A platform for building a dual prevention mechanism for production safety risks
By designing a dual prevention mechanism for production safety risks to build a platform, including risk identification, hierarchical control and hidden danger investigation and control modules, the problem of low efficiency in production safety risks in the existing technology has been solved, and more efficient risk management and safety level improvement has been achieved.
Patent Information
- Application Number
- CN201910879714.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-09-18
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2039-09-18
AI Technical Summary
Incumbent enterprises mainly focus on theoretical exploration in the "dual" preventive working mechanism of production safety risks, and fail to effectively realize informatization and humanized applications at the forefront of engineering construction, resulting in low efficiency in managing production safety risks and insufficient management level.
A platform for building a dual prevention mechanism for production safety risks is designed, including risk identification and assessment module, risk grading control module and hidden danger investigation and governance module. Through risk identification, hierarchical control and hidden danger investigation and governance, QR code and SMS push mechanism are used. , clarify the responsible persons and promote rectification to improve the automation and efficiency of risk management.
It has effectively improved the efficiency of safety production risk control and improved the level of safety management, and achieved significant economic benefits and application prospects in actual projects through the application of the platform.
Smart Images

Figure CN111160684B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to a platform for building a dual prevention mechanism for production safety risks (hereinafter referred to as the "platform"), which is mainly applicable to construction projects such as building, water conservancy, mining, municipal administration, transportation, roads and bridges. Background Art
[0002] At present, many domestic enterprises have carried out a lot of work on the "double" preventive work mechanism for production safety risks, but all of them are theoretical explorations. How to make the "double" preventive work mechanism play a role at the forefront of engineering construction to create an information-based, humanized and applicable platform has not yet been involved by any enterprise. Summary of the invention
[0003] The technical problem to be solved by the present invention is: to propose a platform for building a dual prevention mechanism for production safety risks; this method effectively improves the efficiency of production safety risk management and control and enhances the level of safety management.
[0004] The technical solution adopted by the present invention is:
[0005] A platform for building a dual prevention mechanism for production safety risks, characterized by comprising a risk identification and assessment module, a risk classification control module, and a hidden danger investigation and management module:
[0006] The risk identification and assessment module is composed of a risk identification and assessment submodule (101) and a risk control database submodule; wherein the risk identification and assessment submodule is provided with a project risk identification and assessment list, a list of measures to be taken for safety risks, and a risk list table;
[0007] The risk identification and assessment submodule is used to identify and assess the risks of the project design report, obtain the initial risk assessment value D1 and / or initial risk level, propose corresponding measures to ensure the safety of the construction period, and form a risk list for manual modification. Each risk in the risk list has a corresponding measure, and after manual modification, the final risk list is formed;
[0008] The risk control database is established based on the final risk list. The risk control database is the foundation of the platform. All kinds of risks, risk initial values D1, risk levels and control measures in the subsequent use process can be directly called from the risk control database, so that managers at all levels can call and view them;
[0009] The risk classification control module consists of four sub-modules in order of classification, namely, the risk status sub-module, the technical support system sub-module, the production implementation system sub-module, and the safety supervision management system sub-module;
[0010] During the project construction, the risk status submodule is used to conduct actual identification and assessment of the risk of each construction site in the order of the technical support system submodule, the production implementation system submodule, and the safety supervision management system submodule to determine the risk status; if the risk status is under control, it will directly jump to the next submodule; if the risk status is not under control, it indicates that safety accidents are prone to occur, and the platform directly issues a risk warning. In this case, the reasons for the risk not being under control should be investigated in turn from the technical support system submodule, the production implementation system submodule, and the safety supervision management system submodule to find out the root cause and solve it;
[0011] For risks that are not under control, the platform sets up QR codes at construction risk points, clarifies the responsible persons of the four systems of administration, technology, production, and safety supervision, and informs them of the risks and possible accidents through SMS push notifications, requiring them to check the risks at the risk points and take corresponding measures, so that they can fulfill their safety production responsibilities by "checking in" through scanning the code on the platform;
[0012] For risks that are not under control, first investigate the cause from the technical support system submodule; determine whether there is a safety technical plan that has been reviewed and issued, and whether the safety technical plan has been explained. When both are completed, it means that the reason why the risk is not under control is not in the technical support system, and the process jumps to the next submodule, namely the production implementation system submodule; when both are not completed or one of them is not completed, the risk will be in a warning state on the platform, and the risk value will automatically increase from the initial value D1 to D2. The part should be stopped immediately for rectification, and the person in charge of the technical support system and relevant responsible persons should be reminded by SMS push. The SMS clearly states the requirements, responsible persons and deadlines for rectification; when the person in charge of the technical support system and relevant responsible persons supplement the safety technical plan according to the requirements and explain it, the warning is lifted, the risk value automatically decreases from the initial value D2 to D1, and the process jumps to the next submodule;
[0013] For risks that are not under control, after the process jumps into the production implementation system submodule, the cause is checked from the production implementation system; it is determined whether the construction is organized according to the safety technical plan. When the requirements are met, the process jumps into the next submodule, namely the safety supervision management system submodule; when the construction organization does not meet the requirements, the risk will be in a warning state on the platform, and the risk value will automatically increase from the initial value D1 to D2. The part should be stopped immediately for rectification, and the person in charge of the production implementation system and relevant responsible persons should be reminded by SMS push. The SMS clearly states the requirements, responsible persons and deadlines for rectification; when the person in charge of the production implementation system and relevant responsible persons adjust the production organization arrangements and improve the safety protection facilities according to the requirements, the warning will be lifted, the risk value will automatically increase from the initial value D2 to D1, and the process will jump into the next submodule;
[0014] For risks that are not under control, when the process jumps into the safety supervision management system submodule, the inspection content includes: whether safety supervision is in place, whether emergency preparedness is in place, whether auxiliary monitoring equipment is in place, and whether safety protection facilities are normal; the daily inspection and performance of duties of personnel in the four systems is that personnel at different levels of the four systems of administration, technology, production, and safety supervision inspect the site, scan QR codes of different parts through the platform to record the problems found and take measures to reflect the "punch-in" performance of duties; when a certain link in the inspection content is not implemented, the risk will be in a warning state on the platform, and the risk value will automatically increase from the initial value D1 to D2. The part should be immediately stopped for rectification, and the person in charge of the safety supervision system and relevant responsible persons should be reminded by SMS push. The SMS clearly states the requirements, responsible persons and deadlines for rectification; when the person in charge of the safety supervision system and relevant responsible persons complete the rectification according to the requirements, the warning will be lifted and the risk value will automatically increase from the initial value D2 to D1;
[0015] The hidden danger investigation and treatment module 3 is used for hidden danger investigation and treatment, including making and saving investigation plans, the contents of which include the time, location and participants of hidden danger investigation; conducting hidden danger investigation activities according to the investigation plan, finding out the existing hidden dangers, compiling and saving independent searchable numbers and keywords for each existing hidden danger; making and saving treatment plans for each hidden danger treatment, including clear measures, responsible persons, treatment time limit and related requirements; after the hidden danger rectification is completed, the documents are reported after on-site acceptance to form closed-circuit monitoring.
[0016] The dual prevention mechanism construction platform for production safety risks of the present invention has been well applied in the practice of Yangfanggou Hydropower Station, the first million-kilowatt hydropower station design and construction general contracting project in China. This method effectively improves the efficiency of production safety risk control, enhances the level of safety management, and has good economic benefits and application prospects. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is the module composition and flow chart of the present invention; DETAILED DESCRIPTION
[0018] See attached Figure 1 The dual prevention mechanism construction platform for production safety risks of the present invention is composed of a risk identification and assessment module 1, a risk classification control module 2, and a hidden danger investigation and treatment module 3;
[0019] (I) Risk identification and assessment module 1
[0020] The risk identification and assessment module 1 is composed of a risk identification and assessment submodule 101 and a risk control database submodule 102; wherein the risk identification and assessment submodule includes a risk identification and assessment list for engineering projects, a list of measures to be taken for safety risks, a risk list table, etc.;
[0021] Based on the construction organization design report, the engineering project conducts risk identification and assessment on the engineering project design report through the risk identification and assessment submodule 101, obtains the initial risk assessment value D1 and / or the initial risk level, proposes corresponding measures to ensure the safety during the construction period, and forms a risk list for manual modification. Each risk in the risk list has a corresponding measure. After expert review and manual modification, the final risk list is formed;
[0022] The risk control database 102 is established based on the final risk list table. The risk control database is the foundation of the platform. All kinds of risks, risk initial values D1, risk levels and control measures in the subsequent use process can be directly called from the risk control database, so that managers at all levels can call and view;
[0023] (II) Risk classification control module 2
[0024] The risk classification control module 2 is composed of four sub-modules which are classified in order, namely, the risk status sub-module 201, the technical support system sub-module 202, the production implementation system sub-module 203, and the safety supervision management system sub-module 204;
[0025] During the project construction, according to the actual situation of the project construction, the risk of each construction site is actually identified and evaluated in the order of the technical support system submodule 202, the production implementation system submodule 203, and the safety supervision management system submodule 204 through the risk status submodule 201 to determine the risk status; if the risk status is under control, it will directly jump to the next submodule; if the risk status is not under control (out of control), it indicates that safety accidents are prone to occur, and the platform directly issues a risk warning, then the reasons for the risk not being under control should be checked in turn from the technical support system submodule 202, the production implementation system submodule 203, and the safety supervision management system submodule 204, and the root cause should be found out to solve it;
[0026] In order to pay attention to the uncontrolled risks (out of control), the platform sets QR codes at the construction risk points for the uncontrolled risks, clarifies the responsible persons of the four systems of administration, technology, production and safety supervision, and informs them of the risks and possible accidents through SMS push, requiring them to check the risks at the risk points and take corresponding measures, so as to fulfill their safety production responsibilities by "punching in" by scanning the code on the platform;
[0027] For risks that are not under control, first investigate the cause from the technical support system submodule 202; determine whether there is a safety technical plan that has been reviewed and issued and whether the safety technical plan has been explained. The key points of the investigation are to determine whether the risk is not under control and whether it is not in the technical support system. The process jumps to the next submodule, the production implementation system submodule 203; when both are not completed or one of them is not completed, the risk will be in a warning state on the platform, and the risk value will automatically increase from the initial value D1 to D2. The part should be stopped immediately for rectification, and the person in charge of the technical support system (chief engineer) and relevant responsible persons should be reminded by SMS push. The SMS clearly states the requirements, responsible persons and deadlines for rectification; when the person in charge of the technical support system and relevant responsible persons supplement the safety technical plan according to the requirements and explain it, the warning is lifted, the risk value automatically decreases from the initial value D2 to D1, and the process jumps to the next submodule;
[0028] For risks that are not under control, after the process jumps into the production implementation system submodule 203, the reasons are checked from the production implementation system submodule; it is determined whether the construction is organized according to the safety technical plan. When the requirements are met, the process jumps into the next submodule, namely the safety supervision management system submodule 204; when the construction organization does not meet the requirements, the risk will be in a warning state on the platform, and the risk value will automatically increase from the initial value D1 to D2. The part should be stopped immediately for rectification, and the person in charge of the production implementation system (deputy production manager) and relevant responsible persons should be reminded by SMS push. The SMS clearly specifies the requirements, responsible persons and deadlines for rectification; when the person in charge of the production implementation system and relevant responsible persons adjust the production organization arrangements and improve the safety protection facilities according to the requirements, the warning will be lifted, the risk value will automatically increase from the initial value D2 to D1, and the process will jump into the next submodule;
[0029] For risks that are not under control, when the process jumps into the safety supervision management system submodule 203, the inspection content includes: whether safety supervision is in place (education and training of operating personnel, five minutes before the shift, certification, etc., the on-the-job status of full-time safety officers in important parts, daily inspection and performance of duties of personnel in the four systems, etc.), whether emergency preparations are in place, whether auxiliary monitoring equipment is in place, and whether safety protection facilities are normal; the daily inspection and performance of duties of personnel in the four systems is that personnel at different levels of the four systems of administration, technology, production, and safety supervision inspect the site, scan the QR codes of different parts through the platform to record the problems found and take measures to reflect the "punch-in" performance of duties; when a certain link in the inspection content is not implemented, the risk will be in a warning state on the platform, and the risk value will automatically increase from the initial value D1 to D2. The part should be stopped immediately for rectification, and the person in charge of the safety supervision system and relevant responsible persons should be reminded by SMS push, and the requirements, responsible persons and deadlines for rectification will be clearly stated in the SMS; when the person in charge of the safety supervision system (deputy safety manager) and relevant responsible persons complete the rectification according to the requirements, the warning will be lifted and the risk value will automatically increase from the initial value D2 to D1;
[0030] (III) Hazard detection and control module 3
[0031] The hidden danger investigation and treatment module 3 is used for hidden danger investigation and treatment, including making and saving the investigation plan 301, the content of which includes the hidden danger investigation time, investigation location, and participants; conducting hidden danger investigation activities according to the investigation plan, and finding out the existing hidden dangers 302, and compiling and saving independent searchable numbers and keywords 303 for each existing hidden danger; making and saving a treatment plan for each hidden danger treatment, including clear measures, responsible persons, treatment time limit and related requirements 304; after the hidden danger rectification is completed, the file is reported after on-site acceptance 305 to form closed-circuit monitoring.
Claims
1. A platform for building a dual prevention mechanism for production safety risks, characterized by It consists of a risk identification and assessment module (1), a risk classification and control module (2), and a hidden danger investigation and treatment module (3); The risk identification and assessment module (1) is composed of a risk identification and assessment submodule (101) and a risk control database submodule (102); wherein the risk identification and assessment submodule is provided with a project risk identification and assessment list, a list of measures to be taken for safety risks, and a risk list table; The risk identification and assessment submodule (101) performs risk identification and assessment on the engineering project design report, obtains the initial risk assessment value D1 and / or the initial risk level, proposes corresponding measures to ensure the safety during the construction period, and forms a risk list for manual modification. Each risk in the risk list has a corresponding measure, and after manual modification, a final risk list is formed; The risk control database (102) is established based on the final risk list. The risk control database is the foundation of the platform. All kinds of risks, risk initial values D1, risk levels and control measures in the subsequent use process can be directly called from the risk control database, so that managers at all levels can call and view them. The risk classification control module (2) is composed of four sub-modules which are classified in order, namely, the risk status sub-module (201), the technical support system sub-module (202), the production implementation system sub-module (203), and the safety supervision management system sub-module (204); During the project construction, the risk status submodule (201) is used to perform actual identification and evaluation of the risk of each construction site in the order of the technical support system submodule (202), the production implementation system submodule (203), and the safety supervision management system submodule (204) to determine the risk status; if the risk status is under control, the next submodule is directly jumped into; if the risk status is not under control, indicating that safety accidents are prone to occur, the platform directly issues a risk warning, and the reasons for the risk not being under control are checked in turn from the technical support system submodule (202), the production implementation system submodule (203), and the safety supervision management system submodule (204), and the root cause is found to solve it; For risks that are not under control, the platform sets up QR codes at construction risk points, clarifies the responsible persons of the four systems of administration, technology, production, and safety supervision, and informs them of the risks and possible accidents through SMS push notifications, requiring the responsible persons to check the risks at the risk points and take corresponding measures, and fulfill their safety production responsibilities by "checking in" through scanning the code on the platform; For risks that are not under control, first investigate the cause from the technical support system submodule (202); determine whether there is a safety technical plan that has been reviewed and issued, and whether the safety technical plan has been explained. When both are completed, it means that the reason for the risk not being under control is not in the technical support system, and the process jumps to the next submodule, namely the production implementation system submodule (203); when both are not completed or one of them is not completed, the risk will be in a warning state on the platform, and the risk value will automatically increase from the initial value D1 to D2. The part should be stopped immediately for rectification, and the person in charge of the technical support system and relevant responsible persons should be reminded by SMS push. The SMS clearly states the requirements, responsible persons and deadlines for rectification; when the person in charge of the technical support system and relevant responsible persons supplement the safety technical plan according to the requirements and explain it, the warning is lifted, the risk value automatically decreases from the initial value D2 to D1, and the process jumps to the next submodule; For risks that are not under control, after the process jumps into the production implementation system submodule (203), the cause is checked from the production implementation system; it is determined whether the construction is organized according to the safety technical plan. When the requirements are met, the process jumps into the next submodule, namely the safety supervision management system submodule (204); when the construction organization does not meet the requirements, the risk will be in a warning state on the platform, and the risk value will automatically increase from the initial value D1 to D2. The part should be stopped immediately for rectification, and the person in charge of the production implementation system and relevant responsible persons should be reminded by SMS push. The SMS clearly states the requirements, responsible persons and deadlines for rectification; when the person in charge of the production implementation system and relevant responsible persons adjust the production organization arrangements and improve the safety protection facilities according to the requirements, the warning will be lifted, the risk value will automatically increase from the initial value D2 to D1, and the process will jump into the next submodule; For risks that are not under control, when the process jumps into the safety supervision management system submodule (203), the inspection content includes: whether safety supervision is in place, whether emergency preparedness is in place, whether auxiliary monitoring equipment is in place, and whether safety protection facilities are normal; the daily inspection and performance of the four system personnel is that the four system personnel at different levels of administration, technology, production, and safety supervision inspect the site, scan the QR codes of different parts through the platform to record the problems found and take measures to reflect the "punch-in" performance of duties; when a link in the inspection content is not implemented, the risk will be in a warning state on the platform, and the risk value will automatically increase from the initial value D1 to D2. The part should be immediately stopped for rectification, and the person in charge of the safety supervision system and relevant responsible persons should be reminded by SMS push. The SMS clearly states the requirements, responsible persons and deadlines for rectification; when the person in charge of the safety supervision system and relevant responsible persons complete the rectification according to the requirements, the warning will be lifted and the risk value will automatically increase from the initial value D2 to D1; The hidden danger investigation and treatment module 3 is used for hidden danger investigation and treatment, including making and saving the investigation plan (301), the content of which includes the hidden danger investigation time, investigation location, and participants; carrying out hidden danger investigation activities according to the investigation plan, and obtaining the existing hidden dangers (302), and compiling and saving independent searchable numbers and keywords for each existing hidden danger (303); making and saving a treatment plan for each hidden danger treatment, including clear measures, responsible persons, treatment time limit and related requirements (304); after the hidden danger rectification is completed, the document is reported after on-site acceptance (305) to form closed-circuit monitoring.