Wire harness assembly system

By designing a wire harness distribution system that includes scanning, detection and video recording functions, the problem that existing systems cannot automatically issue drawings and conduct cost analysis is solved, and the automation and efficiency improvement of wire harness distribution is achieved.

CN110880208BActive Publication Date: 2024-11-12XIAN MIDLINE SOFTWARE TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201811038249.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2018-09-06
Publication Date
2024-11-12
Estimated Expiration
2038-09-06

Smart Images

  • Figure CN110880208B_ABST
    Figure CN110880208B_ABST
Patent Text Reader

Abstract

The embodiment of the present invention discloses a wire harness subassembly system, including: a wire harness subassembly station, on which a scanning device and a detection device are arranged; an operator card, which integrates the identity information of the operator; a subassembly and detection integrated fixture, which is detachably mounted on the wire harness subassembly station, and the detection terminals of the detection device can be electrically connected to the two ends of the wire harness installed on the subassembly and detection integrated fixture; a server, which is signal-connected to the signal output end of the scanning device and the signal output end of the detection device; and a display device, which is signal-connected to the controller. The beneficial effects of the embodiment of the present invention are: completing the issuance of drawings, conduction detection and data analysis.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of wire harness subassembly, and in particular to a wire harness subassembly system. Background Art

[0002] Since there are many wire harnesses during subassembly and the subassembly needs to be carried out according to a predetermined path, wire harness subassembly tooling (wire harness subassembly jig) is usually used. However, it can only provide assistance for the subassembly process, but cannot automatically issue drawings, conduction detection, subassembly traceability, subassembly material summary, cost analysis, etc. Other methods are also needed to carry out the corresponding work, making the wire harness subassembly work cumbersome and inefficient. Summary of the invention

[0003] The purpose of the embodiments of the present invention is to provide a wire harness subassembly system to solve the problem that the existing system cannot automatically issue drawings, conduction detection, subassembly traceability, subassembly material summary, cost analysis, etc.

[0004] To achieve the above purpose, the technical solution of the embodiment of the present invention is:

[0005] A wiring harness subassembly system, comprising:

[0006] A wire harness dispensing platform, wherein a scanning device capable of scanning an operator card is provided on the wire harness dispensing platform, and a detection device capable of detecting whether the wire harness is correctly dispensing is also provided on the wire harness dispensing platform;

[0007] Operator card, which integrates the operator's identity information;

[0008] A sub-packaging and detection integrated jig, which is detachably mounted on the wiring harness sub-packaging platform, and the detection terminals of the detection device can be electrically connected to both ends of the wiring harness installed on the sub-packaging and detection integrated jig;

[0009] A server is connected to the signal output end of the scanning device and the signal output end of the detection device; and

[0010] The display device is connected to the controller signal.

[0011] Optionally, a counter is integrated in the detection device.

[0012] Optionally, the server pre-stores drawing information and operator's operation information, and the drawing information is mapped one-to-one with the operator's operation information.

[0013] Optionally, another embodiment of the wire harness subpackaging system further includes a background management terminal, and the background management terminal is communicatively connected to the server.

[0014] Optionally, a cost analysis module is integrated in the server to calculate the cost of wiring harness assembly.

[0015] Optionally, a video recording device is installed on the wire harness assembly table to record the wire harness assembly process.

[0016] Optionally, a slideway is fixed on the wiring harness packaging platform, and the integrated packaging and detection fixture is slidably installed along the slideway.

[0017] Optionally, another embodiment of the wire harness packaging system also includes a sliding power unit and a sliding transmission unit, both of which are installed on the wire harness packaging platform, and the sliding unit is transmission-connected to the sliding transmission unit to drive the integrated packaging and detection fixture to slide along the slide, and the control end of the sliding power unit is communication-connected to the server.

[0018] Optionally, the sliding power unit is a servo motor, the sliding transmission unit is a ball screw, and the integrated assembly and detection fixture is detachably connected to a nut of the ball screw.

[0019] Optionally, it also includes a user interaction interface, and the user interaction interface is signal-connected to the server and the display device.

[0020] The embodiments of the present invention have the following advantages:

[0021] After the operator places his operator card on the scanning device, the scanning device scans the operator's identity information, retrieves the drawings stored in the server, the operation information of the operator corresponding to the operator, and distributes the drawings to the wire harness dispensing station equipped with the cover scanning device through the server, thereby completing the automatic distribution of the drawings. Specifically, the system will automatically issue the drawings according to the selected operator position (corresponding to the wire harness dispensing station). After the operator logs in at any wire harness dispensing station (the corresponding operator card is scanned by the scanning device), the operator will see his own dispensing drawings, quantity and precautions, etc.

[0022] After the wiring harness is assembled, the continuity test can be completed through the detection device and the assembly and detection integrated fixture to ensure the correctness of the wiring harness assembly;

[0023] The detection device is integrated with a counter, which can count the number of wire harnesses that are packaged, so as to complete the counting of the operator's working hours. After the operator's salary is stored in the server, the labor cost of the wire harness packaging can be calculated by the relationship between the operator's salary and working hours;

[0024] The number of wire harnesses used on the sub-assembly (each wire harness assembly station) is counted through a counter, so as to obtain the material cost of each sub-assembly, and the total cost of the sub-assembly is obtained by adding the previous labor cost.

[0025] At the same time, when the operator starts and finishes the operation, the scanning device will scan the operator's card, and the server will record the scanning time, which is the operator's attendance. At the same time, the operator's work efficiency can be obtained by counting the attendance time and the corresponding packaging quantity under attendance, providing objective and accurate data support for improving work efficiency;

[0026] In addition, the wire harness subassembly process is recorded by a video recording device, so that the subassembly of the wire harness on the subassembly can be traced. When there is an error in the subassembly, the basic data of the subassembly is provided for analysis.

[0027] Through the user interaction interface, modules such as "drawing management", "personnel management", "daily report", "system settings" and "data monitoring" can be displayed on the display device to respectively show the above-mentioned distributed drawings, operator identity information and operation information, operator workload statistics, attendance statistics, and data statistics of material cost, labor cost and total cost of sub-assemblies. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 The present invention is a structural diagram of an embodiment of a wire harness subassembly system.

[0029] Figure 2 It is a structural schematic diagram of an embodiment of a wire harness dispensing station.

[0030] In the figure:

[0031] 100. Wire harness dispensing platform; 110. Display device; 120. Slideway;

[0032] 200. Packaging and testing integrated fixture;

[0033] 300. Scanning device. DETAILED DESCRIPTION

[0034] The following examples are used to illustrate the present invention but are not intended to limit the scope of the present invention.

[0035] A wiring harness subassembly system, referring to Figure 1 and Figure 2 , which includes:

[0036] The wire harness dispensing station 100 is provided with a scanning device 300 capable of scanning an operator card, and the wire harness dispensing station 100 is also provided with a detection device capable of detecting whether the wire harness is correctly dispensing. The detection device here is a conductivity detection, which detects whether the same wire harness dispensing on the dispensing detection integrated fixture 200 is powered on, so as to determine whether the wire harness is correctly dispensing;

[0037] The operator card integrates the identity information of the operator. The operator card can be a magnetic card such as RFID. Correspondingly, the scanning device 300 is a device capable of scanning the magnetic card. Similarly, the operator card can also be an electronic or paper QR code, bar code, etc. Correspondingly, the scanning device 300 is a barcode scanning device. The identity information of the operator is obtained by scanning the scanning device 300 and then sent to the server;

[0038] The integrated sub-packaging and testing jig 200 can be detachably mounted on the wire harness sub-packaging platform 100. The detection terminals of the detection device can be electrically connected to the two ends of the wire harness installed on the integrated sub-packaging and testing jig 200. The integrated sub-packaging and testing jig 200 is consistent with the existing wire harness sub-packaging jig structure;

[0039] A server is connected to the signal output end of the scanning device 300 and the signal output end of the detection device. The server can store various data such as the identity information, operation information, and drawing information of the operator; and

[0040] The display device 110 is connected to the server signal, and the above information is displayed on the display device 110 for reference by operators and administrators.

[0041] After the operator places his operator card on the scanning device 300, the scanning device 300 scans the operator's identity information, retrieves the drawings stored in the server, the operation information of the operator corresponding to the operator, and distributes the drawings to the wire harness dispensing station 100 equipped with the cover scanning device 300 through the server, thereby completing the automatic distribution of the drawings. Specifically, the system will automatically issue drawings according to the selected operator position (corresponding to the wire harness dispensing station 100), and after the operator logs in at any wire harness dispensing station 100 (the corresponding operator card is scanned by the scanning device 300), the operator will see his own dispensing drawings, quantities, precautions, etc.

[0042] In addition, a counter is integrated in the detection device. The detection device is integrated with a counter, which can count the number of wire harness sub-packaging, thereby completing the operator's working hours statistics. After the operator's salary is stored in the server, the labor cost of the wire harness sub-packaging can be calculated by the relationship between the operator's salary and working hours. The number of wire harnesses used on the sub-assembly (each wire harness sub-assembly station 100) is counted through the counter, so as to obtain the material cost on each sub-assembly, and the total cost of the sub-assembly is obtained by adding the previous labor cost.

[0043] The server pre-stores the drawing information and the operator's operation information, and the drawing information and the operator's operation information are mapped one by one. When the operator starts and finishes the operation, the scanning device 300 will scan the operator's card, and the server records the scanning time, which is the operator's attendance. At the same time, the operator's work efficiency can be obtained by counting the attendance time and the corresponding packaging quantity under attendance, providing objective and accurate data support for improving work efficiency.

[0044] Another embodiment of the wiring harness subassembly system further includes a backend management terminal, which is connected to the server in communication. Figure 1 Administrator 1, administrator 2 and administrator 3) establish a mapping relationship between the drawing information, the operator's work information, and the operator's identity information, and distribute the corresponding drawings to the corresponding wire harness dispensing station 100.

[0045] In addition, a cost analysis module is integrated in the server to calculate the cost of wiring harness subassembly. The detection device is integrated with a counter, which can count the number of subassemblies of the wiring harness, so as to complete the statistics of the operator's working hours. After the operator's salary is stored in the server, the labor cost of wiring harness subassembly can be calculated by the relationship between the operator's salary and working hours; the number of wiring harnesses used on the subassembly (each wiring harness subassembly station 100) is counted by the counter, so as to obtain the material cost of each subassembly, and the total cost of the subassembly is obtained by adding the previous labor cost.

[0046] At the same time, a video recording device is installed on the wire harness dispensing station 100 to record the wire harness dispensing process. The wire harness dispensing process is recorded by the video recording device, so that the dispensing process of the wire harness on the subassembly can be traced, and when there is an error in dispensing, the basic data of the dispensing process is provided for subsequent analysis.

[0047] A slideway 120 is fixed on the wire harness dispensing platform 100, and the dispensing and testing integrated jig 200 is slidably installed along the slideway 120. When all the wire harnesses on the dispensing and testing integrated jig 200 are dispensing, the testing device performs a conductivity test on each wire harness. When all are qualified, the dispensing and testing integrated jig 200 slides backward. When the dispensing and testing integrated jig 200 on the slideway 120 is full, it is removed from the slideway 120 to complete the dispensing and testing of the wire harnesses.

[0048] Another embodiment of the wire harness subassembly system further includes a sliding power unit and a sliding transmission unit, both of which are installed on the wire harness subassembly platform 100, and the sliding unit is in transmission connection with the sliding transmission unit to drive the subassembly and detection integrated fixture 200 to slide along the slideway 120, and the control end of the sliding power unit is in communication connection with the server. When the results of the conductivity test of all wire harnesses on the same subassembly and detection integrated fixture 200 are qualified, the server sends a working signal to the sliding power unit, and the sliding power unit drives the subassembly and detection integrated fixture 200 to slide along the slideway 120 to free up the installation space of the next subassembly and detection integrated fixture 200, so as to continue the subassembly and detection of the wire harness.

[0049] One form of the above-mentioned sliding power unit is a servo motor, and one form of the sliding transmission unit is a ball screw. The assembly and detection integrated fixture 200 is detachably connected to the nut of the ball screw. The servo motor is easy to control, and the ball screw has high transmission accuracy.

[0050] Another embodiment of the wiring harness subassembly system further includes a user interaction interface, which is signal-connected to the server and the display device 110. Through the user interaction interface, modules such as "drawing management", "personnel management", "daily report", "system settings" and "data monitoring" can be displayed on the display device 110 to respectively display the above-mentioned distributed drawings, the identity information and operation information of the operator, the operator's workload statistics, attendance statistics, and the material cost, labor cost, and total cost statistics of the subassembly.

[0051] Although the present invention has been described in detail above by general description and specific embodiments, it is obvious to those skilled in the art that some modifications or improvements can be made to the present invention. Therefore, these modifications or improvements made without departing from the spirit of the present invention all belong to the scope of protection claimed by the present invention.

Claims

1. A wire harness packaging system, characterized in that: include: A wire harness packaging station is provided with a scanning device capable of scanning an operator's card, and a detection device capable of detecting whether the wire harness is correctly packaged; a video recording device is installed on the wire harness packaging station to record the wire harness packaging process; A counter is integrated in the detection device; Operator card, which integrates the operator's identity information; A sub-packaging and detection integrated jig, which is detachably mounted on the wire harness sub-packaging platform, and the detection terminals of the detection device are electrically connected to both ends of the wire harness mounted on the sub-packaging and detection integrated jig; A server is connected to the signal output terminal of the scanning device and the signal output terminal of the detection device; the server pre-stores drawing information and operator operation information, and the drawing information is mapped one-to-one with the operator operation information; The server is integrated with a cost analysis module to calculate the cost of wiring harness subassembly; The display device is signal-connected to the server.

2. The wire harness subpackaging system according to claim 1, characterized in that: It also includes a background management terminal, which is connected to the server for communication.

3. The wire harness subpackaging system according to any one of claims 1 to 2, characterized in that: A slideway is fixed on the wiring harness subpackaging platform, and the subpackaging and detection integrated fixture is slidably installed along the slideway.

4. The wire harness subpackaging system according to claim 3, characterized in that: It also includes a sliding power unit and a sliding transmission unit, both of which are installed on the wire harness packaging platform. The sliding power unit is transmission-connected to the sliding transmission unit to drive the integrated packaging and detection fixture to slide along the slideway, and the control end of the sliding power unit is communicatively connected to the server.

5. The wire harness subpackaging system according to claim 4, characterized in that: The sliding power unit is a servo motor, the sliding transmission unit is a ball screw, and the integrated assembly and detection fixture is detachably connected to the nut of the ball screw.

6. The wire harness subpackaging system according to claim 5, characterized in that: It also includes a user interaction interface, which is signal-connected to the server and the display device.