A post-production air purification system for coating projects
By using nozzles to spray mist treatment liquid, drying and dust removal in the post-painting production engineering air purification system, combined with photooxygen catalytic decomposition, the pollution problem caused by combustion in the existing technology is solved and more effective exhaust gas purification is achieved.
Patent Information
- Application Number
- CN201911114380.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-11-14
- Publication Date
- 2024-10-01
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing painting waste gas treatment methods lead to PM2.5 pollution and the release of toxic gases through combustion, which cannot effectively remove dust particles and harmful gases, affecting the environment and human health.
An engineering air purification system after painting production is designed, including a gas collection hood, purified water tank, drying box, bag dust collector, photooxygen catalytic box and combustion furnace. The mist treatment liquid is sprayed through the nozzle to contact, dry and dust the exhaust gas. And photooxygen catalytic decomposition, combustion purification after pretreatment.
It greatly reduces the harmful components emitted after combustion, reduces the harm to the environment and human body, and improves the exhaust gas purification effect.
Smart Images

Figure CN110732229B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of coating waste gas treatment, and in particular to a post-coating production engineering air purification system. Background Art
[0002] For the purpose of aesthetics or corrosion prevention, the painting process is a commonly used process in the manufacturing process of various products. Since a large amount of paint and other coatings are used during painting, the painting workshop will inevitably produce a certain amount of waste gas during the production process. The waste gas contains a large amount of gases and particles such as benzene and sulfide. If it is directly discharged into the atmosphere, it will seriously pollute the environment and affect human health. Moreover, with the continuous strengthening of people's environmental awareness, the emission standards for industrial waste gas are becoming more and more stringent. Therefore, the waste gas generated by the painting workshop needs to be purified before it can be discharged. At present, the main treatment method is to directly pass it into the combustion furnace for combustion to purify the waste gas. However, since the waste gas contains not only combustible gases, but also a large amount of dust particles, if it is discharged only by combustion, it will not only cause PM2.5 pollution, but also the dust particles may release toxic gases again when burning in the combustion furnace, thereby polluting the environment. Summary of the invention
[0003] In view of the shortcomings of the prior art, the present invention provides a post-production engineering air purification system for coating, comprising:
[0004] Gas collection hood;
[0005] A purified water tank, which is a closed structure, with an air inlet and an exhaust port respectively arranged at the top of both ends of the purified water tank, the air inlet of the purified water tank is connected to the gas collection hood, the bottom of the purified water tank stores the treatment liquid, the inner wall of the purified water tank is fixedly provided with a nozzle, the nozzle is connected to a water pump, and the water pump is inserted into the treatment liquid through a water pipe;
[0006] A drying box, the air inlet of which is connected to the exhaust port of the purified water tank;
[0007] A bag dust collector, wherein the air inlet of the bag dust collector is connected to the exhaust port of the drying box through a pipeline;
[0008] A photo-oxidation catalytic box, the air inlet of which is connected to the exhaust port of the bag filter;
[0009] The combustion furnace, the exhaust port of the photo-oxygen catalytic box is connected with the combustion furnace through a pipeline, and an exhaust fan is arranged on the pipeline connecting the photo-oxygen catalytic box and the combustion furnace.
[0010] Preferably, the purified water tank is provided with a liquid inlet at the top and a liquid discharge port at the bottom, and valves are provided at both the liquid inlet and the liquid discharge port.
[0011] Preferably, a plurality of upper guide plates are provided at the top of the purified water tank, the plurality of upper guide plates are located between the air inlet and the exhaust port of the purified water tank and are arranged in a straight line from the air inlet to the exhaust port, the upper guide plates are inclined from top to bottom toward the exhaust port, lower guide plates are provided between adjacent upper guide plates, the lower guide plates are inclined from top to bottom toward the air inlet.
[0012] Preferably, the upper end and both sides of the upper guide plate are seamlessly connected to the inner wall of the purified water tank, a gap is left between the lower end of the upper guide plate and the bottom wall of the purified water tank, both sides of the lower guide plate are seamlessly connected to the inner wall of the purified water tank, a gap is left between the lower end of the lower guide plate and the top wall of the purified water tank, the upper end of the lower guide plate is higher than the lower end of the upper guide plate, and the level of the treated liquid is lower than the lower end of the upper guide plate.
[0013] Preferably, a plurality of the nozzles are provided, which are respectively located between adjacent upper guide plates and spray from top to bottom, and are laterally arranged on the upper guide plates, and the nozzles spray the treatment liquid laterally toward the air intake direction.
[0014] Preferably, the nozzle comprises:
[0015] A fixed bracket, the fixed bracket is a cylindrical structure, embedded in the top wall or upper guide plate of the purified water tank, and a cavity is provided inside the fixed bracket;
[0016] The mounting mechanism comprises a cover plate and a sliding plate. The cover plate is in an inwardly concave arc shape and is fixed to the other end of the fixed bracket. The sliding plate is slidably connected to the cover plate and can swing arbitrarily on the arc surface of the cover plate.
[0017] A water pipe joint, passing through the cavity and fixedly connected to the sliding plate, wherein the water inlet end of the water pipe joint is connected to the water pipe;
[0018] A rotating connecting pipe, one end of which is threadedly connected to an end of the water pipe joint facing the air inlet direction, and the other end of the rotating connecting pipe is sleeved with a bearing, and a bearing cap is installed on the bearing;
[0019] The nozzle body is threadedly connected to one end of the bearing cover facing the air inlet direction, a plurality of spray holes are evenly distributed on the circumference of the nozzle body, the spray holes are tangentially arranged with the outer circumference of the nozzle body, an annular groove is transversely arranged in the cavity of the nozzle body, a rotating ring is sleeved in the groove, and a plurality of blades are evenly arranged on the inner wall of the rotating ring;
[0020] An atomizing nozzle is threadedly connected to the spray hole. A water flow accelerating core is arranged in the cavity of the atomizing nozzle. The end of the water flow accelerating core is in a truncated cone shape. A plurality of arc-shaped water grooves are evenly distributed on the surface of the truncated cone. The arc-shaped water grooves form an oblique angle with the center line of the water flow accelerating core. The tail end of the water flow accelerating core is threadedly connected to the inner wall of the atomizing nozzle.
[0021] Preferably, the drying oven comprises:
[0022] Refrigeration equipment;
[0023] A shell, wherein a sealing cover is provided at the upper end of the shell, an exhaust port communicating with the interior of the shell is provided on the side wall, the other end of the exhaust port is connected to the air inlet of the bag filter, and a drain valve is also provided at the bottom of the shell;
[0024] A radiator, wherein the radiator is arranged in a shell, and the radiator comprises an exhaust gas flow channel and a condensing plate. The upper end of the exhaust gas flow channel is closed, and an air inlet interface is connected to the exhaust gas flow channel, and the air inlet interface is connected to the exhaust port of the purified water tank. An annular conduction plate is arranged on the top of the radiator, and a lower end thereof is connected to the condensing plate. A heat transfer column is arranged at the lower end of the refrigeration equipment, and the heat transfer column is inserted into the annular conduction plate and sealed. A gap is arranged between the radiator and the shell to enable the exhaust gas flow channel to communicate with the exhaust interface.
[0025] Preferably, a heat-insulating layer is provided on the outer surface of the shell.
[0026] Preferably, the refrigeration device comprises a power switching circuit, and the power switching circuit comprises:
[0027] The backup power source V2 is electrically connected to the source of the first MOS transistor Q1.
[0028] The first MOS transistor Q1 has a gate electrically connected to one end of the first resistor R1, the other end of the first resistor R1 is connected to the first output end S2 of the voltage regulator controller U1, and the fourth resistor R4 is connected across the first output end S2 of the voltage regulator controller U1 and the source of the first MOS transistor Q1.
[0029] The second MOS transistor Q2, the drain of the first MOS transistor Q1 is electrically connected to the drain of the second MOS transistor Q2,
[0030] The main power supply V1 is connected to one end of the second resistor R2, the other end of the second resistor R2 is electrically connected to the gate of the second MOS transistor Q2, the source of the second MOS transistor Q2 and the input end S1 of the voltage regulator controller U1 are electrically connected to the external device respectively.
[0031] The cathode of the diode D3 is electrically connected to the gate of the second MOS transistor Q2, and the anode of the diode D3 is grounded.
[0032] The sixth resistor R6 is connected in parallel with both ends of the diode D3.
[0033] a third resistor R3, one end of which is electrically connected to the input terminal S1 of the voltage regulator controller U1, and the other end of which is electrically connected to the external device;
[0034] A fifth resistor R5, one end of which is electrically connected to the input terminal S1 of the voltage regulator controller U1, and the other end of which is grounded.
[0035] The capacitor C1 is connected in parallel across the fifth resistor R5.
[0036] Capacitor C2 is connected in parallel across the second output terminal S3 of the voltage regulator controller U1.
[0037] The diode D1 is connected between the drain of the second MOS transistor Q1 and the gate of the second MOS transistor Q1.
[0038] The diode D2 is connected between the drain of the second MOS transistor Q2 and the gate of the second MOS transistor Q2.
[0039] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or be understood by practicing the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structures particularly pointed out in the written description, claims, and drawings.
[0040] The technical solution of the present invention is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS
[0041] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0042] Figure 1 A schematic diagram of the structure of a post-painting production engineering air purification system provided by the present invention;
[0043] Figure 2 It is a schematic diagram of the structure of the purified water tank of the present invention;
[0044] Figure 3 It is a schematic diagram of the structure of the nozzle of the present invention;
[0045] Figure 4 It is a schematic diagram of the structure of the atomizing nozzle of the present invention;
[0046] Figure 5 It is a schematic diagram of the drying box structure of the present invention;
[0047] Figure 6 It is a schematic diagram of the structure of the power switching circuit of the present invention. DETAILED DESCRIPTION
[0048] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.
[0049] like Figure 1 As shown,
[0050] The present invention provides a post-production engineering air purification system for coating, comprising:
[0051] Gas collection hood 1;
[0052] A purified water tank 2, wherein the purified water tank 2 is a closed structure, and an air inlet and an exhaust port are respectively arranged at the top of both ends of the purified water tank 2, and the air inlet of the purified water tank 2 is connected to the gas collection cover 1. The bottom of the purified water tank 2 stores a treatment liquid, and a nozzle 3 is fixedly arranged on the inner wall of the purified water tank 2, and the nozzle 3 is connected to a water pump, and the water pump is inserted into the treatment liquid through a water pipe. In this embodiment, the treatment liquid is an alkaline solution;
[0053] A drying box 4, whose air inlet is connected to the exhaust port of the purified water tank 2;
[0054] A bag dust collector 5, wherein the air inlet of the bag dust collector is connected to the exhaust port of the drying box through a pipeline;
[0055] The air inlet of the photo-oxidation catalytic box 6 is connected to the exhaust port of the bag filter 5;
[0056] The combustion furnace 7 , the exhaust port of the photo-oxygen catalytic box 6 is connected with the combustion furnace 7 through a pipeline, and an exhaust fan 8 is arranged on the pipeline connecting the photo-oxygen catalytic box 6 and the combustion furnace 7 .
[0057] The working principle and beneficial effects of the above technical solution are:
[0058] The processing steps of the present invention when used are:
[0059] Step 1: The painting waste gas collected by the gas collection hood first enters the purification water tank and fully contacts with the mist treatment liquid sprayed by the nozzle, so as to achieve cooling, remove dust particles in the waste gas, and remove waste gas and acidic components that are easily soluble in water.
[0060] Step 2: The waste gas after the first step of treatment enters the drying area for dehydration to remove moisture.
[0061] Step 3: The dried exhaust gas enters the bag filter to further remove solid particles.
[0062] Step 4: The waste gas enters the photocatalytic box and decomposes harmful gases in the air through UV rays.
[0063] Step 5: The waste gas enters the combustion furnace and is discharged after combustion and purification.
[0064] Compared with the prior art, the present invention pre-treats some harmful substances in the exhaust gas before the combustion purification operation, which greatly reduces the harmful components in the exhaust gas after combustion and reduces the harm to the human body and the environment.
[0065] like Figure 2 As shown, in one embodiment, the purified water tank 2 is provided with a liquid inlet at the top and a liquid outlet at the bottom, and valves are provided at both the liquid inlet and the liquid outlet.
[0066] A plurality of upper guide plates 2-1 are provided on the top of the purified water tank 2. The plurality of upper guide plates 2-1 are located between the air inlet and the exhaust port of the purified water tank 2 and are arranged in a straight line from the air inlet to the exhaust port. The upper guide plates 2-1 are inclined from top to bottom toward the exhaust port. Lower guide plates 2-2 are provided between adjacent upper guide plates 2-1. The lower guide plates 2-2 are inclined from top to bottom toward the air inlet.
[0067] The upper end and both sides of the upper guide plate 2-1 are seamlessly connected to the inner wall of the purified water tank 2, and a gap is left between the lower end of the upper guide plate 2-1 and the bottom wall of the purified water tank 2. Both sides of the lower guide plate 2-2 are seamlessly connected to the inner wall of the purified water tank 2, and a gap is left between the lower end of the lower guide plate 2-2 and the top wall of the purified water tank 2. The upper end of the lower guide plate 2-2 is higher than the lower end of the upper guide plate 2-1, and the level of the treated liquid is lower than the lower end of the upper guide plate 2-1.
[0068] There are several nozzles 3, which are respectively located between the adjacent upper guide plates 2-1 to spray from top to bottom, and are transversely arranged on the upper guide plate 2-1. The nozzles 3 spray the treatment liquid transversely toward the air intake direction.
[0069] The working principle and beneficial effects of the above technical solution are:
[0070] In this embodiment, after the exhaust gas enters the purification water tank, the exhaust gas flows up and down between the upper guide plate and the lower guide plate for many times, and the nozzle sprays water mist downward and toward the air inlet direction, so that the exhaust gas and the treatment liquid can fully react, dissolve and absorb. During the purification process, the atomized treatment liquid has a good cooling effect, which condenses the gaseous paint in the exhaust gas into solid particles, which are convenient for adsorption and filtration.
[0071] like Figure 3 and Figure 4 As shown, in one embodiment,
[0072] The nozzle 3 comprises:
[0073] A fixed bracket 3-1, which is a cylindrical structure and is embedded in the top wall of the purified water tank 2 or the upper guide plate 2-1, and a cavity is provided inside the fixed bracket 3-1;
[0074] The mounting mechanism 3-2 includes a cover plate 3-21 and a sliding plate 3-22. The cover plate 3-21 is concave in shape and has a notch at the center. The cover plate 3-21 is fixed to the other end of the fixed bracket 3-1. The sliding plate 3-22 is slidably connected to the cover plate 3-21 and can swing arbitrarily on the curved surface of the cover plate 3-21.
[0075] A water pipe connector 3-3 passes through the cavity and is fixedly connected to the sliding plate 3-22, and a water inlet end of the water pipe connector 3-3 is connected to the water pipe;
[0076] A rotating connecting pipe 3-4, one end of which is threadedly connected to the end of the water pipe joint 3-3 facing the air inlet direction, and the other end of the rotating connecting pipe 3-4 is sleeved with a bearing 3-5, and a bearing cover 3-6 is installed on the bearing;
[0077] The nozzle body 3-7 is threadedly connected to one end of the bearing cover 3-6 facing the air intake direction. A number of spray holes 3-71 are evenly distributed on the circumference of the nozzle body 3-7. The spray holes 3-71 are tangentially arranged with the outer circumference of the nozzle body 3-7. An annular groove 3-72 is transversely arranged in the cavity of the nozzle body 3-7. A rotating ring 3-8 is sleeved in the groove 3-72. In this example, the rotating ring 3-8 is an eccentric ring. A number of blades 3-9 are evenly arranged on the inner wall of the rotating ring 3-8.
[0078] The atomizing nozzle 3-10 is threadedly connected to the spray hole 3-71. A water flow accelerating core 3-11 is arranged in the cavity of the atomizing nozzle 3-10. The end of the water flow accelerating core 3-11 is in a truncated cone shape. A plurality of arc-shaped water grooves 3-12 are evenly distributed on the surface of the truncated cone. The arc-shaped water grooves 3-12 form an oblique angle with the center line of the water flow accelerating core 3-11. The tail end of the water flow accelerating core 3-11 is threadedly connected to the inner wall of the atomizing nozzle 3-10.
[0079] The working principle and beneficial effects of the above technical solution are:
[0080] The treatment liquid enters the nozzle body from the rotating connecting pipe and is sprayed out from the atomizing nozzle. Since the spray hole is tangentially arranged with the outer periphery of the nozzle body, the treatment liquid drives the nozzle body to rotate during the spraying process. No additional driving device is required. The structure is simple. The treatment liquid flows through the blades in the nozzle body. The blades increase the fluid turbulence and help improve the atomization effect. The setting of the water flow acceleration core can increase the spray distance of the atomized treatment liquid and cover a wide range.
[0081] In this embodiment, the rotating ring is an eccentric ring. During the rotation process, the torque of the nozzle body is increased, and at the same time, a lateral force is provided so that the water pipe joint can drive the sliding plate to swing in the cover plate, thereby further increasing the spray range of the nozzle and further improving the purification effect.
[0082] like Figure 5 and Figure 6 As shown, in one embodiment, the drying box 4 includes:
[0083] Refrigeration equipment 4-1;
[0084] A shell 4-2, wherein a sealing cover 4-3 is provided at the upper end of the shell 4-2, an exhaust port communicating with the interior of the shell 4-2 is provided on the side wall, the other end of the exhaust port is connected to the air inlet of the bag filter 5, and a drain valve is also provided at the bottom of the shell 4-2;
[0085] The radiator 4-4 is arranged in the shell 4-2, and the radiator 4-4 includes an exhaust gas flow channel 4-41 and a condensing plate 4-42. The upper end of the exhaust gas flow channel 4-41 is closed, and an air inlet interface is connected to the exhaust gas flow channel 4-41, and the air inlet interface is connected to the exhaust port of the purified water tank 2. The top of the radiator 4-4 is provided with an annular conduction plate 4-43, and its lower end is connected to the condensing plate 4-42. The lower end of the refrigeration equipment 4-1 is provided with a heat transfer column 4-11, and the heat transfer column 4-11 is inserted into the annular conduction plate 4-43 for sealing connection. A gap is provided between the radiator 4-4 and the shell 4-2, so that the exhaust gas flow channel 4-41 is communicated with the exhaust interface.
[0086] The outer surface of the shell 4-2 is provided with a heat-insulating layer.
[0087] The refrigeration device 4-1 includes a power switching circuit, and the power switching circuit includes:
[0088] The backup power source V2 is electrically connected to the source of the first MOS transistor Q1.
[0089] The first MOS transistor Q1 has a gate electrically connected to one end of the first resistor R1, the other end of the first resistor R1 is connected to the first output end S2 of the voltage regulator controller U1, and the fourth resistor R4 is connected across the first output end S2 of the voltage regulator controller U1 and the source of the first MOS transistor Q1.
[0090] The second MOS transistor Q2, the drain of the first MOS transistor Q1 is electrically connected to the drain of the second MOS transistor Q2,
[0091] The main power supply V1 is connected to one end of the second resistor R2, the other end of the second resistor R2 is electrically connected to the gate of the second MOS transistor Q2, the source of the second MOS transistor Q2 and the input end S1 of the voltage regulator controller U1 are electrically connected to the external device respectively.
[0092] The cathode of the diode D3 is electrically connected to the gate of the second MOS transistor Q2, and the anode of the diode D3 is grounded.
[0093] The sixth resistor R6 is connected in parallel with both ends of the diode D3.
[0094] a third resistor R3, one end of which is electrically connected to the input terminal S1 of the voltage regulator controller U1, and the other end of which is electrically connected to the external device;
[0095] A fifth resistor R5, one end of which is electrically connected to the input terminal S1 of the voltage regulator controller U1, and the other end of which is grounded.
[0096] The capacitor C1 is connected in parallel across the fifth resistor R5.
[0097] The second output terminal S3 of the voltage regulator controller U1 is grounded.
[0098] The diode D1 is connected between the drain of the second MOS transistor Q1 and the gate of the second MOS transistor Q1.
[0099] The diode D2 is connected between the drain of the second MOS transistor Q2 and the gate of the second MOS transistor Q2.
[0100] The working principle and beneficial effects of the above technical solution are:
[0101] When this embodiment is in use, the refrigeration equipment performs cooling, and the heat transfer column is used to lower and maintain the radiator at an appropriate temperature. When the exhaust gas enters from the air inlet interface, it can only flow to the shell cavity through the outlet of the exhaust gas flow channel, and is quickly cooled to produce a preliminary condensation and dehumidification effect. After the gas comes out of the outlet of the exhaust gas flow channel, it can only pass through the gap between the condensing plate and the shell, and finally be discharged from the exhaust interface. In this way, the gas has been cooled for a long time and over a large area, and the remaining moisture in the gas has been effectively eliminated. The moisture generated by condensation gathers near the drain valve at the bottom of the shell under the action of gravity and can be discharged through the drain valve.
[0102] The refrigeration device of this embodiment is provided with a power switching circuit, which can enable the refrigeration device to quickly switch to the backup power supply and continue to work for a period of time after a power outage, thereby preventing the drying box from losing its function, resulting in excessive moisture in the exhaust gas, resulting in incomplete combustion, and thus failing to achieve a purification effect.
[0103] The power switching circuit of this embodiment can avoid the problem in the prior art that the external device restarts due to voltage instability during power switching.
[0104] The contents not described in detail in the present invention may adopt the existing technology, so they are not described in detail.
[0105] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.
Claims
1. A post-production air purification system for coating, characterized in that: include, Gas collection hood (1); A purified water tank (2), the purified water tank (2) being a closed structure, an air inlet and an air outlet being respectively arranged at the top of both ends of the purified water tank (2), the air inlet of the purified water tank (2) being in communication with the gas collection hood (1), a treatment liquid being stored at the bottom of the purified water tank (2), a nozzle (3) being fixedly arranged on the inner wall of the purified water tank (2), the nozzle (3) being connected to a water pump, and the water pump being inserted into the treatment liquid through a water pipe; A drying box (4), the air inlet of which is connected to the exhaust port of the purified water tank (2); A bag dust collector (5), wherein an air inlet of the bag dust collector is connected to an exhaust port of the drying box via a pipeline; A photo-oxidation catalytic box (6), the air inlet of which is connected to the exhaust port of the bag filter (5); A combustion furnace (7), wherein the exhaust port of the photo-oxygen catalytic box (6) is connected to the combustion furnace (7) via a pipeline, and an exhaust fan (8) is provided on the pipeline connecting the photo-oxygen catalytic box (6) and the combustion furnace (7); The nozzle (3) comprises: A fixed bracket (3-1), the fixed bracket (3-1) being a cylindrical structure, embedded in the top wall or the upper guide plate (2-1) of the purified water tank (2), and a cavity being provided inside the fixed bracket (3-1); The mounting mechanism (3-2) comprises a cover plate (3-21) and a sliding plate (3-22); the cover plate (3-21) is in an inwardly concave arc shape and is fixed to the other end of the fixed bracket (3-1); the sliding plate (3-22) is slidably connected to the cover plate (3-21) and can swing arbitrarily on the arc surface of the cover plate (3-21); A water pipe joint (3-3) passes through the cavity and is fixedly connected to the sliding plate (3-22), and a water inlet end of the water pipe joint (3-3) is connected to the water pipe; A rotating connecting pipe (3-4) has one end threadedly connected to one end of the water pipe joint (3-3) facing the air intake direction, and the other end of the rotating connecting pipe (3-4) is sleeved with a bearing (3-5), and a bearing cover (3-6) is installed on the bearing; A nozzle body (3-7) is threadedly connected to one end of the bearing cover (3-6) facing the air intake direction, a plurality of spray holes (3-71) are evenly distributed on the circumference of the nozzle body (3-7), the spray holes (3-71) are tangentially arranged with the outer circumference of the nozzle body (3-7), an annular groove (3-72) is transversely arranged in the cavity of the nozzle body (3-7), a rotating ring (3-8) is sleeved in the groove (3-72), and a plurality of blades (3-9) are evenly distributed on the inner wall of the rotating ring (3-8), wherein the rotating ring (3-8) is an eccentric ring; An atomizing nozzle (3-10) is threadedly connected to the spray hole (3-71); a water flow accelerating core (3-11) is arranged in the cavity of the atomizing nozzle (3-10); the end of the water flow accelerating core (3-11) is in the shape of a truncated cone; a plurality of arc-shaped water grooves (3-12) are evenly distributed on the surface of the truncated cone; the arc-shaped water grooves (3-12) form an oblique angle with the center line of the water flow accelerating core (3-11); and the tail end of the water flow accelerating core (3-11) is threadedly connected to the inner wall of the atomizing nozzle (3-10); The drying box (4) comprises a refrigeration device (4-1); The refrigeration device (4-1) comprises a power switching circuit, wherein the power switching circuit comprises: The backup power source V2 is electrically connected to the source of the first MOS tube Q1. The first MOS transistor Q1 has a gate electrically connected to one end of the first resistor R1, the other end of the first resistor R1 is connected to the first output end S2 of the voltage regulator controller U1, and the fourth resistor R4 is connected across the first output end S2 of the voltage regulator controller U1 and the source of the first MOS transistor Q1. The second MOS transistor Q2, the drain of the first MOS transistor Q1 is electrically connected to the drain of the second MOS transistor Q2, The main power supply V1 is connected to one end of the second resistor R2, the other end of the second resistor R2 is electrically connected to the gate of the second MOS transistor Q2, the source of the second MOS transistor Q2 and the input end S1 of the voltage regulator controller U1 are electrically connected to the external device respectively. The cathode of the diode D3 is electrically connected to the gate of the second MOS transistor Q2, and the anode of the diode D3 is grounded. The sixth resistor R6 is connected in parallel with both ends of the diode D3. a third resistor R3, one end of which is electrically connected to the input terminal S1 of the voltage regulator controller U1, and the other end of which is electrically connected to the external device; A fifth resistor R5, one end of which is electrically connected to the input terminal S1 of the voltage regulator controller U1, and the other end of which is grounded. The capacitor C1 is connected in parallel across the fifth resistor R5. Capacitor C2 is connected in parallel across the second output terminal S3 of the voltage regulator controller U1. The diode D1 is connected between the drain of the second MOS transistor Q1 and the gate of the second MOS transistor Q1. The diode D2 is connected between the drain of the second MOS transistor Q2 and the gate of the second MOS transistor Q2.
2. A post-production air purification system for coating according to claim 1, characterized in that: The purified water tank (2) is provided with a liquid inlet at the top and a liquid outlet at the bottom, and valves are provided at both the liquid inlet and the liquid outlet.
3. The post-production air purification system for coating according to claim 2 is characterized in that: A plurality of upper guide plates (2-1) are provided at the top of the purified water tank (2); the plurality of upper guide plates (2-1) are located between the air inlet and the air outlet of the purified water tank (2) and are arranged in a straight line at intervals from the air inlet to the air outlet; the upper guide plates (2-1) are inclined from top to bottom toward the air outlet; lower guide plates (2-2) are provided between adjacent upper guide plates (2-1); and the lower guide plates (2-2) are inclined from top to bottom toward the air inlet.
4. The post-production air purification system for coating according to claim 3 is characterized in that: The upper end and both sides of the upper guide plate (2-1) are seamlessly connected to the inner wall of the purified water tank (2); a gap is left between the lower end of the upper guide plate (2-1) and the bottom wall of the purified water tank (2); both sides of the lower guide plate (2-2) are seamlessly connected to the inner wall of the purified water tank (2); a gap is left between the lower end of the lower guide plate (2-2) and the top wall of the purified water tank (2); the upper end of the lower guide plate (2-2) is higher than the lower end of the upper guide plate (2-1); and the level of the treated liquid is lower than the lower end of the upper guide plate (2-1).
5. The post-production air purification system for coating according to claim 4 is characterized in that: A plurality of the nozzles (3) are provided, each of which is located between adjacent upper guide plates (2-1) to spray from top to bottom, and is laterally arranged on the upper guide plate (2-1). The nozzles (3) spray the treatment liquid laterally in the direction of air intake.
6. The post-production air purification system for coating according to claim 1 is characterized in that: The drying box (4) further comprises: A shell (4-2), wherein a sealing cover (4-3) is provided at the upper end of the shell (4-2), an exhaust port communicating with the interior of the shell (4-2) is provided on the side wall, the other end of the exhaust port is connected to the air inlet of the bag filter (5), and a drain valve is also provided at the bottom of the shell (4-2); A radiator (4-4), wherein the radiator (4-4) is arranged in a shell (4-2), and the radiator (4-4) comprises an exhaust gas flow channel (4-41) and a condensing plate (4-42). The upper end of the exhaust gas flow channel (4-41) is closed, and an air inlet interface is connected to the exhaust gas flow channel (4-41), and the air inlet interface is connected to the exhaust port of the purified water tank (2). An annular conductive plate (4-43) is arranged on the top of the radiator (4-4), and its lower end is connected to the condensing plate (4-42). A heat transfer column (4-11) is arranged at the lower end of the refrigeration device (4-1), and the heat transfer column (4-11) is inserted into the annular conductive plate (4-43) for sealing connection. A gap is arranged between the radiator (4-4) and the shell (4-2), so that the exhaust gas flow channel (4-41) is communicated with the exhaust interface.
7. The post-production air purification system for coating according to claim 6 is characterized in that: The outer surface of the shell (4-2) is provided with a heat-insulating layer.
