearing capacity and flatness for the cap beam 9 through the concrete cushion layer 1, fills the frame 2 of the sand box with fine sand filler 3, and covers the fine sand filler 3 with a plastic film 7 to facilitate the removal of the fine sand filler 3 and prevent cement slurry from seeping into the fine sand filler 3 and affecting the removal of the fine sand filler 3 when casting the cap beam 9. The bottom template 8 is set on the plastic film 7 to ensure the flatness of the bottom surface of the cap beam 9; and the tension bolts on the frame 2 can balance the load of the upper cap beam 9 and generate an outward extrusion force on the fine sand filler 3 through the bottom template 8, thereby improving the structural stability of the frame 2; when disassembling the sand box, loosen the nuts 5 on the tension bolts, pull out the tension screws 4, and then take out the fine sand filler 3 from the through holes of the frame 2; the present invention can construct a low cast-in-place cap beam 9 in a narrow space, is not affected by the construction space, has little disturbance to the soil below, and is simple to build and disassemble the supporting structure without affecting the safety of the structure below the soil.
[0044] The above disclosure is only a preferred embodiment of the present invention, which certainly cannot be used to limit the scope of rights of the present invention. Therefore, equivalent changes made according to the scope of the patent application of the present invention are still within the scope covered by the present invention.
Claims
1. A construction method for a support structure of a low cast-in-place cap beam, characterized in that: The supporting structure of the low cast-in-place cap beam includes a concrete cushion layer, a sand box, a plastic film and a bottom formwork arranged in sequence from bottom to top. The sand box includes a frame, tension bolts and dry fine sand filler. The frame includes two longitudinal frame bars and two transverse frame bars. The longitudinal frame bars are fixedly connected and sealed to the transverse frame bars. A plurality of through holes matching the tension bolts are respectively opened at corresponding positions of the two longitudinal frame bars. The through holes are arranged at equal intervals along the length direction of the longitudinal frame bars. The tension bolts include a tension screw and two nuts. Both ends of the tension screw are provided with threads. The tension screw passes through the frame and its threaded portion extends out of the longitudinal frame bar through the through hole, the nut is sleeved on the threaded portion and tightened until the nut is pressed against the longitudinal frame bar, the bottom surface area of the frame is smaller than the top surface area of the concrete cushion layer, the fine sand filler fills the inner cavity of the frame, and the fine sand filler is in a compressed state, the top surface of the fine sand filler is flush with the top surface of the frame, the plastic film covers the top surface of the sand box, the bottom template is set on the plastic film, and the cap beam is cast on the bottom template; The construction method of the support structure of the low cast-in-place cap beam comprises the following steps: Step 1: Dig a foundation pit on the ground according to the installation height of the cap beam, and pour a 20cm thick concrete cushion on the foundation pit; Step 2: A plurality of through holes are opened on the two longitudinal frame bars along the length direction thereof, and the two longitudinal frame bars and the two transverse frame bars are welded into a rectangular sand box frame. After the concrete cushion layer in step 1 reaches the design strength, the frame is placed on the concrete cushion layer, and the tension screw rods are passed through the through holes and penetrate the frame. The threaded parts at both ends of the tension screw rods extend out of the longitudinal frame bars, and washers and nuts are sequentially sleeved on the threaded parts at both ends of the tension screw rods and the nuts are tightened to press the washers onto the longitudinal frame bars; wherein the longitudinal frame bars and the transverse frame bars are both steel sections, and the bottom surface area of the frame is smaller than the top surface area of the concrete cushion layer; Step 3, filling the inner cavity of the frame with dry fine sand, and compacting the fine sand in the inner cavity of the frame so that the top surface of the fine sand filling is flush with the top surface of the frame; Step 4: Cover the top surface of the sand box with a plastic film, splice multiple unit templates to form a bottom template, and stick them to the joints between adjacent unit templates with transparent adhesive; wherein the width of the unit template is equal to the net width of the sand box, and the total splicing length of all the unit templates is equal to the net length of the sand box; Step 5, pouring a cap beam on the bottom formwork; Step six, after the cap beam in step five reaches the designed strength, loosen and remove all the nuts at both ends of the tension screws, knock the tension screws loose with a hammer and pull them out of the sand box, take out the fine sand filler in the sand box from the through hole, pass a steel wire rope through the through hole and tie the frame and the hook of the crane, then use the crane to drag the frame horizontally, and finally tap the unit formwork with a hammer to pull out the unit formwork.
2. The construction method of the support structure of the low cast-in-place cap beam according to claim 1, characterized in that: A gasket is provided between the nut and the longitudinal frame bar.
3. The construction method of the support structure of the low cast-in-place cap beam according to claim 2, characterized in that: Two washers are arranged between the nut and the longitudinal frame bar.
4. The construction method of the support structure of the low cast-in-place cap beam according to claim 1, characterized in that: The longitudinal frame bars and the transverse frame bars are both steel sections.
5. The construction method of the support structure of the low cast-in-place cap beam according to claim 1, characterized in that: The thickness of the concrete cushion layer is 15cm~25cm.
6. The construction method of the support structure of the low cast-in-place cap beam according to claim 1, characterized in that: The aperture of the through hole is 3 mm to 8 mm larger than the outer diameter of the tension screw.
Citation Information
Patent Citations
Transparent soil model test device for mining area pile foundation bearing force and test method
CN105696632A
Novel bottom die sand box and system thereof
CN108729359A
Supporting structure of low cast-in-place bent cap
CN210684440U