A road embankment retaining structure

By using a U-shaped groove structure and adjustable pulling anchor cable in the embankment support structure, the problems of height restricted and large machining in the existing technology are solved, and small structural size and machining are achieved. The effect of small quantity and controllable wall top displacement, and the wall top displacement deformation is regularly monitored through monitoring equipment during operation.

CN110847227BActive Publication Date: 2024-11-15CHINA RAILWAY FIFTH SURVEY & DESIGN INST GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201911268257.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-12-11
Publication Date
2024-11-15
Estimated Expiration
2039-12-11

AI Technical Summary

Technical Problem

The existing embankment support structures have problems such as height restriction, large structural size, large machining volume and difficult wall top displacement.

Method used

Adopt embankment support structure including foundation, U-shaped groove structure and adjustable pull-on anchor cable, fixedly installed on the top of the foundation through the U-shaped groove structure, fill the filler, and adjust its tension force by pull-on anchor cable to share the filling Soil lateral pressure and vehicle load control wall top displacement.

Benefits of technology

It has achieved the effect of small structural size, small machining volume, and controllable wall top displacement, breaking through the height limitation of traditional embankment support structures, and regularly monitoring the wall top displacement and deformation during operation through monitoring equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110847227B_ABST
    Figure CN110847227B_ABST
Patent Text Reader

Abstract

The embodiments of the present application relate to the technical field of embankment support, and specifically, to an embankment support structure. The embankment support structure includes a foundation, a U-shaped groove structure, tension anchor cables, and fillers; the U-shaped groove structure is fixedly installed on the top of the foundation, and includes a bottom wall and two side walls fixedly connected to the two ends of the bottom wall and arranged oppositely, and a U-shaped groove is formed around the bottom wall and the side walls; the tension anchor cables are adjustably tensioned between the two side walls; and the fillers are filled in the U-shaped groove. The embankment support structure can solve the problems of the existing embankment support structure, such as limited height, large structural size, large masonry workload, and difficult to control wall top displacement.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of embankment support, and in particular, to an embankment support structure. Background Art

[0002] The existing embankment retaining structures mainly include the following: gravity and counterweight retaining walls, cantilever and buttress retaining walls, trough retaining walls, reinforced earth retaining walls, pile foundation beam retaining walls and pile foundation cantilever retaining walls, pile-sheet walls, etc. In the design and actual engineering applications, the above traditional embankment retaining structures have the following defects: the height of the embankment retaining wall generally cannot exceed 8m, the existing retaining structures mostly rely on their own gravity to resist the lateral pressure of the embankment fill and vehicle loads, and there are no effective measures to control the displacement and deformation of the top of the wall during the operation period after the construction is completed. As a result, the existing embankment retaining structures have the problems of height limitation, large structural size, large masonry volume and difficult to control the displacement of the top of the wall. Summary of the invention

[0003] An embankment retaining structure is provided in an embodiment of the present application, which can solve the problems of existing embankment retaining structures, such as limited height, large structural size, large amount of masonry work and difficult to control wall top displacement.

[0004] The embodiment of the present application provides an embankment retaining structure, which includes a foundation, a U-shaped groove structure, a tension anchor cable and a filler;

[0005] The U-shaped groove structure is fixedly installed on the top of the foundation, and includes a bottom wall and two side walls fixedly connected to both ends of the bottom wall and arranged opposite to each other, and a U-shaped groove is formed between the bottom wall and the side walls;

[0006] The tension anchor cable is adjustably tensioned between the two side walls;

[0007] The filler is filled in the U-shaped groove.

[0008] Preferably, the U-shaped groove structure comprises a plurality of U-shaped beams arranged in parallel, a longitudinal connecting beam fixedly connected to adjacent U-shaped beams, and a plug plate fixedly mounted on the U-shaped beams;

[0009] The insert plate is fixedly mounted on the U-shaped beam to form the side wall and the bottom wall;

[0010] The tension anchor cable is installed on each of the U-shaped beams.

[0011] Preferably, each of the U-shaped beams comprises a bottom crossbeam and columns disposed at both ends of the bottom crossbeam;

[0012] The plugboard includes a plurality of side plugboards and a plurality of bottom plugboards;

[0013] The side plug plate is fixedly mounted on the column;

[0014] The bottom plug plate is fixedly mounted on the bottom of the bottom crossbeam;

[0015] The tension anchor cable is installed on the column.

[0016] Preferably, the tension anchor cable comprises an anchor cable and anchors arranged at both ends of the anchor cable;

[0017] The end of the anchor cable is detachably connected to the anchor after passing through the side plug plate and the column.

[0018] Preferably, it also includes a protective sleeve installed between the columns and a positioning tube installed on the columns;

[0019] The anchor cable is inserted into the protective casing;

[0020] The positioning tube is pre-buried in the column.

[0021] Preferably, the foundation is a pile foundation, comprising piles and a raft of an integrated structure, wherein the raft is located on top of the piles.

[0022] Preferably, the side plug plate is provided with a drainage hole.

[0023] Preferably, the U-shaped beam, the longitudinal connecting beam, the side insert plates and the bottom insert plates are all prefabricated reinforced concrete parts.

[0024] Preferably, the U-shaped beam is connected to the longitudinal connecting beam, the side insert plate and the bottom insert plate by pins or bolts.

[0025] Preferably, an inner corner located inside the U-shaped groove and an outer corner located outside the U-shaped groove are provided at the connection portion between the column and the bottom cross beam.

[0026] The embankment retaining structure provided in the embodiment of the present application has the following beneficial effects:

[0027] Since the above-mentioned embankment retaining structure includes a U-shaped groove structure arranged on the top of the foundation, and adjustable tension anchor cables are tensioned on the opposite side walls of the U-shaped groove structure; the U-shaped groove structure combined with the tension anchor cables can adjust the force system of the rigid retaining structure of the retaining wall, control the displacement of the wall top, and break through the maximum height of the general retaining wall design; the tension anchor cables share the role of the U-shaped groove structure in resisting the lateral pressure of the embankment fill and the vehicle load, which can reduce the structure size and the amount of masonry work; by adjusting the tensioning force of the tension anchor cables, it is convenient to control the development of the wall top displacement or reversely correct the wall top displacement; at the same time, in combination with monitoring equipment such as anchor cable stress gauges and level meters, regular monitoring of the wall top displacement deformation during the operation period can be carried out.

[0028] Therefore, the embankment retaining structure has the characteristics of small structural size, small masonry volume, controllable wall top displacement and the ability to break through height restrictions. It can solve the problems of existing embankment retaining structures such as limited height, large structural size, large masonry volume and difficult to control wall top displacement. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] The drawings described herein are used to provide a further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:

[0030] Figure 1 A schematic structural diagram of an embankment retaining structure provided in an embodiment of the present application;

[0031] Figure 2 for Figure 1 A side view of the embankment retaining structure provided in;

[0032] Figure 3 for Figure 1 An overhead view of the embankment retaining structure is provided in.

[0033] Reference numerals:

[0034] 1-foundation; 2-U-shaped groove structure; 3-tension anchor cable; 11-pile; 12-raft; 21-U-shaped groove; 22-U-shaped beam; 23-longitudinal connecting beam; 24-side plug plate; 25-bottom plug plate; 31-anchor cable; 32-anchor; 221-bottom cross beam; 222-column; 223-inner corner; 224-outer corner. DETAILED DESCRIPTION

[0035] In order to make the technical solutions and advantages in the embodiments of the present application more clearly understood, the exemplary embodiments of the present application are further described in detail below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present application, rather than an exhaustive list of all the embodiments. It should be noted that the embodiments in the present application and the features in the embodiments can be combined with each other without conflict.

[0036] An embodiment of the present application provides an embankment support structure, which is suitable for use in fill embankment support projects such as railways, highways, municipal roads, and port dams.

[0037] like Figure 1 and Figure 2As shown in the structure, the embankment retaining structure includes a foundation 1, a U-shaped groove structure 2, a tension anchor cable 3 and a filler (not shown in the figure); the foundation 1 can be a pile 11 foundation, and includes a pile 11 and a raft 12 of an integrated structure, the raft 12 is located on the top of the pile 11, the pile 11 can be a bored pile 11, the pile 11 and the raft 12 can be made of reinforced concrete on-site construction, or can also be made of reinforced concrete prefabricated parts; the size and number of the pile 11 can be calculated and determined according to specific roadbed parameters;

[0038] The U-shaped groove structure 2 is fixedly installed on the top of the foundation 1, and includes a bottom wall and two side walls fixedly connected to both ends of the bottom wall and arranged opposite to each other, and a U-shaped groove 21 is formed between the bottom wall and the side walls; a filler is filled in the U-shaped groove 21; the filler can be a building filler such as soil, and after the filler is filled in the U-shaped groove 21, it is necessary to compact the filled filler using a small rolling machine;

[0039] The tension anchor cable 3 can be adjusted to be tensioned between the two side walls. Figure 1 and Figure 3 As shown in the structure, a plurality of tension anchor cables 3 are arranged on opposite side walls in the U-shaped groove structure 2, and the tensioning force of the tension anchor cables 3 can be adjusted to achieve control and adjustment of the side walls.

[0040] During the use of the above-mentioned embankment retaining structure, the pressure of filler and other backfill and the vehicle load on the road are transmitted to the U-shaped beam 22 through the plug plate fixedly installed on the side wall of the U-shaped trough structure 2, and the main load is borne by the tension anchor cable 3. The tension anchor cable 3 is used as the main force-bearing system to bear the lateral pressure of the backfill in the U-shaped trough 21; during construction, the prestressing can be adjusted according to the deformation observation results of the U-shaped beam 22 at different stages to ensure that the deformation of the U-shaped beam 22 and the tension anchor cable 3 are coordinated and the force is optimal.

[0041] Since the above-mentioned embankment retaining structure includes a U-shaped groove structure 2 arranged on the top of the foundation 1, and adjustable tension anchor cables 3 are tensioned on the opposite side walls of the U-shaped groove structure 2; the U-shaped groove structure 2 combined with the tension anchor cables 3 can adjust the force system of the rigid retaining structure of the retaining wall, control the displacement of the wall top, and break through the maximum height of the general retaining wall design; the tension anchor cables 3 share the role of the U-shaped groove structure 2 in resisting the lateral pressure of the embankment fill and the vehicle load, the structural size can be reduced, the amount of masonry work can be reduced, and the tensioning force of the tension anchor cables 3 can be adjusted to facilitate the control of the development of the wall top displacement or reverse correction of the wall top displacement. At the same time, in combination with monitoring equipment such as anchor stress gauges and level meters, regular monitoring of the wall top displacement deformation during the operation period can be carried out.

[0042] Therefore, the embankment retaining structure has the characteristics of small structural size, small masonry volume, controllable wall top displacement and the ability to break through height restrictions. It can solve the problems of existing embankment retaining structures such as limited height, large structural size, large masonry volume and difficult to control wall top displacement.

[0043] In a specific implementation manner, Figure 2 and Figure 3 As shown in the structure, the U-shaped trough structure 2 includes a plurality of U-shaped beams 22 arranged in parallel, a longitudinal connecting beam 23 fixedly connected to adjacent U-shaped beams 22, and a plug plate fixedly installed on the U-shaped beam 22; the plug plate is fixedly installed on the U-shaped beam 22 to form a side wall and a bottom wall; and a tension anchor cable 3 is installed on each U-shaped beam 22. Figure 2 and Figure 3 As shown in the structure, the U-shaped groove structure 2 includes three U-shaped beams 22 arranged in parallel, and the U-shaped beams 22 are fixedly connected together by longitudinal connecting beams 23 and plug plates, and the U-shaped groove 21 is formed by the plug plates fixedly installed between the U-shaped beams 22; the plug plates may include side plug plates 24 fixedly installed on the U-shaped beams 22 and forming side walls, and bottom plug plates 25 fixedly installed on the U-shaped beams 22 and forming bottom walls. The side plug plates 24 and the bottom plug plates 25 may adopt the same structure and may also adopt the same paving form; Figure 2 and Figure 3 The structure shown is only used to illustrate the specific composition of the U-shaped trough structure 2. In actual use, the U-shaped trough structure 2 can be provided with 10, 20, 30 or more U-shaped beams 22 according to the actual length of the roadbed; the longitudinal connecting beams 23 fixedly connecting the U-shaped beams 22 can be arranged at intervals of 1, 2, 3 or more along the height direction, and the number and position of the longitudinal connecting beams 23 are set according to actual needs.

[0044] By using fixedly connected U-shaped beams 22, longitudinal connecting beams 23 and insert plates to form a U-shaped groove structure 2, the size of the existing embankment retaining wall structure at the same height can be reduced, the construction workload can be reduced, and the masonry workload can be reduced by more than 50%. The U-shaped beams 22 are fixedly connected to form an integrated structure through the longitudinal connecting beams 23, which is conducive to improving the overall stability of the embankment retaining structure.

[0045] like Figure 1 As shown in the structure, each U-shaped beam 22 includes a bottom crossbeam 221 and columns 222 disposed at both ends of the bottom crossbeam 221; Figure 1As shown in the structure, the bottom crossbeam 221 of the U-shaped beam 22 is located at the top of the foundation 1, and columns 222 are respectively arranged at both ends of the bottom crossbeam 221. The cross-sectional shape of the column 222 can be any shape such as circular, rectangular, square, stepped, etc.; at the same time, in order to improve the connection strength between the column 222 and the bottom crossbeam 221, an inner corner 223 located in the U-shaped groove 21 and an outer corner 224 located outside the U-shaped groove 21 are arranged at the connection part between the column 222 and the bottom crossbeam 221; the plug plate includes a plurality of side plug plates 24 and a plurality of bottom plug plates 25; the side plug plates 24 are fixedly installed on the column 222; the bottom plug plate 25 is fixedly installed on the bottom of the bottom crossbeam 221; and the tension anchor cable 3 is installed on the column 222. The longitudinal connecting beam 23, the side plug plates 24 and the bottom plug plates 25 can all be connected to the U-shaped beam 22 by using non-penetrating pins, or by bolts.

[0046] By setting the tension anchor cable 3 on the column 222, the lateral pressure of the upper fill and the vehicle load can be shared, and the bending moment at the corner of the retaining wall can be reduced; corner equal wall heels are set on the inner and outer sides of the corner between the column 222 and the bottom beam 221, and the bending moment at the corner is shared by the resistance of the corner equal wall heels; in order to further improve the structural strength at the corner, oblique tension bars can also be set on the inner side of the corner to improve the tensile strength of the reinforced concrete at the corner, thereby improving the structural strength and rigidity of the embankment retaining structure.

[0047] like Figure 1 and Figure 3 As shown in the structure, the tension anchor cable 3 may include an anchor cable 31 and anchors 32 arranged at both ends of the anchor cable 31; the ends of the anchor cable 31 are detachably connected to the anchors 32 after passing through the side plug plate 24 and the column 222. When preparing the side plug plate 24 and the column 222, an anchor cable 31 installation hole for passing the anchor cable 31 can be reserved. After the anchor cable 31 passes through the anchor cable 31 installation hole, the anchor cable 31 is tensioned between the two columns 222 by the anchor 32, thereby sharing the lateral pressure of the U-shaped beam 22 and improving the structural reliability; the prestress of the anchor cable 31 can bear the instantaneous impact force brought by the dynamic load of vehicles such as trains, prevent the cracking problem at the connection between the side wall and the bottom wall of the U-shaped groove 21, and effectively control the displacement of the top wall of the U-shaped groove 21; during operation, the stress of the anchor cable 31 and the deformation of the wall are regularly monitored by the anchor cable stress gauge, and the anchor cable 31 can be adjusted and replaced in time when abnormalities or damage are found, so as to ensure that the entire structural force system is effectively controllable, thereby reducing the difficulty of operation and maintenance.

[0048] In order to improve the service life of the tension anchor cable 3, the above-mentioned embankment support structure can also include a protective casing (not shown in the figure) installed between the columns 222 and a positioning tube (not shown in the figure) installed on the column 222; the anchor cable 31 is inserted into the protective casing; the positioning tube is pre-buried in the column 222.

[0049] The protective sleeve and the positioning tube can protect the anchor cable 31 from damage such as wear and corrosion, thereby ensuring the tensile strength and service life of the anchor cable 31 during use, thereby improving the reliability and stability of the U-shaped groove structure 2.

[0050] In order to prevent water accumulation in the U-shaped groove 21, drainage holes are provided on the side plug plates 24 so that rainwater and other accumulated water in the U-shaped groove 21 can flow out of the U-shaped groove 21 through the drainage holes to prevent the safety of the embankment from being affected by excessive water accumulation.

[0051] On the basis of the various embodiments described above, the U-shaped beam 22, the longitudinal connecting beam 23, the side insert plate 24, and the bottom insert plate 25 can all be reinforced concrete prefabricated parts. During the prefabrication process, the U-shaped beam 22, the longitudinal connecting beam 23, the side insert plate 24, and the bottom insert plate 25 of different sizes and models can be prefabricated and mass-produced. Since the components constituting the U-shaped trough structure 2 can all be prefabricated in advance, the on-site assembly construction speed is fast, and multi-point synchronous construction can be carried out, which is conducive to improving the construction progress and shortening the construction period.

[0052] The above-mentioned embankment retaining structure can be constructed in the following order:

[0053] The first step is to calculate the prestressing force of the anchor cable 31 and the size and reinforcement of each prefabricated component according to the width of the roadbed surface, the height of the fill and the train load, and prefabricate them according to different models; when prefabricating the U-shaped beam, the tension of the anchor cable 31 can be considered, and the reinforcement can be strengthened at the stress-bearing part of the anchor cable 31;

[0054] The second step is to level the site after the foundation treatment, and pour a layer of concrete leveling layer on the crushed stone cushion layer for the composite foundation and the pile 11 mesh structure. The foundation 1 structure may not have a leveling layer. If a leveling layer is set, a bottom plug plate 25 is set on the leveling layer;

[0055] The third step is to use mechanical lifting to erect the U-shaped beam 22 on the bottom plug plate 25 and connect and fix it with bolts or pins. When the longitudinal connecting beam 23 is used to assemble the first and second U-shaped beams 22, mechanical equipment can be used to fix the U-shaped beam 22 to prevent it from tipping over or tilting.

[0056] Step 4: Use a lifting platform to assemble a longitudinal connecting beam 23 and two U-shaped beams 22 and fix them by penetrating bolts, and the columns 222 on both sides of the U-shaped beam 22 are constructed simultaneously;

[0057] The fifth step is to install the anchor cable 31 positioning tube, the anchor cable 31 and the anchor cable stress gauge through the reserved anchor cable 31 installation hole of the U-shaped beam 22, and apply the initial tensile stress of the anchor cable 31 according to the calculation, and lock the anchor cable 31 and the anchor 32 with the two columns 222 of the U-shaped beam 22;

[0058] Step 6: Install the side plug plate 24 by mechanical lifting operation. The side plug plate 24 and the U-shaped beam 22 are fixed by impermeable bolts. After every 2m to 3m of installation, fill the soil. When the height is 0.5m from the side plug plate 24, install the upper side plug plate 24, and then fill the soil. The process is carried out in sequence. The mechanical joints of each part are treated with anti-rust treatment, and the side plug plate 24 is reserved with drainage holes.

[0059] Finally, the backfilling operation is carried out in layers, and the filling material is compacted by a small rolling machine. When the clearance under the anchor cable 31 does not meet the mechanical construction conditions, artificial vibration compaction is adopted locally. When the backfilling reaches the position of the anchor cable 31, the prestress of the anchor cable 31 is adjusted to 70% of the design value. After the backfilling is completed, the prestress of the anchor cable 31 is adjusted to the design value.

[0060] Although the preferred embodiments of the present application have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications falling within the scope of the present application.

[0061] Obviously, those skilled in the art can make various changes and modifications to the present application without departing from the spirit and scope of the present application. Thus, if these modifications and variations of the present application fall within the scope of the claims of the present application and their equivalents, the present application is also intended to include these modifications and variations.

Claims

1. A road embankment retaining structure, characterized in that: Including foundation, U-shaped channel structure, tension anchor cables and fillers; The U-shaped groove structure is fixedly installed on the top of the foundation, and includes a bottom wall and two side walls fixedly connected to both ends of the bottom wall and arranged opposite to each other, and a U-shaped groove is formed between the bottom wall and the side walls; The tension anchor cable is adjustably tensioned between the two side walls; The filler is filled in the U-shaped groove; The U-shaped groove structure includes a plurality of U-shaped beams arranged in parallel, a longitudinal connecting beam fixedly connected to adjacent U-shaped beams, and a plug plate fixedly installed on the U-shaped beams; The insert plate is fixedly mounted on the U-shaped beam to form the side wall and the bottom wall; The tension anchor cable is installed on each of the U-shaped beams; Each of the U-shaped beams comprises a bottom crossbeam and columns arranged at both ends of the bottom crossbeam; The plugboard includes a plurality of side plugboards and a plurality of bottom plugboards; The side plug plate is fixedly mounted on the column; The bottom plug plate is fixedly mounted on the bottom of the bottom crossbeam; The tension anchor cable is installed on the column; The tension anchor cable comprises an anchor cable and anchors arranged at both ends of the anchor cable; The end of the anchor cable is detachably connected to the anchor after passing through the side plug plate and the column.

2. The embankment retaining structure according to claim 1, characterized in that: It also includes a protective sleeve installed between the columns and a positioning tube installed on the columns; The anchor cable is inserted into the protective casing; The positioning tube is pre-buried in the column.

3. The embankment retaining structure according to claim 1, characterized in that: The foundation is a pile foundation, comprising piles and a raft slab of an integrated structure, wherein the raft slab is located on the top of the piles.

4. The embankment retaining structure according to claim 3, characterized in that: The side plug plate is provided with a drain hole.

5. The embankment retaining structure according to claim 4, characterized in that: The U-shaped beam, the longitudinal connecting beam, the side insert plates and the bottom insert plates are all prefabricated reinforced concrete parts.

6. The embankment retaining structure according to claim 5, characterized in that: The U-shaped beam is connected to the longitudinal connecting beam, the side plug plate and the bottom plug plate by pins or bolts.

7. The embankment retaining structure according to any one of claims 1 to 6, characterized in that: An inner corner located in the U-shaped groove and an outer corner located outside the U-shaped groove are arranged at the connection portion between the column and the bottom cross beam.