Concrete pipe, bridge pier structure and manufacturing method thereof
By adopting a combination design of concrete pipes, protective layer, longitudinal reinforcement, and stirrup in the lower structure of the bridge, combined with the reserved slot technology, the problems of low construction efficiency and environmental pollution of the existing bridge lower structure are solved, and high efficiency and greenness are achieved The construction and installation of the bridge pier structure improves impact resistance and seismic resistance.
Patent Information
- Application Number
- CN201911191016.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-11-28
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2039-11-28
AI Technical Summary
The existing bridge lower structure has not yet adopted prefabricated segment assembly technology, resulting in low construction efficiency, high environmental pollution, and lack of efficient, energy-saving, green and low-carbon solutions in urban bridge construction.
A concrete pipe structure including protective layer, longitudinal reinforcement and stirrups is adopted. By setting up a protective structure outside the corrugated pipe and combining the reserved slot design of the bridge pier support beam and the foundation, the efficient connection and lifting of the concrete pipe and the bridge pier are achieved, and the simplification of Construction process.
The construction efficiency, impact resistance and seismic performance of the bridge pier structure are improved, while reducing the degree of construction mechanization and environmental pollution, realizing factory-based prefabrication and rapid on-site installation.
Smart Images

Figure CN110924293B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of bridge engineering, and in particular to a concrete pipe, a pier structure and a manufacturing method thereof. Background Art
[0002] Bridge engineering is an important transportation infrastructure. As an important part of the bridge, the appearance design and quality management of the bridge pier have a profound impact on the overall stability of the bridge. High efficiency and energy saving, green and low carbon, environmentally friendly, high performance and durability will be the important development direction of the new generation of bridge construction in the future. The rapid construction technology of prefabricated bridges has many advantages, such as the factory production of bridge components, high quality and durability of component processing in the factory, high degree of mechanization in construction, fewer workers in high-altitude operations, less construction safety risks, less construction waste, less construction dust and noise pollution, fast construction speed and greatly shortened on-site construction period.
[0003] The prefabricated segment assembly technology for bridge substructures is still in the preliminary research stage. Only some cross-sea projects have adopted the prefabricated assembly technology of whole pier prefabricated cast-in-place wet joint connections. The prefabricated segment assembly technology has not yet been adopted for urban bridge substructures.
[0004] my country is in the process of large-scale transportation infrastructure construction. In the construction of urban bridges and cross-sea bridges, rapid bridge construction technology is increasingly valued by construction owners due to its advantages of high component processing quality, high construction efficiency, and environmental friendliness. Bridge structure prefabrication and assembly technology will be an important development direction for future bridge engineering construction. Summary of the invention
[0005] 1. Technical issues to be resolved
[0006] In view of the above-mentioned technical defects and application needs, the present application proposes a concrete pipe, a pier structure and a manufacturing method thereof, which not only solves the existing technology but also provides an important development direction for future bridge engineering construction.
[0007] (II) Technical solution
[0008] In order to solve the above problems, the present invention provides a concrete pipe, comprising:
[0009] A first corrugated pipe and a protective structure; the protective structure comprises: a protective layer, a plurality of longitudinal bars and a plurality of stirrups;
[0010] The protective layer is sleeved on the outside of the first corrugated pipe, and the longitudinal bars and stirrups are spliced together and arranged in a ring on the protective layer; the longitudinal bars are arranged in sequence along a ring inside the protective layer, and the stirrups are tied to the longitudinal bars in sequence from top to bottom.
[0011] Furthermore, the top end of the longitudinal reinforcement passes through the protective layer and is arranged outside the protective layer; the bottom end of the longitudinal reinforcement is arranged inside the protective layer.
[0012] Furthermore, a second corrugated tube is provided on the outer side of the bottom end of the protective layer.
[0013] Furthermore, the concrete pipe also includes: a plurality of support parts; the support parts are arranged on one side of the top end of the protective structure, and support part stirrups are arranged inside the support parts.
[0014] To solve the above problems, the present invention provides a pier structure, including: a pier support beam, a pier foundation and a concrete pipe; the top end of the concrete pipe is connected to the pier support beam, and the bottom end of the concrete pipe is connected to the pier foundation.
[0015] Furthermore, the pier foundation is provided with a first reserved slot hole, a third corrugated pipe is embedded in the first reserved slot hole, and the first reserved slot hole and the third corrugated pipe have the same height; the concrete pipe is connected to the pier foundation through the third corrugated pipe.
[0016] Furthermore, the pier support beam is provided with a second reserved slot hole penetrating the pier support beam, a fourth corrugated pipe is embedded in the second reserved slot hole, and the second reserved slot hole and the fourth corrugated pipe have the same height; the fourth corrugated pipe is sleeved on the outer side of the top end of the longitudinal reinforcement, and the concrete pipe is connected to the pier support beam through the fourth corrugated pipe.
[0017] Furthermore, if a second corrugated pipe is disposed on the outer side of the bottom end of the protective layer, the gap between the second corrugated pipe and the third corrugated pipe is filled with concrete.
[0018] Furthermore, the concrete pipe further comprises: a filling layer, wherein the filling layer is sleeved inside the first corrugated pipe.
[0019] In order to solve the above problems, the present invention provides a method for manufacturing a pier structure, comprising:
[0020] Step 1: fix the first corrugated pipe in the longitudinal reinforcement and the stirrups, pour and fill concrete on the longitudinal reinforcement and the stirrups to form a protective structure outside the first corrugated pipe to form a concrete pipe; wherein the protective structure includes: a protective layer, a plurality of longitudinal reinforcements and a plurality of stirrups; each longitudinal reinforcement and each stirrup are spliced and arranged on the protective layer; each longitudinal reinforcement is arranged in a ring in the protective layer in sequence, and each stirrup is tied to each longitudinal reinforcement in sequence from top to bottom;
[0021] Step 2: embed the third corrugated pipe in the first reserved slot of the pier foundation; sleeve the second corrugated pipe on the outer side of the bottom end of the protective layer, erect the concrete pipe in the first reserved slot, pour concrete between the second corrugated pipe and the third corrugated pipe, and connect the concrete pipe to the pier foundation; pour self-compacting concrete inside the first corrugated pipe to the top of the protective layer;
[0022] Step 3: embed the fourth corrugated pipe in the second reserved slot of the pier support beam; sleeve the top end of the longitudinal reinforcement into the fourth corrugated pipe to support the pier support beam on the support part, pour self-compacting concrete in the second reserved slot to complete the manufacture of the pier structure.
[0023] (III) Beneficial effects
[0024] The present invention provides a concrete pipe, a pier structure and a manufacturing method thereof. By arranging a protective structure including a protective layer, longitudinal reinforcement and stirrups outside the corrugated pipe, the pier support beam and the pier foundation can be matched to bear the load. The structure is simple and easy to process. It can be directly prefabricated in the factory, and the mechanized construction of the pier column is easy to carry out. At the same time, the concrete pipe is easy to hoist and install. It can be widely used in the prefabrication of prefabricated bridge piers and prefabricated building structure columns, and the construction efficiency, impact resistance, durability and earthquake resistance of the structure can be greatly improved while controlling the cost. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0026] Figure 1 is a front view of a concrete pipe provided by an embodiment of the present invention;
[0027] Figure 2 is a schematic cross-sectional view of a concrete pipe provided by an embodiment of the present invention;
[0028] Figure 3 is a schematic structural diagram of a first bellows provided in an embodiment of the present invention;
[0029] Figure 4 is a structural schematic diagram of a pier structure provided by an embodiment of the present invention;
[0030] Figure 5 is a structural schematic diagram of a pier foundation provided by an embodiment of the present invention;
[0031] Figure 6 is a schematic structural diagram of a pier support beam provided by an embodiment of the present invention;
[0032] Figure 7 is a structural schematic diagram of a single pier structure provided by an embodiment of the present invention;
[0033] Figure 8 is a structural schematic diagram of a double pier structure provided by an embodiment of the present invention;
[0034] Among them, 1. the first corrugated pipe; 2. the protective structure; 3. the filling layer; 4. the supporting part; 5. the pier support beam; 6. the pier foundation; 7. the third corrugated pipe; 8. the fourth corrugated pipe; 9. the second corrugated pipe; 21. the protective layer; 22. the longitudinal reinforcement; 23. the stirrups. DETAILED DESCRIPTION
[0035] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0036] An embodiment of the present invention provides a concrete pipe, such as Figure 1 and Figure 2 As shown, the concrete pipe comprises: a first corrugated pipe 1 and a protective structure 2. The protective structure 2 comprises: a protective layer 21, a plurality of longitudinal bars 22 and a plurality of stirrups 23.
[0037] The protective layer 21 is sleeved outside the first corrugated tube 1, and the longitudinal bars 22 and the stirrups 23 are spliced and arranged on the protective layer 21. The longitudinal bars 22 are arranged in a ring in the protective layer 21, and the stirrups 23 are tied to the longitudinal bars 22 in a ring from top to bottom. The corrugated tube inside the concrete pipe can be used as an inner template and can improve the bonding ability between the concrete and the pipe wall during the subsequent pouring process.
[0038] The concrete pipe provided in the embodiment of the present invention can cooperate with the pier support beam and the pier foundation to bear the load by arranging a protective structure including a protective layer, longitudinal reinforcement and stirrups outside the corrugated pipe. The structure is simple and easy to process. It can be directly prefabricated in the factory, and it is easy to carry out mechanized construction of pier columns. At the same time, the concrete pipe is easy to hoist and install. It can be widely used in the prefabrication of prefabricated bridge piers and prefabricated building structure columns, and greatly improves the construction efficiency, impact resistance, durability and seismic performance of the structure while controlling the cost.
[0039] In one embodiment provided by the present invention, Figure 1 and Figure 2As shown, in order to facilitate the connection of the pier support beam, the longitudinal reinforcement 22 needs to extend to a certain length, that is, the top of the longitudinal reinforcement 22 passes through the protective layer, and the longitudinal reinforcement 22 is arranged outside the protective layer 21. The bottom of the longitudinal reinforcement 22 is arranged inside the protective layer 21. The longitudinal reinforcement 22 can be ordinary strength or high strength ribbed steel bars.
[0040] In order to facilitate supporting the bridge pier support beam, the concrete pipe can be additionally provided with a plurality of support parts 4, and the support parts 4 can be supported by corbels. The support parts 4 are arranged on one side of the top of the protective structure 2, and support part stirrups are arranged inside the support parts 4.
[0041] To enhance the strength of the concrete pipe, the first corrugated pipe 1 is a metal corrugated pipe with a structure as shown in FIG. Figure 3 shown.
[0042] In order to facilitate the connection between the concrete pipe and the pier foundation, a second corrugated pipe 9 may be arranged around the outer side of the bottom end of the protective layer 21 .
[0043] Among them, the protective layer 21 is filled with a combination of one or more of ordinary concrete, high-performance concrete or ultra-high-performance concrete. Ordinary concrete refers to an artificial stone made of cement as the main cementitious material, water, sand, gravel, chemical admixtures and mineral admixtures when necessary, mixed in appropriate proportions, and evenly stirred, compacted, formed, and cured and hardened. High-performance concrete is a new type of high-tech concrete, produced using conventional materials and processes, with various mechanical properties required by concrete structures, and has high durability, high workability and high volume stability. Ultra-High Performance Concrete (Ultra-High Performance Concrete, referred to as UHPC), also known as active powder concrete In addition, the protective layer 21 can also be filled with fiber concrete, which is a general term for composite materials composed of fibers and cement-based materials, such as the new type of ultra-tough fiber concrete (Engineered Cementitious Composites, referred to as ECC).
[0044] An embodiment of the present invention provides a pier structure, such as Figure 4 , Figure 5 and Figure 6 As shown, the pier structure includes: a pier support beam 5, a pier foundation 6 and a concrete pipe. The concrete pipe includes: a first corrugated pipe 1 and a protective structure 2. The protective structure 2 includes: a protective layer 21, a plurality of longitudinal bars 22 and a plurality of stirrups 23. The protective layer 21 is sleeved outside the first corrugated pipe 1, and each longitudinal bar 22 and each stirrup 23 are spliced and arranged on the protective layer 21. Each longitudinal bar 22 is arranged in a ring in the protective layer 21 in sequence, and each stirrup 23 is tied to each longitudinal bar 22 in sequence from top to bottom. The top end of the concrete pipe is connected to the pier support beam 5, and the bottom end of the concrete pipe is connected to the pier foundation 6.
[0045] In this embodiment, the pier foundation 6 is a pier column, and the pier foundation 6 is provided with a first reserved slot hole, in which a third corrugated pipe 7 is pre-buried, and the first reserved slot hole is at the same height as the third corrugated pipe 7. The concrete pipe is connected to the pier foundation 6 through the third corrugated pipe 7.
[0046] If a second corrugated pipe 9 is provided on the outer side of the bottom end of the protective layer 21 , the gap between the third corrugated pipe 7 and the second corrugated pipe 9 is filled with concrete, that is, the gap between the concrete pipe and the pier foundation 6 is filled with concrete material.
[0047] The pier support beam 5 is a prefabricated cap beam or main beam, and the pier support beam 5 is provided with a second reserved slot hole penetrating the pier support beam. A fourth corrugated pipe 8 is embedded in the second reserved slot hole, and the second reserved slot hole and the fourth corrugated pipe 8 have the same height. The fourth corrugated pipe 8 is sleeved on the outside of the top end of the longitudinal reinforcement 22, and the concrete pipe is connected to the pier support beam 5 through the fourth corrugated pipe 8.
[0048] The concrete pipe also includes a filling layer 3, which is sleeved in the first corrugated pipe. The filling layer 3 is filled with self-compacting concrete. Self-compacting concrete refers to concrete that can flow and compact under its own gravity, can completely fill the formwork even if there are dense steel bars, and has good homogeneity and does not require additional vibration. By filling with self-compacting concrete, the overall bearing capacity and rigidity of the concrete pipe can be improved, while the total cost of the entire part can be controlled.
[0049] The pier structure provided by the embodiment of the present invention can cooperate with the pier support beam and the pier foundation to bear the load by arranging a protective structure including a protective layer, longitudinal reinforcement and stirrups outside the corrugated pipe. The structure is simple and easy to process. It can be directly prefabricated in the factory, and it is easy to carry out mechanized construction of the pier column. At the same time, the concrete pipe is easy to hoist and install. It can be widely used in the prefabrication of prefabricated bridge piers and prefabricated building structure columns, and greatly improves the construction efficiency, impact resistance, durability and seismic performance of the structure while controlling the cost.
[0050] In addition, compared with the prior art, the concrete in the concrete pipe uses high-performance concrete materials to improve the impact resistance, durability and seismic resistance of the pier column, and the use of ultra-tough fiber concrete materials can improve the energy consumption capacity and deformation capacity of the pier column. The concrete pipe is easy to be prefabricated in factories and industrialized, has a light weight, is easy to transport and hoist and install on site, and has low requirements for the hoisting capacity of construction machinery. The corrugated pipe inside the concrete pipe can be used as an inner template and can also improve the bonding ability between the concrete and the pipe wall during the subsequent pouring process. Casting self-compacting concrete in the concrete pipe can improve the overall bearing capacity and rigidity of the pier column, while controlling the total cost of the entire prefabricated column. The gap between the concrete pipe and the pier foundation is filled with concrete materials to improve the bonding between the two. The present invention can be widely used in the prefabrication of prefabricated bridge piers and prefabricated building structure columns, while controlling the cost and greatly improving the construction efficiency of the structure as well as the impact resistance, durability and seismic resistance.
[0051] It should be noted that if Figure 7 and Figure 8 As shown, the pier structure can be used not only in a single-column pier but also in a double-column pier, and only two concrete pipes and a pier foundation need to be provided.
[0052] An embodiment of the present invention provides a method for manufacturing a pier structure, comprising:
[0053] Step 1: fix the first corrugated pipe in the longitudinal reinforcement and the stirrups, pour and fill concrete on the longitudinal reinforcement and the stirrups to form a protective structure outside the first corrugated pipe to form a concrete pipe; wherein the protective structure includes: a protective layer, a plurality of longitudinal reinforcements and a plurality of stirrups; each longitudinal reinforcement and each stirrup are spliced and arranged on the protective layer; each longitudinal reinforcement is arranged in a ring in the protective layer in sequence, and each stirrup is tied to each longitudinal reinforcement in sequence from top to bottom;
[0054] Step 2: embed the third corrugated pipe in the first reserved slot of the pier foundation; sleeve the second corrugated pipe on the outer side of the bottom end of the protective layer, erect the concrete pipe in the first reserved slot, pour concrete between the second corrugated pipe and the third corrugated pipe, and connect the concrete pipe to the pier foundation; pour self-compacting concrete inside the first corrugated pipe to the top of the protective layer;
[0055] Step 3: embed the fourth corrugated pipe in the second reserved slot of the pier support beam; sleeve the top end of the longitudinal reinforcement into the fourth corrugated pipe to support the pier support beam on the support part, pour self-compacting concrete in the second reserved slot to complete the manufacture of the pier structure.
[0056] In a specific embodiment, manufacturing the bridge pier structure includes the following steps:
[0057] 1) Make concrete pipes in the factory. Fix the first corrugated pipe in the steel skeleton composed of longitudinal bars and stirrups, and fix the second corrugated pipe outside the steel skeleton. After the formwork is supported, pour the filling concrete and then perform curing. Alternatively, after tying the steel skeleton and fixing the first and second corrugated pipes, the concrete can be centrifugally formed into a reinforced concrete pipe.
[0058] 2) When making the cast-in-place pier foundation at the construction site, a first reserved slot hole is reserved at the designed position of the pier foundation, and a third corrugated pipe is embedded in the first reserved slot hole, and its length is consistent with that of the second corrugated pipe.
[0059] 3) After the concrete pipe is transported to the construction site, it is erected in the first reserved slot in the pier foundation, and then the concrete pipe is adjusted to be upright, and concrete is poured between the second corrugated pipe and the third corrugated pipe. Then, self-compacting concrete is poured inside the concrete pipe to the top.
[0060] 4) A prefabricated pier support beam is manufactured in a factory, a second reserved slot is reserved at a designed position on the pier support beam, a fourth corrugated pipe is embedded in the second reserved slot, and the length of the fourth corrugated pipe is consistent with the depth of the pier support beam.
[0061] 5) Install the pier support beam to the top of the concrete pipe and temporarily support it on the support. Pour self-compacting concrete into the second reserved slot of the pier support beam to complete the construction of the entire pier structure.
[0062] In summary, the method for manufacturing the pier structure provided by the embodiment of the present invention can cooperate with the pier support beam and the pier foundation to bear the load by setting a protective structure including a protective layer, longitudinal reinforcement and stirrups outside the corrugated pipe. The structure is simple and easy to process. It can be directly prefabricated in the factory, and it is easy to carry out mechanized construction of the pier column. At the same time, the concrete pipe is easy to hoist and install. It can be widely used in the prefabrication of prefabricated bridge piers and prefabricated building structure columns, and can greatly improve the construction efficiency, impact resistance, durability and seismic performance of the structure while controlling the cost.
[0063] In addition, compared with the prior art, the concrete in the concrete pipe uses high-performance concrete materials to improve the impact resistance, durability and seismic resistance of the pier column, and the use of ultra-tough fiber concrete materials can improve the energy consumption capacity and deformation capacity of the pier column. The concrete pipe is easy to be prefabricated in factories and industrialized, has a light weight, is easy to transport and hoist and install on site, and has low requirements for the hoisting capacity of construction machinery. The corrugated pipe inside the concrete pipe can be used as an inner template and can also improve the bonding ability between the concrete and the pipe wall during the subsequent pouring process. Casting self-compacting concrete in the concrete pipe can improve the overall bearing capacity and rigidity of the pier column, while controlling the total cost of the entire prefabricated column. The gap between the concrete pipe and the pier foundation is filled with concrete materials to improve the bonding between the two. The present invention can be widely used in the prefabrication of prefabricated bridge piers and prefabricated building structure columns, while controlling the cost and greatly improving the construction efficiency of the structure as well as the impact resistance, durability and seismic resistance.
[0064] The device embodiments described above are merely illustrative, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Ordinary technicians in this field can understand and implement it without paying creative labor.
[0065] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A bridge pier structure, characterized in that: include: Pier support beams, pier foundations and concrete pipes; The top end of the concrete pipe is connected to the pier support beam, and the bottom end of the concrete pipe is connected to the pier foundation; The concrete pipe comprises: a first corrugated pipe, a protective structure and a plurality of supporting parts; The protective structure comprises: a protective layer, a plurality of longitudinal bars and a plurality of stirrups; the protective layer is sleeved on the outside of the first corrugated tube, and the longitudinal bars and stirrups are spliced and arranged on the protective layer; the longitudinal bars are arranged in sequence along a ring in the protective layer, and the stirrups are tied to the longitudinal bars in sequence from top to bottom; the top of the longitudinal bar passes through the protective layer and is arranged outside the protective layer; the bottom of the longitudinal bar is arranged in the protective layer; a second corrugated tube is arranged on the outside of the bottom end of the protective layer; the support part is arranged on one side of the top of the protective structure, and the support part stirrups are arranged in the support part; the pier foundation is provided with a first reserved slot hole, and a third corrugated tube is pre-embedded in the first reserved slot hole, and the first reserved slot hole is equal to the height of the third corrugated tube; the concrete pipe is connected to the pier foundation through the third corrugated tube; the gap between the third corrugated tube and the second corrugated tube is filled with concrete; The pier support beam is provided with a second reserved slot hole penetrating the pier support beam, a fourth corrugated pipe is embedded in the second reserved slot hole, and the second reserved slot hole and the fourth corrugated pipe have the same height; the fourth corrugated pipe is sleeved on the outside of the top end of the longitudinal reinforcement, the concrete pipe is connected to the pier support beam through the fourth corrugated pipe, and the concrete pipe further includes: a filling layer, the filling layer is sleeved in the first corrugated pipe, and the filling layer is filled with self-compacting concrete.
2. A method for manufacturing a bridge pier structure as claimed in claim 1, characterized in that: include: Step 1: fix the first corrugated pipe in the longitudinal reinforcement and the stirrups, pour and fill concrete on the longitudinal reinforcement and the stirrups to form a protective structure outside the first corrugated pipe to form a concrete pipe; wherein the protective structure includes: a protective layer, a plurality of longitudinal reinforcements and a plurality of stirrups; each longitudinal reinforcement and each stirrup are spliced and arranged on the protective layer; each longitudinal reinforcement is arranged in a ring in the protective layer in sequence, and each stirrup is tied to each longitudinal reinforcement in sequence from top to bottom; Step 2: embed the third corrugated pipe in the first reserved slot of the pier foundation; sleeve the second corrugated pipe on the outer side of the bottom end of the protective layer, erect the concrete pipe in the first reserved slot, pour concrete between the second corrugated pipe and the third corrugated pipe, and connect the concrete pipe to the pier foundation; pour self-compacting concrete inside the first corrugated pipe to the top of the protective layer; Step 3: embed the fourth corrugated pipe in the second reserved slot of the pier support beam; sleeve the top end of the longitudinal reinforcement into the fourth corrugated pipe to support the pier support beam on the support part, pour self-compacting concrete in the second reserved slot to complete the manufacture of the pier structure.