A high-precision formwork equipment suitable for double-width extra-long wall construction

Through double-width ultra-long wall high-precision construction formwork equipment, using portal steel bracket system and steel frame bamboo glue formwork, the problems of low construction efficiency and poor precision in traditional construction methods have been solved, and efficient, green and environmentally friendly pool concrete has been realized Wall construction.

CN110748150BActive Publication Date: 2024-10-29SHANGHAI CONSTR NO 5 GRP CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN201911062178.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-11-02
Publication Date
2024-10-29
Estimated Expiration
2039-11-02

AI Technical Summary

Technical Problem

In the construction of long strip pool concrete walls, the traditional full-floor scaffolding + formwork method results in low construction efficiency, limited flatness adjustment, poor formwork integrity, low installation accuracy and difficulty in disassembly, which affects the construction progress and quality.

Method used

High-precision construction formwork equipment for double-width ultra-long walls is used, including portal steel support systems and steel-framed bamboo glue formwork. Through standardized module assembly, sliding devices and hydraulic power systems, high-precision adjustment and convenient installation and dismantling are achieved.

Benefits of technology

It improves construction efficiency and quality, enhances the integrity of the formwork and installation accuracy, simplifies the dismantling process, reduces costs and achieves green environmental protection.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110748150B_ABST
    Figure CN110748150B_ABST
Patent Text Reader

Abstract

The present invention is a high-precision formwork equipment suitable for the construction of double-width extra-long walls, comprising two groups of portal steel support systems and steel frame bamboo glue formwork; the two groups of portal steel support systems are relatively arranged and connected by a connecting truss. In the high-precision formwork equipment suitable for the construction of double-width extra-long walls of the present invention, the end formwork backing steel frame and the middle formwork backing steel frame are both standardized modules, which are convenient for assembly and disassembly, thereby improving the installation efficiency of the equipment. In addition, the end formwork backing steel frame and the middle formwork backing steel frame are in the shape of a gate, and the installation position of the formwork of the end formwork backing steel frame and the middle formwork backing steel frame can be adjusted according to different pool wall sections, thereby improving the construction quality of the pool wall.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of building construction, and is particularly suitable for the construction of long strip pool concrete walls, and in particular relates to high-precision construction formwork equipment suitable for double-width super-long walls. Background Art

[0002] At present, the pool wall generally adopts the construction method of full-height scaffolding + formwork. However, when the pool wall is long and the cross-section of the pool wall is irregular, the use of the traditional full-height scaffolding + formwork construction method will lead to low on-site construction efficiency, limited flatness adjustment measures, poor integrity of the formwork, low formwork installation accuracy, and difficulty in removing the formwork, all of which will affect the construction progress and quality. Summary of the invention

[0003] In order to solve the above problems, the present invention provides a high-precision construction formwork equipment suitable for double-width extra-long walls.

[0004] A technical solution of a high-precision construction formwork equipment suitable for double-width super-long walls of the present invention is as follows:

[0005] A high-precision formwork equipment suitable for double-width extra-long wall construction, which includes two sets of door-type steel support systems and steel frame bamboo glue formwork;

[0006] The portal steel support system includes two end template backing steel frames and a plurality of middle template backing steel frames, the middle template backing steel frames are arranged in sequence between the two end template backing steel frames, and the end template backing steel frames and the middle template backing steel frames are connected as a whole through connecting crossbeams, and the shapes of the end template backing steel frames and the middle template backing steel frames are both in the shape of a gate;

[0007] Steel frame bamboo glue formwork is fixed on the inner end surface of the gate-shaped inner frame of each end formwork backing steel frame and the middle formwork backing steel frame;

[0008] Two groups of portal steel support systems are arranged opposite to each other and connected by a connecting truss.

[0009] The present invention is suitable for high-precision construction formwork equipment for double-width ultra-long walls. The end formwork backing steel frame and the middle formwork backing steel frame are standardized modules, which are easy to assemble and disassemble, and improve the installation efficiency of the equipment. In addition, the end formwork backing steel frame and the middle formwork backing steel frame are in a door shape, and the installation position of the templates of the end formwork backing steel frame and the middle formwork backing steel frame can be adjusted according to different pool wall sections, thereby improving the construction quality of the pool wall.

[0010] Furthermore, in the high-precision construction formwork equipment suitable for double-width extra-long walls, the steel frame bamboo glue formwork includes a formwork steel frame and a bamboo glue formwork arranged on the inner end face of the formwork steel frame, the gate-shaped inner side frames of the end formwork backing steel frame and the middle formwork backing steel frame are bolted with formwork fixing supports and corresponding formwork sliding channel steels at intervals from bottom to top, the outer end face of the formwork steel frame is bolted with the other end of the formwork fixing support and fixed with a formwork pulley, the formwork pulley is slid in the corresponding formwork sliding channel steel, and the formwork pulley is fixed on the corresponding formwork fixing support. The use of bamboo glue formwork can not only ensure construction quality, but also save costs and be green and environmentally friendly. In addition, the template fixing support and the template sliding channel steel are fixed to the portal steel support system in advance by bolts. During installation, the steel frame bamboo glue template is hoisted onto the template sliding channel steel, and the template pulley is placed in the corresponding template sliding channel steel. By pushing the steel frame bamboo glue template, the template pulley of the steel frame bamboo glue template moves along the template sliding channel steel to the specified position, and then the template steel frame is fixed to the template fixing support. The above structure and installation method can effectively improve the installation accuracy of the steel frame bamboo glue template and make the installation and removal of the steel frame bamboo glue template more convenient.

[0011] Furthermore, in the high-precision formwork equipment for double-width extra-long wall construction, each end formwork backing steel frame and the middle formwork backing steel frame are provided with a sliding device, the sliding device includes a roller and a steel frame fixing support, the roller is provided at the bottom of the end formwork backing steel frame and the middle formwork backing steel frame, and the steel frame fixing support is provided on both sides of the roller. The sliding device makes it easier to move the end formwork backing steel frame and the middle formwork backing steel frame. After the end formwork backing steel frame and the middle formwork backing steel frame are moved into place, the steel frame fixing supports on both sides of the roller can be fixedly connected to the ground by bolts, making the end formwork backing steel frame and the middle formwork backing steel frame more stable.

[0012] Furthermore, in the high-precision construction formwork equipment suitable for double-width extra-long walls, a posture adjustment component is provided on the side of the portal steel support system, and the posture adjustment component includes a diagonal brace and a sliding part placed on the floor for adjusting the diagonal brace, one end of the diagonal brace is hinged to the upper side of the portal steel support system, and the other end is connected to the sliding part. The posture adjustment component can adjust the verticality of the portal steel support system, further improving the construction quality.

[0013] Furthermore, in the high-precision construction formwork equipment suitable for double-width and extra-long walls, the sliding part includes a sleeve wrapping the bottom of the diagonal brace, an adjusting bolt, an adjusting nut, a U-bolt, two locking nuts, a diagonal brace bracket, and a mounting plate. An internal threaded hole is opened at the bottom of the sleeve, the adjusting bolt is passed through the internal threaded hole and supports the bottom of the diagonal brace and is locked by the adjusting nut. The diagonal brace bracket is vertically arranged on the side of the portal steel support system, the mounting plate is arranged at the end of the diagonal brace bracket, the sleeve is arranged on the mounting plate, the U-bolt is sleeved on the diagonal brace, both ends of the U-bolt pass through the mounting plate and lock the diagonal brace respectively by two locking nuts, and a universal wheel is installed at the bottom of the diagonal brace bracket. When adjusting the verticality of the portal steel support system, first, move the posture adjustment assembly to the specified position through the universal wheel, set one end of the diagonal brace and one end of the diagonal brace support on the side of the portal steel support system, and screw the adjustment bolt to move the adjustment bolt diagonally up and down. The adjustment bolt drives the diagonal brace to move, and then the diagonal brace moves against the corresponding portal frame, thereby adjusting the verticality of the corresponding portal frame. After the verticality is adjusted, tighten the adjustment bolt with the adjustment nut, and put the U-bolt on the diagonal brace. The two ends of the U-bolt pass through the mounting plate and lock the diagonal brace with two locking nuts to prevent the diagonal brace from moving downward.

[0014] Furthermore, in the high-precision construction formwork equipment suitable for double-span extra-long walls, in order to make the posture adjustment component more stable, it also includes an inclined support frame respectively arranged on both sides of the inclined support bracket, one end of the inclined support frame is connected to the end of the inclined support bracket, and the other end is connected to the side of the portal steel support system, and the inclined support frame and the diagonal support bracket are located in the same plane.

[0015] Furthermore, in the high-precision formwork equipment suitable for double-width extra-long wall construction, specifically, six connecting steels are arranged from bottom to top in the middle of the end formwork backing steel frame; and an H-shaped steel is arranged in the middle of the middle formwork backing steel frame.

[0016] Furthermore, in the high-precision construction formwork equipment suitable for double-width extra-long walls, in order to facilitate construction workers, operating platforms are fixed at intervals from bottom to top on both sides of the portal steel support system.

[0017] Furthermore, in the high-precision construction formwork equipment suitable for double-width extra-long walls, in order to facilitate construction workers, vertical cage-type maintenance channels are set at both ends of the portal steel support system.

[0018] Furthermore, the high-precision construction formwork equipment suitable for double-width super-long walls also includes a hydraulic power system corresponding to the portal steel support system; the hydraulic power system includes a controller, a track, an intermittent clamping device, a hydraulic cylinder, a connecting corbel support and a displacement sensor; the sliding device is placed on the track, the intermittent clamping device is movably connected to the track, the intermittent clamping device is fixedly connected to one end of the hydraulic cylinder, the other end of the hydraulic cylinder is fixedly connected to one end of the connecting corbel support, and the other end of the connecting corbel support is fixedly connected to the portal steel support system; the displacement sensor is used to monitor the stroke propulsion displacement of the hydraulic cylinder and transmit it to the controller, the controller is used to compare the stroke propulsion displacement transmitted by each displacement sensor, and when the two stroke propulsion displacements are not synchronized, the hydraulic cylinder is adjusted according to the deviation value to achieve synchronous stroke propulsion. When the hydraulic power system is working, the intermittent clamping device clamps the corresponding track, starts the hydraulic cylinder, and pushes the portal steel support system forward. Then, the intermittent clamping device is released, the hydraulic cylinder contracts, and a stroke propulsion is achieved.

[0019] Furthermore, in the high-precision formwork equipment suitable for double-width extra-long wall construction, in order to make the formwork equipment more stable, a vertical adjustable support is arranged below the middle of the connecting truss, and wheels are arranged at the bottom of the vertical adjustable support. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a schematic diagram of a high-precision construction formwork equipment suitable for double-width super-long walls of the present invention;

[0021] Figure 2 It is a front view of a high-precision construction formwork equipment suitable for double-width extra-long walls of the present invention;

[0022] Figure 3 It is a top view of a portal steel support system suitable for high-precision construction formwork equipment of double-width extra-long walls of the present invention;

[0023] Figure 4 It is a structural schematic diagram of a steel frame bamboo glue formwork, an operating platform, a posture adjustment component and a sliding device suitable for high-precision construction formwork equipment of a double-width super-long wall of the present invention;

[0024] Figure 5 It is a partial schematic diagram of a steel frame bamboo glue formwork suitable for high-precision construction formwork equipment of double-width extra-long walls of the present invention;

[0025] Figure 6 The present invention is a schematic diagram of a hydraulic power system suitable for high-precision construction formwork equipment for double-width extra-long walls. DETAILED DESCRIPTION

[0026] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments. The advantages and features of the present invention will become more apparent from the following description and claims. It should be noted that the drawings are all in very simplified form and are not in precise proportions, and are only used to conveniently and clearly assist in explaining the purpose of the embodiments of the present invention.

[0027] Embodiment 1:

[0028] refer to Figures 1 to 3 , This embodiment provides a high-precision formwork equipment suitable for double-width extra-long wall construction, which includes two sets of portal steel support systems 100 and steel frame bamboo glue formwork 200;

[0029] The portal steel support system 100 includes two end template backing steel frames 101 and a plurality of middle template backing steel frames 102. The middle template backing steel frames 102 are arranged in sequence between the two end template backing steel frames 101, and the end template backing steel frames 101 and the middle template backing steel frames 102 are connected as a whole through connecting crossbeams. The shapes of the end template backing steel frames 101 and the middle template backing steel frames 102 are both in the shape of a gate.

[0030] The inner end surface of the gate-shaped inner frame of each end template backing steel frame 101 and the middle template backing steel frame 102 is fixed with a steel frame bamboo glue template 200;

[0031] Two groups of portal steel support systems 100 are arranged opposite to each other and connected by a connecting truss 1000 .

[0032] In the high-precision construction formwork equipment for double-width ultra-long walls, the end formwork backing steel frame 101 and the middle formwork backing steel frame 102 are standardized modules, which are easy to assemble and disassemble, and improve the installation efficiency of the equipment. In addition, the end formwork backing steel frame 101 and the middle formwork backing steel frame 102 are in the shape of a gate, and the installation position of the templates of the end formwork backing steel frame 101 and the middle formwork backing steel frame 102 can be adjusted according to different pool wall sections, thereby improving the construction quality of the pool wall.

[0033] As a preferred embodiment, refer to Figures 4 to 5In the high-precision construction formwork equipment suitable for double-width super-long walls, the steel frame bamboo glue formwork 200 includes a formwork steel frame 201 and a bamboo glue formwork 202 arranged on the inner end surface of the formwork steel frame 201. The gate-shaped inner side frames of the end formwork backing steel frame 101 and the middle formwork backing steel frame 102 are bolted with formwork fixing supports 203 and corresponding formwork sliding channel steels 204 from bottom to top at intervals. The outer end surface of the formwork steel frame 201 is bolted with the other end of the formwork fixing support 203 and fixed with a formwork pulley 205, which is slidably matched in the corresponding formwork sliding channel steel 204, and the formwork pulley 205 is fixed on the corresponding formwork fixing support 203. The use of bamboo glue formwork 202 can not only ensure construction quality, but also save costs and be green and environmentally friendly. In addition, the template fixing support 203 and the template sliding channel steel 204 are fixed to the portal steel support system 100 in advance by bolts. During installation, the steel frame bamboo glue template 200 is hoisted onto the template sliding channel steel 204, and the template pulley 205 is placed in the corresponding template sliding channel steel 204. By pushing the steel frame bamboo glue template 200, the template pulley 205 of the steel frame bamboo glue template 200 moves along the template sliding channel steel 204 to the specified position, and then the template steel frame 201 is fixed to the template fixing support 203. Through the above structure and installation method, the installation accuracy of the steel frame bamboo glue template 200 can be effectively improved, and the installation and removal of the steel frame bamboo glue template 200 can be more convenient.

[0034] As a preferred embodiment, refer to Figure 1 and Figure 4 In the high-precision formwork equipment for double-width super-long wall construction, each end formwork backing steel frame 101 and the middle formwork backing steel frame 102 is provided with a sliding device 500, and the sliding device 500 includes a roller 501 and a steel frame fixing support 502, the roller 501 is arranged at the bottom of the end formwork backing steel frame 101 and the middle formwork backing steel frame 102, and the steel frame fixing support 502 is arranged on both sides of the roller 501. The sliding device 500 makes the movement of the end formwork backing steel frame 101 and the middle formwork backing steel frame 102 more convenient. After the end formwork backing steel frame 101 and the middle formwork backing steel frame 102 are moved into place, the steel frame fixing supports 502 on both sides of the roller 501 can be fixedly connected to the ground by bolts, so that the end formwork backing steel frame 101 and the middle formwork backing steel frame 102 are more stable.

[0035] As a preferred embodiment, refer to Figure 1 and Figure 4In the high-precision construction formwork equipment suitable for double-width super-long walls, a posture adjustment component 400 is set on the side of the portal steel support system 100. The posture adjustment component 400 includes a diagonal brace 401 and a sliding part placed on the floor for adjusting the diagonal brace 401. One end of the diagonal brace 401 is hinged to the upper side of the portal steel support system 100, and the other end is connected to the sliding part. The posture adjustment component 400 can adjust the verticality of the portal steel support system 100 to further improve the construction quality.

[0036] As a preferred embodiment, refer to Figure 1 and Figure 4 , the high-precision construction formwork equipment suitable for double-width extra-long walls, the sliding part includes a sleeve 402 wrapped around the bottom of the diagonal brace, an adjusting bolt 403, an adjusting nut 404, a U-bolt 405, two locking nuts, a diagonal brace bracket 406, and a mounting plate 408, the bottom of the sleeve 402 is provided with an internal threaded hole, the adjusting bolt 403 is penetrated through the internal threaded hole and supports the bottom of the diagonal brace 401 and is locked by the adjusting nut 404, the diagonal brace bracket 406 is vertically arranged on the side of the portal steel support system 100, the mounting plate 408 is arranged at the end of the diagonal brace bracket 406, the sleeve 402 is arranged on the mounting plate 408, the U-bolt 405 is sleeved on the diagonal brace 401, the two ends of the U-bolt 405 pass through the mounting plate 408 and lock the diagonal brace 401 respectively by two locking nuts, and the bottom of the diagonal brace bracket 406 is installed with a universal wheel 407. When adjusting the verticality of the portal steel support system 100, first, the posture adjustment assembly 400 is moved to the specified position through the universal wheel 407, and one end of the diagonal brace 401 and one end of the diagonal brace bracket 406 are respectively set on the side of the portal steel support system 100, and the adjustment bolt 403 is screwed to make the adjustment bolt 403 move diagonally upward and downward, and the adjustment bolt 403 drives the diagonal brace 401 to move, and then the diagonal brace 401 moves against the corresponding portal frame, thereby adjusting the verticality of the corresponding portal frame. After the verticality adjustment is completed, the adjustment bolt 403 is locked with the adjustment nut 404, and the U-bolt 405 is sleeved on the diagonal brace 401. The two ends of the U-bolt 405 pass through the mounting plate 408 and are respectively locked with the diagonal brace 401 through two locking nuts to prevent the diagonal brace 401 from moving downward.

[0037] As a preferred embodiment, refer to Figure 3 and Figure 4 In the high-precision construction formwork equipment suitable for double-width extra-long walls, in order to make the posture adjustment component 400 more stable, it also includes an inclined support frame 4062 respectively arranged on both sides of the inclined support bracket 406, one end of the inclined support frame 4062 is connected to the end of the inclined support bracket 406, and the other end is connected to the side of the portal steel support system 100, and the inclined support frame 4062 and the inclined support bracket 406 are located in the same plane.

[0038] As a preferred embodiment, the high-precision formwork equipment suitable for double-width extra-long wall construction is specifically provided with six connecting steels from bottom to top in the middle of the end formwork backing steel frame 101; and an H-shaped steel is provided in the middle of the middle formwork backing steel frame 102.

[0039] As a preferred embodiment, refer to Figure 1 The high-precision construction formwork equipment suitable for double-width extra-long walls is provided. In order to facilitate construction workers, operating platforms 300 are fixed at intervals from bottom to top on both sides of the portal steel support system 100.

[0040] As a preferred embodiment, refer to Figure 2 The high-precision construction formwork equipment suitable for double-width extra-long walls is provided with vertical cage-type maintenance channels 700 at both ends of the portal steel support system 100 to facilitate construction workers.

[0041] As a preferred embodiment, refer to Figure 3 , Figure 4 , Figure 6 The high-precision formwork equipment for double-width super-long wall construction also includes a hydraulic power system 800 corresponding to the portal steel support system 100; the hydraulic power system 800 includes a controller, a track 801, an intermittent clamping device 802, a hydraulic cylinder 804, a connecting corbel support 805 and a displacement sensor 806; the sliding device 500 is placed on the track 801, the intermittent clamping device 802 is movably connected to the track 801, the intermittent clamping device 802 is fixedly connected to one end of the hydraulic cylinder 804, the other end of the hydraulic cylinder 804 is fixedly connected to one end of the connecting corbel support 805, and the other end of the connecting corbel support 805 is fixedly connected to the portal steel support system 100; the displacement sensor 806 is used to monitor the stroke propulsion displacement of the hydraulic cylinder 804 and transmit it to the controller, the controller is used to compare the stroke propulsion displacement transmitted by each displacement sensor 806, and when the two stroke propulsion displacements are not synchronized, the hydraulic cylinder 804 is adjusted according to the deviation value to achieve synchronous stroke propulsion. When the hydraulic power system is working, the intermittent clamping device 802 clamps the corresponding track 801, starts the hydraulic cylinder 804, and pushes the portal steel support system 100 forward. Then, the intermittent clamping device 802 is released, and the hydraulic cylinder 804 is contracted to achieve a stroke advancement.

[0042] As a preferred embodiment, refer to Figure 1 In the high-precision formwork equipment suitable for double-width extra-long wall construction, in order to make the formwork equipment more stable, a vertical adjustable support 900 is arranged below the middle of the connecting truss 1000, and wheels 901 are arranged at the bottom of the vertical adjustable support 900.

[0043] Embodiment 2:

[0044] This embodiment provides a method for using the high-precision construction formwork equipment for double-width extra-long walls described in Embodiment 1:

[0045] refer to Figures 1 to 6 The technical features of the construction method of the embodiment of the invention applicable to the high-precision construction formwork equipment for double-width extra-long walls are as follows, including the following steps:

[0046] The first step is to assemble the end formwork backing steel frame 101 and the middle formwork backing steel frame 102 respectively;

[0047] The second step is to assemble the assembled end formwork backing steel frame 101 and the middle formwork backing steel frame 102 together through connecting crossbeams, and the middle formwork backing steel frame 102 is sequentially arranged between the two end formwork backing steel frames 101 to form two sets of oppositely arranged portal steel support systems 100;

[0048] The third step is to set a posture adjustment component 400 on the side of the portal steel support system 100, and adjust the verticality of the portal steel support system 100 through the posture adjustment component 400;

[0049] The fourth step is to fix the template fixing support 203 and the template sliding channel steel 204 on the portal steel support system 100 by bolts, and hoist each steel frame bamboo glue template 200 onto the template sliding channel steel 204 respectively, and place the template pulley 205 in the corresponding template sliding channel steel 204. By pushing the steel frame bamboo glue template 200, the template pulley 205 of the steel frame bamboo glue template 200 moves along the template sliding channel steel 204 to the specified position, and then fix the template steel frame 201 on the template fixing support 203;

[0050] The fifth step is to set a connecting truss 1000 between the two groups of portal steel support systems 100 , set a vertical adjustable support 900 below the middle of the connecting truss 1000 , and set wheels 901 at the bottom of the vertical adjustable support 900 .

[0051] Step 6: pouring concrete into the portal steel support system 100 and maintaining it;

[0052] Step 7: After the concrete strength reaches the design requirement, each steel frame bamboo glue formwork 200 is slid out of the portal steel support system 100 from top to bottom;

[0053] Step 8. Move the high-precision construction formwork equipment suitable for double-width extra-long walls to the next workstation and repeat steps 1 to 7.

[0054] The technical effects of the construction method of the present embodiment applicable to the high-precision construction formwork equipment for double-width extra-long walls are as follows:

[0055] (1) The end formwork support steel frame 101 and the middle formwork support steel frame 102 are both standardized modules, which are easy to assemble and disassemble, thereby improving the installation efficiency of the equipment;

[0056] (2) The end template backing steel frame 101 and the middle template backing steel frame 102 are in a gate shape, and the installation positions of the templates of the end template backing steel frame 101 and the middle template backing steel frame 102 can be adjusted according to different pool wall sections to improve the construction quality of the pool wall;

[0057] (3) The posture adjustment assembly 400 can adjust the verticality of the portal steel support system 100 to further improve the construction quality;

[0058] (4) The steel frame bamboo glue formwork 200 is installed by sliding installation, which can effectively improve the installation accuracy of the steel frame bamboo glue formwork 200 and make the installation and removal of the steel frame bamboo glue formwork 200 more convenient.

[0059] As a preferred embodiment, in the construction method suitable for high-precision construction formwork equipment for double-width extra-long walls, each end formwork backing steel frame 101 and the middle formwork backing steel frame 102 is provided with a sliding device 500, and the sliding device 500 includes a roller 501 and a steel frame fixed support 502, the roller 501 is arranged at the bottom of the end formwork backing steel frame 101 and the middle formwork backing steel frame 102, and the steel frame fixed support 502 is arranged on both sides of the roller 501; in the third step, the position of the portal steel support system 100 is first adjusted by the roller 501, and after the verticality adjustment of the portal steel support system 100 is completed, the bolts are passed through the steel frame fixed support 502 and connected to the ground to fix the portal steel support system 100; in the seventh step, the bolts in the steel frame fixed support 502 are removed. The sliding device 500 makes the movement of the end formwork backing steel frame 101 and the middle formwork backing steel frame 102 more convenient. After the end formwork backing steel frame 101 and the middle formwork backing steel frame 102 are moved into place, the steel frame fixing supports 502 on both sides of the roller 501 can be fixed to the ground by bolts, making the end formwork backing steel frame 101 and the middle formwork backing steel frame 102 more stable.

[0060] As a preferred embodiment, the construction method suitable for high-precision construction formwork equipment for double-width extra-long walls also includes a hydraulic power system 800 corresponding to the portal steel support system 100; the hydraulic power system 800 includes a controller, a track 801, an intermittent clamping device 802, a hydraulic cylinder 804, a connecting bracket support 805 and a displacement sensor 806; the sliding device 500 is placed on the track 801, the intermittent clamping device 802 is movably connected to the track 801, and the intermittent clamping device 802 is movably connected to the track 801. One end of the hydraulic cylinder 804 is fixedly connected, and the other end of the hydraulic cylinder 804 is fixedly connected to one end of the connecting corbel support 805, and the other end of the connecting corbel support 805 is fixedly connected to the portal steel support system 100; the displacement sensor 806 is used to monitor the stroke propulsion displacement of the hydraulic cylinder 804 and transmit it to the controller, and the controller is used to compare the stroke propulsion displacement transmitted by each displacement sensor 806. When the two stroke propulsion displacements are not synchronized, the hydraulic cylinder 804 is adjusted according to the deviation value to achieve synchronous stroke propulsion. When the hydraulic power system is working, the intermittent clamping device 802 clamps the corresponding track 801, starts the hydraulic cylinder 804, and pushes the portal steel support system 100 forward. Then, the intermittent clamping device 802 is released, and the hydraulic cylinder 804 contracts to achieve a stroke propulsion.

[0061] As a preferred embodiment, in the construction method suitable for high-precision construction formwork equipment for double-width extra-long walls, the sliding part includes a sleeve 402 wrapping the bottom of the diagonal brace, an adjusting bolt 403, an adjusting nut 404, a U-bolt 405, two locking nuts, a diagonal brace bracket 406, and a mounting plate 408. The bottom of the sleeve 402 is provided with an internal threaded hole, the adjusting bolt 403 is passed through the internal threaded hole and supports the bottom of the diagonal brace 401 and is locked by the adjusting nut 404. The diagonal brace bracket 406 is vertically arranged on the side of the portal steel support system 100, the mounting plate 408 is arranged at the end of the diagonal brace bracket 406, the sleeve 402 is arranged on the mounting plate 408, the U-bolt 405 is sleeved on the diagonal brace 401, the two ends of the U-bolt 405 pass through the mounting plate 408 and lock the diagonal brace 401 respectively by two locking nuts, and the bottom of the diagonal brace bracket 406 is installed with a universal wheel 407. In the third step, when adjusting the verticality of the portal steel support system 100, first, the posture adjustment component 400 is moved to the specified position through the universal wheel 407, and one end of the diagonal brace 401 and one end of the diagonal brace bracket 406 are respectively set on the side of the portal steel support system 100, and the adjustment bolt 403 is screwed to make the adjustment bolt 403 move diagonally upward and downward, and the adjustment bolt 403 drives the diagonal brace 401 to move, and then the diagonal brace 401 moves against the corresponding portal frame, thereby adjusting the verticality of the corresponding portal frame. After the verticality is adjusted, the adjustment bolt 403 is locked with the adjustment nut 404, and the U-bolt 405 is sleeved on the diagonal brace 401. The two ends of the U-bolt 405 pass through the mounting plate 408 and are respectively locked with the diagonal brace 401 through two locking nuts to prevent the diagonal brace 401 from moving downward.

[0062] As a preferred embodiment, in the high-precision construction formwork equipment suitable for double-span extra-long walls, in order to make the posture adjustment assembly 400 more stable, the third step also includes an inclined support frame 4062 respectively arranged on both sides of the inclined support bracket 406, one end of the inclined support frame 4062 is connected to the end of the inclined support bracket 406, and the other end is connected to the side of the portal steel support system 100, and the inclined support frame 4062 and the diagonal support bracket 406 are located in the same plane.

[0063] The above description is only a description of the preferred embodiments of the present invention, and is not intended to limit the scope of the present invention. Any changes or modifications made by a person skilled in the art based on the above disclosure shall fall within the scope of protection of the claims.

Claims

1. A high-precision formwork equipment suitable for double-width ultra-long wall construction, characterized in that: It comprises two sets of door-type steel support systems (100) and steel frame bamboo glue formwork (200); The gate-type steel support system (100) comprises two end template support steel frames (101) and a plurality of middle template support steel frames (102), the middle template support steel frames (102) are arranged in sequence between the two end template support steel frames (101), and the end template support steel frames (101) and the middle template support steel frames (102) are connected as a whole through a connecting crossbeam, and the end template support steel frames (101) and the middle template support steel frames (102) are both in the shape of a gate; A steel frame bamboo glue formwork (200) is fixed to the inner end surface of the gate-shaped inner frame of each end formwork backing steel frame (101) and the middle formwork backing steel frame (102); Two groups of portal steel support systems (100) are arranged opposite to each other and connected by a connecting truss (1000); The steel frame bamboo glue formwork (200) comprises a formwork steel frame (201) and a bamboo glue formwork (202) arranged on the inner end surface of the formwork steel frame (201); the gate-shaped inner side frames of the end formwork backing steel frame (101) and the middle formwork backing steel frame (102) are both bolted with formwork fixing supports (203) and corresponding formwork sliding channel steels (204) at intervals from bottom to top; the outer end surface of the formwork steel frame (201) is bolted with the other end of the formwork fixing support (203) and is fixed with a formwork pulley (205); the formwork pulley (205) is slidably fitted in the corresponding formwork sliding channel steel (204); and the formwork pulley (205) is fixed on the corresponding formwork fixing support (203).

2. The high-precision formwork equipment for double-width super-long wall construction as claimed in claim 1 is characterized in that: Each end formwork backing steel frame (101) and the middle formwork backing steel frame (102) is provided with a sliding device (500), and the sliding device (500) comprises a roller (501) and a steel frame fixing support (502), the roller (501) is arranged at the bottom of the end formwork backing steel frame (101) and the middle formwork backing steel frame (102), and the steel frame fixing support (502) is arranged on both sides of the roller (501).

3. The high-precision formwork equipment for double-width super-long wall construction as claimed in claim 1 is characterized in that: A posture adjustment assembly (400) is arranged on the side of the portal steel support system (100), and the posture adjustment assembly (400) comprises a diagonal brace (401) and a sliding part placed on the ground for adjusting the diagonal brace (401), one end of the diagonal brace (401) is hinged to the upper side of the portal steel support system (100), and the other end is connected to the sliding part.

4. The high-precision formwork equipment for double-width super-long wall construction as claimed in claim 3 is characterized in that: The sliding part comprises a sleeve (402) wrapping the bottom of the diagonal brace, an adjusting bolt (403), an adjusting nut (404), a U-shaped bolt (405), two locking nuts, a diagonal brace bracket (406), and a mounting plate (408); an internal threaded hole is provided at the bottom of the sleeve (402); the adjusting bolt (403) is passed through the internal threaded hole and supports the bottom of the diagonal brace (401) and is locked by the adjusting nut (404); the diagonal brace bracket (406) is vertically arranged The invention is placed on the side of the door-type steel support system (100), the mounting plate (408) is arranged at the end of the diagonal support bracket (406), the sleeve (402) is arranged on the mounting plate (408), the U-shaped bolt (405) is sleeved on the diagonal support (401), the two ends of the U-shaped bolt (405) pass through the mounting plate (408) and are respectively locked to the diagonal support (401) by two locking nuts, and the bottom of the diagonal support bracket (406) is installed with a universal wheel (407).

5. The high-precision formwork equipment for double-width super-long wall construction as claimed in claim 4 is characterized in that: It also includes an oblique support frame (4062) respectively arranged on both sides of the oblique support frame (406), one end of the oblique support frame (4062) is connected to the end of the oblique support frame (406), and the other end is connected to the side of the portal steel support system (100), and the oblique support frame (4062) and the oblique support frame (406) are located in the same plane.

6. The high-precision formwork equipment for double-width super-long wall construction as claimed in claim 1, characterized in that: Six connecting steels are arranged from bottom to top in the middle of the end template backing steel frame (101); An H-shaped steel is arranged in the middle of the intermediate template backing steel frame (102).

7. The high-precision formwork equipment for double-width extra-long wall construction as claimed in claim 1 is characterized in that: Operating platforms (300) are fixed at intervals on both sides of the portal steel support system (100) from bottom to top.

8. The high-precision formwork equipment for double-width super-long wall construction as claimed in claim 1, characterized in that: Vertical cage-type maintenance passages (700) are provided at both ends of the portal steel support system (100).

9. The high-precision formwork equipment for double-width extra-long wall construction as claimed in claim 2, characterized in that: The invention also comprises a hydraulic power system (800) arranged corresponding to the portal steel support system (100); the hydraulic power system (800) comprises a controller, a track (801), an intermittent clamping device (802), a hydraulic cylinder (804), a connecting bracket support (805) and a displacement sensor (806); the sliding device (500) is placed on the track (801), the intermittent clamping device (802) is movably connected to the track (801), and the intermittent clamping device (802) is fixedly connected to one end of the hydraulic cylinder (804). The other end of the hydraulic cylinder (804) is fixedly connected to one end of the connecting corbel support (805), and the other end of the connecting corbel support (805) is fixedly connected to the portal steel support system (100); the displacement sensor (806) is used to monitor the stroke propulsion displacement of the hydraulic cylinder (804) and transmit it to the controller, and the controller is used to compare the stroke propulsion displacement transmitted by each displacement sensor (806). When the two stroke propulsion displacements are not synchronized, the hydraulic cylinder (804) is adjusted according to the deviation value to achieve synchronous stroke propulsion.

10. The high-precision formwork equipment for double-width super-long wall construction as claimed in claim 1, characterized in that: A vertical adjustable support (900) is arranged below the middle of the connecting truss (1000), and wheels (901) are arranged at the bottom of the vertical adjustable support (900).

Citation Information

Patent Citations

  • High-precision construction formwork device suitable for double-width super-long wall

    CN211775729U