A robot production line for automatic installation of door stoppers of various specifications

Through the combined warehouse body and robot assembly mechanism of the multi-specified door stop strip automatic installation robot production line, the problem of low picking automation caused by the variety of workpiece models in door frame assembly is solved, and the tight arrangement and efficient automatic installation of the stop strip is realized, which improves the improvement of the correct arrangement and efficient automatic installation of the stop strips. Automation level.

CN110561069BActive Publication Date: 2024-12-03NANTONG YUETONG CNC EQUIP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201910864643.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-09-12
Publication Date
2024-12-03
Estimated Expiration
2039-09-12

AI Technical Summary

Technical Problem

There are many types of workpieces during the assembly of door frames, which leads to low automation in material picking installation and complicated sorting process.

Method used

Design a multi-specified door stop strip automatic installation robot production line, including a joint warehouse body, a robot assembly mechanism and a bus control module. The joint warehouse body is used to classify and store and release each model of barrier strip according to instructions, and the robot assembly mechanism is used to receive instructions Perform clamping, translation and installation, combining the conveyor and glue coating mechanism to improve the degree of automation.

Benefits of technology

The tightly arranged storage and efficient automatic installation of the barrier strips are realized, which significantly improves the degree of automation of material selection and batching and reduces workload.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110561069B_ABST
    Figure CN110561069B_ABST
Patent Text Reader

Abstract

The present invention discloses a multi-specification door stopper automatic installation robot production line, including a bus control module, a loading platform, a conveyor transition platform, a gluing mechanism, a manipulator assembly mechanism, a combined warehouse and a conveying device; the combined warehouse includes a conveying device and a plurality of closely arranged stopper warehouses, each stopper warehouse stores a type of stopper and receives instructions from the bus control module at the same time; when the stopper warehouse receives the instruction, it releases a stopper onto the conveyor and is transported out by the conveyor; a loading platform is provided at one end of the combined warehouse, a bidirectional conveyor is provided at the discharging end of the loading platform, a manipulator assembly mechanism is provided at the discharging end of the bidirectional conveyor, a gluing mechanism is provided at the feeding end of the manipulator assembly mechanism, and the manipulator assembly mechanism receives instructions from the bus control module to clamp, translate and position the stopper, thereby installing and fixing it to the target position. The present invention realizes the automated process of loading, selecting materials and assembling multi-specification door stoppers.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of door frame assembly processing equipment, and in particular to a robot production line for automatically installing door stop strips of multiple specifications. Background Art

[0002] In the process of assembling door frame structural workpieces, workpieces of different types, sizes, and materials are needed, and these workpieces are classified and stored in the library. To use workpieces to assemble a specific structural workpiece, the required workpieces must first be picked out from their respective libraries. The sizes and types of the stopper workpieces used in the door frame assembly process are various, which makes the sorting process very complicated. The stopper of each model needs to be stored separately, and the degree of centralization is not high, which increases the workload of sorting the stopper. Therefore, the degree of automation in the picking and installation of door frame installation is not high. Summary of the invention

[0003] The technical problems to be solved by the present invention are:

[0004] In order to solve the problems of various workpiece models and low degree of automation in picking and installing materials during door frame assembly, the present invention proposes a robot production line for automatic installation of multi-specification door stop strips.

[0005] The present invention adopts the following technical solutions to solve the above technical problems:

[0006] The present invention proposes a multi-specification door stopper automatic installation robot production line, which is characterized by comprising a combined storage body, a manipulator assembly mechanism and a bus control module, wherein the combined storage body is used for classified storage and releases various types of stoppers according to instructions, and a manipulator assembly mechanism is provided at one end of the combined storage body;

[0007] The combined storage body includes a conveying device and a plurality of closely arranged baffle bar storage bodies, each baffle bar storage body is used to store a type of baffle bar and receive instructions from the bus control module; the conveying device is located below the plurality of closely arranged baffle bar storage bodies, and when the baffle bar storage body receives an instruction, a baffle bar is released from the bottom onto the conveying device and transported out by the conveying device;

[0008] The manipulator assembly mechanism is used to receive instructions from the bus control module, and to clamp, translate, position and install the baffle bars transported by the conveying device to a designated position.

[0009] As described above, a multi-specification door stop strip automatic installation robot production line, further: a loading platform is provided on one side of the combined warehouse body, a two-way conveying platform is connected to the discharge end of the loading platform, the discharge end of the two-way conveying platform is connected to the manipulator assembly mechanism, and a gluing mechanism is provided between the two-way conveying platform and the manipulator assembly mechanism.

[0010] As described above, a robot production line for automatic installation of door stop strips of multiple specifications, further: the stop strip warehouse body includes a material stop plate, a warehouse body connecting frame and a material blanking component, and a plurality of material stop plates are vertically fixed on both sides of the warehouse body connecting frame, respectively, for stacking the stop strips in the stop strip warehouse body; the material blanking component is fixed at one end or both ends of the bottom of the stop strip warehouse body, for receiving the stop strips and allowing the stop strips to fall onto the conveying device.

[0011] A multi-specification door stop strip automatic installation robot production line as described above, further: the equal material blanking component (including a main body plate, a piston rod, a valve plate, and a ejector rod, the main body plate is arranged at the lower part of the warehouse, the main body plate is provided with a through hole, the through hole is penetrated by a piston rod, one end of the piston rod is connected to the piston of the first cylinder, the other end of the piston rod is connected to the valve plate, the valve plate is used to receive the stacked workpieces; the main body plate is also provided with a through hole, the through hole is penetrated by an ejector rod, the other end of the ejector rod is connected to the piston of the second cylinder.

[0012] As described above, a multi-specification door stop strip automatic installation robot production line, further: the cross-section of the material baffle is T-shaped, the T-shaped crossbeam structure is used to contact the workpiece, and the T-shaped vertical structure is used to increase the strength of the material baffle; the lower part of the material baffle is provided with a bottom surface fixedly connected to the T-shaped cross-section, and the bottom surface of the material baffle is provided with a through hole for bolt fixing.

[0013] As described above, a robot production line for automatic installation of door stop strips of multiple specifications, further: the warehouse also includes an alarm device and a reset device, the alarm device is used to alarm when the warehouse is short of materials, and the reset device is used to reset after the material replenishment is completed.

[0014] As described above, a robot production line for automatic installation of door stop strips of multiple specifications, further: the alarm device is an alarm indicator light.

[0015] As described above, a multi-specification door stop strip automatic installation robot production line, further: the warehouse body includes a concave positioning component and two warehouse body connecting frames, the concave positioning component is fixed at both ends of the warehouse body connecting frame, and is used to fix the warehouse body connecting frame; the material baffle is fixed on the upper surface of the warehouse body connecting frame.

[0016] As described above, a robot production line for automatic installation of door stop strips of multiple specifications, further: the manipulator assembly mechanism includes a nail gun, a pressure strip device, a manipulator, and a transmission roller device, the nail gun and the transmission roller device are arranged at intervals, and are used to realize nailing assembly of workpieces located on the workbench; the two ends of the pressure strip device are respectively connected to the vertical support parts of the frame, and the two ends of the pressure strip device are connected to cylinders for controlling the rising and falling of the pressure strip device; the pressure strip device is used to clamp, position, and press the stop strip.

[0017] As described above, a multi-specification door stop strip automatic installation robot production line, further: the gluing mechanism includes a horizontal moving part, a vertical moving part, and a glue outlet, and the horizontal moving part and the vertical moving part are both fixedly connected to the glue outlet, and are respectively used to enable the glue outlet to achieve horizontal movement and vertical movement and adjustment.

[0018] Compared with the prior art, the present invention adopts the above technical solution and has the following technical effects:

[0019] 1. The present invention assembles single-piece baffle bar storage bodies together to form a storage assembly, so that long strip workpieces can be closely arranged and stored, and the assembly has strong mobility;

[0020] 2. The equal material blanking component of the present invention uses gravity to realize single-piece blanking, which is convenient and practical;

[0021] 3. The present invention adopts a warehouse assembly in conjunction with a conveying mechanism to achieve coordinated conveying according to instructions, which greatly increases the degree of automation of material selection and batching. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 This is a three-dimensional diagram of this production line.

[0023] Figure 2 This is a three-dimensional diagram of the combined warehouse.

[0024] Figure 3 This is a three-dimensional diagram of the baffle warehouse.

[0025] Figure 4 It is a three-dimensional diagram of the blanking parts.

[0026] Figure 5 This is the front view of the baffle body.

[0027] Figure 6 This is a three-dimensional diagram of the robot assembly mechanism.

[0028] Figure 7 This is a top view of the robot assembly mechanism. DETAILED DESCRIPTION

[0029] The technical solution of the present invention is further described in detail below in conjunction with the accompanying drawings:

[0030] It will be understood by those skilled in the art that, unless otherwise defined, all terms (including technical and scientific terms) used herein have the same meaning as those generally understood by those skilled in the art in the art to which the present invention belongs. It should also be understood that terms such as those defined in common dictionaries should be understood to have meanings consistent with the meanings in the context of the prior art, and will not be interpreted with idealized or overly formal meanings unless defined as herein.

[0031] First, the workflow of the present invention is introduced. The workpieces involved in the workflow of the present invention include various structural components in the door frame assembly processing process, including stop bars, door panels, etc. Figure 1 This is a three-dimensional diagram of the production line. The workflow of the production line includes:

[0032] Step 1: Stack workpieces of the same type in a material baffle of a baffle warehouse, including door frame baffles, door panels, etc.;

[0033] Step 2: assemble multiple baffle bar storage bodies together to form a combined storage body;

[0034] Step 3: The bus control module sends a workpiece screening instruction to the corresponding baffle storage body;

[0035] Step 4: For the baffle bar storage body that needs to output the workpiece, the baffle bar storage body checks whether there is a shortage of inventory; if there is a shortage of inventory, an alarm is issued until the inventory is sufficient, and then step 5 is entered;

[0036] Step 5: The ejector rod of the material blanking component of the baffle bar warehouse extends to between the bottom baffle bar and the second to last baffle bar;

[0037] Step 6: The valve plate is withdrawn, so that the workpiece at the bottom of the baffle body falls onto the conveying mechanism;

[0038] Step 7: The conveying mechanism transports the workpiece to the conveying platform;

[0039] Step 8: The conveying platform conveys the baffle to the bidirectional conveying platform;

[0040] Step nine, the gluing device applies glue on the door frame board;

[0041] Step 10: The pressure strip device operates the barrier strip, and the operations include grabbing, positioning, pressing, etc.;

[0042] Step 11: Use a nail gun to fix the stop strip to the door frame by nailing;

[0043] Step 12: The processed workpiece is moved out in parallel along the conveying direction of the bidirectional conveyor. Example

[0044] Figure 1 This is a three-dimensional diagram of the production line. Figure 1As shown, the multi-specification door stopper automatic installation robot production line of this embodiment includes a combined warehouse body 1, a manipulator assembly mechanism 2 and a bus control module 3. A loading platform 4 is provided on one side of the combined warehouse body 1, and a bidirectional conveying platform 5 is connected to the discharge end of the loading platform 4. The discharge end of the bidirectional conveying platform 5 is connected to the manipulator assembly mechanism 2, and a gluing mechanism 6 is provided between the bidirectional conveying platform 5 and the manipulator assembly mechanism 2. Figure 2 The combined warehouse body 1 is used for classified storage and release of various types of baffles according to instructions.

[0045] The combined warehouse body 1 includes a conveying device 101 and a plurality of closely arranged baffle bar warehouse bodies 102, each baffle bar warehouse body 102 is used to store a model of baffle bars and receive instructions from the bus control module 3; the conveying device 101 is located below the plurality of closely arranged baffle bar warehouse bodies 102, and when the baffle bar warehouse body 102 receives an instruction, a baffle bar is released from the bottom onto the conveying device 101 and transported out by the conveying device 101. Figure 3 The figure is a three-dimensional diagram of the barrier bar warehouse. Figure 3 As shown, the baffle bar warehouse body 102 includes a material baffle plate 1021, a warehouse body connecting frame 1022 and a material blanking component 1023. A plurality of material baffle plates 1021 are vertically fixed on both sides of the warehouse body connecting frame 1022, respectively, for stacking the baffle bars in the baffle bar warehouse body 102; the material blanking component 1023 is fixed at one or both ends of the bottom of the baffle bar warehouse body 102, for receiving the baffle bars and allowing the baffle bars to fall onto the conveying device 101. The baffle bar warehouse body 102 includes a concave positioning component and two warehouse body connecting frames 1022. The concave positioning component is fixed at both ends of the warehouse body connecting frame 1022, for fixing the warehouse body connecting frame 1022; the material baffle plate 1021 is fixed on the upper surface of the warehouse body connecting frame 1022. The cross-section of the material baffle plate 1021 is T-shaped, and the T-shaped crossbeam structure is used to contact the workpiece, and the T-shaped vertical structure is used to increase the strength of the material baffle plate; the upper part of the crossbeam structure of the material baffle plate is at an outward angle with the main body, and the lower part of the material baffle plate 1021 is provided with a bottom surface fixedly connected to the T-shaped cross-section, and the bottom surface of the material baffle plate 1021 is provided with a through hole for bolt fixing.

[0046] Figure 4 This is a three-dimensional diagram of the blanking parts. Figure 4As shown, the material blanking component 1023 includes a main plate 10231, a piston rod 10232, a valve plate 10233, and a ejector rod 10234. The main plate 10231 is arranged at the lower part of the baffle library 102. The main plate 10231 is provided with a through hole, and the piston rod 10232 is penetrated through the through hole. One end of the piston rod 10232 is connected to the piston of the first cylinder, and the other end of the piston rod 10232 is connected to the valve plate 10233. The valve plate 10233 is used to receive the stacked workpieces; the main plate 10231 is also provided with a through hole, and the ejector rod 10234 is penetrated through the through hole, and the other end of the ejector rod 60234 is connected to the piston of the second cylinder.

[0047] Figure 5 This is the front view of the baffle body. Figure 5 As shown, in this embodiment, the barrier bar storage body 102 further includes an alarm device 1027 and a reset device 1028. The alarm device 1027 is used to alarm when the barrier bar storage body 102 is short of material, and the reset device 1028 is used to reset after the material is replenished. The alarm device 1027 is an alarm indicator light.

[0048] Figure 6 This is a three-dimensional diagram of the robot assembly mechanism. Figure 7 This is a top view of the robot assembly mechanism. Figure 6 , Figure 7 As shown, the manipulator assembly mechanism 2 is used to receive instructions from the bus control module 3, and translate, rotate and flip the baffle on the bidirectional conveyor platform 5 so as to fix it to the target position. It includes a nail gun 201, a pressure strip device 202 and a manipulator 203. The nail gun 201 is arranged at intervals with the rolling shaft of the bidirectional conveyor platform 5, and is used to shoot nails at the workpiece baffle on the rolling shaft to fix the workpiece baffle; the two ends of the pressure strip device 202 are respectively connected to the vertical support parts of the frame, and the two ends of the pressure strip device 202 are connected to cylinders for controlling the rise and fall of the pressure strip device 202; the pressure strip device 202 is used to apply pressure to the baffle and fix it;

[0049] The glue coating mechanism 6 includes a horizontal moving part, a vertical moving part, and a glue outlet. The horizontal moving part and the vertical moving part are both fixedly connected to the glue outlet and are respectively used to enable the glue outlet to move horizontally and vertically; the horizontal moving part includes a cylinder, the vertical moving part includes a cylinder, and the vertical moving part is used to cooperate with the glue outlet to realize glue discharge and stop glue discharge.

[0050] Next, the workflow of the production line described in this embodiment is described. For ease of management, the workpieces used to assemble the door frame should be stored separately according to type. At the same time, for ease of access, the distance between the workpieces used to assemble the target door frame should be minimized. Because the individual components in actual production are usually in the shape of strips, it is more appropriate to stack the components of the same model vertically in a single baffle bar warehouse body, and to arrange the baffle bar warehouse bodies storing components of different models side by side, thereby reducing the distance between components of different models. When assembling door frames of specific specifications, the baffle bar warehouse bodies where the components of the model required for assembly are located are assembled together to form a baffle bar warehouse body matrix, and a control module for control, a conveying device for transmission, and a warehouse rack for support are arranged around the baffle bar warehouse body matrix.

[0051] Workpieces such as door frame baffles of target models are stored in the baffle warehouse in advance. During production, the bus control module sends a blanking instruction to the assembled baffle warehouses; each baffle warehouse is first detected by its detection device to see if there is enough inventory: the detection device of this embodiment uses the infrared detection principle to emit infrared rays on one side of the lower part of the baffle warehouse, and an infrared receiving end is set on the other side of the baffle warehouse, and the infrared transmitting end continuously emits infrared rays; if the infrared receiving end cannot detect the signal, the infrared rays are blocked during the transmission process, indicating that the baffle warehouse has inventory; if the infrared receiving end receives an infrared signal, it means that the infrared rays are unblocked during the transmission process, indicating that the baffle warehouse lacks inventory. When there is a lack of inventory, the alarm device starts to work. In this embodiment, the alarm device is an alarm indicator light, and the alarm indicator light is on when there is a lack of inventory. After the inventory is replenished manually, the reset device is pressed at the same time, and the alarm indicator light goes out.

[0052] When the inventory is sufficient and the instruction of material dropping is received, the bar storage body realizes material dropping by controlling the movement of the material dropping parts: the ejector rod is extended to between the last bar and the second to last bar, and then the valve plate originally on the bottom bar is withdrawn through the cylinder control, so that the bottom bar falls on the conveying mechanism, and the second to last bar is supported by the ejector rod and will not fall; after the material dropping is completed, the valve plate is extended to return to its original position, and the ejector rod is retracted;

[0053] The workpiece is transported out by the conveying mechanism, passes through the conveying platform and the two-way conveying platform and enters the control range of the manipulator assembly mechanism. In this embodiment, the manipulator is equipped with a CCD module for detecting the position and direction of workpieces such as door panels and baffles. The manipulator gives feedback based on the detected position and direction of the workpiece and controls the workpiece until it reaches the target orientation; the pressure strip device applies pressure to the workpiece in the vertical direction to fix the workpiece in the current orientation. For the door panel, the gluing mechanism moves to the top of the workpiece under the control of the horizontal moving part, and then reaches an appropriate distance from the workpiece under the control of the vertical moving part, and cooperates with the glue discharging part to apply glue to the surface of the workpiece. The manipulator cooperates with the pressure strip device to move the door panel along the two-way conveying platform to the part containing the nail gun. The baffle to be fixed is also fixed to the target position, and the nail gun shoots nails at the target position to fix the baffle and the door panel. After the fixation is completed, the pressure strip device is controlled by the cylinder to move up, and the vertical pressure on the door panel and baffle stops. The fixed door panel and baffle are conveyed to the discharge end by the conveying roller device of the two-way conveying platform.

[0054] The above descriptions are only some embodiments of the present invention. It should be pointed out that, for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. A robot production line for automatic installation of door stoppers of various specifications, characterized by: It comprises a combined storage body (1), a manipulator assembly mechanism (2) and a bus control module (3), wherein the combined storage body (1) is used for classified storage and release of baffles of various types according to instructions, and a manipulator assembly mechanism (2) is provided at one end of the combined storage body (1); The combined storage body (1) comprises a conveying device (101) and a plurality of closely arranged baffle bar storage bodies (102), each baffle bar storage body (102) being used to store a type of baffle bar and simultaneously receiving instructions from a bus control module (3); the conveying device (101) is located below the plurality of closely arranged baffle bar storage bodies (102), and upon receiving an instruction, the baffle bar storage body (102) releases a baffle bar from the bottom onto the conveying device (101) and is transported out by the conveying device (101); The manipulator assembly mechanism (2) is used to receive instructions from the bus control module (3) to clamp, translate, position and install the baffle bars transported by the conveying device (101) to a designated position; The baffle bar storage body (102) comprises a material baffle plate (1021), a storage body connecting frame (1022) and a material blanking component (1023); a plurality of material baffle plates (1021) are respectively fixed vertically on both sides of the storage body connecting frame (1022) to enable the baffle bars in the baffle bar storage body (102) to be stacked; the material blanking component (1023) is fixed at one end or both ends of the bottom of the baffle bar storage body (102) to receive the baffle bars and allow the baffle bars to fall onto the conveying device (101); The material blanking component (1023) comprises a main body plate (10231), a piston rod (10232), a valve plate (10233), and a material ejecting rod (10234); the main body plate (10231) is arranged at the lower part of the baffle bar storage body (102); a through hole is arranged on the main body plate (10231); a piston rod (10232) is arranged through the through hole; one end of the piston rod (10232) is connected to the piston of the first cylinder; the other end of the piston rod (10232) is connected to the valve plate (10233); the valve plate (10233) is used to receive the stacked workpieces; the main body plate (10231) is further provided with a through hole; a material ejecting rod (10234) is arranged through the through hole; the other end of the material ejecting rod (10234) is connected to the piston of the second cylinder; The manipulator assembly mechanism (2) comprises a nail gun (201), a pressure strip device (202), a manipulator (203), a transmission roller device (204), and a workbench. The nail gun (201) and the transmission roller device (204) are arranged at intervals and are used to nail workpieces located on the workbench to achieve the combination of the workpieces. The two ends of the pressure strip device (202) are respectively connected to the vertical support part of the frame. The two ends of the pressure strip device (202) are connected to cylinders for controlling the lifting and lowering of the pressure strip device (202). The manipulator (203) is installed on the pressure strip device (202) and clamps the retaining strip by grabbing the cylinder. The pressure strip device (202) is used to clamp, position and press the retaining strip.

2. The multi-specification door stopper automatic installation robot production line according to claim 1, characterized in that: A loading platform (4) is provided on one side of the combined warehouse body (1); a discharging end of the loading platform (4) is connected to a bidirectional conveying platform (5); the discharging end of the bidirectional conveying platform (5) is connected to the manipulator assembly mechanism (2); and a gluing mechanism (6) is provided between the bidirectional conveying platform (5) and the manipulator assembly mechanism (2).

3. The multi-specification door stopper automatic installation robot production line as claimed in claim 1, characterized in that: The cross section of the material baffle plate (1021) is T-shaped, the T-shaped crossbeam structure is used to contact the workpiece, and the T-shaped vertical structure is used to increase the strength of the material baffle plate; the lower part of the material baffle plate (1021) is provided with a bottom surface fixedly connected to the T-shaped cross section, and the bottom surface of the material baffle plate (1021) is provided with a through hole for bolt fixing.

4. The multi-specification door stopper automatic installation robot production line as claimed in claim 2, characterized in that: The baffle bar storage body (102) further comprises an alarm device (1027) and a reset device (1028), wherein the alarm device (1027) is used to generate an alarm when the baffle bar storage body (102) is short of material, and the reset device (1028) is used to reset after material replenishment is completed.

5. The multi-specification door stopper automatic installation robot production line as claimed in claim 4, characterized in that: The warning device (1027) is a warning indicator light.

6. The multi-specification door stopper automatic installation robot production line as claimed in claim 2, characterized in that: The baffle bar storage body (102) comprises a concave positioning component and two storage body connecting frames (1022), wherein the concave positioning component is fixed at both ends of the storage body connecting frames (1022) and is used to fix the storage body connecting frames (1022); the material baffle plate (1021) is fixed on the upper surface of the storage body connecting frames (1022).

7. The multi-specification door stopper automatic installation robot production line according to claim 2, characterized in that: The glue coating mechanism (6) comprises a horizontal moving part, a vertical moving part and a glue outlet. The horizontal moving part and the vertical moving part are both fixedly connected to the glue outlet and are used to respectively enable the glue outlet to move horizontally and vertically and to be adjusted.