Prefabricated wall and assembly structure of assembled building and construction method thereof
By designing mechanical connections and using fastening components and cast-in-place layers in prefabricated walls, the problem of indirect force transmission and grouting quality in the wall in the existing technology is difficult to guarantee, and direct force transmission and stable connection are achieved. Improves the ductility of the wall and the stability of the overall structure.
Patent Information
- Application Number
- CN201810753058.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2018-07-10
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2038-07-10
AI Technical Summary
In the existing prefabricated building technology, the force transmission method of the steel bars between the walls is indirect, which causes the concrete to generate additional bending moments and shear forces when it is stressed. Moreover, it is difficult to ensure the tightness of the grouting material, and problems such as cracks and concrete falling off are prone to occur. .
An assembled prefabricated wall is used, including a concrete body and a rigid frame poured in it. By designing mechanical connections at the ends of vertical bars, direct force transmission is achieved, and gaps are filled through fastening components and cast-in-place layers. , ensuring connection visibility and stability.
It simplifies the internal structure of the wall, improves the directness and stability of the connection, avoids the weakness caused by the grouting hole occupying too much bottom volume, enhances the ductility and load-bearing capacity of the wall, and ensures the connection quality and the stability of the overall structure. .
Smart Images

Figure CN110700420B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of building structures, and in particular to an assembled prefabricated wall and an assembled structure and a construction method of the structure. Background Art
[0002] At present, as my country vigorously promotes the industrialization of housing, various regions have carried out a number of prefabricated housing projects. The existing prefabricated construction technology is mostly introduced from abroad, using the "sleeve grout anchor connection" and "pre-reserved hole indirect lap grout anchor connection" technologies commonly used in the United States and Japan. The common point of the "sleeve grout anchor connection" and "pre-reserved hole indirect lap grout anchor connection" technologies is to pre-embed the grouting sleeve in the concrete. After the concrete reaches the required strength, the steel bar is inserted into the grouting sleeve, and then the high-strength non-shrinkage grouting material is poured into the grouting sleeve for curing to play the role of anchoring the steel bar. Figure 1 The steel sleeve grouting technology makes buildings prefabricated and is recognized by engineering users.
[0003] However, due to the construction or structure required by the above two connection methods, there are the following shortcomings:
[0004] First of all, the force transmission method of the steel bars between the walls of the above two connection technologies is indirect force transmission, which needs to be transmitted through the grouting material in the reserved holes. The force transmission is not direct. When subjected to normal force, two steel bars far apart need to transmit force to each other. This force transmission method will produce additional bending moment and shear force on the surrounding concrete, making the wall force complex here. At the same time, when the axial pressure is relatively high, local compression cracks will appear on the top of the grouting material. In addition, the two connection processes have high requirements for grouting materials and grouting processes. If there are bubbles or other loose factors in the grouting material in the grouting sleeve, it will have a great impact on this type of connection.
[0005] Secondly, this connection method is hidden inside the wall. If the grouting is not dense during the construction process, or if there is a slight leakage afterwards causing insufficient grouting length, it will be difficult to be detected by construction workers or quality inspectors, and there is a hidden danger that the assembly quality cannot be guaranteed.
[0006] Thirdly, in order to meet the requirements of grouting process, grouting holes and air outlets protruding from the grouting sleeve need to be reserved on the grouting sleeve. In the wall with more longitudinal steel bars, the grouting holes and air outlets will occupy a larger volume at the bottom of the wall. In actual projects, the bottom area of the wall is often subjected to greater force, which is the part that provides greater contribution to the ductility of the wall. However, the above setting method makes the bottom area of the wall a relatively weak part of the wall. In practice, cracks often spread from the grouting holes or air outlets to the surrounding area, and there is a phenomenon that the concrete falls off in one piece here. In addition, the outer diameter of the grouting sleeve is relatively large, ranging from 4 to 5 cm, and the outer surface of the grouting sleeve is generally made relatively smooth, which cannot form an effective constraint with the surrounding concrete. Therefore, in the later stage of the project, large pieces of bottom concrete often fall out, and the effective pressure area at the bottom is reduced. Therefore, the assembly structure itself will affect the later bearing capacity of the wall and reduce the ductility of the wall.
[0007] Based on the above, the field of prefabricated buildings urgently needs a prefabricated wall with direct force transmission and stable structure, as well as an assembly structure and construction method with controllable assembly quality and little impact on the wall. Summary of the invention
[0008] One of the purposes of the present invention is to provide an assembled prefabricated wall with a simple wall frame and no need for additional embedded parts on the basis of the existing technology in order to solve the technical problem that the base of the prefabricated wall has many and complex structural components, which has seriously affected the bearing capacity of the wall.
[0009] In order to achieve the above-mentioned purposes, the technical solutions respectively adopted by the present invention are as follows:
[0010] A prefabricated wall comprises a concrete body and a rigid skeleton cast in the concrete body, wherein the rigid skeleton comprises n vertical ribs extending longitudinally, n being an integer greater than or equal to 3, wherein the upper end face and the lower end face of the prefabricated wall are formed with m mechanical connection parts at the same axis of the vertical ribs, m being an integer less than or equal to 2n, and the mechanical connection parts are all formed at the end parts of the vertical ribs. The purpose of such arrangement is that, since the present invention designs the mechanical connection parts at the ends of the vertical ribs, on the one hand, all the embedded parts at the foot of the prefabricated wall are eliminated, which greatly simplifies the structure of the internal framework of the prefabricated wall, is conducive to the positioning and fixing of the skeleton during the prefabrication of the wall, effectively avoids the problem of the displacement of the mechanical connection parts caused during the casting process, and further facilitates the stability of the vibration compaction. On the other hand, the mechanical connection parts are designed at the ends of the vertical ribs, which is conducive to the direct transmission of the force after the connection. On the other hand, the connection point is exposed outside the concrete body, so that the firmness of the connection becomes visible and controllable, which effectively guarantees the quality of the connection.
[0011] The mechanical connection part includes a receiving end and / or a receiving cavity, and the end of the vertical reinforcement extends out of the surface of the concrete body and / or the receiving portion formed at the end of the vertical reinforcement is the receiving end; the end of the vertical reinforcement forms an open receiving portion that is recessed inward along its axial direction as the receiving cavity. The purpose of this arrangement is: on the one hand, the mechanical connection part can extend out of the concrete body, and the mechanical connection part is no longer embedded in the concrete body, so that the connection is visualized, which is convenient for inspection and intuitive understanding of the firmness of the connection, and convenient for ensuring the quality of the connection; on the other hand, the wall structure of the pre-embedded sleeve in the concrete body in the prior art is changed, and the mechanical connection part does not need to be provided with grouting holes and air outlet holes, so as to overcome the technical problem that the foot of the wall in the prior art has many and complex structural components, resulting in reduced ductility of the wall.
[0012] The outer diameter of the receiving end is 0.7 to 2 times the outer diameter of the vertical reinforcement, and the outer diameter of the receiving cavity is 1.2 to 3 times the outer diameter of the vertical reinforcement. The purpose of this arrangement is to greatly shorten and reduce the volume of the mechanical connection part compared with the existing sleeves, so as to overcome the problem that the grouting holes and air outlet holes of the sleeves in the sleeve connection or overlap in the prior art occupy too much bottom volume, making the bottom area of the wall a relatively weak part of the wall, avoiding the formation of diffusion cracks due to the relative weakness around the grouting holes or air outlet holes when subjected to force, and the phenomenon that the concrete falls off in one piece at this place.
[0013] The receiving end is provided with an external thread, and the receiving cavity is provided with an internal thread. The purpose of such a setting is to connect multiple components through threads, facilitate the processing and installation of mechanical connection parts and other components, and through the threaded connection, the force transmission is clear, the connection is reliable, and the installation is convenient, which can significantly improve the construction speed.
[0014] The receiving cavity is formed by a sleeve rigidly connected to the end of the vertical rib, and an open receiving cavity is formed at the end of the sleeve away from the vertical rib. The purpose of such a setting is that, since the receiving cavity is formed by the combination of the vertical rib and the sleeve connected to the end thereof, the processing cost is lower than that of the receiving cavity formed integrally with the vertical rib, and it is also convenient when the receiving cavity needs to be rotated when the frame is fixed during the wall prefabrication process. At this time, the vertical rib and the sleeve are relatively independent, and the sleeve can be rotated alone, which is conducive to the positioning and fixing of the vertical rib and the sleeve in the mold.
[0015] The assembled prefabricated wall includes not only a straight wall, but also L-shaped, rectangular, U-shaped arc-shaped and other special-shaped walls. When the prefabricated wall is a special-shaped structure, the adjacent walls between the prefabricated walls are ∠α in the horizontal direction, 0°<∠α<360°, and the special-shaped prefabricated wall can be formed by fixing multiple walls together or forming them in one piece. The purpose of such a setting is that when a single prefabricated wall cannot meet the needs of the building, it is necessary to combine or deform the prefabricated walls, and form the above-mentioned prefabricated walls into a non-linear whole wall in the horizontal direction. Then, a structure similar to the above-mentioned wall with vertical ribs and mechanical connection parts is formed in the longitudinal direction of the prefabricated wall. In this way, the structural structure of the embedded parts and the rigid skeleton of the prefabricated wall formed in the prefabricated wall is greatly simplified, which provides great convenience and practical basis for prefabricating complex walls in the mold. At the same time, it also further provides great convenience for the connection between the walls in the longitudinal direction.
[0016] Another object of the present invention is to address the technical problems of indirect force transmission, high sealing requirements and difficulty in ensuring connection quality in the existing connection methods of assembled prefabricated walls, and to propose a connection method or assembly structure of prefabricated components that is easy to assemble and has direct force transmission, and its construction method.
[0017] An assembly structure of an assembled building including the above-mentioned prefabricated wall, comprising an upper wall, a lower wall, and a fastening assembly, wherein the upper wall and the lower wall are the above-mentioned prefabricated walls; wherein the upper wall is located above the lower wall, and the vertical ribs in the upper wall and the vertical ribs in the lower wall are mechanically connected by the fastening assembly.
[0018] It also includes a cast-in-place concrete area between the upper wall and the lower wall, and the cast-in-place concrete area covers the fastening components.
[0019] The fastening assembly includes an insert rod, a locking member, a buckle tube, and an adapter sleeve. The mechanical connection part of the upper wall or the lower wall corresponds to the adapter sleeve and the insert rod, the buckle tube is fixed in the adapter sleeve, the insert rod is inserted into the buckle tube, and the locking member is sleeved on the outer edge of the insert rod, so that the insert rod and the buckle tube are connected without gap. Thus, the upper wall and the lower wall are firmly connected in the longitudinal direction in the cast-in-place area. Such a connection structure makes the connected parts no longer hidden in the wall, and it can be clearly observed whether the connection is in place, so as to ensure the stability of the wall connection and the controllability of the assembly quality. In addition, such a connection structure directly connects the wall or the longitudinal (vertical) reinforcement in the wall, so that the force transmission is more direct, and through reinforcement is formed inside the wall connection structure, which improves the overall ductility of the wall and the building composed of it.
[0020] Furthermore, it also includes a prefabricated floor and a cast-in-place layer, the lower edge of the prefabricated floor is placed on the adjacent lower wall, the cast-in-place layer fills the assembly gap between the prefabricated floor, the upper wall and the lower wall, and in the vertical direction, the height of the cast-in-place layer is at least flush with the lower end surface of the upper assembled prefabricated wall or the wall. Since the mechanical connection part between the walls is arranged outside the prefabricated wall in the technical solution of the present invention, it is necessary to fill or fill the overhead part with the cast-in-place layer when forming the overall building. The cast-in-place layer fills the assembly gap well. Since the cast-in-place concrete material has fluidity, all assembly gaps can be fully and effectively filled at one time, which further ensures the integrity of the assembled connection structure, ensures that the connection structure is gapless and integrated, and further improves its stability.
[0021] Furthermore, the assembly gap filled by the cast-in-place layer includes the overhead area between the lower end surface of the upper wall and the upper end surface of the lower wall, and the space between the upper surface of the prefabricated floor and the plane where the lower end surface of the upper wall is located. Since the molding of the cast-in-place layer requires a certain amount of time, the cast-in-place layer is filled on the prefabricated floor, so that during the molding process of the cast-in-place layer, it is convenient to further construct the cast-in-place layer on the prefabricated floor to add other attachments, such as floor tiles, floor keels, and power strips.
[0022] Furthermore, the upper surface of the prefabricated floor is exposed with rigid trusses, and the cast-in-place layer covers the rigid trusses. The rigid trusses are exposed on the prefabricated floor, and then covered and filled with cast-in-place layers to facilitate the fixing of embedded objects in the prefabricated floor, and further construction of the internal structure of the prefabricated floor. The embedded objects of the prefabricated floor are fixed on the rigid trusses or laid on the prefabricated floor or inserted in the gaps of the rigid trusses. After the cast-in-place layer is filled, these embedded objects are fixed in the floor. The embedded objects include transverse ribs or longitudinal ribs of the prefabricated floor, electrical wires and pipes, air conditioning pipes, floor heating pipes, water pipes, etc.
[0023] A construction method for an assembled building comprises the following steps:
[0024] Lower wall fixing steps: fix the lower wall to the foundation or pedestal or the assembled floor;
[0025] Support setting steps: Assemble the support frame for the prefabricated floor slab around the lower wall according to the design requirements;
[0026] Prefabricated floor slab laying steps: laying the prefabricated floor slab on the support, and making the end of the prefabricated floor slab overlap with the top of the lower wall;
[0027] Wall docking steps: hoist the upper wall to the designated position so that the vertical reinforcement of the upper wall and the vertical reinforcement of the lower wall are mechanically connected by the fastening components;
[0028] Fastener adjustment step: adjust the fastener assembly to meet the pull-out and tensile strength requirements of the connection and fixation between the upper wall and the lower wall;
[0029] Cast-in-place step: pouring concrete filler into the assembly gap between the prefabricated floor slab and the upper wall and the lower wall to form a cast-in-place layer, so that the floor slab, the upper wall and the lower wall form a gap-free integral structure;
[0030] Repeat the above support setting steps to the cast-in-place step until the construction of the prefabricated building is completed.
[0031] In the support setting step, the support bracket is assembled and fixed flush with the upper end surface of the lower wall so that the support frame supports the prefabricated floor slab in the horizontal direction to avoid the accident of the prefabricated floor slab falling.
[0032] Furthermore, in the wall docking step, it also includes adjusting the positioning, setting an adjustment pad between the upper wall and the lower wall, and setting a diagonal brace between the prefabricated floor slab and the upper wall. In this way, when the walls are docked, the level and height of the long side of the wall can be adjusted by adjusting the number of pads, and the verticality of the wall and the level and inclination of the short side can be adjusted by the diagonal brace, which can not only free up the hanger but also further achieve accurate docking and improve the connection accuracy.
[0033] Compared with the prior art, the present invention has the following characteristics and beneficial effects:
[0034] The method of the present invention adopts a connection method in which the vertical bars are directly connected by fastening components and mechanical connecting parts, which can quickly install and position the prefabricated wall, increase the node connection stiffness, and realize the design principle of strong nodes and weak components. This node structure has excellent seismic performance and ensures that the wall connection has good stability. The design of the prefabricated wall takes into account the integrity of the wall stress, and uses vertical bars to strengthen the strength of part of the concrete wall, improve the ductility at the foot of the wall, so that the overall stability of the component is enhanced, and the wall is safe and reliable. After the vertical bars are connected to each other, through bars are formed in the prefabricated connection structure, which better ensures the integrity of the connection structure, effectively ensures the wall stress, and ensures that the bearing capacity is not reduced.
[0035] Instruction Manual
[0036] Figure 1 It is a schematic diagram of the sleeve grouting wall structure in the background technology;
[0037] Figure 2 It is a structural schematic diagram of the prefabricated wall of the present invention;
[0038] Figure 3 This is a schematic diagram of the internal structure of the prefabricated wall of the present invention;
[0039] Figure 4It is a structural schematic diagram of the mechanical connection part of the prefabricated wall of the present invention;
[0040] Figure 5 It is a structural schematic diagram of the receiving end of the present invention;
[0041] Figure 6 It is a structural schematic diagram of the receiving cavity of the present invention;
[0042] Figure 7 It is a structural schematic diagram of the specific positions of the receiving end and the receiving cavity of the present invention;
[0043] Figure 8 It is a structural schematic diagram of another receiving end and the specific position of the receiving cavity of the present invention;
[0044] Fig. 9 It is a schematic diagram of the specific structure of the receiving end and the receiving cavity of the present invention;
[0045] Fig.10 It is a schematic diagram of the specific structure of another receiving end and receiving cavity of the present invention;
[0046] Fig.11 It is a structural schematic diagram of the prefabricated wall of the present invention;
[0047] Fig.12 It is a structural schematic diagram of another prefabricated wall of the present invention;
[0048] Fig.13 It is a structural schematic diagram of another prefabricated wall of the present invention;
[0049] Fig.14 It is a schematic diagram of the structure before connection of the connection structure of the prefabricated wall of the present invention;
[0050] Fig.15 It is a structural schematic diagram of the connection structure of the prefabricated wall of the present invention;
[0051] Fig.16 A schematic diagram of the structure before connection of another prefabricated wall connection structure;
[0052] Fig.17 It is a structural schematic diagram of another connection structure of prefabricated walls;
[0053] Fig.18 A schematic diagram of the structure before connection of another prefabricated wall connection structure;
[0054] Fig.19 It is a structural schematic diagram of another connection structure of prefabricated walls;
[0055] Fig. 20 It is a structural schematic diagram of the connection structure of the prefabricated wall of Example 4;
[0056] Fig.21 for Fig. 20 A in the middle is a schematic diagram of the enlarged structure;
[0057] Fig. 22 It is a structural schematic diagram of the connection structure of the prefabricated wall of Example 5;
[0058] Fig.23 for Fig. 22 Schematic diagram of the structure with enlarged B position;
[0059] Fig.24 It is a schematic diagram of the construction method flow chart;
[0060] Among them: prefabricated wall 1, concrete body 2, rigid skeleton 3, vertical ribs 4, mechanical connection part 5, receiving end 6, receiving cavity 7, sleeve 8, special-shaped prefabricated wall 9, upper wall 10, lower wall 11, fastening assembly 12, plug rod 13, locking piece 14, buckle sleeve 15, adapter sleeve 16, cast-in-place layer 17, overhead area 18, prefabricated floor 19, rigid truss 20, grouting sleeve 21, grouting hole 22, air outlet 23, support frame 24, adjustment pad 25, diagonal brace 26. DETAILED DESCRIPTION
[0061] The present invention will be further described below in conjunction with the embodiments.
[0062] Example 1
[0063] See also Figure 2 As shown, an assembled prefabricated wall includes a concrete body 2 and a rigid frame 3 cast in the concrete body 2, wherein the rigid frame is composed of vertical bars, transverse bars and stirrups connected to each other, wherein rigidity refers to the ability to resist deformation under static load, and the rigid frame 3 refers to a support structure that does not use shrinkable materials or structures and has very small deformation or displacement under pressure, including a frame composed of materials such as steel bars, composite metals and hard fibers that are fixed by weaving or interlacing, see Figure 3 As shown, the rigid skeleton 3 includes a group of vertical ribs 4 evenly spaced along the length direction of the wall, wherein the number of vertical ribs 4 is at least 3. When the number of vertical ribs 4 is less than 3, even if all the vertical ribs 4 are connected, the connection between the prefabricated walls is not stable enough. Therefore, in order to enhance the stability, the number of vertical ribs 4 is at least 3. When the vertical ribs 4 need to be connected according to the requirements of the architectural design, a mechanical connection part 5 is formed at the end of the vertical ribs 4 to be connected. Therefore, the mechanical connection part 5 is exposed or open on the concrete body, that is, when connection is required, it can be directly connected to it through a fastening assembly, or at least it can be directly connected to one component in the fastening assembly. In this way, the mechanical connection part 5 is required to be formed at the end of the vertical rib 4.
[0064] This technical solution not only brings the aforementioned effects through the setting of the mechanical connection part, but also overcomes the following disadvantages of the pre-embedded grouting sleeve. Due to the pre-embedded grouting sleeve and the overlapping steel bars in the sleeve, the internal structure of the foot of the wall is provided with vertical steel bars that are twice the number of the wall, plus horizontal reinforcement, pre-embedded grouting sleeves and spiral stirrups, etc. The structural components here are many and complex. At the same time, due to the lack of more reasonable supporting equipment and perfect construction technology, the positioning of the vertical steel bars and sleeves here is also relatively more complicated, which is easy to cause the grouting sleeve to be misplaced when pouring concrete, affecting the wall splicing. In addition, in such a complex structure, it is difficult to ensure the compaction of concrete here. The setting of the vertical bars and the mechanical connection part in this technical solution greatly simplifies the structure of the interior of the prefabricated wall. The rigid skeleton of this solution can be fully prepared according to the production method of the steel cage in the traditional cast-in-place, without the need to install other embedded parts. In this way, the internal structure of the prefabricated wall only includes necessary reinforcement, without the need for double vertical bars.
[0065] See also Figure 4 As shown, the mechanical connection part 5 includes a receiving end 6 or a receiving cavity 7. The receiving end 6 is usually higher than the surface of the concrete body 2, and the receiving cavity 7 is usually set to be flush with the surface of the concrete body 2. The receiving end 6 or the receiving cavity 7 is set to serve as a connection port for connecting the upper and lower walls when the prefabricated wall 1 is assembled. The receiving end 6 and the receiving cavity 7 are provided with corresponding interface structures that can be used for connection according to the specific connection method. For example, according to the design requirements, the corresponding fastening components are connected with them, and the receiving end 6 and the receiving cavity 7 are provided with a connecting groove or a connecting block for connection. It can also be set to a threaded connection or a pin key connection. In this embodiment, see Figure 5 , 6 As shown, based on the advantages of threaded connection such as clear force transmission, reliable connection and convenient installation, threaded connection is preferred, that is, an external thread is provided on the receiving end 6, and an internal thread is provided in the receiving cavity 7. In addition, in order to overcome the disadvantage that the grouting sleeve or lap sleeve itself and its grouting holes and air outlet holes used for connection in the prior art occupy too much bottom volume, the present invention starts from reducing and proportionally reducing the outer dimensions of the mechanical connection part of the end. The present invention has concluded through a large number of experiments that the best effect is achieved when the specific dimensions are limited as follows, which can achieve the effect of not being easy to break and having a firm connection at the same time, that is, the outer diameter of the receiving end 6 is 0.7 to 2 times the outer diameter of the vertical rib 4, and the outer diameter of the receiving cavity 7 is 1.2 to 3 times the outer diameter of the vertical rib 4, wherein the outer diameter of the vertical rib 4 is d, the outer diameter of the receiving end 6 is d1, and the outer diameter of the receiving cavity 7 is d2, then 2d≥d1≥0.7d, 3d≥d2≥1.2d, and such a setting avoids the formation of cracks and concrete shedding due to the large volume occupied by the embedded parts when subjected to force.
[0066] The specific positions of the receiving end 6 and the receiving cavity 7 on the end surface of the prefabricated wall can be flexibly set, such as Figure 7 As shown, the receiving end heads 6 are all located at the upper end of the prefabricated wall 1, and the receiving cavities 7 are all located at the lower end of the prefabricated wall 1. This arrangement unifies the directions of the receiving end heads 6 and the receiving cavities 7 on the prefabricated wall 1, which is beneficial to the material matching and reinforcement and the fixation of the skeleton when the prefabricated wall 1 is prefabricated in the factory; when the prefabricated wall is assemble, due to the consistency of the ends, there is no need to consider the connection direction of the mechanical connection part 5, which is convenient for installation and assembly.
[0067] like Figure 8 As shown, the receiving end 6 and the receiving cavity 7 are randomly distributed at the upper and lower ends of the prefabricated wall 1. Although such an arrangement is laborious during prefabrication, during the wall assembly, since there is a height difference between the receiving end 6 and the receiving cavity 7 relative to the prefabricated wall 1 itself, after the connection is completed, the connection point also naturally forms a height difference, that is, the height of each connection point is also formed with the arrangement of the receiving end 6 and the receiving cavity 7. A connection point with a height difference is formed. In this way, when the connected concrete structure is subjected to shear force, since the connection points are not on the same horizontal plane, it can withstand greater shear force, thereby improving the stability of the building structure.
[0068] See also Fig. 9 As shown, the receiving end 6 is formed by processing the end of the vertical reinforcement 4 extending out of one end of the concrete body 2, and the receiving cavity 7 is formed by processing the end of the vertical reinforcement 4 into an open cavity recessed inward along its axial direction after upsetting. In this way, connecting the prefabricated wall 1 through the receiving end 6 and the receiving cavity 7 is equivalent to directly connecting the vertical reinforcement 4 between the prefabricated walls 1 together, thereby forming a vertical through reinforcement penetrating the structure in the wall structure, better ensuring the integrity of the structure, and improving the stability and safety of the wall.
[0069] See also Fig.10 As shown, the receiving end 6 is formed by processing the end of the vertical rib 4 extending out of one end of the concrete body 2, and the receiving cavity 7 is formed based on the sleeve 8 rigidly connected to the end of the vertical rib 4, and the sleeve 8 forms an open receiving cavity at one end away from the vertical rib 4. The rigid connection here refers to the connection between two objects. When one object is displaced or subjected to force, the other object connected to it will not be displaced or relatively deformed relative to the first object, that is, the two are connected as a whole. It can be a threaded connection, a pin-key connection, a welding connection, a heat treatment or a cold rolling connection, etc. Although this slightly loses the integrity of the receiving cavity and the vertical rib, it greatly improves the convenience of installation and processing, and can be processed and assembled very flexibly, and the processing cost is also lower.
[0070] Example 2
[0071] See also Figure 11-13As shown, the special-shaped prefabricated wall 9 is composed of a single piece of prefabricated wall 1, that is, the prefabricated walls adjacent to each other between multiple prefabricated walls 1 are spliced together at a certain angle in the horizontal direction. Since the splicing method or the horizontal connection is not within the protection scope of the present invention, and the splicing method can be obtained by a technician in this field according to the prior art, of course, the connection of the transverse reinforcement between the prefabricated walls can also adopt the structural structure of the above-mentioned vertical reinforcement, as well as the connection method described later in this case, which will not be repeated here. The feature of the present invention is that since the special-shaped prefabricated wall 9 is composed of the above-mentioned prefabricated walls 1, the longitudinal mechanical connection part 5 of the special-shaped prefabricated wall 9 and the embedded skeleton structure in the special-shaped prefabricated wall 9 are all derived from the prefabricated wall 1. Therefore, the special-shaped prefabricated wall 9 combines the advantages of the prefabricated wall 1 itself. In addition, the special-shaped prefabricated wall 9 provides a feasible practical basis for the realization of prefabricating complex walls, that is, when the special-shaped prefabricated wall 9 is prefabricated as a whole, due to its simple internal skeleton, it is greatly convenient to fix the skeleton in the mold, and the internal embedded parts are basically negligible. Even if it is a complex wall, its wall properties will not change, which provides great convenience and practicality for prefabricating complex walls. Of course, since the prefabricated wall 1 and the special-shaped prefabricated wall 9 only change in shape, and their key vertical ribs and mechanical connections are the same, the special-shaped prefabricated wall 9 can be regarded as a deformation of the prefabricated wall, so the prefabricated wall 1 in this case includes a straight wall and a special-shaped wall.
[0072] In this embodiment Fig.11 As shown, the prefabricated wall 1 is an "L"-shaped prefabricated wall, and the angle ∠a between the inner wall surfaces between the walls is 90°. A mechanical connecting part 5 is provided in the longitudinal direction of the wall to facilitate the connection between the walls.
[0073] In this embodiment Fig.12 As shown, the prefabricated wall 1 is a "V"-shaped prefabricated wall, and the angle ∠b between the inner wall surfaces of the walls is less than 90°. A mechanical connecting portion 5 is provided in the longitudinal direction of the wall to facilitate the connection between the walls.
[0074] In this embodiment Fig.13 As shown, the prefabricated wall 1 is an open isosceles trapezoidal prefabricated wall, wherein the angle ∠c between the inner wall surfaces of adjacent walls is 91° to 179°, and a mechanical connecting portion 5 is provided in the longitudinal direction of the wall to facilitate the connection between the walls.
[0075] Example 3
[0076] See also Fig.14 , 15As shown, an assembly structure of an assembled building, the upper wall 10 is the prefabricated wall 1 in Example 1 or the special-shaped prefabricated wall 9 in Example 2 (hereinafter referred to as the upper wall) set to match the end face at the upper layer, and the lower wall 11 is the prefabricated wall 1 in Example 1 or the special-shaped prefabricated wall 9 in Example 2 (hereinafter referred to as the lower wall) set to match the end face at the lower layer. End face matching means that the mechanical connection parts arranged on the wall or the end face of the wall are designed to correspond to each other. Specifically, when the upper and lower end faces of the two walls are opposite, the mechanical connection part 5 on the same axis and used for connecting the walls meets the requirements of the reinforcement connection between the walls. The common feature of the upper wall 10 and the lower wall 11 is that according to design requirements, the end portions of the longitudinally arranged vertical ribs 4 form corresponding mechanical connection parts 5 on the wall. The upper wall 10 and the lower wall 11 are connected to the mechanical connection parts 5 through a fastening assembly 12 and locked and fixed to form an assembly structure of the prefabricated building. The fastening assembly 12 is assembled and connected corresponding to the overhead area 18 left between the walls.
[0077] The connection structure of the wall also includes a cast-in-place layer 17. After the fastening components 12 are assembled and firmly connected in the connecting overhead area 18 formed between the upper wall 10 and the lower wall 11, the cast-in-place layer 17 fills the overhead area 18 tightly, making the upper wall 10 and the lower wall 11 become a whole.
[0078] The connection between the upper wall 10 and the lower wall 11 is achieved by assembling the fastening components 12 in correspondence with the overhead area 18 left between the walls through the fastening components 5, that is, an overhead area 18 for connection is formed between the upper wall 10 and the lower wall 11, and the fastening components 12 are assembled in the overhead area 18. The fastening components 12 only need to connect the upper and lower walls relatively fixedly together through the connection ports reserved on the connecting walls so that the wall connection meets the design requirements. Therefore, there are multiple options for the combination method and connection structure of the fastening components 12. Those skilled in the art should understand that the connection method of the main reinforcement in the rigid skeleton and the fastening components between the main reinforcements should be applicable here. For example, welding connection, threaded connection, pin-key connection, etc., one scheme of threaded connection is listed here, wherein the fastening assembly 12 includes an insert rod 13, a locking piece 14, a buckle tube 15, and a transition sleeve 16, the mechanical connection part 5 of the upper wall 10 corresponds to the connection with the transition sleeve 16, and the mechanical connection part 5 of the lower wall 11 corresponds to the connection with the insert rod 13; or, the mechanical connection part 5 of the upper wall 10 corresponds to the connection with the insert rod 13, and the mechanical connection part 5 of the lower wall 11 corresponds to the connection with the transition sleeve 16, the buckle tube 15 is fixed in the transition sleeve 16, the insert rod 13 is inserted into the buckle tube 15, and the locking piece 14 is sleeved on the outer edge of the insert rod 13, so that the insert rod 13 and the buckle tube 15 are clamped without gap. Thereby, the upper wall 10 and the lower wall 11 are firmly connected in the longitudinal direction. Such a connection structure makes the connected parts no longer hidden in the wall, and it can be clearly observed whether the connection is in place, so as to ensure the stability of the wall connection. In addition, such a connection structure directly connects the longitudinal (vertical) reinforcements in the wall, and the force transmission is more direct, which improves the overall ductility of the wall and the building formed by the wall.
[0079] When the mechanical connection part 5 of the upper wall 10 is the receiving cavity 7 and the mechanical connection part 5 of the lower wall 6 is the receiving end 6, the plug rod 13 is installed at the receiving cavity 7 after the upper wall 10 is prefabricated, and the adapter sleeve 16 is installed at the receiving end 6 after the lower wall 11 is prefabricated, and the buckle tube 15 is accommodated and fixed in the adapter sleeve 16. When the upper wall 10 is connected with the lower wall 11, the height of the upper wall 10 is adjusted, and the plug rod 13 is inserted into the buckle tube 15. The plug connector on the plug rod 13 is stretched open and passes through the spring sheet on the buckle tube 15. The spring sheet naturally returns to the tightened state, thereby forming a role of limiting the withdrawal of the plug rod 13, and then the locking piece 14 on the plug rod 13 is tightened, so that the plug rod 13 and the buckle tube 15 are clamped without gap.
[0080] When the mechanical connection part 5 of the upper wall 10 is the receiving end 6 and the mechanical connection part 5 of the lower wall 11 is the receiving cavity 7, the connection between the upper wall 10 and the lower wall 11 is just opposite to the above situation, and the connection method can be reversed.
[0081] See also Fig.16 ,17 As shown, when the mechanical connection part 5 of the upper wall 10 is the receiving end 6 and the mechanical connection part 5 of the lower wall 11 is the receiving end 6, after the upper wall 10 is prefabricated, the adapter sleeve 16 is installed at the receiving end 6, and then the plug rod 13 is installed in the adapter sleeve 16. At this time, the connection cavity of the adapter sleeve 16 needs to be shaped as the internal shape of the receiving cavity 7. After the lower wall 11 is prefabricated, the adapter sleeve 16 is installed at the receiving end 6, and the buckle tube 15 is accommodated and fixed. Fixed in the adapter sleeve 16, when the upper wall 10 is connected to the lower wall 11, the height of the upper wall 10 is adjusted, and the plug rod 13 is inserted into the buckle tube 15. The plug connector on the plug rod 13 is stretched open and passes through the spring sheet on the buckle tube 15. The spring sheet naturally returns to a contracted state, thereby forming a limit and stopper for the plug rod 13. Then, the locking piece 14 on the plug rod 13 is tightened, so that the plug rod 13 and the buckle tube 15 are clamped without gap, thereby firmly connecting the vertical ribs together.
[0082] See also Fig.18 , 19 As shown, when the mechanical connection part 5 of the upper wall 10 is the receiving cavity 7 and the mechanical connection part 5 of the lower wall 11 is the receiving cavity 7, the receiving cavity 7 of the lower wall 11 is shaped as the inner cavity of the adapter sleeve 16. In this way, the plug rod 13 is installed at the receiving cavity 7 after the upper wall 10 is prefabricated, and the buckle tube 15 is directly accommodated and fixed in the receiving cavity 7 at the receiving cavity 7 after the lower wall 11 is prefabricated. When the upper wall 10 is connected with the lower wall 11, the height of the upper wall 10 is adjusted, and the plug rod 13 is inserted into the buckle tube 15. The plug connector on the plug rod 13 is stretched open and passes through the spring sheet on the buckle tube 15. The spring sheet naturally returns to the tightened state, thereby forming a role of limiting the withdrawal of the plug rod 13, and then the locking piece 14 on the plug rod 13 is tightened, so that the plug rod 13 and the buckle tube 15 are clamped without gap, thereby firmly connecting the vertical reinforcement together.
[0083] Example 4
[0084] Reference Fig. 20 , 21As shown, an assembly structure of an assembled building includes the assembly structure of the wall in Example 4, and also includes a prefabricated floor 19 and a cast-in-place layer 17. The lower edge of the prefabricated floor 19 overlaps the lower wall 11 adjacent to each other, and the cast-in-place layer 17 fills the assembly gap between the prefabricated floor 19, the upper wall 10 and the lower wall 11, and fills the overhead area 18 formed on the prefabricated floor 19 and the upper wall 10 and the lower wall 11 at least flush with the lower end surface of the upper wall 10, that is, the height of the cast-in-place layer in the vertical direction is at least flush with the lower end surface of the upper wall 10. Among them, the cast-in-place layer 17 is a fluid concrete filler or a modified filler that meets the mechanical requirements of the building filler. Specifically, it can also be a freshly mixed concrete with low slump made by a concrete mixer using sand, stone, cement, water, additives and admixtures after accurate measurement.
[0085] The assembly structure of the upper and lower walls in the assembly structure of this embodiment adopts the following method: Fig.14 The assembly structure shown, that is, the mechanical connection part 5 of the upper wall 10 is the receiving cavity 7, and the mechanical connection part 5 of the lower wall 11 is the receiving end 6, and the vertical ribs 4 are connected as a whole by the fastening assembly 12. At the same time, since there is a fastening assembly 12 on the end faces between the walls, the prefabricated floor 19 can only be overlapped horizontally between the lower walls 11, and the transverse ribs between the prefabricated floor slabs 19 also need to be overlapped. In this way, there must be an assembly gap between the prefabricated floor slab 19, the upper wall 10 and the lower wall 11, wherein the assembly gap includes the overhead area 18 between the lower end face of the upper wall 10 and the upper end face of the lower wall 11, and the space between the upper surface of the prefabricated floor slab 19 and the plane where the lower end face of the upper wall 10 is located. That is, the area filled by the cast-in-place layer 17 includes the overhead area 18 between the lower end surface of the upper wall 10 and the upper end surface of the lower wall 11, and the space between the upper surface of the prefabricated floor 19 and the plane where the lower end surface of the upper wall 10 is located. After all the reinforcements that need to be connected between the walls are firmly connected, the present invention uses the cast-in-place layer 17 to fill the assembly gap. On the one hand, the mechanical connection part is visible and controllable, ensuring the connection quality; on the other hand, the building component connection structure is integrated into a whole, and multiple through bars are connected in the structure, which effectively improves the earthquake resistance, tensile resistance and pull-out resistance of the building structure, making the overall building structure safer and more reliable.
[0086] Example 5
[0087] See also Fig. 22 , 23As shown, this embodiment is basically the same as Embodiment 4, except that the upper surface of the precast floor 19 is exposed with a rigid truss 20 to facilitate the fixing of attachments or embedded objects in the precast floor 19, and the attachments or embedded objects of the precast floor 19 are fixed to the rigid truss 20 or in the gaps between the rigid trusses 20 laid on the precast floor 19. The attachments or embedded objects include transverse ribs or longitudinal ribs of the precast floor 19, electrical wire pipelines, air-conditioning pipelines, floor heating pipelines, water pipelines, etc. In this way, the cast-in-place layer 17 fills the rigid truss 20, and these attachments or embedded objects are fixed in the floor, so that the surface of the building is fresh and clean, avoiding damage to the building structure caused by grooving during later decoration, and also having good economic effects, saving resources and reducing costs.
[0088] See also Fig.24 As shown, a construction method of an assembly structure of an assembled building is further described, especially the construction method of the assembly structure in Example 4 and Example 5, including the prefabricated floor 19, the upper wall 10 and the lower wall 11, the prefabricated floor 19 is placed on the upper ends of the adjacent lower walls 11 through the support frame 24, the upper wall 10 is suspended above the lower wall 11 at a thickness higher than the prefabricated floor 19, the end faces of the upper wall 10 and the lower wall 11 are opposite, after the reinforcement is firmly connected in the overhead area 18 between the upper wall 10, the lower wall 11 and the prefabricated floor 19, the cast-in-place layer 17 is used to fill the assembly gap, and the cast-in-place layer 17 is at least flush with the lower end face of the upper wall 10 to fill the overhead area 18 formed on the prefabricated floor 19 and the upper wall 10 and the lower wall 11.
[0089] The construction method of the assembly structure of the above-mentioned building is to construct in accordance with the following steps in sequence:
[0090] Component prefabrication step: prefabrication and processing of assembled prefabricated walls 1 and prefabricated floor slabs 19;
[0091] Component transporting step: transporting the processed assembled prefabricated wall 1 and prefabricated floor slab 19 to the construction site, and assembling the fastening components 12 to the parts of the prefabricated wall 1 and prefabricated floor slab 19 that need to be connected;
[0092] Lower wall fixing step: installing the lower wall 11 or the assembled floor;
[0093] The floor assembly step is to lay the prefabricated floor 19 between the lower walls 11; for convenience and to prevent the floor from falling, the support setting step can be performed first: according to the design requirements, the support frame 24 for supporting the prefabricated floor is assembled around the lower wall, and the supporting bracket is assembled and fixed flush with the upper end surface of the lower wall 11, so that the support frame 24 supports the prefabricated floor 19 in the horizontal direction. The support frame 24 can be a horizontal and vertical top supporting rod or a triangular top supporting frame.
[0094] Wall docking steps: hoist the upper wall 10 to the designated position; in order to better position the upper wall 10, an adjustment pad 25 is set between the upper wall 10 and the lower wall 11, and the height is changed by adding or reducing the adjustment pad 25 to adjust the level and height of the long side of the upper wall 10, and a diagonal brace 26 is set between the prefabricated floor 19 and the upper wall 10, and the vertical and short side levels and inclinations of the upper wall 10 are adjusted by the diagonal brace 26.
[0095] Fastener adjustment step: between the upper wall 10 and the lower wall 11, the fastening components 12 are fixedly connected to the mechanical connection parts 5 respectively, and the fastening components 12 are adjusted to meet the pull-out and tensile strength requirements of the upper wall 10 and the lower wall 11 for fixation.
[0096] On-site pouring step: pour concrete filler into the assembly gap between the precast floor 19 and the upper wall 10 and the lower wall 11 at the construction site, so that the precast floor 19, the upper wall 10 and the lower wall 11 form a gap-free integral structure. Among them, the on-site poured part forms the cast-in-place layer 17, which is a fluid concrete filler, which is a fresh concrete with low slump made of sand, stone, cement, water, additives and admixtures through precise measurement using a concrete mixer.
[0097] Repeat the above support setting steps to the on-site pouring steps until the construction of the prefabricated building is completed.
[0098] Compared with the sleeve grouting technology, this construction method uses cast steel or profile cutting to form the grouting sleeve, which has a higher processing cost, and the longer overlap length also requires more steel bars and grouting materials. In this way, the cost of the prefabricated wall is almost twice that of the cast-in-place wall, and the workload of on-site grouting is large. The construction period depends entirely on the construction speed of the on-site workers for grouting. The workers are limited by factors such as skill proficiency and work conscientiousness. During the construction process, the grouting is often not dense, and the quality is difficult to guarantee. This case overcomes the shortcomings of the existing assembly structure, such as slow installation speed and difficulty in ensuring efficiency and quality, and optimizes the connection node structure between the wall and the floor slab, making the assembly structure reliable, simple in structure, convenient in construction, and easy to install.
Claims
1. An assembly structure of an assembled building, comprising: The upper wall, the lower wall and the fastening assembly are characterized by: The upper wall is located above the lower wall, and the vertical ribs in the upper wall are mechanically connected to the vertical ribs in the lower wall by a fastening assembly; The fastening assembly includes an insert rod, a locking piece, a buckle tube, and a transfer sleeve; The mechanical connection part of the upper wall corresponds to the connection adapter sleeve, and the mechanical connection part of the lower wall corresponds to the connection plug rod; or, the mechanical connection part of the upper wall corresponds to the connection plug rod, and the mechanical connection part of the lower wall corresponds to the connection adapter sleeve; The buckle barrel is fixed in the adapter sleeve, the insertion rod is inserted into the buckle barrel, and the locking piece is sleeved on the outer edge of the insertion rod, so that the insertion rod and the buckle barrel are clamped without gap; A spring sheet is arranged on the buckle tube, and the insertion rod is stretched and passes through the spring sheet on the buckle tube, and the spring sheet is tightened to form a limiting and stopping effect on the insertion rod.
2. The assembly structure according to claim 1, characterized in that: The upper wall and the lower wall are prefabricated walls, which include a concrete body and a rigid frame cast in the concrete body, the rigid frame including n longitudinally extending vertical ribs, n being an integer greater than or equal to 3, and the upper end surface and the lower end surface of the prefabricated wall having a total of m exposed mechanical connection parts formed at the same axis of the vertical ribs, m being an integer less than or equal to 2n, and the mechanical connection parts are all formed at the end portions of the vertical ribs.
3. The assembly structure according to claim 2, characterized in that: The mechanical connection part comprises a receiving end, wherein the end part of the vertical reinforcement forms a receiving part protruding from the vertical end surface of the concrete body as the receiving end.
4. The assembly structure according to claim 3, characterized in that: The receiving end is provided with an external thread; The outer diameter of the connecting end is 0.7~2 times the outer diameter of the vertical reinforcement.
5. The assembly structure according to claim 2, characterized in that: The mechanical connection part comprises a receiving cavity, wherein the end part of the vertical rib forms an open receiving part which is recessed inwardly along the axial direction thereof and serves as the receiving cavity.
6. The assembly structure according to claim 5, characterized in that: The receiving cavity is formed by a sleeve rigidly connected to the end portion of the vertical rib, and an end of the sleeve away from the vertical rib forms an open receiving cavity.
7. The assembly structure according to claim 5, characterized in that: An internal thread is provided in the receiving cavity; The outer diameter of the receiving cavity is 1.2 to 3 times the outer diameter of the vertical rib.
8. The assembly structure according to claim 1, characterized in that: It also includes a cast-in-place concrete area between the upper wall and the lower wall, and the cast-in-place concrete area covers the fastening components.
9. The assembly structure according to claim 1, characterized in that: It also includes prefabricated floor slabs, the lower edges of which are placed on two adjacent lower-layer walls.
10. The assembly structure according to claim 9, characterized in that: The upper surface of the precast floor slab has exposed rigid trusses.
11. The assembly structure according to any one of claims 9 or 10, characterized in that: It also includes a cast-in-place layer, which is laid on the prefabricated floor slab and can fill the assembly gaps between the prefabricated floor slab, the upper wall and the lower wall.
12. A method for constructing an assembled building, characterized in that: The prefabricated building adopts the assembly structure described in claim 1, comprising the following steps: Lower wall fixing step: fixing the lower wall to the foundation or pedestal or the assembled floor; Support setting steps: According to the design requirements, assemble the support frame for supporting the prefabricated floor slab around the lower wall; Prefabricated floor slab laying step: laying the prefabricated floor slab on the support and making the end of the prefabricated floor slab overlap with the top of the lower wall; Wall docking step: hoisting the upper wall to the designated position so that the vertical reinforcement of the upper wall is mechanically connected with the vertical reinforcement of the lower wall by the fastening assembly; The fastener adjustment step: adjusting the fastener assembly to meet the pull-out and tensile strength requirements of the connection and fixation of the upper wall and the lower wall; Cast-in-place step: pouring concrete filler into the assembly gap between the prefabricated floor slab and the upper wall and the lower wall to form a cast-in-place layer, so that the floor slab, the upper wall and the lower wall form a gap-free integral structure; Repeat the above support setting steps to the cast-in-place step until the construction of the prefabricated building is completed.
Citation Information
Patent Citations
Energy-saving building structural system suitable for industrialized production
CN101575872A
Unlockable modularized steel structure inserting self-locking type joint
CN107338867A
Prefabricated core column type self-insulating exterior wall plate, connecting structure and construction method thereof
CN107386492A
Bearing aerated block assembling type wallboard body and floor plate body
CN107724592A
Connecting joint of laminated walls and horizontal members and construction method of connecting joint
CN107893478A