By designing quantitative corrugated steel plate-lined arch foot structures and locking foot anchors, the problems of high construction risk and insufficient lateral stability in the existing technology have been solved, and a safe, reliable and economical design for railway tunnel lining disease remediation has been achieved. .
Patent Information
- Application Number
- CN201911175148.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-11-26
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2039-11-26
AI Technical Summary
The existing corrugated steel plate lining reinforcement method has problems in the treatment of railway tunnel lining diseases, such as high construction risk, rationality of basic structure reinforcement relying on engineering experience, and insufficient lateral stability guarantee.
Design a corrugated steel plate-lined arch foot structure for a railway tunnel. Through the quantitative design of the arch foot foundation structure and locking anchors, the secondary lining removal construction is avoided, the external load is clarified, and the two-dimensional plane strain composite numerical calculation is performed. The model optimizes the basic structure reinforcement and locking anchor parameters.
It reduces construction risks, saves costs, shortens the construction period, improves the safety and reliability of the infrastructure, and ensures lateral stability.
Smart Images

Figure CN110778342B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of tunnel lining disease corrugated steel plate lining reinforcement design, and specifically relates to a corrugated steel plate lining arch foot structure of a railway tunnel and an optimization design method thereof. Background Art
[0002] As the operation time of tunnels continues to increase, the number of tunnel lining water seepage, erosion, crack damage and other diseases increases year by year under the interaction of various influencing factors, affecting the normal operation and safety of tunnels, and must be dealt with and rectified in a timely manner. At present, the corrugated steel plate lining reinforcement method is widely used due to its advantages of factory prefabrication, controllable construction quality, good durability, green environmental protection, short construction period, high overall stiffness, high bending bearing capacity, and meeting the requirements of building limits and tunnel clearance.
[0003] When the current corrugated steel plate lining reinforcement method is applied to the design of railway tunnel lining disease treatment, due to the horizontal distance between the tunnel secondary lining and the power cable trough of the tunnel auxiliary structure, the corrugated steel plate lined arch foot foundation structure obtains the construction space of the reinforced concrete foundation structure by partially chiseling the secondary lining near the arch foot position, and determines the foundation structure reinforcement through similar engineering experience. This method has three disadvantages. The first disadvantage is that the construction space of the reinforced concrete foundation structure is obtained by partially chiseling the secondary lining near the arch foot position, which has an adverse effect on the stress of the tunnel lining, has a high construction risk, and has a long construction period; the second disadvantage is that the external force load of the corrugated steel plate lined arch foot foundation structure is unclear, resulting in the rationality of the foundation structure reinforcement to a large extent depends on the engineer's work experience in similar projects, which is subjective and cannot guarantee the accuracy and economy of the relevant parameters; the third disadvantage is that there is no effective measure to ensure the lateral stability of the foundation structure. Summary of the invention
[0004] The purpose of the present invention is to overcome the defects of the prior art and provide a corrugated steel plate lining arch foot structure of a railway tunnel and an optimized design method thereof, which avoids the original secondary lining chiseling construction, reduces construction risks, saves construction costs, and shortens the construction period; clarifies the external load of the foundation structure, and realizes the quantitative design of the foundation structure reinforcement and locking anchor parameters. The entire design process is clearly quantified, easy to implement, safe, reliable, and economical.
[0005] The present invention is implemented as follows: the present invention provides a corrugated steel plate lining arch foot structure of a railway tunnel, comprising an arch foot foundation structure and a plurality of locking foot anchor rods respectively located at two arch feet of the arched corrugated steel plate lining, wherein the arch foot foundation structure is a reinforced concrete structure, the arch foot foundation structure is arranged longitudinally along the corrugated steel plate lining, the arch foot of the corrugated steel plate lining is fixed to the corresponding arch foot foundation structure, one end of the locking foot anchor rod is inserted into the anchor hole of the tunnel wall, the other end of the locking foot anchor rod is fixed in the arch foot foundation structure, and the plurality of locking foot anchor rods are distributed longitudinally along the corrugated steel plate lining.
[0006] The end of the locking foot anchor rod is connected to the arch foot of the corrugated steel plate lining.
[0007] The end of the locking foot anchor rod is connected to the corrugated steel plate lining arch foot through an anchor plate and a nut component, so that the corrugated steel plate arch and the locking foot anchor rod are stressed together, limiting the lateral deformation of the corrugated steel plate arch foot.
[0008] The arch foot of the corrugated steel plate lining is fixedly connected to the corresponding arch foot foundation structure through pre-buried anchor bolts; the arch foot of the corrugated steel plate lining is provided with a grounding flange, and the pre-buried anchor bolts located in the arch foot foundation structure are fixedly connected to the grounding flange of the corrugated steel plate lining arch foot through nuts.
[0009] The locking foot anchor rod is installed in an inclined direction downward.
[0010] The arch foot foundation structure includes a concrete structure and a steel frame located in the concrete structure. The steel frame is composed of longitudinal force-bearing main bars connected with structural stirrups; the structural stirrups are triangular stirrups.
[0011] The arch foot foundation structures at the two arch feet of the arched corrugated steel plate lining are respectively fixed on the bases on both sides of the tunnel, and the arch foot foundation structures are located between the secondary lining of the tunnel and the power cable trough provided on the base; the arch foot foundation structure is fixedly connected to the secondary lining by implanted steel bars, one end of the implanted steel bars is located in the secondary lining of the tunnel, and the other end of the implanted steel bars is located in the arch foot foundation structure.
[0012] The present invention provides a method for optimizing the design of a corrugated steel plate lining arch foot structure of a railway tunnel, comprising the following steps:
[0013] S1: Design of geometric dimensions of corrugated steel plate lined arch foot foundation structure;
[0014] S2: Determination of external loads on the corrugated steel plate lined arch foot foundation structure;
[0015] S3: The strength grade of the concrete of the corrugated steel plate lined arch foot foundation structure is determined. To ensure the strength of the foundation structure, a grade higher than the strength grade of the secondary lining concrete is used;
[0016] S4: Structural reinforcement design of corrugated steel plate lined arch foot foundation;
[0017] S5: Design of locking anchor rods for corrugated steel plate lined arch foot foundation structure, determine the longitudinal spacing D, the number of longitudinal roots per linear meter N, the diameter d1 and the length L of the locking anchor rods R parameter.
[0018] As a further improvement of the present invention, the geometrical dimension design of the corrugated steel plate lined arch foot foundation structure described in step S1 can be determined according to the following steps:
[0019] S11: The length of the arch foot foundation structure along the longitudinal arrangement of the corrugated steel plate is equal to the length of the tunnel disease section remediation;
[0020] S12: In order to ensure the strength, rigidity and stability of the corrugated steel plate lined arch foot foundation structure, the geometric dimensions of the foundation structure need to be increased as much as possible. Considering that the tunnel disease section is short, half of the space of the power cable trough of the tunnel auxiliary structure can be occupied according to the site conditions. The bottom width of the base b2 is the shortest horizontal distance from the intersection of the vertical center line of the cable trough and the horizontal line of the bottom surface of the cable trough to the secondary lining structure. Based on formula (1) and formula (2), the top width b1 and height h of the arch foot foundation structure can be obtained:
[0021] b1=b-b3-b4 (1)
[0022] h=2(h1+h2) (2)
[0023] Where: b is the shortest horizontal distance from the intersection of the vertical center line of the cable trough and the horizontal line of the top surface of the base to the secondary lining structure; b3 is the seam width of the cable trough cover; b4 is the overlap width of the cable trough cover; h1 is the net width of the cable trough; h2 is the thickness of the cable trough cover.
[0024] As a further improvement of the present invention, the external load of the corrugated steel plate lined arch foot foundation structure described in step S2 can be determined according to the following steps:
[0025] S21: Based on the results of on-site testing and investigation, the thickness table of the secondary lining in the tunnel diseased section is obtained, and the section with the most unfavorable stress on the secondary lining is selected;
[0026] S22: according to the most unfavorable section determined in step S21, the horizontal surrounding rock pressure of the secondary lining is calculated by taking into account factors such as the stratum, hydrogeology, surrounding rock grade, burial depth, and the distribution ratio of the initial support and secondary lining loads of the most unfavorable section;
[0027] S23: According to the most unfavorable section determined in step S21, the surrounding rock pressure and the geometric parameters of the corrugated steel plate determined in step S22, a two-dimensional plane strain composite numerical calculation model containing the damaged secondary lining, the filling layer and the corrugated steel plate is established, wherein the damaged secondary lining and the filling layer, and the filling layer and the corrugated steel plate are considered to be rigidly connected, and the secondary lining structure is simulated by full-ring block unequal thickness beam units according to the secondary lining thickness results of non-destructive testing; the filling layer is simulated by solid elastic units; the corrugated steel plate structure is simulated by equivalent beam units, and the beam height and density of the corrugated steel plate equivalent beam are obtained according to the principle of equivalent bending stiffness; the interaction between the surrounding rock and the secondary lining is simulated by spring units, and the location nodes of the arch foot foundation structure on both sides are simulated by fixed ends;
[0028] S24: According to the composite numerical calculation model determined in step S23, the maximum horizontal reaction force F borne by the fixed nodes of the arch foot foundation structure on both sides is calculated. x , Maximum vertical reaction force F y With maximum bending moment M.
[0029] As a further improvement of the present invention, the reinforcement design of the corrugated steel plate lined arch foot foundation structure described in step S4 is based on the foundation structure geometric dimensions determined in step S1, the external force load determined in step S24 and the concrete strength grade determined in step S3 to perform the reinforcement design of the ultimate bearing capacity state and the normal use limit state of the reinforced concrete structure, determine the longitudinal force main reinforcement, and configure the structural stirrups according to the construction requirements.
[0030] As a further improvement of the present invention, the design of the locking foot anchor rod of the corrugated steel plate lined arch foot foundation structure in step S5 can be determined according to the following steps:
[0031] S51: According to the longitudinal block length L1 of the corrugated steel plate lining and the longitudinal spacing D of the locking anchor rods, the number of longitudinal roots n of the locking anchor rods per linear meter can be determined based on formula (3):
[0032] n=L1 / D (3)
[0033] Where D is the longitudinal spacing of the locking foot anchor rods;
[0034] S52: Based on formula (4), the design anchoring force Nr of each locking anchor can be determined:
[0035] Nr=(k1×F x ) / (n×cosθ) (4)
[0036] Where k1 is the anchor force safety factor of the anchor bolt design; F x is the maximum horizontal reaction force borne by the nodes of the arch foot foundation structure on both sides determined in step S24; n is the number of longitudinal roots of the locking foot anchor rods per linear meter determined in step S51, and θ is the angle between the locking foot anchor rods and the horizontal plane;
[0037] S53: Determine the locking foot anchor diameter d1 based on formula (5):
[0038]
[0039] Wherein, Nr is the design anchoring force of each locking foot anchor determined in step S52; σ is the tensile strength of the anchor rod body;
[0040] S54: Determine the length L of the locking foot anchor rod based on formula (6) and formula (7) R :
[0041] L R ≥L R1 +L R2 +L R3 (6)
[0042]
[0043] Where: L R1 L is the exposed length of the locking foot anchor rod; R2 L is the effective length of the locking anchor rod; R3 is the anchor length of the locking foot anchor rod; k2 is the safety factor of the locking foot anchor rod length; d1 is the locking foot anchor rod diameter determined in step S53; d2 is the drilling diameter of the locking foot anchor rod; f st Design tensile strength of the locking foot anchor rod; f cs is the bonding strength between the anchor filler and the steel bar; f cr It is the bonding strength between the locking anchor filling body and the surrounding rock.
[0044] Compared with the prior art, the present invention has the following beneficial effects:
[0045] Effect (1) By occupying half of the space of the original tunnel power cable trough, the construction space of the arch foot foundation structure is obtained, which avoids the secondary lining chiseling construction at the arch foot position, reduces the construction risk, saves construction costs, shortens the operation time, and reasonably determines the geometric dimensions of the arch foot foundation structure according to the actual needs of the site;
[0046] Effect (2) is to establish a two-dimensional plane strain composite numerical calculation model containing damaged secondary lining, filling layer and corrugated steel plate based on the tunnel lining disease detection results. The external load of the arch foot foundation structure is clarified according to the calculation results, and the quantitative design of the foundation structure reinforcement is realized, avoiding the blindness and arbitrariness of traditional methods and effectively improving the safety and reliability of the arch foot foundation structure.
[0047] Effect (3) is based on the calculation results of the composite numerical model of the damaged secondary lining, filling layer and corrugated steel plate as a whole, and the required bearing capacity of the foundation structure locking anchor rod is determined, so as to realize the quantitative design of the foundation structure locking anchor rod parameters and effectively ensure the lateral stability of the arch foot foundation structure.
[0048] In summary, the present invention provides a design method for the corrugated steel plate lined arch foot foundation structure of a railway tunnel, which avoids the original secondary lining chiseling construction, effectively reduces the construction risk, saves construction costs, shortens the operation time, further clarifies the external load of the foundation structure, and realizes the quantitative design of the foundation structure reinforcement and locking anchor parameters. The entire design process is clearly quantified, easy to implement, safe and reliable. The present invention can be widely used in the field of tunnel lining disease remediation design, is economical and applicable, and has great prospects for promotion and application. BRIEF DESCRIPTION OF THE DRAWINGS
[0049] Figure 1 A flow chart of the design of the corrugated steel plate lined arch foot foundation structure of a railway tunnel according to an embodiment of the present invention;
[0050] Figure 2 It is a schematic diagram of the design of the corrugated steel plate lining arch foot structure of the railway tunnel of the present invention;
[0051] Figure 3 It is a schematic diagram of the corrugated steel plate lining reinforcement structure of the railway tunnel of the present invention;
[0052] Figure 4 It is a schematic diagram of the connection between the corrugated steel plate lining and the arch foot foundation structure of the present invention;
[0053] Figure 5 It is a schematic diagram of the connection between the locking foot anchor rod and the surrounding rock of the present invention;
[0054] Figure 6 This is the reinforcement diagram of the arch foot structure of the present invention.
[0055] In all the drawings, the same reference numerals represent the same technical features, specifically: 1 is the secondary lining, 2 is the filling layer between the secondary lining and the corrugated steel plate, 3 is the corrugated steel plate lining, 31 is the grounding flange, 4 is the arch foot foundation structure, 41 is the longitudinal force-bearing main reinforcement, 42 is the structural stirrup, 5 is the locking foot anchor rod, 6 is the original tunnel power cable trough, 7 is the power cable trough after compression space, 8 is the longitudinal force-bearing main reinforcement, 9 is the structural stirrup, 10 is the filling body, 11 is the surrounding rock, 12 is the embedded anchor bolt, 13 is the nut, 14 is the implanted steel bar, b is the nearest horizontal distance from the intersection of the vertical center line of the cable trough and the horizontal line of the top surface of the base to the secondary lining structure; b1 is the top width of the reinforced concrete base, b2 is the bottom width of the reinforced concrete base; b3 is the seam width of the cable trough cover, b4 is the lap width of the cable trough cover; h is the height of the reinforced concrete base, h1 is the net width of the cable trough, h2 is the thickness of the cable trough cover, d1 is the diameter of the locking foot anchor rod, L R is the length of the locking foot anchor, L R1 L is the exposed length of the anchor rod. R2 is the effective length of the anchor rod, L R3 is the anchoring length. DETAILED DESCRIPTION
[0056] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0057] Embodiment 1
[0058] See also Figures 1 to 6 The present embodiment provides an arch foot structure of a corrugated steel plate lining of a railway tunnel. The present invention provides an arch foot structure of a corrugated steel plate lining of a railway tunnel, comprising an arch foot foundation structure and a plurality of locking foot anchor rods respectively located at two arch feet of the arched corrugated steel plate lining. The arch foot foundation structure is a reinforced concrete structure. The arch foot foundation structure is arranged longitudinally along the corrugated steel plate lining. The arch feet of the corrugated steel plate lining are fixed to the corresponding arch foot foundation structure. One end of the locking foot anchor rod is inserted into the anchor hole of the tunnel wall, and the other end of the locking foot anchor rod is fixed in the arch foot foundation structure. The plurality of locking foot anchor rods are distributed longitudinally along the corrugated steel plate lining.
[0059] The end of the locking foot anchor rod is connected to the arch foot of the corrugated steel plate lining.
[0060] The end of the locking foot anchor rod is connected to the corrugated steel plate lining arch foot through an anchor plate and a nut component, so that the corrugated steel plate arch and the locking foot anchor rod are stressed together, limiting the lateral deformation of the corrugated steel plate arch foot.
[0061] The arch foot of the corrugated steel plate lining is fixedly connected to the corresponding arch foot foundation structure through pre-buried anchor bolts; the arch foot of the corrugated steel plate lining 3 is provided with a grounding flange 31, and the pre-buried anchor bolts 12 located in the arch foot foundation structure are fixedly connected to the grounding flange 31 of the corrugated steel plate lining arch foot through nuts 13.
[0062] The locking foot anchor rod is installed in an inclined direction downward.
[0063] The arch foot foundation structure includes a concrete structure and a steel frame located in the concrete structure. The steel frame is composed of longitudinal force-bearing main bars 41 connected with structural stirrups 42.
[0064] The arch foot foundation structures at the two arch feet of the arched corrugated steel plate lining are respectively fixed on the bases on both sides of the tunnel, and the arch foot foundation structures are located between the secondary lining of the tunnel and the power cable trough provided on the base; the arch foot foundation structure is fixedly connected to the secondary lining by implanted steel bars 14, one end of the implanted steel bars is located in the secondary lining of the tunnel, and the other end of the implanted steel bars is located in the arch foot foundation structure.
[0065] In order to ensure the effective connection between the arch foot foundation structure and the secondary lining and the overall stress, the surface of the original secondary lining concrete was roughened, and HRB400 steel bars with a diameter of 20 mm were implanted. The implanted ends had 180-degree hooks and the implantation depth was 20 cm. A plum blossom-shaped arrangement with a spacing of 0.3 m was adopted, and Class A adhesive was used for anchoring.
[0066] Embodiment 2
[0067] See also Figures 1 to 6 This embodiment provides a method for designing a corrugated steel plate lining arch foot foundation structure of a railway tunnel, comprising the following steps:
[0068] S1: Design of geometric dimensions of corrugated steel plate 3 lining arch foot foundation structure 4;
[0069] S11: The length of the arch foot foundation structure 4 arranged longitudinally along the corrugated steel plate 3 is equal to the length of the tunnel disease section remediation;
[0070] S12: In order to ensure the strength, rigidity and stability of the corrugated steel plate 3 lined arch foot foundation structure 4, the geometric dimensions of the foundation structure need to be increased as much as possible. Considering that the length of the tunnel disease section is short, it can occupy half of the space of the tunnel auxiliary structure power cable trough 6 according to the on-site conditions. The base bottom width b2 is the shortest horizontal distance from the intersection of the vertical center line of the tunnel power cable trough 6 and the horizontal line of the bottom surface of the tunnel power cable trough 6 to the secondary lining 3 structure. Based on formula (1) and formula (2), the top width b1 and height h of the arch foot foundation structure 4 can be obtained:
[0071] b1=b-b3-b4 (1)
[0072] h=2(h1+h2) (2)
[0073] In the formula: b is the closest horizontal distance from the intersection of the vertical center line of the tunnel power cable trough 6 and the horizontal line of the top surface of the base to the secondary lining 3 structure; b3 is the seam width of the cover plate of the tunnel power cable trough 6, generally b3 = 10mm; b4 is the overlap width of the cover plate of the tunnel power cable trough 6, generally b4 = 70mm; h1 is the net width of the tunnel power cable trough 6; h2 is the thickness of the cover plate of the tunnel power cable trough 6, generally h2 = 80mm.
[0074] S2: corrugated steel plate 3 lining arch foot foundation structure 4 external load determination;
[0075] S21: Based on the results of on-site testing and investigation, the thickness table of the secondary lining 3 of the tunnel diseased section is obtained, and the section with the most unfavorable stress on the secondary lining 1 is selected;
[0076] S22: according to the most unfavorable section determined in step S21, the horizontal surrounding rock pressure of the secondary lining 1 is calculated by taking into account factors such as the stratum, hydrogeology, surrounding rock grade, burial depth, and the initial support and secondary lining 1 load distribution ratio of the most unfavorable section;
[0077] S23: According to the most unfavorable section determined in step S21, the surrounding rock pressure and the geometric parameters of the corrugated steel plate 3 determined in step S22, a two-dimensional plane strain composite numerical calculation model containing the damaged secondary lining 1, the filling layer 2, and the corrugated steel plate 3 is established, wherein it is considered that the damaged secondary lining 1 and the filling layer 2, and the filling layer 2 and the corrugated steel plate 3 are rigidly connected, and the secondary lining 1 structure is simulated by full-ring block unequal thickness beam units according to the non-destructive testing results of the secondary lining 1 thickness; the filling layer 2 is simulated by solid elastic units; the corrugated steel plate 3 structure is simulated by equivalent beam units, and the beam height and density of the equivalent beam of the corrugated steel plate 3 are obtained according to the principle of equivalent bending stiffness; the interaction between the surrounding rock and the secondary lining 1 is simulated by spring units, and the position nodes of the arch foot foundation structure 4 on both sides are simulated by fixed ends;
[0078] S24: According to the composite numerical calculation model determined in step S23, the maximum horizontal reaction force F borne by the fixed nodes of the arch foot foundation structure 4 on both sides is calculated. x , Maximum vertical reaction force F y With maximum bending moment M.
[0079] S3: The concrete strength grade of the corrugated steel plate 3 inner lining arch foot foundation structure 4 is determined. To ensure the strength of the foundation structure, a grade higher than the concrete strength grade of the secondary lining 1 is adopted;
[0080] S4: Reinforcement design of the corrugated steel plate 3 lined arch foot foundation structure 4, according to the geometric dimensions of the foundation structure 4 determined in step S1, the external load determined in step S24 and the concrete strength grade determined in step S3, the ultimate limit state and the normal use limit state reinforcement design of the reinforced concrete structure bearing capacity are carried out, the longitudinal force-bearing main reinforcement 8 is determined, and the structural stirrups 9 are configured as required. For example, the present invention adopts triangular stirrups, and the stirrups adopt HRB400 steel bars with a diameter of 12 mm, and the longitudinal spacing is 100 mm.
[0081] S5: Design of corrugated steel plate 3 lined arch foot foundation structure 4 locking foot anchor 5, determine the longitudinal spacing D, the number of longitudinal roots per linear meter N, the diameter d1 and the length L of the locking foot anchor 5 R parameter;
[0082] S51: According to the longitudinal block length L1 of the corrugated steel plate lining and the longitudinal spacing D of the locking anchor rods 5, the longitudinal number n of the locking anchor rods 5 per linear meter can be determined based on formula (3):
[0083] n=L1 / D (3)
[0084] Where D is the longitudinal spacing of the locking foot anchor rods 5, which is generally 0.3m to 0.5m;
[0085] S52: Based on formula (4), the design anchoring force Nr of each locking foot anchor rod 5 can be determined:
[0086] Nr=(k1×F x ) / (n×cosθ) (4)
[0087] Where, k1 is the anchor force safety factor of the anchor rod design, which is generally taken as 1.2 to 1.3; F x is the maximum horizontal reaction force borne by the nodes of the arch foot foundation structure 4 on both sides determined in step S24; n is the number of longitudinal roots of the locking foot anchor rods 5 per linear meter determined in step S51, and θ is the angle between the locking foot anchor rods 5 and the horizontal plane, which is generally taken as 15° to 20°;
[0088] S53: Determine the diameter d1 of the locking foot anchor rod 5 based on formula (5):
[0089]
[0090] Wherein, Nr is the design anchoring force of each locking foot anchor rod 5 determined in step S52; σ is the tensile strength of the anchor rod body;
[0091] S54: Determine the length L of the locking foot anchor rod 5 based on formula (6) and formula (7) R :
[0092] L R ≥L R1 +L R2 +LR3 (6)
[0093]
[0094] Where: L R1 L is the exposed length of the locking foot anchor rod 5, which is generally 0.2m to 0.3m; R2 L is the effective length of the locking foot anchor rod 5; R3 is the anchoring length of the locking foot anchor rod 5, which is generally (0.5-0.6) m; k2 is the safety factor of the length of the locking foot anchor rod 5, which is generally 1.3; d1 is the diameter of the locking foot anchor rod 5 determined in step S53; d2 is the drilling diameter of the locking foot anchor rod, which is d2=d1+25 mm; f st Design tensile strength of the locking foot anchor rod 5; f cs is the bonding strength between the locking foot anchor filler 10 and the steel bar (anchor rod body 5); cr It is the bonding strength between the filling body of the locking foot anchor 5 and the surrounding rock 11.
[0095] The filling body of the locking anchor is generally cement mortar, which is used to bond the anchor rod body (i.e., steel bar) to the surrounding rock. The filling body refers to cement mortar, and the anchor rod body (i.e., steel bar) and the surrounding rock are connected by cement mortar, so there are bonding surfaces between the filling body and the steel bar, and between the filling body and the surrounding rock. cs Determined according to the anchor rod material and filler material; cr It can be determined based on on-site anchor pull-out force tests.
[0096] It will be easily understood by those skilled in the art that the above description is only a preferred embodiment of the present invention and is not intended to limit the invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
[0097] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A method for optimizing the design of the corrugated steel plate lining arch foot structure of a railway tunnel, characterized in that: The steps include: S1: Design of geometric dimensions of corrugated steel plate lined arch foot foundation structure. The specific steps include: S11: The length of the arch foot foundation structure along the longitudinal arrangement of the corrugated steel plate is equal to the length of the tunnel disease section remediation; S12: In order to ensure the strength, rigidity and stability of the corrugated steel plate lined arch foot foundation structure, the geometric dimensions of the foundation structure need to be increased. Considering that the tunnel disease section is short, half of the space of the power cable trough of the tunnel auxiliary structure can be occupied according to the site conditions. The bottom width of the base b2 is the shortest horizontal distance from the intersection of the vertical center line of the cable trough and the horizontal line of the bottom surface of the cable trough to the secondary lining structure. Based on formula (1) and formula (2), the top width b1 and height h of the arch foot foundation structure can be obtained: b1=b-b3-b4 (1) h=2(h1+h2)(2) Where: b is the shortest horizontal distance from the intersection of the vertical center line of the cable trough and the horizontal line of the top surface of the base to the secondary lining structure; b3 is the seam width of the cable trough cover; b4 is the overlap width of the cable trough cover; h1 is the net width of the cable trough; h2 is the thickness of the cable trough cover; S2: Determination of external loads on the corrugated steel plate lined arch foot foundation structure. The specific steps include: S21: Based on the results of on-site testing and investigation, the thickness table of the secondary lining in the tunnel diseased section is obtained, and the section with the most unfavorable stress on the secondary lining is selected; S22: according to the most unfavorable section determined in step S21, the horizontal surrounding rock pressure of the secondary lining is calculated taking into account the stratum, hydrogeology, surrounding rock grade, burial depth and the initial support and secondary lining load distribution ratio factors of the most unfavorable section; S23: According to the most unfavorable section determined in step S21, the surrounding rock pressure determined in step S22 and the geometric parameters of the corrugated steel plate, a two-dimensional plane strain composite numerical calculation model containing the damaged secondary lining, the filling layer and the corrugated steel plate is established, wherein the damaged secondary lining and the filling layer, and the filling layer and the corrugated steel plate are considered to be rigidly connected, and the secondary lining structure is simulated by full-ring block unequal thickness beam units according to the secondary lining thickness results of non-destructive testing; the filling layer is simulated by solid elastic units; the corrugated steel plate structure is simulated by equivalent beam units, and the beam height and density of the corrugated steel plate equivalent beam are obtained according to the principle of equivalent bending stiffness; the interaction between the surrounding rock and the secondary lining is simulated by spring units, and the location nodes of the arch foot foundation structure on both sides are simulated by fixed ends; S24: According to the composite numerical calculation model determined in step S23, the maximum horizontal reaction force F borne by the fixed nodes of the arch foot foundation structure on both sides is calculated. x , Maximum vertical reaction force F y and the maximum bending moment M; S3: The strength grade of the concrete of the corrugated steel plate lined arch foot foundation structure is determined. To ensure the strength of the foundation structure, a grade higher than the strength grade of the secondary lining concrete is used; S4: Structural reinforcement design of corrugated steel plate lined arch foot foundation; S5: Design of locking anchor rods for corrugated steel plate lined arch foot foundation structure, determine the longitudinal spacing D, the number of longitudinal roots per linear meter N, the diameter d1 and the length L of the locking anchor rods R Parameters, the specific steps include: S51: According to the longitudinal block length L1 of the corrugated steel plate lining and the longitudinal spacing D of the locking anchor rods, the number of longitudinal locking anchor rods per meter can be determined based on formula (3): n = L1 / D (3) Where D is the longitudinal spacing of the locking foot anchor rods; S52: Based on formula (4), the design anchoring force Nr of each locking anchor can be determined: (4); Where k1 is the anchor force safety factor of the anchor bolt design; F x is the maximum horizontal reaction force borne by the nodes of the arch foot foundation structure on both sides determined in step S2; n is the number of longitudinal roots of the locking foot anchor rods per meter determined in step S51, is the angle between the locking foot anchor rod and the horizontal plane; S53: Determine the locking foot anchor diameter d1 based on formula (5): (5); Wherein, Nr is the design anchoring force of each locking anchor rod determined in step S52; is the tensile strength of the anchor rod body; S54: Determine the length L of the locking foot anchor rod based on formula (6) and formula (7) R : (6) (7); Where: L R1 L is the exposed length of the locking foot anchor rod; R2 L is the effective length of the locking anchor rod; R3 is the anchoring length of the locking foot anchor rod; is the safety factor of the locking foot anchor rod length; d1 is the locking foot anchor rod diameter determined in step S53; d2 is the locking foot anchor rod drilling diameter; Design tensile strength for the locking foot anchor rod; It is the bonding strength between the locking foot anchor filler and the steel bar; It is the bonding strength between the locking anchor filling body and the surrounding rock.
2. The method according to claim 1, characterized in that: The reinforcement design of the corrugated steel plate lined arch foot foundation structure is carried out according to the geometric dimensions of the foundation structure determined in step S1, the external force load determined in step S2 and the concrete strength grade determined in step S3 to carry out the reinforcement design of the ultimate bearing capacity state and the normal use limit state of the reinforced concrete structure, determine the longitudinal force main reinforcement, and configure the structural stirrups according to the structural requirements.