Inclined drilling construction method
A technology of inclined drilling and construction method, applied in drilling equipment, directional drilling, earth-moving drilling, etc., can solve the problems of inaccurate construction, accidents, movement trajectory deviation, etc., saving time, manpower and material resources, measuring Correction is accurate and the effect of coordinate system is realized
Patent Information
- Authority / Receiving Office
- CN · China
- Current Assignee / Owner
- Publication Date
- 2020-04-10
Smart Images

Figure 1 
Figure 2
Abstract
Description
technical field
[0001] The invention relates to a method for constructing inclined boreholes. Background technique
[0002] In the process of mine reconstruction and construction, it is often necessary to construct new shafts, especially inclined shafts, on the basis of existing roadways and mines to meet production needs. During the construction process, the following problems will be encountered: (1) Inclined drilling is non-vertical drilling construction. Due to the weight of the drill bit, its trajectory will be offset, and the construction will not be accurate, which will easily affect other roadways or transportation systems, and even (2) Due to historical reasons, there are many coordinate systems for underground roadways, and there are often cases where different coordinate systems are used for different roadways. The fixed error between the holes is not precise and clear, and the coordinate system of the starting position and the end position of the drilling cannot...
Examples
Embodiment Construction
[0020] The technical scheme of the present invention is described in detail below in conjunction with accompanying drawing:
[0021] Such as figure 1 with 2 , Xincheng Gold Mine -466m fine ore system transformation, need to construct a -466m to -530m fine ore recovery shaft (hole to be constructed). The hole is designed from the -466m construction drilling rig chamber, and a 58m long hole with an inclination angle of 81° is constructed by raising drilling. After passing through the -530m slag storage chamber, it is reversed into a φ1.4m fine ore recovery shaft .
[0022] In the figure: 1. Main shaft, 2. Lifting shaft, 3. Auxiliary ramp, 4. Pedestrian equipment shaft, 5. Holes to be constructed.
[0023] Existing construction difficulties:
[0024] 1. Since the -466m powder ore recovery lane was a project in the 1990s, the survey control point has been basically destroyed, and its coordinate system is -383m. There is only one roof control point at the import site, and there...