A battery box cooling bottom plate gluing and assembly integrated machine
By designing an all-in-one battery box cooling bottom plate gluing assembly machine, using a servo motor-driven mobile platform and a 6-axis robot gluing mechanism, the automated production of new energy vehicle battery box cooling bottom plates has been realized, solving the production efficiency problems in the existing technology. It solves the problems of low cost, high cost and low product consistency, and improves product quality and production efficiency.
Patent Information
- Application Number
- CN201911019168.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-10-24
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2039-10-24
AI Technical Summary
The existing production process of the cooling bottom plate of the new energy vehicle battery box is complex, cumbersome, and lacks automation, resulting in low production efficiency, high cost, and low product qualification rate and consistency.
An all-in-one machine for gluing and assembly of battery box cooling bottom plates is designed, including a gluing splicing platform, a robot gluing mechanism and a compatible robot loading mechanism. It uses a servo motor-driven mobile platform and a 6-axis robot gluing mechanism to realize the bottom plate Automatic positioning, gluing and splicing of cold plates ensures that glue curing does not affect production rhythm.
It improves production efficiency, reduces labor costs, ensures the dimensional accuracy and consistency of products, reduces glue application errors, and realizes full automation of base plate glue application and splicing.
Smart Images

Figure CN110614200B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the fields of high-end intelligent manufacturing and new energy vehicles, and in particular to the field of automated manufacturing of cooling bottom plates of aluminum alloy battery boxes of new energy vehicles. Background Art
[0002] With the development of society and the improvement of living standards, cars have become the main means of transportation for people to travel. The market demand for cars is huge, and the number of cars in use is increasing day by day. However, with the decreasing oil resources and the increasing environmental pollution, the application of internal combustion engines that consume a lot of fossil energy in the field of road transportation is gradually being replaced by various power systems that use other energy sources. At present, my country has abundant electricity resources. It is our basic national policy to vigorously develop the emerging industry of new energy vehicles. The new energy vehicle industry with electrification as its technical background has ushered in a good opportunity for development. Nowadays, the market demand for cars is increasing, and the employment costs of enterprises are also increasing. It is urgent to realize the efficient and automated production of new energy vehicle parts. The core of new energy vehicles lies in the battery system, and the aluminum alloy battery box is the installation platform of the battery system. Since the battery will emit a lot of heat during use, the cooling water system of the box is indispensable. It is also usually called the cooling base plate in this field. The battery box cooling base plate in the prior art is composed of 9 small plates, including 5 A-type base plates and 4 B-type cold plates adjacent to each other in sequence. Each small plate is connected through the following steps: Figure 2 The gluing method shown in the figure is used for connection. Each cooling bottom plate needs to be glued at 8 locations. Each time the glue is applied, the boards are spliced and the splicing needs to be completed before the glue is initially set. After the splicing, the two small boards at the glued locations are not allowed to have relative displacement before the glue is initially set. The process is complex and cumbersome, and it is easy to have deviations in splicing and gluing. Therefore, it is very necessary to realize efficient production by automating the process. Summary of the invention
[0003] In order to overcome the technical defects of existing manual production, solve the problems of low production efficiency, high cost, low product qualification rate and consistency, and realize the automatic gluing and splicing of the cooling bottom plate of the aluminum alloy battery box, the present invention provides a battery box cooling bottom plate gluing and assembly integrated machine. This invention fills the gap in the automatic production equipment of the cooling bottom plate of the battery box of new energy vehicles.
[0004] The complete technical solution of the present invention includes:
[0005] A battery box cooling bottom plate gluing and assembly integrated machine, comprising a gluing and splicing platform, a robot gluing mechanism and a compatible robot feeding mechanism.
[0006] The gluing and splicing platform comprises an equipment main frame, a bottom plate moving and positioning gluing mechanism, a cold plate moving and positioning gluing mechanism, and a bottom plate fixed gluing mechanism, wherein the bottom plate fixed gluing mechanism is fixed on the equipment main frame, and the bottom plate moving and positioning gluing mechanism and the cold plate moving and positioning gluing mechanism are arranged on the equipment main frame and can move along the splicing direction of the battery box cooling bottom plate;
[0007] The robot gluing mechanism comprises a gluing robot, a glue pump and a glue gun;
[0008] The compatible robot feeding mechanism comprises a feeding robot and a compatible feeding tool.
[0009] The glue coating and splicing platform also includes a power transmission rack.
[0010] The gluing robot and the loading robot are 6-axis robots.
[0011] The compatible loading tooling includes a vacuum suction cup for grabbing materials, and the vacuum suction cup is controlled separately by multi-channel vacuum.
[0012] The bottom plate moving positioning gluing mechanisms are 4, the cold plate moving positioning gluing mechanisms are 4, and the bottom plate fixing gluing mechanism is 1.
[0013] The bottom plate moving positioning and gluing mechanism and the cold plate moving positioning and gluing mechanism have the following structures: including a Y-direction positioning mechanism, an X-direction blocking mechanism, an X-direction correcting mechanism, a Z-direction positioning and rotating clamping mechanism, a tooling horizontal pad, a mobile installation platform, and a gear transmission mechanism driven by a servo motor;
[0014] The X direction refers to the splicing direction of the cooling bottom plate of the battery box, the Y direction refers to the horizontal direction perpendicular to the X direction, and the Y direction refers to the direction perpendicular to both the X direction and the Y direction.
[0015] The bottom plate moving positioning glue coating mechanism and the cold plate moving positioning glue coating mechanism are both connected to the main frame of the equipment through a slide rail slider, and the power output is performed by gears driven by a servo system.
[0016] An automatic welding and assembly production line and production process of an aluminum alloy box for a vehicle using the glue coating machine, including a material car, an automatic coding unit, a stir friction welding unit, a coding NG car, a manipulator and a ground rail handling unit, a deburring unit, a transfer rack, a full-automatic arc welding unit, a full-automatic machining unit, a chip removal unit, a transfer table, a manual repair welding unit, a manual cleaning unit, a code scanning and input unit, a glue coating unit, a curing table, an automatic visual inspection device, an airtightness inspection device, an automatic packaging area, a scrap car and a wooden partition bar car unit;
[0017] The manipulator and the ground rail handling unit realize the handling and conveying of raw materials on the production line. The manipulator and the ground rail handling unit include two sections, which are connected by a transfer rack in the middle; the incoming material vehicle is located on one side of the manipulator and the ground rail handling unit, and can enter the feeding area of the production line. The feeding area has a mechanism for positioning and clamping the feeding vehicle. The automatic coding unit and the stir friction welding unit are located at the right end of the incoming material vehicle in sequence. The coding NG vehicle is located at one end of the manipulator and the ground rail handling unit, close to the automatic coding unit and the stir friction welding unit;
[0018] The deburring unit is located on the other side of the manipulator and the ground rail transport unit, and is arranged opposite to the incoming material vehicle.
[0019] The transfer rack is located on the other side of the manipulator and the ground rail handling unit, and is arranged adjacent to the deburring unit;
[0020] The fully automatic arc welding unit is located on one side of the manipulator and the ground rail transport unit, and is arranged adjacent to the incoming material vehicle;
[0021] The fully automatic machining unit and the chip removal unit are respectively located on both sides of the manipulator and the ground rail handling unit, and are respectively arranged adjacent to the fully automatic arc welding unit and the transfer rack;
[0022] The manual repair welding unit, manual cleaning unit, code scanning and input unit and wooden spacer trolley are sequentially located on one side of the manipulator and the ground rail handling unit;
[0023] The gluing unit, curing table, airtightness detection equipment, and automatic visual detection equipment are sequentially located on the other side of the manipulator and the ground rail handling unit;
[0024] The scrap car is located on one side of the manipulator and the ground rail handling unit and is arranged opposite to the automatic visual inspection equipment;
[0025] The automatic packaging area is located at the other end of the manipulator and the ground rail handling unit.
[0026] The production line is provided with two transfer racks and a transfer table, which serve as a buffer for the production process and ensure the continuity of production.
[0027] The glue coating unit uses a robot to drive a glue gun, which is equipped with a glue pump to complete the sealant coating process of the product. At the same time, a curing table is set up to ensure that the curing of the glue does not affect the production rhythm;
[0028] The automatic packaging area and the wooden partition bar trolley realize the automatic packaging process of product production.
[0029] The fully automatic arc welding unit uses a robot to drive the welding gun and is equipped with an axis positioner, an automatic wire feeder and a workpiece positioning fixture to achieve full automation of the arc welding process.
[0030] The method for automatically welding and assembling a vehicle aluminum alloy box body using the production line comprises the following steps:
[0031] The operator first pushes the feeding cart filled with product raw materials to the feeding area. If the feeding area detects incoming materials, the feeding cart will be positioned and clamped, and the manipulator and the ground rail handling unit will send the raw materials to the automatic coding unit for coding. After coding, it will automatically detect whether the coding is successful. If successful, it will proceed to the next step. If not, it will be sent to the coding NG car and manually repaired and then repeat the step;
[0032] After the automatic coding is successful, the robot and the ground rail transport unit will send the workpiece to the stir friction welding unit to complete the workpiece stir welding. After friction welding, there will be burrs at the welding point, so the robot will send the workpiece to the deburring unit to remove the burrs on the workpiece; then, the robot arm will send the workpiece to the fully automatic arc welding unit for CMT welding of the workpiece; after the welding is completed, it will be sent to the fully automatic machining unit for precise machining of the workpiece; after the machining is completed, the chip removal unit will clean up the waste chips of the workpiece;
[0033] After the workpiece is cleaned of waste chips, the robot moves the workpiece to the manual repair welding unit, performs manual self-inspection on the welding of the workpiece, and performs manual repair welding on the parts that need repair welding; after repair welding, the workpiece goes to the glue coating unit to apply weld sealant, and then is sent to the curing station for curing of the sealant;
[0034] After the glue is cured, the workpiece is sent to the manual cleaning unit for glue filling and appearance cleaning;
[0035] After the above processes are completed, the robot will perform an airtight inspection on the workpiece using airtight inspection equipment and a visual inspection on the machined holes and the braces using automatic visual inspection equipment to determine whether they are qualified. If unqualified, they will be sent to the scrap truck; if qualified, they will be sent to the automatic packaging area for product packaging.
[0036] In a preferred embodiment, the present invention also provides an automotive aluminum alloy box arc welding fixture used in a fully automatic arc welding unit:
[0037] It includes a reference platform, one X-direction centering clamping mechanism, two Y-direction centering clamping mechanisms, ten Z-direction rotating clamping mechanisms and an incoming material detection switch, wherein the X-direction centering clamping mechanism is located at the center of the reference platform, and the two Y-direction centering clamping mechanisms are located on both sides of the X-direction centering clamping mechanism, and their centering clamping directions are perpendicular to the X-direction centering clamping mechanism; the ten Z-direction centering clamping mechanisms are all distributed around the reference platform, and a small contact surface pad is provided under each Z-direction rotating clamping mechanism;
[0038] The X-direction centering clamping mechanism and the Y-direction centering clamping mechanism are both composed of a centering clamping block, a centering finger cylinder, a tie rod guide bearing and a tie rod radial guide limit block. The centering finger cylinder provides centering power, and the tie rod connected thereto passes through the tie rod guide bearing. The centering clamping block is installed on the tie rod connected to the centering finger cylinder. The tie rod radial guide limit block is located between the tie rod guide bearing and the centering clamping block. The tie rod guide bearing and the tie rod radial guide limit block ensure the consistency of the movement direction of the centering clamping block during the tightening process. During the centering and positioning process of the box body, the centering clamping block moves to clamp the box body.
[0039] The Z-direction rotary clamping mechanism consists of a rotary clamping cylinder, a cylinder mounting plate and a T-shaped clamping block. The rotary clamping cylinder is connected to the reference platform through the cylinder mounting plate and the high-precision pin positioning hole; the rotary clamping cylinder is connected to the T-shaped clamping block and drives the T-shaped clamping block to clamp the box.
[0040] The reference platform is manufactured by welding a square tube and a steel plate and subjected to stress relief treatment, and then is clamped and processed in one step.
[0041] The one X-direction centering clamping mechanism, the two Y-direction centering clamping mechanisms, the ten Z-direction rotating clamping mechanisms and the incoming material detection switch are all connected via positioning pins, screws and a reference platform.
[0042] The X-direction centering clamping mechanism and the Y-direction centering clamping mechanism transmit the centering power through the pull rod; the pull rod is axially guided by the pull rod guide bearing, and a step is provided on the pull rod, and radial guidance and limitation are achieved through the cooperation between the step and the pull rod radial guide limit block.
[0043] When the automotive aluminum alloy box arc welding fixture completes the entire production process, each action is controlled by electronic control.
[0044] In another preferred embodiment, the present invention also provides a three-in-one mechanical gripper for an aluminum alloy box for a vehicle used in a production line:
[0045] It includes a gripper reference frame, a box grabbing unit, a fixture grabbing unit and a bottom plate grabbing unit; the reference frame includes two parallel crossbeams and a longitudinal beam perpendicular to the crossbeams;
[0046] The box grabbing unit includes a rotary clamping cylinder, a support block, an X-axis limit block, and a Y-axis limit block. There are four sets of box grabbing units, which are symmetrically installed at the two ends of the longitudinal beams on both sides of the three-in-one mechanical gripper reference frame, wherein an adjustable tooling support block is provided under the rotary clamping cylinder, and the X-axis limit block and the Y-axis limit block are arranged on the longitudinal beam of the reference frame and are perpendicular to each other; during the grabbing process, the X-axis limit block is used to locate the accuracy in the X direction, and the Y-axis limit block ensures the accuracy in the Y direction; the rotary clamping cylinder presses the aluminum alloy box after grabbing it to ensure that the aluminum alloy box is firmly clamped;
[0047] The fixture tooling grabbing unit is located inside the box grabbing unit, and includes four sets of clamping mechanisms, a stroke cylinder that drives the clamping mechanism to move, a stroke guide slide block group, and two tightening cylinders; the front end of the clamping mechanism is provided with a gripper and a polyurethane pad for grabbing, and is installed on the crossbeam through the stroke cylinder and the stroke guide slide block group, and a tightening cylinder that can push along the Z-axis direction is provided between every two sets of stroke cylinders;
[0048] The lower bottom plate grabbing unit is a vacuum adsorption mechanism, comprising 6 adsorption panels located on the crossbeam, and the positions of the 6 adsorption panels are set according to the position of the center of gravity of the lower bottom plate.
[0049] The rotary clamping cylinder, the X-axis limit block and the Y-axis limit block are connected to the reference frame through a support plate and high-precision pin positioning holes; the rotary clamping cylinder is connected to a T-shaped clamping block.
[0050] The three-in-one mechanical gripper for automotive aluminum alloy boxes can grasp the aluminum alloy boxes, tooling fixtures and lower base plates.
[0051] The three-in-one mechanical gripper for the automotive aluminum alloy box also includes a robot connected to a reference frame.
[0052] The gripper reference frame is made by welding square tubes and steel plates and undergoing stress relief treatment, and is obtained by one-time clamping and processing.
[0053] In another preferred embodiment, the present invention also provides a continuous curing device for coating glue on an aluminum alloy housing for a vehicle used in a curing platform:
[0054] It includes the active end, conveyor line, driven end, baking shed, loading manipulator and unloading manipulator.
[0055] The conveyor line body is used to convey the curing box body, the driven end and the driving end are respectively located at the two ends of the conveyor line body, the loading manipulator is located at the driven end side, and the unloading manipulator is located at the driving end side. A baking shed is provided on the conveyor line body, and the baking shed includes a connecting part with the conveyor line body and a shed body. There is a baking space between the shed body and the conveyor line body for the curing box body to pass through;
[0056] The conveying line body is spliced by short square tubes, and the length of the conveying line body can be adjusted by adding or reducing short square tubes;
[0057] The automotive aluminum alloy box body glue coating continuous curing device also includes a chain, which connects the active end, the driven end and the conveying line as a whole, and the chain is connected to a chain plate so that the entire conveying surface is covered by the flat chain plate;
[0058] The height of the shed body can be adjusted freely.
[0059] In another preferred embodiment, the present invention further provides another battery box two-component structural adhesive coating and curing device used in a curing platform, comprising a conveying and curing line, a curing fixture, an automatic gluing unit, and a bottom plate rack;
[0060] The conveying and curing line is a continuous closed-loop circulating conveying mechanism, and is provided with a material incoming station, a transmission station, a gluing station, a first lifting station, an assembly station, a plurality of curing stations and a second lifting station in sequence;
[0061] The automatic gluing unit is located on the gluing station, and the lower bottom plate rack is located on the assembly station.
[0062] The curing fixture comprises a frame placement platform, a fixture frame and a self-locking manual pressing tool, wherein the fixture frame is located on the frame placement platform, and the self-locking manual pressing tool is distributed on the fixture frame;
[0063] The material incoming station, the transfer station, and the curing station are two-way transfer stations with lifting functions, and the first lifting station and the second lifting station have a workpiece lifting function.
[0064] The transfer station includes a first transfer station and a second transfer station.
[0065] Only one workpiece is stored in the gluing station and the first lifting station at the same time. After the operation of the first lifting station is completed, the next workpiece will enter the gluing station from the second transfer station for gluing.
[0066] There are 9 curing stations in total.
[0067] There are 14 curing fixtures on the conveying and curing line, which operate in a cycle.
[0068] The advantages of the present invention over the prior art are:
[0069] 1. The gluing and splicing platform adopts a mobile platform mechanism driven by 8 servo motors, and each platform mechanism is individually controllable, so that the incoming material positioning, gluing, translation splicing and many other processes of each base plate are integrated into one, with a high degree of automation and high production efficiency, which greatly reduces labor costs;
[0070] 2. Compared with manual gluing, the amount of glue can be freely set in the robot gluing mechanism, which is convenient for controlling problems such as overflow and insufficient glue, and the gluing is uniform. After one debugging is completed, the gluing consistency of the workpiece is high and the production efficiency is high.
[0071] 3. Compatible robot feeding mechanism, different workpiece feeding mechanisms are completed with a unified mechanism, with strong compatibility, low cost and high degree of automation;
[0072] 4. Since the insertion depth of the slots between the workpieces can be deep or shallow, and there are many connection points, it is difficult to control the X-direction dimensional error of the final product in manual production. Since the workpieces are positioned mechanically in the glue splicing platform, the positioning accuracy is high, and the 8 moving transmission systems are completed by high-precision servo motors and high-precision gear racks, the repeated positioning accuracy is very high, and the dimensional error does not exceed 0.02mm, which greatly improves the dimensional accuracy of the finished product and the consistency of the product;
[0073] 5. The control accuracy of the initial setting time of the glue during the manual gluing process is low. The base plate gluing and assembly integrated machine can set the initial setting time after the base plate gluing according to different products. Only when the initial setting conditions are met can it enter the next process, and the gel time can be accurately controlled.
[0074] 7. After the base plates are glued and spliced, each platform firmly fixes each base plate, effectively avoiding the secondary displacement of each base plate during the gel process.
[0075] 8. The three major mechanisms of the baseboard gluing and assembly machine work together to realize the full automation of the complex process of baseboard gluing and splicing, which greatly reduces labor costs and has the advantages of high production efficiency and good product quality. BRIEF DESCRIPTION OF THE DRAWINGS
[0076] Figure 1 The figure is a schematic diagram of the overall structure of an automatic welding assembly production line for automotive aluminum alloy boxes using the glue coating machine of the present invention.
[0077] Figure 2 This is a schematic diagram of the overall structure of the arc welding fixture for automotive aluminum alloy boxes.
[0078] Figure 3 This is a schematic diagram of the structure of the Y-direction clamping mechanism of the automotive aluminum alloy box arc welding fixture.
[0079] Figure 4 This is a schematic diagram of the structure of the Z-direction clamping mechanism of the automotive aluminum alloy box arc welding fixture.
[0080] Figure 5 This is a schematic diagram of the three-in-one mechanical gripper structure.
[0081] Figure 6 a is a schematic diagram of the structure of the existing aluminum alloy battery box cooling base plate.
[0082] Figure 6 b is a schematic diagram of the battery box cooling base plate connection slot.
[0083] Figure 7 It is an overall schematic diagram of the cooling bottom plate gluing and assembling all-in-one machine of the present invention.
[0084] Figure 8 The present invention is a schematic diagram of a gluing and splicing platform of a cooling bottom plate gluing and assembling machine, wherein (a) is a stereogram and (b) is a front view.
[0085] Fig. 9 It is a schematic diagram of the robot gluing mechanism of the cooling bottom plate gluing assembly integrated machine of the present invention.
[0086] Fig.10 This is a schematic diagram of a compatible robot feeding mechanism of the cooling bottom plate gluing assembly integrated machine of the present invention, wherein (a) is a view from one angle, and (b) is a view from another angle.
[0087] Fig.11 The present invention is a schematic diagram of the gluing mechanism for moving and positioning the bottom plate of the gluing splicing platform, wherein (a) is a stereogram and (b) is a front view.
[0088] Fig.12 It is a schematic diagram of the transmission mechanism composition of the mobile positioning gluing mechanism of the present invention.
[0089] Fig.13 This is a plan view of the continuous curing device for gluing aluminum alloy boxes.
[0090] Fig.14 It is a side view of the continuous curing device for gluing aluminum alloy box.
[0091] Fig.15 This is a diagram of the composition of a two-component structural adhesive coating and curing device.
[0092] Fig.16 This is a process flow chart of a two-component structural adhesive coating and curing device.
[0093] Fig.17 This is a diagram of the structural adhesive curing fixture. DETAILED DESCRIPTION
[0094] In order to make the technical means, creative features, objectives and effects of the invention easier to understand, the present invention is further described below in conjunction with the accompanying drawings.
[0095] The present invention provides a vehicle battery box cooling bottom plate gluing assembly integrated machine, through a fully automatic feeding, gluing, splicing unit design, realizes the bottom plate incoming material positioning, gluing, translation splicing and other processes into one, high automation, high production efficiency, greatly reducing labor costs; the basic structure of the gluing unit is described as follows: Figure 7-Figure 12 As shown, the battery box cooling bottom plate gluing and assembly integrated machine mainly consists of three parts: a gluing and splicing platform 301, a robot gluing mechanism 302, and a compatible robot feeding mechanism 303.
[0096] Specifically, the gluing and splicing platform includes a main frame 344 of the equipment, on which are disposed four bottom plate moving and positioning gluing mechanisms 341, four cold plate moving and positioning gluing mechanisms 342, one bottom plate fixed gluing mechanism 343, and a power transmission rack 345. Among them, one bottom plate fixed gluing mechanism 343 is fixed to the main frame 344 of the equipment by a fixed L-shaped bracket.
[0097] In the 8 movable positioning and gluing mechanisms, including 4 bottom plate movable positioning and gluing mechanisms 341 and 4 cold plate movable positioning and gluing mechanisms 342, each mechanism is composed of a Y-direction positioning mechanism 371, an X-direction blocking mechanism 373, an X-direction correcting mechanism 375, a Z-direction positioning and rotating clamping mechanism 377, a tooling horizontal pad 374, a movable installation platform 372, and a gear transmission mechanism 376 driven by a servo motor. The 8 movable positioning and gluing mechanisms are all connected to the main frame 344 of the equipment through a slide rail slider, and the power output is carried out by the gear driven by the servo system. In the working process, the workpieces driven by the 8 movable installation platforms move closer to the fixed platform one by one along the X direction after gluing.
[0098] Specific transmission methods such as Fig.12 All mobile positioning glue coating mechanism platforms 391 are connected to the slide rails fixed on the glue coating and splicing platform through high-precision guide sliders 393 to guide the workpiece translation in the X direction. The transmission system is driven by a servo motor to drive a high-precision gear rack 392 to complete the translation of each bottom plate in the X direction. The cold plate mobile positioning glue coating mechanism 342 and the bottom plate fixed glue coating mechanism 343 use the same mechanism for precise positioning of the product. The only difference is that the bottom plate fixed glue coating mechanism does not require the workpiece to be fixed, so it is directly installed on the frame of the glue coating and splicing platform, reducing the servo transmission mechanism.
[0099] The robot gluing mechanism is composed of a 6-axis robot 351, a glue gun 352, and a glue pump 503. After the robot loading mechanism completes all the incoming material loading processes, all the base plates on the gluing splicing platform are in an open state, and the 6-axis robot of the gluing mechanism 2 drives the glue gun to complete the gluing of the fixed base plate and the cold plate closest to the fixed base plate, and then the two plates are spliced under the drive of the mobile installation platform, and the two plates will not move before all the processes are completed. At the same time, the gluing robot completes the gluing between the second cold plate and the third base plate, and then the third base plate moves closer to the previous two plates for splicing. After completion, the first three plates will no longer move before all the processes are completed, and the subsequent actions are analogous.
[0100] The compatible robot loading mechanism is composed of a 6-axis robot 361 and a compatible loading tooling 362. The compatible loading tooling is provided with a suction cup frame 364 and a vacuum suction cup 363. Since a complete cooling base plate needs to be composed of 9 plates, manual loading is very cumbersome, and the shape of each plate is slightly different. Therefore, the compatible loading tooling is designed with a compatible gripper, which grasps the base plate through a vacuum suction cup and has two or more independent vacuum systems to control it. When the base plate loading is completed, the first vacuum system is turned on and the second vacuum system is turned off; when the cooling plate loading is completed, the second vacuum system is turned on and the first is turned off; in this way, a set of grippers is realized, which is compatible with the grasping of base plates of various shapes.
[0101] During use, the loading of all base plates and cold plates is completed by the compatible robot loading mechanism. At this time, all the mobile positioning gluing mechanisms of the gluing and splicing platform are in the open position. Each time the loading is completed, each mobile positioning gluing mechanism positions and clamps the workpiece in the X, Y, and Z directions. After the positioning of all incoming materials is completed, the work described for the robot gluing mechanism is started. After the above process is completed, the initial setting of the glue is carried out. After the initial setting time is up, the positioning and clamping mechanisms in the X, Y, and Z directions of all platforms are opened, and a complete cooling plate gluing and splicing process is completed.
[0102] At the same time, the present invention also discloses an automatic welding and assembly production line and production process for an aluminum alloy housing for a vehicle using the glue coating machine of the present invention, which is applied to its glue coating unit, such as Figure 1 As shown, the one end and both ends mentioned below refer to the direction of raw material conveying in the parallel production line, that is, the endpoints along the longer direction of the production line, or the horizontal direction, and the one side, both sides, left and right sides refer to the direction of raw material conveying in the perpendicular production line, that is, along the narrower direction of the production line, or the longitudinal direction.
[0103] The present invention provides an automatic welding and assembly production line and production process for an aluminum alloy box for a vehicle, which mainly comprises a material incoming vehicle 1, an automatic coding unit 2, a stir friction welding unit 3, a coding NG vehicle 4, a deburring unit 6, a manipulator and a ground rail handling unit 5, a full-automatic arc welding unit 8, a full-automatic machining unit 9, a chip removal unit 10, a manual repair welding unit 12, a manual cleaning unit 13, a code scanning and inputting unit 14, a gluing unit 15, a curing table 16, a transfer table 11, a transfer material rack 7, an automatic visual inspection device 18, an airtight inspection device 17, an automatic packaging area 21, a scrap vehicle 20, a wooden spacer vehicle 19 and other units, and two ground rail handling robots are connected in series to complete the full automation of the production of the aluminum alloy box from incoming materials, production to inspection, and then to cleaning and packaging.
[0104] The manipulator and the ground rail handling unit 5 realize the handling and conveying of the raw materials on the production line. The manipulator and the ground rail handling unit 5 are arranged horizontally and include two sections, which are connected by a transfer frame 11 in the middle; the incoming material trolley 1 is located on one side of the manipulator and the ground rail handling unit 5, and can enter the feeding area of the production line. The feeding area has a mechanism for positioning and clamping the feeding trolley 1. The automatic coding unit 2 and the stir friction welding unit 3 are located at the right end of the incoming material trolley in sequence, and the coding NG trolley 4 is located at one end of the manipulator and the ground rail handling unit 5, close to the automatic coding unit 2 and the stir friction welding unit 3;
[0105] The deburring unit 6 is located on the other side of the manipulator and the ground rail handling unit 5, and is arranged opposite to the incoming material vehicle 1.
[0106] The transfer rack 7 is located on the other side of the manipulator and the ground rail handling unit 5, and is arranged adjacent to the deburring unit 6;
[0107] The fully automatic arc welding unit 8 is located on one side of the manipulator and the ground rail handling unit 5 and is arranged adjacent to the incoming material vehicle 1;
[0108] The fully automatic machining unit 9 and the chip removal unit 10 are respectively located on both sides of the manipulator and the ground rail handling unit 5, and are respectively arranged adjacent to the fully automatic arc welding unit 8 and the transfer rack 7;
[0109] The manual repair welding unit 12, the manual cleaning unit 13, the code scanning and input unit 14 and the wooden spacer trolley 19 are sequentially located on one side of the manipulator and the ground rail transport unit 5;
[0110] The gluing unit 15, the curing station 16, the airtightness detection equipment 17, and the automatic visual detection equipment 18 are sequentially located on the other side of the manipulator and the ground rail handling unit 5;
[0111] The scrap vehicle 20 is located on one side of the manipulator and the ground rail handling unit 5 and is arranged opposite to the automatic visual inspection device 18;
[0112] The automatic packaging area 21 is located at the other end of the robot and ground rail handling unit 5 .
[0113] Two transfer racks 7 and a transfer table 11 are provided in the production line to buffer the production process and ensure the continuity of production.
[0114] The glue coating unit 15 uses a robot to drive a glue gun, which is equipped with a glue pump to complete the sealant coating process of the product. At the same time, a curing table is set up to ensure that the curing of the glue does not affect the production rhythm;
[0115] The automatic packaging area 21 and the wooden partition bar trolley 21 realize the automatic packaging process of product production.
[0116] The fully automatic arc welding unit 8 uses a robot to drive the welding gun and is equipped with a 2-axis positioner, an automatic wire feeder and a workpiece positioning fixture to achieve full automation of the arc welding process.
[0117] Specifically, the working steps of the present invention are as follows:
[0118] The operator first pushes the feeding trolley 1 filled with product raw materials to the feeding area. If the feeding area detects incoming materials, the feeding trolley is positioned and clamped, and the robot and the ground rail handling unit 5 send the original to the automatic coding unit 2. After coding, it will automatically detect whether the coding is successful. If successful, the next step will be carried out. If not, it will be sent to the coding NG car 4, and the step will be repeated after manual repair;
[0119] After the automatic coding is successful, the workpiece is sent to the stir friction welding unit 3 by the manipulator and the ground rail transport unit 5 to complete the workpiece stir welding. After friction welding, since there will be burrs at the welding point, the manipulator sends the workpiece to the deburring unit 6 to remove the burrs on the workpiece; then, the manipulator sends the workpiece to the full-automatic arc welding unit 8, and the workpiece is positioned and fixed with a fixture before CMT welding of the workpiece; after the welding is completed, it is sent to the full-automatic machining unit 9 for precise machining of the workpiece; after the machining is completed, the chip removal unit 10 cleans the waste chips of the workpiece;
[0120] After the workpiece is cleaned of waste chips, the workpiece is carried by the robot to the manual welding unit 12, where the welding of the workpiece is manually self-checked and the parts that need welding are manually welded; after welding, the workpiece is sent to the glue coating unit 15 for the application of weld sealant. Since the curing of the sealant takes time, the present invention provides a curing station 16 to achieve continuous production.
[0121] After the glue is cured, the workpiece is sent to the manual cleaning unit 13 for glue filling and appearance cleaning;
[0122] After the above process is completed, the robot will perform an airtight inspection on the workpiece by the airtight inspection equipment 17 and a visual inspection on whether the machined holes and the braces are qualified by the automatic visual inspection equipment 18; if unqualified, it will be sent to the scrap car 20; if qualified, it will be sent to the automatic packaging area 21 for product packaging.
[0123] Two transfer racks 7 and a transfer table 11 are distributed in the above-mentioned production line, which play a role in buffering the production process and ensuring the continuity of production.
[0124] In addition, in the above production line, the fully automatic arc welding unit 8 connects the frame and the bottom plate of the automotive aluminum alloy box body by arc welding. When the above components are welded, due to the large number of welding points of the product, the traditional manual welding production efficiency is low, the traditional fixture has low repeatability and positioning accuracy, and the clamping mechanism is complex, which does not have the conditions to cooperate with the automatic welding process. In addition, due to the large welding deformation of aluminum alloy, the clamping force of the traditional fixture is insufficient, the workpiece is unevenly stressed, and the requirements for product dimensional tolerance and shape and position tolerance cannot be met. Therefore, in a preferred embodiment of the present invention, an arc welding fixture for automotive aluminum alloy boxes is designed, and the designed fixture is used to fix the workpiece before welding. The fixture has a structure such as Figure 2-4 As shown, the main components are: including a reference platform 101, a small contact surface pad 103 is distributed under each Z-direction rotating clamping mechanism, 1 X-direction centering clamping mechanism 105, 2 Y-direction centering clamping mechanisms 104, 10 Z-direction rotating clamping mechanisms 102 evenly distributed around the product, and an incoming material detection switch 106. The reference platform is made of square tubes and steel plates welded and stress-relieved, and then clamped and processed once to ensure that the platform has a high flatness and the platform pin hole has a high positioning accuracy; the remaining mechanisms are connected to the reference platform through positioning pins, screws and the reference platform. Figure 3 As shown, the basic principles of the X and Y direction centering clamping mechanisms are the same, and both are composed of finger cylinders, pull rods, linear bearings and centering blocks.
[0125] Specifically, the idea behind the above design is that this type of aluminum alloy box product needs to connect the surrounding frames and bottom panels through arc welding, and the airtightness needs to be strictly controlled to prevent leakage. On the other hand, since the product has many welding points and the demand is large, automated welding is needed to improve production efficiency and product consistency. Since the size of the incoming product will also have a certain error, the traditional single-side correction method in the X and Y directions has poor positioning accuracy, so the following method is used: Figure 3 The centering positioning shown is used to attenuate the dimensional error of the incoming material.
[0126] Because the product will deform in a free state, and due to its special material, the deformation is difficult to control during welding, external downward pressure is required to firmly press the product to control the deformation, such as Figure 4The Z-direction rotary clamping mechanism shown in the figure comprises a rotary clamping cylinder 121, a cylinder mounting plate 122, and a T-shaped clamping block 123, which can provide a large downward clamping force; Figure 2 As shown, 10 uniformly distributed Figure 5 The mechanism shown can effectively press down the product on all sides, firmly control the workpiece, and play a good role in preventing deformation of the product during welding.
[0127] like Figure 3 As shown, the centering positioning in the Y direction includes a centering clamping block 141, a centering finger cylinder 142, a pull rod guide bearing 143, and a pull rod radial guide limit block 144. The centering finger cylinder 142 provides the centering power, and the pull rod guide bearing 143 and the pull rod radial guide limit block 144 ensure the consistency of the movement direction of the centering clamping block 141 during the tightening process; during the centering positioning of the workpiece, the two centering clamping blocks 141 move and tighten simultaneously.
[0128] During use, the robot or worker places the workpiece Figure 2 In the fixture shown, after the detection switch 106 detects the incoming material, the centering mechanisms in the X and Y directions are clamped at the same time, and then the 10 clamping mechanisms in the Z direction are pressed down at the same time to firmly fix the workpiece. Since the clamping mechanism has the advantages of large clamping force, small size, and simple structure, the welding point of the workpiece can be completely exposed. During welding, a robot can be used to drive the welding gun for automatic welding, which improves the consistency and production efficiency of arc welding of the workpiece. After the arc welding is completed and the workpiece is cooled, the 10 clamping mechanisms in the Z direction are automatically opened at the same time, and then the centering positioning in the X and Y directions are opened at the same time, and then the workpiece is removed by a robot or manually.
[0129] The designed arc welding fixture for automotive aluminum alloy boxes has a simple and reasonable structure and a high degree of automation. It can be reasonably compatible with both manual loading and unloading and automatic loading and unloading by robots. It also has the characteristics of high consistency and qualified rate of manufactured products and high production efficiency, and can well complete the automated production of automotive aluminum alloy boxes.
[0130] In addition, in the production line disclosed in the present invention, the manipulator and the ground rail transport unit need to grasp the aluminum frame and the lower bottom plate of the aluminum alloy box, as well as various components. The traditional production process requires the use of a manipulator to grasp the fixture, the aluminum alloy box, and the upper cover of the box in steps. The traditional robot gripper can only operate with a single function and can only clamp a single workpiece. A robot arm is equipped with one gripper. The traditional robot gripper requires more robots, wastes resources, and delays the entire production process.
[0131] Therefore, in view of the needs and processing methods of the entire production line, the present invention can adopt a three-in-one robot gripper of a designed box, a fixture, and a lower base plate in the manipulator and the ground rail handling unit, as well as other required occasions. The basic structure is as follows Figure 5 As shown, it includes a reference frame 202, a box grabbing unit, a fixture grabbing unit and a bottom plate grabbing unit; the reference frame includes two parallel beams and a longitudinal beam perpendicular to the beams.
[0132] The box grabbing unit mainly consists of a mechanism consisting of four groups of rotary clamping cylinders 201, support blocks 209, X-axis limit blocks 211, and Y-axis limit blocks 210; wherein, the four groups of mechanisms are respectively installed at the two ends of the longitudinal beams on both sides of the three-in-one mechanical gripper reference frame, and are symmetrically distributed in the X direction and the Y axis direction, wherein the rotary clamping cylinder is provided with a support block 209, and the X-axis limit blocks 211 and the Y-axis limit blocks 210 are provided on the longitudinal beams of the three-in-one mechanical gripper and are perpendicular to each other. During the handling process, the positioning accuracy of the box must be strictly controlled, relying on the X-axis limit block 211 to position the accuracy in the X direction, and the Y-axis limit block 210 to ensure the accuracy in the Y direction; the rotary clamping cylinder 1 presses the box after grabbing the aluminum alloy box to ensure that the aluminum alloy box is firmly clamped on the gripper.
[0133] The fixture tooling grabbing unit is located inside the box grabbing unit, including four sets of clamping mechanisms 203, a stroke cylinder 204 that drives the clamping mechanism to move, a stroke guide slide block 208 structure, and two tightening cylinders 205; the front end of the clamping mechanism includes an L-shaped structure clamp and a polyurethane pad 207 for grabbing, and is installed on the beam through the stroke cylinder 204 and the stroke guide slide block group 208. A tightening cylinder is provided between every two sets of stroke cylinders 204. During the clamping process, the clamping mechanism 203 is opened by the stroke cylinder 204, and the clamping mechanism 203 is ensured to have displacement accuracy by the stroke slide block group 208. The polyurethane pad 207 buffers the clamping force to prevent deformation and wear of the workpiece. After the fixture frame is clamped, the tightening cylinder 205 will push the frame along the Z-axis direction to firmly position the fixture frame and limit the freedom in the Z-axis direction. Stable and accurate clamping is achieved.
[0134] The gripping unit of the fixture is located on the crossbeam, and includes a vacuum adsorption mechanism 206 for grabbing the bottom plate. The bottom plate is adsorbed by the vacuum adsorption device 205. According to the center of gravity of the bottom plate, six adsorption panels are used to adsorb the bottom plate, and the positioning and fixing function is also performed. The bottom plate is firmly fixed on the adsorption device to achieve the purpose of adsorption and transportation.
[0135] The above design has strong adaptability, whether it is the robot automatically taking and placing aluminum alloy boxes, bottom plates, or handling fixtures, it can be reasonably compatible. It also has the characteristics of high consistency and qualified rate of manufactured products, high production efficiency, space saving, and reduced robot investment costs, and can well complete the automated production of automotive aluminum alloy boxes.
[0136] In the production line of the present invention, a curing station 16 is provided to ensure that the curing of the glue does not affect the production rhythm. Since the existing box body, whether it is a structural adhesive or a sealant, requires a certain curing time, and different glues have different properties and require different curing times. Some glues even require an initial setting time of 90 minutes. Therefore, in a preferred embodiment, the curing station can also adopt a continuous curing structure device for glue coating, which mainly consists of Figure 13-14 As shown, it includes a driving end 404, a conveying line body 402, a driven end 401, a baking shed 403, a loading robot 406 and a unloading robot 405.
[0137] The conveyor line body 402 is used to convey the box body being cured. The driven end 401 and the driving end 404 are respectively located at the two ends of the conveyor line body 402. The loading robot 406 is located on the side of the driven end 401, and the unloading robot 405 is located on the side of the driving end 44. A baking shed 403 is provided on the conveyor line body 402. The baking shed includes a connecting part 421 with the conveyor line body 402, and a shed body 422. There is a baking space 423 between the shed body and the conveyor line body 402 for the curing box body to pass through.
[0138] During the curing process, the loading robot 406 takes the box to be cured after the glue is applied and places it on the curing workpiece station on the side of the driven end 401 of the conveyor line body 402, and then the driving motor of the active end 404 drives the shaft of the active end 404 to rotate, driving the shaft of the driven end 401, thereby driving the chain plate from the driven end 401 to the active end 404, so that the workpiece enters the next station and enters the baking shed 403 for curing. When the station for the workpiece to be cured is vacant, the loading robot 406 puts another box to be cured, and so on. After the workpiece reaches the curing completion area, it is taken down by the unloading robot 405.
[0139] At present, the production cycle of aluminum alloy production line is 6-8 minutes. Calculated as 6 minutes, one box to be cured is put in every 6 minutes. Figure 1 The line shown can accommodate 13 components at the same time, but the time for each curing box on the line is 12*6=72 minutes. In continuous production, the line can ensure a 72-minute curing time and meet a 6-minute production cycle. Continuous automated production of box glue curing is achieved.
[0140] This design can meet the current glue curing process of all aluminum alloy boxes. During use, the baking temperature or whether to enable the baking function can be freely set according to the curing process of different glues; according to the initial setting time of different glues, the gluing process, and the box structure, the line length can be freely designed. For workpieces with too long initial setting time, the workpieces can be stacked in piles to increase the workpiece capacity of the line. It is only necessary to appropriately increase the height of the baking shed 422 to achieve the effect of extending the curing time without increasing the production cycle.
[0141] In addition, in the production process of this production line, some boxes require two components of glue. Therefore, in another preferred embodiment, the curing station can also use a two-component structural glue coating and curing mechanism, such as Figure 15-17 As shown, it includes a conveying and curing line 521, a curing fixture 522, an automatic gluing unit 523, and a lower bottom plate rack 524.
[0142] Specifically, a two-component structural adhesive should be applied to the workpiece frame, and then the lower base plate should be buckled onto the frame. The two are bonded and cured with the structural adhesive. During the curing process, the workpieces must not undergo relative displacement, and neither can undergo significant deformation; the initial setting time is about 1 hour.
[0143] As mentioned above, the conveying and curing line is a continuous closed-loop circulating conveying mechanism, and the four corners adopt a two-way transmission station with lifting. A curing fixture is designed, including a fixture frame 541, a frame placement platform 543 and 8 self-locking manual clamping tools 542. The frame is conveyed into the frame placement platform, and the frame after gluing is assembled with the bottom plate frame, and then clamped by the self-locking manual clamping tool 542. It can complete the curing clamping work of the workpiece well.
[0144] The vacant curing fixture receives the frame material at the incoming material station 501. The incoming material station 501 has a two-way transmission function. The material passes through the first transmission station 502 and the second transmission station 503 to the gluing station 504. The structural glue is automatically applied by a robot at the gluing station 504. After gluing, the material goes to the first lifting station 505. The lifting station 505 is equipped with a workpiece lifting device. After the workpiece is lifted, it can be freely rotated manually and sent to the assembly station 506. The operator assembles the lower base plate and the glued frame at the assembly station 506 and clamps them with a fixture. After that, the workpiece enters the curing time and passes through the assembly station 506, namely the first curing station, the second curing station 507, the third curing station 508, the fourth curing station 509, the fifth curing station 510, the sixth curing station 511, the seventh curing station 512, the eighth curing station 513, and the ninth curing station 514 in sequence. Since the cycle of a single component is 8 minutes, the curing time is 9*8=72 minutes. When the workpiece is transferred to the second lifting station 515, the workpiece is lifted up, and the clamping mechanism of the fixture is manually released. Finally, it reaches the incoming material station 501 through the third transmission station 516, and the cured workpiece is taken away, leaving the remaining vacant curing fixture.
[0145] The incoming material station 501, the second transfer station 503, the fourth curing station 509 and the sixth curing station 511 on the conveyor line are two-way transfer stations with lifting functions, and the first lifting station 505 and the second lifting station 515 have the lifting function of the workpiece; the gluing station 504 and the first lifting station 505 can only store one workpiece at the same time, and the next workpiece can only enter the gluing station 504 from the second transfer station 503 for gluing after the operation of the first lifting station 505 is completed; the conveyor line has a total of 14 curing fixtures, which circulate in a cycle.
[0146] This design has a reasonable layout, convenient production, meets the production requirements of the process, has a high degree of automation, and has the characteristics of high consistency and qualified rate of manufactured products, high production efficiency, etc. It can well complete the colloid curing process of automotive aluminum alloy boxes.
[0147] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any way. Any simple modification, change and equivalent structural change made to the above embodiment based on the technical essence of the present invention still falls within the protection scope of the technical solution of the present invention.
Claims
1. A battery box cooling bottom plate gluing and assembly integrated machine, characterized in that: Including glue splicing platform, robot glue coating mechanism and compatible robot feeding mechanism, The gluing and splicing platform comprises an equipment main frame, a bottom plate moving and positioning gluing mechanism, a cold plate moving and positioning gluing mechanism, and a bottom plate fixed gluing mechanism, wherein the bottom plate fixed gluing mechanism is fixed on the equipment main frame, and the bottom plate moving and positioning gluing mechanism and the cold plate moving and positioning gluing mechanism are arranged on the equipment main frame and can move along the splicing direction of the battery box cooling bottom plate; The bottom plate moving positioning and gluing mechanism and the cold plate moving positioning and gluing mechanism have the following structures: including a Y-direction positioning mechanism, an X-direction blocking mechanism, an X-direction correcting mechanism, a Z-direction positioning and rotating clamping mechanism, a tooling horizontal pad, a mobile installation platform, and a gear transmission mechanism driven by a servo motor; The X direction refers to the splicing direction of the battery box cooling bottom plate, the Y direction refers to the horizontal direction perpendicular to the X direction, and the Y direction refers to the direction perpendicular to both the X direction and the Y direction; The compatible robot feeding mechanism is composed of a feeding robot and a compatible feeding tool; The robot gluing mechanism is composed of a gluing robot, a glue gun and a glue pump; after the compatible robot loading mechanism completes all the incoming material loading processes, all the bottom plates on the gluing splicing platform are in an open state, and the gluing robot of the robot gluing mechanism drives the glue gun to complete the gluing of the bottom plate fixed gluing mechanism and the cold plate closest to the bottom plate fixed gluing mechanism, and then the two plates are spliced under the drive of the mobile installation platform, and the two plates will not move before all the processes are completed. At the same time, the gluing robot completes the gluing between the second cold plate and the third bottom plate, and then the third bottom plate moves closer to the previous two plates for splicing. After completion, the three plates will no longer move before all the processes are completed, and the subsequent actions are similar; The gluing robot and the loading robot are 6-axis robots.
2. The battery box cooling bottom plate gluing and assembling machine according to claim 1, characterized in that: The glue-spreading and splicing platform also includes a power transmission rack.
3. The battery box cooling bottom plate gluing and assembling machine according to claim 1, characterized in that: The compatible feeding tooling includes a vacuum suction cup for grasping materials, and the vacuum suction cup is controlled separately by multi-channel vacuum.
4. The battery box cooling bottom plate gluing and assembling machine according to claim 1, characterized in that: The bottom plate moving positioning gluing mechanisms are 4, the cold plate moving positioning gluing mechanisms are 4, and the bottom plate fixing gluing mechanism is 1.
5. The battery box cooling bottom plate gluing and assembling machine according to claim 1, characterized in that: The bottom plate moving positioning glue coating mechanism and the cold plate moving positioning glue coating mechanism are both connected to the main frame of the equipment through a slide rail slider, and the power output is performed by gears driven by a servo system.
Citation Information
Patent Citations
Redwood furniture board surface structure and processing method
CN104441095A
Carton glue coating and pressing all-in-one machine
CN105196609A
Aluminum alloy cavity board for furniture and manufacturing method thereof
CN105332981A
Plank splicing machine
CN108621262A
Flange for wind pipe connection construction method