Underground rigid pipeline support structure and method
Through the combined structure of temporary support units and concrete support piers, the problem that underground rigid pipelines are prone to cracking during construction is solved, stable support of the pipeline is achieved, the construction period is shortened, construction efficiency is improved, and the materials are recyclable, economical and environmentally friendly.
Patent Information
- Application Number
- CN201910942271.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-09-30
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2039-09-30
AI Technical Summary
During the construction of earthwork or foundation pits, underground rigid pipes such as gas heating and sewage pipes are prone to cracking, causing fire or environmental risks, and existing protection methods are not suitable for underground rigid pipes, causing construction to inevitably cause disturbance and damage to the pipelines, affecting The lives of surrounding residents.
Design an underground rigid pipeline support structure that includes temporary support units and concrete support piers. The temporary support unit is composed of foundation cushion, longitudinal load-bearing beams, transverse load-bearing beams and vertical load-bearing columns. Permanent support piers are formed through concrete pouring. , to achieve stable support for pipelines.
It achieves safe and reliable support for underground rigid pipelines, reduces the disturbance and damage to pipelines during construction, shortens the construction period, improves construction efficiency, and the materials are recyclable, economical and environmentally friendly.
Smart Images

Figure CN110578833B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of municipal engineering, and in particular relates to an underground rigid pipeline supporting structure and a supporting method. Background Art
[0002] Since the reform and opening up, China has been in a stage of large-scale development and construction. With the development of urban construction, the upsurge of old city renovation has emerged in major cities, and large high-rise buildings, new residential areas, and urban elevated roads have been replanned and constructed in old urban areas. During the earthwork or foundation pit construction process, there are often intricate underground pipelines, such as rigid pipelines such as gas, heat, and sewage. During the construction process, if the gas and heat pipelines are cracked, there will be fire and explosion hazards, and if the sewage pipes are cracked, there will be environmental risks.
[0003] When there is no relocation plan for rigid pipelines such as gas, heat, and sewage and they are located within the road soil base, construction excavation will inevitably have a certain impact on the pipelines. Disturbance or damage to the pipelines will also have an adverse impact on the work and life of surrounding residents. Therefore, how to ensure that they are not disturbed during the construction process and avoid pipeline cracking becomes an urgent problem that needs to be solved.
[0004] Conventional pipeline protection methods, such as Bailey beam reinforcement protection, are only applicable to suspended pipelines, not underground pipelines, and wire rope suspension method is only applicable to flexible pipelines, not rigid pipelines. Therefore, it is of great significance to design an efficient, convenient, economical, reasonable, safe and reliable underground rigid pipeline protection method. Summary of the invention
[0005] The purpose of the present invention is to provide an underground rigid pipeline support structure and a support method, which can play a safe and reliable supporting role for underground rigid pipelines.
[0006] The technical solution adopted by the present invention to solve the technical problem is:
[0007] An underground rigid pipeline support structure comprises a temporary support unit and a concrete support pier;
[0008] The temporary support unit includes a foundation cushion layer, a longitudinal load-bearing beam and a transverse load-bearing beam. The foundation cushion layer includes at least two pairs, each pair of foundation cushion layers is symmetrically arranged on both sides of the bottom of the underground rigid pipeline. The longitudinal load-bearing beams include two, each longitudinal load-bearing beam is installed on the foundation cushion layer on the same side of the underground rigid pipeline. The transverse load-bearing beams include at least two, and the transverse load-bearing beams are vertically installed on the longitudinal load-bearing beams at a certain distance. The top of the transverse load-bearing beam is provided with a support groove for placing the underground rigid pipeline.
[0009] After the temporary support unit completes the support of the underground rigid pipeline, concrete is poured at the bottom of the underground rigid pipeline between two adjacent transverse load-bearing beams to form the concrete support pier, and the top of the concrete support pier is provided with an arc groove for placing the underground rigid pipeline.
[0010] According to the above technical solution, the support groove is formed by the top surface of the transverse load-bearing beam and a pair of limit supports. The pair of limit supports are installed on the transverse load-bearing beam and are symmetrically arranged on both sides of the underground rigid pipeline. The surface of the limit supports that fits with the underground rigid pipeline is an arc-shaped surface.
[0011] According to the above technical solution, the temporary support unit also includes a vertical load-bearing column installed between each foundation cushion layer and the longitudinal load-bearing beam.
[0012] According to the above technical solution, the temporary support unit also includes a diagonal brace installed between each pair of vertical load-bearing columns.
[0013] According to the above technical solution, the diagonal brace is a scissors brace.
[0014] According to the above technical solution, the longitudinal load-bearing beams, transverse load-bearing beams and vertical load-bearing columns are all made of I-beams.
[0015] According to the above technical solution, the foundation cushion layer is cast by concrete.
[0016] Accordingly, the present invention also provides an underground rigid pipeline support method based on the above-mentioned underground rigid pipeline support structure, comprising the following steps:
[0017] S1. Mark the location of underground rigid pipelines;
[0018] S2. First, excavate the soil around the underground rigid pipeline according to the markings until at least half of the pipeline is exposed, and then excavate at least two pairs of foundation pits on both sides of the underground rigid pipeline for pouring the foundation cushion layer;
[0019] S3. Pour concrete into the foundation pit to form a foundation cushion layer, and the top surfaces of the foundation cushion layers on both sides of the underground rigid pipeline are at the same elevation;
[0020] S5. longitudinally excavate the earth above the foundation cushion layer on the same side of the underground rigid pipeline to form a longitudinal channel, place a longitudinal load-bearing beam in the longitudinal channel, and fix the longitudinal load-bearing beam on the foundation cushion layer;
[0021] S6. Excavate the soil at the bottom of the underground rigid pipeline and above the longitudinal load-bearing beam horizontally to form at least two transverse channels, place a transverse load-bearing beam in each transverse channel, place the underground rigid pipeline in the support groove of the transverse load-bearing beam, and fix the transverse load-bearing beam on the longitudinal load-bearing beam to achieve temporary support for the underground rigid pipeline;
[0022] S7, clearing the remaining earthwork under the underground rigid pipeline, pouring concrete on the bottom of the underground rigid pipeline between two adjacent transverse load-bearing beams to form a concrete support pier, and the top of the concrete support pier is provided with an arc groove for placing the underground rigid pipeline;
[0023] S8. After the concrete support piers have been cured to the required condition, the longitudinal and transverse load-bearing beams of the temporary support unit shall be removed.
[0024] According to the above technical solution, before step S5, step S4 is also included, in which vertical load-bearing columns are fixedly installed on each foundation cushion layer, and each pair of vertical load-bearing columns are connected by diagonal braces.
[0025] According to the above technical solution, in step S7, after the concrete support piers are poured, the earth is backfilled in the area other than the concrete support piers and compacted in layers; in step S8, after the longitudinal load-bearing beams and the transverse load-bearing beams are removed, the earth around the underground rigid pipeline is backfilled in time.
[0026] The beneficial effects of the present invention are as follows: the present invention temporarily supports the underground rigid pipeline through the temporary support unit, and permanently supports the underground rigid pipeline through the concrete support pier. When the temporary support unit is used, only a small part of the earthwork needs to be excavated, which can play a good rigid support role. After the underground rigid pipeline is temporarily supported, the remaining earthwork can be excavated without causing disturbance or damage to the pipeline, and then the concrete support pier is poured to achieve permanent support for the underground rigid pipeline.
[0027] The present invention has the following advantages: 1. Short construction period and fast progress: a temporary support unit that is easy to process and install is used, and the processing of the temporary support unit and the excavation of the upper earthwork can be carried out simultaneously, saving time; 2. Strong operability: the support structure provided by the present invention is not restricted by the direction of the pipeline and the surrounding environment, can change with the site, and can be flexibly operated; 3. Good safety: the present invention adopts a temporary support unit with high rigidity and small deformation, which can effectively reduce the sinking and cracking of the pipeline. At the same time, the support groove of the transverse load-bearing beam can prevent lateral displacement, making the support more stable; 4. Recyclable materials: after the concrete support pier is completed and reaches the strength, the temporary support unit can be dismantled and reused, which is economical and environmentally friendly. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] The present invention will be further described below with reference to the accompanying drawings and embodiments, in which:
[0029] Figure 1 is a cross-sectional schematic diagram of an embodiment of the present invention;
[0030] Figure 2 It is a schematic longitudinal section diagram of an embodiment of the present invention.
[0031] In the figure: 1-foundation cushion layer, 2-vertical load-bearing column, 3-longitudinal load-bearing beam, 4-transverse load-bearing beam, 5-limited bearing, 6-scissors brace, 7-concrete support pier, 8-underground rigid pipe. DETAILED DESCRIPTION
[0032] In order to make the purpose, technical scheme and advantages of the embodiments of the present invention clearer, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, rather than all the embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention. Based on the embodiments in the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0033] like Figure 1 , Figure 2 As shown, an underground rigid pipeline support structure includes a temporary support unit and a concrete support pier 7;
[0034] The temporary support unit includes a foundation cushion layer 1, a longitudinal load-bearing beam 3 and a transverse load-bearing beam 4. The foundation cushion layer 1 includes at least two pairs, each pair of foundation cushion layers 1 is symmetrically arranged on both sides of the bottom of the underground rigid pipeline 8, the longitudinal load-bearing beam 3 includes two, each longitudinal load-bearing beam 3 is installed on the foundation cushion layer 1 located on the same side of the underground rigid pipeline, and the transverse load-bearing beam 4 includes at least two, and the transverse load-bearing beam 4 is vertically installed on the longitudinal load-bearing beam 3 at a certain distance. The top of the transverse load-bearing beam 4 is provided with a support groove for placing the underground rigid pipeline;
[0035] After the temporary support unit completes the support of the underground rigid pipeline, concrete is poured at the bottom of the underground rigid pipeline between two adjacent transverse load-bearing beams 4 to form a concrete support pier 7. The top of the concrete support pier 7 is provided with an arc groove for placing the underground rigid pipeline.
[0036] In a preferred embodiment of the present invention, Figure 1 , Figure 2 As shown, the support groove is formed by the top surface of the transverse load-bearing beam 4 and a pair of limit supports 5. The pair of limit supports 5 are installed on the transverse load-bearing beam 4 and are symmetrically arranged on both sides of the underground rigid pipeline. The surface of the limit support that fits the underground rigid pipeline is an arc surface. During installation, the transverse load-bearing beam is installed first, and then a pair of limit supports are installed on the transverse load-bearing beam. The limit supports can limit the lateral movement of the underground rigid pipeline.
[0037] In a preferred embodiment of the present invention, Figure 1 , Figure 2As shown, the temporary support unit also includes a vertical load-bearing column 2 installed between each foundation cushion layer 1 and the longitudinal load-bearing beam 3, which can reduce the pouring thickness of the foundation cushion layer and reduce the construction cost.
[0038] In a preferred embodiment of the present invention, Figure 1 , Figure 2 As shown, the temporary support unit also includes a diagonal brace installed between each pair of vertical load-bearing columns 2. Preferably, the diagonal brace is a scissors brace 6, which can enhance the support strength.
[0039] In a preferred embodiment of the present invention, Figure 1 , Figure 2 As shown, the longitudinal load-bearing beam 3, the transverse load-bearing beam 4 and the vertical load-bearing column 2 are all made of I-beams, which are easy to obtain, simple to manufacture and low in cost.
[0040] In a preferred embodiment of the present invention, Figure 1 , Figure 2 As shown, the foundation cushion layer 1 is made of concrete, the foundation is solid and the construction is simple.
[0041] like Figure 1 , Figure 2 As shown, the present invention also provides an underground rigid pipeline support method based on the above-mentioned underground rigid pipeline support structure, comprising the following steps:
[0042] S1. Mark the location of underground rigid pipelines;
[0043] S2, first excavate the soil around the underground rigid pipeline according to the markings until at least half of the pipeline is exposed, and then excavate at least two pairs of foundation pits for pouring the foundation cushion layer 1 on both sides of the underground rigid pipeline;
[0044] S3, pouring concrete into the foundation pit to form a foundation cushion layer 1, and the top surfaces of the foundation cushion layers 1 on both sides of the underground rigid pipeline are at the same elevation;
[0045] S5, longitudinally excavating the earth above the foundation cushion layer 1 on the same side of the underground rigid pipeline to form a longitudinal channel, placing a longitudinal load-bearing beam 3 in the longitudinal channel, and fixing the longitudinal load-bearing beam 3 on the foundation cushion layer 1;
[0046] S6, excavating the earthwork at the bottom of the underground rigid pipeline and above the longitudinal load-bearing beam 3 horizontally to form at least two horizontal channels, placing a horizontal load-bearing beam 4 in each horizontal channel, placing the underground rigid pipeline in the support groove of the horizontal load-bearing beam 4, and fixing the horizontal load-bearing beam 4 on the longitudinal load-bearing beam 3 to achieve temporary support for the underground rigid pipeline;
[0047] S7, clear the remaining earthwork under the underground rigid pipeline, pour concrete on the bottom of the underground rigid pipeline between two adjacent transverse load-bearing beams 4 to form a concrete support pier 7, and the top of the concrete support pier 7 is provided with an arc groove for placing the underground rigid pipeline;
[0048] S8. After the concrete support pier 7 has been cured to the required level, the longitudinal load-bearing beams 3 and transverse load-bearing beams 4 of the temporary support unit are removed.
[0049] In a preferred embodiment of the present invention, Figure 1 , Figure 2 As shown, before step S5, step S4 is also included, in which vertical load-bearing columns 2 are fixedly installed on each foundation cushion layer 1, and each pair of vertical load-bearing columns 2 are connected by diagonal braces.
[0050] In a preferred embodiment of the present invention, Figure 1 , Figure 2 As shown, in step S7, after the concrete support pier 7 is poured, the earth is backfilled in the area other than the concrete support pier 7 and compacted in layers; in step S8, after the longitudinal load-bearing beam 3 and the transverse load-bearing beam 4 are removed, the earth around the underground rigid pipeline is backfilled in time.
[0051] The present invention is used in specific applications, such as Figure 1 , Figure 2 As shown, an underground rigid pipeline support structure includes a foundation cushion layer 1, vertical load-bearing columns 2, longitudinal load-bearing beams 3, transverse load-bearing beams 4, limit bearings 5, scissor braces 6 and concrete support piers 7.
[0052] The foundation cushion layer consists of two pairs, each of which is a cast-in-place C20 concrete foundation with a thickness of 20cm and a length and width of 600mm*600mm. The longitudinal spacing between the two pairs along the pipeline is 1.5m, and the spacing between each temporary support unit is 4m.
[0053] The vertical load-bearing columns are placed on each foundation cushion layer. The material is I-beam, usually model I25a. A steel plate is welded at the upper and lower ends of the vertical load-bearing columns made of I-beam. The size of the steel plate is 20mm thick and 400mm*400mm long and wide.
[0054] The longitudinal load-bearing beams are arranged along both sides of the length direction of the rigid pipeline and placed on the steel plate at the upper end of the vertical load-bearing column. The material of the longitudinal load-bearing beams is I-beams, usually model I25a.
[0055] The transverse load-bearing beam is perpendicular to the length direction of the rigid pipe, placed on the longitudinal load-bearing beam, and located directly below the rigid pipe to directly support the rigid pipe. The material of the transverse load-bearing beam is I-beam, usually model I25a.
[0056] The limit support is located at the angle between the transverse load-bearing beam and the rigid pipe on both sides. It is welded on both sides of the transverse load-bearing beam. The contact surface with the rigid pipe is arc-shaped. The limit support is usually made of 25mm thick steel plate.
[0057] The scissors brace is cross-welded on both sides of the two vertical load-bearing columns of the same section, using 10# U-shaped steel channel steel.
[0058] The concrete support pier is the final support for the rigid pipe. It is 80cm thick and is cast on-site using C30 concrete. The top is U-shaped, with the top surface at 1 / 2 of the height of the rigid pipe body.
[0059] In a specific application, the present invention provides an underground rigid pipeline support method, and the specific construction steps are as follows:
[0060] Step 1: Construction preparation: Check the relevant data of the pipeline, find out the coordinates, direction, burial depth and other information of the pipeline, use the total station to mark the location of the pipeline, and sprinkle white lime for marking;
[0061] Step 2: Excavate the soil around the pipeline: Use machinery to excavate to 500mm above the top of the pipe, then use machinery and manual labor to clean to 1 / 2 of the pipe body, then manually excavate to the position of the vertical load-bearing foundation cushion layer and clean it up;
[0062] Step 3: Pouring of foundation cushion concrete: According to the preset position of each group of foundation cushions, clean out a small pit of 60cm*60cm*20cm, pour C20 concrete, embed a steel plate on the surface of the cushion to ensure that the steel plate is level and the foundation cushions on both sides are at the same elevation;
[0063] Step 4: Install vertical load-bearing columns: According to the calculated length, adjust the length of I25a I-beam in combination with the actual situation on site to ensure that the I25a I-beam is vertical. Weld one end of the I-beam to the embedded steel plate and the other end to another steel plate. Add stiffening ribs to the contact position between the steel plate and the I-beam to stabilize it.
[0064] Step 5: Install the longitudinal load-bearing beam: Locate the position of the longitudinal load-bearing beam, manually excavate the earthwork of the longitudinal load-bearing beam, and set up I25a I-beams on both sides of the rigid pipeline along the pipeline direction. The I-beams are located on the top steel plates of the vertical load-bearing columns and are welded together by double-sided welding;
[0065] Step 6: Install the transverse load-bearing beam: dig a small hole at the bottom of the rigid pipe manually at the position of the transverse load-bearing beam, pass an I25a I-beam across, erect it on the longitudinal load-bearing beam, adjust the plane position and elevation, and weld it on both sides. The transverse load-bearing beam is the direct load-bearing structure of the pipeline;
[0066] Step 7: Installation of limit bearings: In order to prevent lateral deformation and rolling of the pipeline, a 25mm thick steel plate is welded on both sides at the angle between the transverse load-bearing beam and the two sides of the rigid pipeline. The contact surface between the steel plate and the pipeline is arc-shaped and cushioned;
[0067] Step 8: Install the scissor brace: dig the soil around the vertical load-bearing column under the pipeline manually, and weld the scissor brace. The scissor brace is made of 10# U-shaped steel, which is cross-welded on both sides of the two vertical load-bearing columns in the same section. After all the scissor braces are installed, excavate the remaining soil at the bottom of the pipeline;
[0068] Step 9: Cast concrete support piers: clean the soil under the pipeline, set a U-shaped concrete support pier with a width of 80cm and a strength of C30 inside each group of four vertical load-bearing columns, from the top surface to 1 / 2 of the height of the rigid pipeline body, backfill the area except the support pier, and compact it layer by layer, lay a sand and gravel cushion layer at the bottom of the pipe, and cast plain concrete to protect the pipe;
[0069] Step 10. Dismantle the steel support system: After the support pier reaches 100% of the design strength, the steel support system shall be dismantled. The principle of dismantling the first installed ones last and the last installed ones first shall be followed. After the dismantling is completed, the earth around the pipeline shall be backfilled in time.
[0070] In the description of the present invention, it should be noted that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance.
[0071] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances. In addition, in the description of the present invention, unless otherwise specified, "plurality" means two or more.
[0072] It should be understood that those skilled in the art can make improvements or changes based on the above description, and all these improvements and changes should fall within the scope of protection of the appended claims of the present invention.
Claims
1. An underground rigid pipeline support method, the method is implemented based on an underground rigid pipeline support structure, the underground rigid pipeline support structure comprises a temporary support unit and a concrete support pier (7), the temporary support unit comprises a foundation cushion layer (1), a longitudinal load-bearing beam (3) and a transverse load-bearing beam (4), the foundation cushion layer (1) comprises at least two pairs, each pair of foundation cushion layers (1) is symmetrically arranged on both sides of the bottom of the underground rigid pipeline, the longitudinal load-bearing beam (3) comprises two, each longitudinal load-bearing beam (3) is installed on the foundation cushion layer (1) located on the same side of the underground rigid pipeline. 1), the transverse load-bearing beams (4) include at least two, the transverse load-bearing beams (4) are vertically installed on the longitudinal load-bearing beams (3) at a certain distance, the top of the transverse load-bearing beam (4) is provided with a support groove for placing an underground rigid pipeline, after the temporary support unit completes the support of the underground rigid pipeline, concrete is poured on the bottom of the underground rigid pipeline between two adjacent transverse load-bearing beams (4) to form the concrete support pier (7), the top of the concrete support pier (7) is provided with an arc groove for placing an underground rigid pipeline, characterized in that, The method comprises the following steps: S1. Mark the location of underground rigid pipelines; S2, first excavate the soil around the underground rigid pipeline according to the markings until at least half of the pipeline is exposed, and then excavate at least two pairs of foundation pits on both sides of the underground rigid pipeline for pouring the foundation cushion layer (1); S3, pouring concrete into the foundation pit to form a foundation cushion layer (1), wherein the top surfaces of the foundation cushion layers (1) on both sides of the underground rigid pipeline are at the same elevation; S5, longitudinally excavating the earth above the foundation cushion layer (1) on the same side of the underground rigid pipeline to form a longitudinal channel, placing a longitudinal load-bearing beam (3) in the longitudinal channel, and fixing the longitudinal load-bearing beam (3) on the foundation cushion layer (1); S6, excavating the earth at the bottom of the underground rigid pipeline and above the longitudinal load-bearing beam (3) horizontally to form at least two transverse channels, placing a transverse load-bearing beam (4) in each transverse channel, placing the underground rigid pipeline in the support groove of the transverse load-bearing beam (4), and fixing the transverse load-bearing beam (4) on the longitudinal load-bearing beam (3) to achieve temporary support for the underground rigid pipeline; S7, clearing the remaining earthwork below the underground rigid pipeline, pouring concrete on the bottom of the underground rigid pipeline between two adjacent transverse load-bearing beams (4) to form a concrete support pier (7), the top of the concrete support pier (7) is provided with an arc groove for placing the underground rigid pipeline; S8. After the concrete support pier (7) has been cured to the required level, the longitudinal load-bearing beam (3) and the transverse load-bearing beam (4) of the temporary support unit are removed.
2. The underground rigid pipeline support method according to claim 1, characterized in that: The support groove is formed by the top surface of the transverse load-bearing beam (4) and a pair of limit supports (5). The pair of limit supports (5) are installed on the transverse load-bearing beam (4) and are symmetrically arranged on both sides of the underground rigid pipeline. The surface of the limit supports that fits the underground rigid pipeline is an arc surface.
3. The underground rigid pipeline support method according to claim 1, characterized in that: The temporary support unit also includes a vertical load-bearing column (2) installed between each foundation cushion layer (1) and the longitudinal load-bearing beam (3).
4. The underground rigid pipeline support method according to claim 3, characterized in that: The temporary support unit also includes a diagonal brace installed between each pair of vertical load-bearing columns (2).
5. The underground rigid pipeline support method according to claim 4, characterized in that: The diagonal brace is a scissors brace (6).
6. The underground rigid pipeline support method according to claim 3, characterized in that: The longitudinal load-bearing beam (3), the transverse load-bearing beam (4) and the vertical load-bearing column (2) are all made of I-beams.
7. The underground rigid pipeline support method according to claim 1, characterized in that: The foundation cushion layer (1) is cast by concrete.
8. The underground rigid pipeline support method according to claim 1, characterized in that: Before step S5, the method further includes step S4, in which vertical load-bearing columns (2) are fixedly installed on each foundation cushion layer (1), and each pair of vertical load-bearing columns (2) are connected by diagonal braces.
9. The underground rigid pipeline support method according to claim 1, characterized in that: In step S7, after the pouring of the concrete support pier (7) is completed, the earth is backfilled in the area other than the concrete support pier (7) and compacted in layers; in step S8, after the longitudinal load-bearing beam (3) and the transverse load-bearing beam (4) are removed, the earth around the underground rigid pipeline is backfilled in time.