A method and device for pushing and pulling a pipe in a coal mine gas extraction protection hole
By designing a coal mine gas drainage hole protection push-pull pipe device and using a combined structure of a negative pressure vacuum cleaner and a multi-section hole protection pipe, the problems of borehole collapse and difficulty in cleaning cinders in soft coal seams have been solved, and the hole protection pipe has been used multiple times. and improvement of gas extraction efficiency.
Patent Information
- Application Number
- CN201911013167.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-10-23
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2039-10-23
AI Technical Summary
Drilling holes in soft coal seams are prone to collapse, resulting in drilling failure. It is difficult to effectively remove coal slag with the existing technology, resulting in the hole protection tube being unable to be inserted or pulled out, and the screen tube can only be used once, resulting in waste and increased gas drainage costs. .
A device for pushing and pulling out pipes for coal mine gas drainage protection holes is designed, which includes a clamping device, a driving device and a slag discharge device. It uses a combined structure of a negative pressure vacuum cleaner and a multi-section hole protection pipe to rotate and push in/pull out the pipe. Continuously clean the cinders to realize multiple uses of the hole protection pipe.
It can effectively prevent borehole collapse, improve borehole length and gas drainage efficiency, reduce costs, realize the recycling and multiple use of hole protection screens, and reduce gas drainage costs.
Smart Images

Figure CN110761714B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of gas extraction, and relates to a method and device for protecting holes in coal mine gas extraction, and specifically to a method and device for protecting holes in coal mine gas extraction with a recyclable and reusable screen pipe, which is particularly suitable for soft high-gas coal seams. Background Art
[0002] The coal seam strength coefficient of most of my country's high-gas and coal and gas outburst mines is poor (f < 1), and as mining progresses, the mining depth gradually increases, and many shallow low-gas mines will be transformed into deep high-gas mines. Soft coal seams are caused by faults and layer slides, usually mainly composed of crushed coal and mylonitic coal, and the coal body strength is low. If a borehole is drilled in a soft coal seam, the borehole will often fail due to borehole collapse. In gas extraction, the failed borehole cannot effectively extract the gas in the coal seam, and the remaining gas in the coal seam will become a hidden danger of gas disasters. Therefore, preventing borehole collapse and increasing the effective length of the borehole are the key to gas control in soft coal seams.
[0003] The screen pipe hole protection technology is a hole protection technology that has been formed as the scale of production has expanded and the geological conditions have become more and more complex. When drilling in soft coal seams, in order to avoid the collapse and blockage of the borehole due to reasons such as instability of the borehole wall, after the drilling operation is completed, a PVC or PE screen pipe is placed in the borehole as a hole protection pipe and extraction pipe. Due to the collapse of the borehole, a large amount of coal slag accumulates near the screen pipe, making it difficult to extract the screen pipe. In the subsequent coal mining process, the screen pipe is destroyed by the coal mining machine and transported out with the coal. However, the price of the screen pipe made of PVC pipe is relatively high. If the screen pipe can only be used once, a large number of screen pipes will be required in the gas extraction stage, which will cause waste of PVC pipes and increase the cost of gas extraction. During the hole protection operation, a large amount of coal slag will be left in the borehole. If the coal slag cannot be removed in time, the resistance of the sealing pipe will be too large and the lower pipe will fail; during the pipe pulling operation, the local collapsed coal body covers the pipe wall. If it cannot be cleaned, the hole protection pipe cannot be pulled out.
[0004] A Chinese invention patent published on June 26, 2018, with a publication number of CN108204213A, entitled "An inflatable drilling hole sealing section residue cleaning device and its use method", uses the positional relationship between the inflated and non-inflated states of the expansion device to ensure smooth cleaning work; a Chinese invention patent published on July 18, 2012, with a publication number of CN102587961A, entitled "A method for delivering a borehole protection pipe in a soft coal seam gas extraction hole", when escorting the extraction pipe into the borehole, pushes High-pressure air is pressed into the extraction tube, and the air flows out from between the borehole wall and the extraction tube, and the generated coal slag is discharged at the same time, reducing the large resistance caused by the coal slag. A pipe pulling device and a pipe pulling machine with a publication number of CN206971090U disclosed in China on February 6, 2018, are connected to the outer ring by a slider device to form a pipe channel, which can be used to pull out the pipe. However, the above invention and the invention both have the problem of difficulty in inserting the pipe and failure to pull out the pipe due to the obstruction of the coal slag. Summary of the invention
[0005] The present invention overcomes the shortcomings of the prior art and proposes a method and device for pushing and pulling a protection hole pipe for coal mine gas extraction, with the purpose of timely sucking out the coal slag in the borehole, facilitating the insertion of the protection hole pipe into the borehole, and pulling out the protection hole pipe in the borehole. When the protection hole pipe is pulled out, the coal slag in the borehole is discharged, the protection hole screen pipe is recovered and reused multiple times, and the problem of the coal slag in the borehole affecting the insertion and pulling of the pipe is solved.
[0006] In order to achieve the above object, the present invention is implemented through the following technical solutions.
[0007] A device for pushing and pulling a pipe for protecting a hole in coal mine gas extraction comprises a clamping device, a driving device and a slag discharge device, wherein the clamping device comprises a first clamper, a baffle and a bearing, wherein the baffle is installed inside the bearing and the baffle is adapted to the inner diameter of the bearing so that the baffle can rotate relative to the bearing, and the bearing is arranged on a plane support plate through a fixed bracket; a first clamper for clamping a hole-protecting pipe is installed at the center of the baffle, and the axis of the first clamper is connected to the borehole; the driving device comprises a pneumatic single column, a connecting rod, a pneumatic motor, a driven gear and an active gear gear, the support plate is provided with a slideway, the pneumatic motor is arranged on the slideway so that it can slide back and forth along the slideway, and the fixed ends of multiple pneumatic monomer columns are respectively fixed to the outer circumference of the baffle; the axis of the driving gear is connected to the pneumatic motor through a connecting rod, and the pneumatic motor is used to drive the driving gear to rotate forward and reverse, and the driven gear is meshed with the driving gear. The second clamper is fixed to the driven gear so that the second clamper rotates under the drive of the driven gear, and the second clamper is connected to the telescopic rod end of the pneumatic monomer column, and the tail end of the hole protection tube is connected to the slag discharge device.
[0008] Furthermore, the slag discharge device is a negative pressure vacuum cleaner.
[0009] Furthermore, a lifting bracket is connected to the bottom of the support plate.
[0010] Furthermore, the support plate is provided with a support device for supporting the second clamper.
[0011] Furthermore, the second clamp is connected to the ends of telescopic rods of two pneumatic single columns installed in parallel.
[0012] Furthermore, the hole protection pipe is a multi-section structure, each section of the hole protection pipe is connected by threads, and there are anti-dropping pins at the threads and male and female joints passing through the two sections of the hole protection pipe.
[0013] A method for pushing and pulling a pipe for coal mine gas extraction protection hole, based on the coal mine gas extraction protection hole pushing and pulling pipe device, comprises the following steps:
[0014] Step 1: After the drilling construction is completed, the head end of the first section of the hole protection pipe is inserted into the drill hole, the pipe body of the first section of the hole protection pipe is inserted into the pushing and pulling pipe device, the tail end of the first section of the hole protection pipe is connected to the slag discharge device, and the first section of the hole protection pipe is pushed into the drill hole while rotating by using the pushing and pulling pipe device, and the slag discharge device is started at the same time to suck out the coal powder in the drill hole.
[0015] Step 2: Connect the head end of the second section of the hole protection pipe to the tail end of the first section of the hole protection pipe, and connect the slag discharge device to the tail end of the second section of the hole protection pipe, use the tube pushing and pulling device to push the second section of the hole protection pipe into the borehole while rotating, and start the slag discharge device during the pushing process to suck out the coal powder in the borehole; repeat this step to push the hole protection pipes into the borehole one by one; remove the tube pushing and pulling device.
[0016] Step 3: Put the sealing tube over the tail end of the hole protection tube, insert the sealing tube into the borehole and seal the hole with sealing liquid, connect the gas extraction tube after sealing the hole; connect the slag discharge device to the tail end of the last section of the hole protection tube.
[0017] Step 4: When the borehole gas extraction time exceeds the designed period, the pipe pushing and pulling device is installed in reverse at the tail end of the last section of the borehole protection pipe, the slag discharge device is connected to the tail end pipe mouth of the last section of the borehole protection pipe, the borehole protection pipe is pulled out while rotating and the coal dust in the borehole is cleaned.
[0018] Preferably, the bore protection tubes include bore protection tubes with sieve holes of equal diameter and bore protection tubes without sieve holes, and the diameter of the sieve holes and the density of the sieve holes of the bore protection tubes with sieve holes gradually decrease as the depth of the borehole increases.
[0019] Preferably, the slag discharge device is a negative pressure vacuum cleaner, and the suction force of the negative pressure vacuum cleaner increases with the increase of the insertion depth of the hole protection tube.
[0020] Preferably, the inner diameter of the sealing tube is 1.4-1.6 times the outer diameter of the hole protecting tube.
[0021] The beneficial effects of the present invention compared with the prior art are as follows.
[0022] The present invention inserts each section of the hole protection pipe assembly into the borehole. In order to prevent the borehole from being blocked by coal slag and coal powder and then the hole protection pipe cannot be inserted, the coal slag and coal powder in the borehole are always sucked out by a negative pressure vacuum cleaner during the pushing process. When the hole protection pipe is sent to the final hole position, the hole is sealed by a sealing pipe and then an external gas extraction pipe is connected to extract gas. When the gas extraction is completed, the hole protection pipe is pulled out by external force. In order to prevent the borehole from being blocked by coal slag and coal powder and then the hole protection pipe cannot be pulled out, the negative pressure vacuum cleaner is always used during the pulling process. Coal slag and coal powder are sucked out. In the process of pushing and pulling out the borehole protection tube, in order to facilitate pushing the borehole protection tube into or pulling it out of the borehole with less effort, the borehole protection tube can be pushed in while rotating or pulled out while rotating. This device can suck out the coal slag in the borehole in time, facilitate inserting the borehole protection tube into the borehole, and can also pull out the borehole protection tube in the borehole. When pulling out the borehole protection tube, the coal slag in the borehole can be discharged, so that the borehole protection screen can be recovered and reused multiple times, so as to reduce the cost of gas extraction in soft coal seams, prevent and control borehole collapse, and increase the amount of gas extraction. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a schematic structural diagram of the hole protecting device of the present invention when in use.
[0024] Figure 2 It is a schematic structural diagram of the hole protection device of the present invention.
[0025] Figure 3 It is a schematic diagram of the driving gear of the hole protection device of the present invention driving the driven gear to rotate.
[0026] Figure 4 It is a schematic diagram of the connection between the pneumatic single column, the clamping head and the bearing of the hole protection device described in the present invention.
[0027] Among them, 1 is a lifting bracket, 2 is a pneumatic single column, 3 is a supporting guard plate, 4 is a first clamper, 5 is a pneumatic motor, 6 is a supporting plate, 7 is a baffle, 8 is a bearing, 9 is a fixed bracket, 10 is a driven gear, 11 is a driving gear, 12 is a connecting rod, 13 is a drilling hole, 14 is a hole protection tube, 15 is a negative pressure vacuum cleaner, and 16 is a second clamper. DETAILED DESCRIPTION
[0028] In order to make the technical problems, technical solutions and beneficial effects to be solved by the present invention clearer, the present invention is further described in detail in conjunction with the embodiments and the accompanying drawings. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention. The technical solutions of the present invention are described in detail below in conjunction with the embodiments and the accompanying drawings, but the scope of protection is not limited thereto.
[0029] like Figure 1 and Figure 2 As shown, it is a device for pushing and pulling a pipe for gas extraction and hole protection in coal mines, including a clamping device, a driving device and a slag discharge device. The clamping device includes a first clamper 4, a baffle 7 and a bearing 8. The baffle 7 is installed inside the bearing 8 and the baffle 7 is adapted to the inner diameter of the bearing 8 so that the baffle 7 can rotate relative to the bearing 8. The bearing 8 is arranged on a flat support plate 6 through a fixed bracket 9. A lifting bracket 1 is connected to the bottom of the support plate 6. A first clamper 4 for clamping the hole protection pipe 14 is installed at the center of the baffle 7, and the axis of the first clamper 4 is connected to the borehole 13; as shown in FIG. Figure 3 and Figure 4 As shown, the driving device includes a pneumatic single column 2, a connecting rod 12, a pneumatic motor 5, a driven gear 10 and a driving gear 11. The support plate 6 is provided with a slideway, and the pneumatic motor 5 is arranged on the slideway so that it can slide forward and backward along the slideway. The fixed ends of the two pneumatic single columns 2 are respectively fixed to the outer circumference of the baffle 7; the axis of the driving gear 11 is connected to the pneumatic motor 5 through the connecting rod 12, and the pneumatic motor 5 is used to drive the driving gear 11 to rotate forward and reverse. The driven gear 10 and the driving gear 11 are geared to the driven gear 10 and the driving gear 11. Engagement; a support guard plate 3 for supporting the second clamper 16 is provided on the support plate 6, and the second clamper 16 is fixed to the driven gear 10 so that the second clamper 16 rotates driven by the driven gear 10, and the second clamper 16 is connected to the telescopic rod ends of two parallel installed pneumatic monomer columns 2, and the hole protection tube 14 is a multi-section structure, and each section of the hole protection tube 14 is connected by a threaded connection, and the tail end of the last section of the hole protection tube 14 is connected to the slag discharge device, and the slag discharge device is a negative pressure vacuum cleaner 15.
[0030] One end of the support plate 6 is arranged close to the coal seam, and the other end is suspended in the air, and a slideway is set on the support plate 6; the bottom end of the lifting bracket 1 is fixed to one end of the support plate 6 close to the coal seam, and a clamp used to match the hole protection pipe 14 is installed at the axis center of the second clamp 16.
[0031] First, the pneumatic motor 5 drives the active gear 11 to rotate, and the active gear 11 drives the driven gear 10. The rotation of the driven gear 10 drives the second clamper 16 to rotate, and the hole protection tube 14 matched with the second clamper 16 rotates, drives the bearing 8 to rotate, and the baffle 7 matched with the inner ring of the bearing 8 rotates, drives the two pneumatic single columns 2 to rotate. According to the forward rotation time set by the pneumatic motor 5, forward and reverse rotation can be continuously realized. When it is necessary to pull out the hole protection tube 14, the oil cylinders of the two pneumatic single columns 2 extend and drive the pneumatic motor 5 and the lifting bracket 1 on the right to move backward, and the hole protection tube is pulled out, realizing pulling out while rotating. When it is necessary to push the hole protection tube 14 into the drill hole, the oil cylinders of the two pneumatic single columns 2 shrink, and the pneumatic motor 5 and the lifting bracket 1 move forward to push the hole protection tube in, that is, pushing in while rotating is realized.
[0032] The diameters of the borehole protection pipe with sieve holes and the borehole protection pipe without sieve holes are equal. The diameter and density of the sieve holes of the borehole protection pipe with sieve holes gradually decrease with the increase of the depth of the borehole.
[0033] The hole protection pipes 14 are connected by threads, and anti-dropping pins are arranged at the threads and pass through male and female joints of the two hole protection pipes.
[0034] The suction force of the negative pressure vacuum cleaner 15 increases as the insertion depth of the hole protection tube increases.
[0035] The inner diameter of the sealing tube is 1.4-1.6 times the outer diameter of the hole protecting tube 14 .
[0036] The specific working process is:
[0037] Step 1: Drilling is carried out, and a hole is made with a 113mm drill bit. After the hole is drilled, the head end of the first section of the 5m long Ф108*6mm non-sieve hole protection pipe 14 is inserted into the borehole 13, and the body of the borehole protection pipe 14 is inserted into the pushing and pulling pipe device. The tail end of the borehole protection pipe 14 is connected to the negative pressure vacuum cleaner 15, and the first section of the non-sieve hole protection pipe is pushed into the borehole 13 by using the screen pipe hole protection device, and the negative pressure vacuum cleaner 15 is started at the same time to suck out the coal powder in the borehole 13.
[0038] Step 2: Connect the second section of 5m long hole-protecting pipe 14 without sieve holes to the tail end of the first section of hole-protecting pipe 14, connect the two sections of hole-protecting pipes by using the threads between the hole-protecting pipes 14, connect the male and female joints at the threads, connect the negative pressure vacuum cleaner 15 to the tail end of the second section of hole-protecting pipe without sieve holes, and use the sieve pipe hole-protecting device to push the second section of hole-protecting pipe without sieve holes 14 into the borehole 13. During the pushing process, start the negative pressure vacuum cleaner 15 to suck out the coal powder in the borehole 13; as the length of the hole-protecting pipe 14 increases, the negative pressure of the negative pressure vacuum cleaner 15 is gradually increased.
[0039] Step 3: Repeat step 2. When the number of the borehole protection tubes 14 without sieve holes entering the borehole reaches 4, replace the borehole protection tubes 14 without sieve holes with borehole protection tubes 14 with sieve holes of the same specification, and the sieve hole diameter and sieve hole density of the borehole protection tubes 14 with sieve holes gradually decrease with the increase of the depth of the borehole.
[0040] Step 4: Use the sieve tube hole protection device to push the hole protection tube 14 with sieve holes into the borehole 13 until the hole protection tube 14 with sieve holes can no longer be pushed. At this time, there is no need to connect the next section of the hole protection tube 14 with sieve holes to the tail end of the previous section, and remove the pushing and pulling device.
[0041] Step 5: Put the Ф151.2*6mm sealing pipe over the tail end of the last section of the hole protection pipe 14, insert the sealing pipe into the borehole 13, seal the hole with cement slurry for 20 meters, and then connect the gas extraction pipe.
[0042] Step six: when the borehole gas extraction time exceeds 90 days, the screen tube hole protection device is reversely installed at the tail end of the last section of the hole protection tube 14, and the negative pressure vacuum cleaner 15 is connected to the tail end pipe mouth of the last section of the hole protection tube 14 with screen holes, and the hole protection tubes 14 are pulled out section by section and the coal dust in the borehole is cleaned; when the hole protection tubes 14 cannot be pulled out, the pneumatic motor can be started to rotate the support plate 6 and the horizontal surface of the lifting bracket 1 to the left and right by a certain angle. When all the hole protection tubes 14 are pulled out, they are arranged for use.
[0043] The above content is a further detailed description of the present invention in combination with a specific preferred embodiment. It cannot be determined that the specific embodiments of the present invention are limited to this. For ordinary technicians in the technical field to which the present invention belongs, several simple deductions or substitutions can be made without departing from the present invention, which should be regarded as belonging to the present invention and the scope of patent protection determined by the submitted claims.
Claims
1. A pipe pushing and pulling device for coal mine gas extraction protection hole, It is characterized in that The invention comprises a clamping device, a driving device and a slag discharge device, wherein the clamping device comprises a first clamper (4), a baffle (7) and a bearing (8), wherein the baffle (7) is installed inside the bearing (8) and the baffle (7) is matched with the inner diameter of the bearing (8) so that the baffle (7) can rotate relative to the bearing (8), and the bearing (8) is arranged on a plane support plate (6) through a fixing bracket (9); a first clamper (4) for clamping a hole protection tube (14) is installed at the center of the baffle (7), and the axis of the first clamper (4) is connected to the drill hole (13); the driving device comprises a pneumatic monomer column (2), a connecting rod (12), a pneumatic motor (5), a driven gear (10) and a driving gear (11); the support plate (6) is provided with a slideway, and the pneumatic motor (5) is provided with a The pneumatic single column (2) is placed on the slideway so that it can slide forward and backward along the slideway. The fixed ends of the plurality of pneumatic single columns (2) are respectively fixed to the outer circumference of the baffle (7). The axis of the driving gear (11) is connected to the pneumatic motor (5) through a connecting rod (12). The pneumatic motor (5) is used to drive the driving gear (11) to rotate forward and reverse. The driven gear (10) is meshed with the driving gear (11). The second clamper (16) is fixed to the driven gear (10) so that the second clamper (16) rotates under the drive of the driven gear (10). The second clamper (16) is connected to the telescopic rod end of the pneumatic single column (2). The tail end of the hole protection tube (14) is connected to the slag discharge device. The slag discharge device is a negative pressure vacuum cleaner (15). The bottom of the support plate (6) is connected to a lifting bracket (1).
2. A coal mine gas extraction hole protection pushing and pulling pipe device according to claim 1, It is characterized in that The support plate (6) is provided with a support device for supporting the second clamper (16).
3. A coal mine gas extraction hole protection pushing and pulling pipe device according to claim 1, It is characterized in that The second clamp (16) is connected to the telescopic rod ends of two pneumatic single columns (2) installed in parallel.
4. A coal mine gas extraction hole protection pushing and pulling pipe device according to claim 1, It is characterized in that The hole protection pipe (14) is a multi-section structure, and each section of the hole protection pipe (14) is connected by threads.
5. A method for pushing and pulling a pipe for coal mine gas extraction protection hole, It is characterized in that A coal mine gas extraction hole protection pushing and pulling pipe device according to claim 1 comprises the following steps: Step 1: After the construction of the borehole (13) is completed, the head end of the first section of the hole protection pipe is inserted into the borehole (13), the pipe body of the first section of the hole protection pipe is inserted into the pushing and pulling pipe device, the tail end of the first section of the hole protection pipe is connected to the slag discharge device, and the first section of the hole protection pipe is pushed into the borehole (13) while rotating by using the pushing and pulling pipe device, and the slag discharge device is started at the same time to suck out the coal powder in the borehole (13); Step 2: Connect the head end of the second hole protection pipe to the tail end of the first hole protection pipe, and connect the slag discharge device to the tail end of the second hole protection pipe, and use the pushing and pulling pipe device to push the second hole protection pipe into the borehole (13) while rotating, and start the slag discharge device during the pushing process to suck out the coal powder in the borehole (13); repeat this step to push the hole protection pipes into the borehole (13) one by one; remove the pushing and pulling pipe device; Step 3: Cover the tail end of the hole protection pipe with a hole sealing pipe, insert the hole sealing pipe into the borehole (13), seal the hole with a hole sealing liquid, and connect the gas extraction pipe after sealing the hole; connect the slag discharge device to the tail end of the last section of the hole protection pipe; Step 4: When the borehole gas extraction time exceeds the designed period, the pipe pushing and pulling device is installed in reverse at the tail end of the last section of the borehole protection pipe, the slag discharge device is connected to the tail end pipe mouth of the last section of the borehole protection pipe, the borehole protection pipe is pulled out while rotating and the coal dust in the borehole is cleaned.
6. A method for pushing and pulling a pipe for coal mine gas extraction protection hole according to claim 5, It is characterized in that The bore protection pipes include bore protection pipes with sieve holes of equal diameter and bore protection pipes without sieve holes. The diameter of the sieve holes and the density of the sieve holes of the bore protection pipes decrease gradually with the increase of the depth of the borehole.
7. A method for pushing and pulling a pipe for coal mine gas extraction protection hole according to claim 5, It is characterized in that The slag removal device is a negative pressure vacuum cleaner (15), and the suction force of the negative pressure vacuum cleaner (15) increases as the insertion depth of the hole protection pipe increases.
8. A method for pushing and pulling a pipe for coal mine gas extraction protection hole according to claim 5, It is characterized in that The inner diameter of the sealing tube is 1.4-1.6 times the outer diameter of the protection tube.
Citation Information
Patent Citations
Feeding method and device for hole protecting pipe for soft coal seam gas extraction hole
CN102587961A
Air inflating type hole-drilling hole-sealing section residue cleaning device and using method thereof
CN108204213A
Pipe drawing device and drawbench
CN206971090U
Coal mine gas extraction hole protection push-pull pipe device
CN211038514U