A new type of quick-install welding-free cantilever steel beam fixing device
Through the new fast-install weld-free cantilever steel beam fixing device, the disassembly of the fixed parts and material components, the problems of short service life and material loss of the cantilever beam structure are solved, and the recycling and welding-free integration of anchor bolts are realized Chemical construction improves the turnover number and construction safety of I-steel.
Patent Information
- Application Number
- CN202010201708.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-03-20
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2040-03-20
AI Technical Summary
In the prior art, the cantilever beam structure has a short service life, few turnover times and high material loss. The welding fixing method is prone to damage when removed, resulting in material waste and reduced safety.
The new fast-load welding-free cantilever steel beam fixing device is adopted to disassemble and connect the cantilever I-steel main beam, coupling beam and vertical rod through the first, second and third fixing parts, and use fixing sleeves, anchor bolt components, and plastics. Pipe, channel steel and angle steel realize recycling of anchor bolts and integrated welding-free construction.
It effectively increases the turnover number of I-steel, reduces material losses and waste, reduces construction costs, ensures construction safety, and achieves green and sustainable construction.
Smart Images

Figure CN111270850B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of construction equipment, and more particularly to a novel quick-install welding-free cantilever steel beam fixing device. Background Art
[0002] Safety protection of construction scaffolding is an important part of safety protection at building construction sites. Usually, scaffolding protection for multi-story or small high-rise buildings mostly adopts ground-type protective scaffolding, while high-rise buildings mostly adopt segmented cantilever protective scaffolding or integral lifting protective scaffolding. For segmented cantilever protective scaffolding, the cantilever beam is usually used as the load-bearing foundation of the scaffolding, and the anchor end of the cantilever beam is firmly fixed to the floor slab with an anchor ring. When the building plane is irregular and at the corners of the building, in order to meet the requirements of the vertical pole spacing and ensure that the vertical poles are evenly arranged and the scissor brace angle meets the requirements of the specifications, it is usually necessary to add a connecting beam to the cantilever I-beam main beam to facilitate the erection of scaffolding on it.
[0003] At present, the cantilever beams are generally fixed on the construction site with embedded U-shaped anchor bolts, and wooden wedges are used to tighten the two sides of the I-beam, which results in a certain waste of wood. Although the embedded bolts can ensure the safety of the anchoring of the ends of the I-beams, the end of the bolts exposed on the floor will be directly cut off during the later removal, which makes it impossible to recycle and reuse the anchor bolts, resulting in material loss and not meeting the strategic needs of sustainable development. For the fixation of the cantilever I-beam main beam and the connecting beam on site, as well as the fixing of the connecting beam and the scaffolding uprights, welding is mostly used to ensure the stability of the connection between the main beam and the connecting beam, and between the connecting beam and the scaffolding uprights. However, it is easy to cause damage to the edge of the I-beam wing plate during the later removal, thereby reducing the strength and bearing capacity of the I-beam, reducing the service life, turnover times and safety of the I-beam, and increasing material loss.
[0004] Therefore, it is an urgent problem to be solved by technical personnel in this field to provide a new type of quick-installation welding-free cantilever steel beam fixing device that can achieve the recycling of anchor bolts, reduce material loss and waste, and effectively increase the turnover number of I-beams. Summary of the invention
[0005] In view of this, in order to solve the technical problems of short service life, small turnover times and high material loss of cantilever beam structures in the prior art, the present invention provides a new quick-installation welding-free cantilever steel beam fixing device which can achieve the recycling of anchor bolts, reduce material loss and waste, and effectively increase the turnover times of I-beams.
[0006] In order to achieve the above object, the present invention adopts the following technical solution:
[0007] A new type of quick-install welding-free cantilever steel beam fixing device, fixed on wooden formwork and concrete floor, including:
[0008] A cantilever I-beam main beam, a first fixing piece, a cantilever I-beam coupling beam, a second fixing piece, a vertical pole and a third fixing piece, wherein the first fixing piece is used to detachably connect one end of the cantilever I-beam main beam to the wooden formwork and the concrete floor slab, the cantilever I-beam coupling beam is detachably connected to the top of the other end of the cantilever I-beam main beam by the second fixing piece, and the vertical pole is detachably connected to the cantilever I-beam coupling beam by the third fixing piece.
[0009] It can be seen from the above technical scheme that compared with the existing technical scheme, the present invention discloses a new type of quick-installation welding-free cantilever steel beam fixing device, which can fix one end of the cantilever I-beam main beam on the wooden formwork and the concrete floor by utilizing the first fixing member and is easy to disassemble, and can fix the cantilever I-beam connecting beam to the other end of the cantilever I-beam main beam by utilizing the second fixing member and is easy to disassemble, and can fix the scaffolding uprights on the cantilever I-beam connecting beam by utilizing the third fixing member and is easy to disassemble. The novel quick-installation welding-free cantilever steel beam fixing device of the present invention can realize the recycling of anchor bolts and reduce the use and waste of wood by utilizing the first fixing member, the second fixing member and the third fixing member detachably connected with the cantilever I-beam main beam, the cantilever I-beam connecting beam and the vertical pole, thereby realizing the welding-free integrated construction of the cantilever beam and effectively reducing the loss and waste of cantilever I-beam material during the construction process and maximizing the turnover number of I-beams. The cantilever steel beam fixing device has a simple structure, a reasonable design, simple operation and convenient and quick installation. While ensuring construction safety, it can also effectively reduce construction costs and realize green and sustainable construction, and has good application prospects.
[0010] Furthermore, the first fixing member includes a fixing sleeve, an anchor bolt assembly, a plastic pipe, a channel steel and an angle steel, the anchor bolt assembly includes an anchor bolt and a nut, one end of the anchor bolt is arranged in the fixing sleeve, the fixing sleeve bolt is connected to the wooden formwork, the plastic pipe is adapted to be arranged outside the fixing sleeve and the anchor bolt, and the concrete floor is cast outside the plastic pipe, the bottom wing plate of the cantilever I-beam main beam and the channel steel are both arranged on the top surface of the concrete floor, and the channel steel is arranged on both sides of the cantilever I-beam main beam along the height direction of the web of the cantilever I-beam main beam, the angle steel is arranged on the top wing plate of the cantilever I-beam main beam, the other end of the anchor bolt passes through the channel steel and the angle steel in sequence from bottom to top, and the nut is threadedly connected to the anchor bolt, for fixing one end of the cantilever I-beam main beam to the concrete floor and the wooden formwork.
[0011] The beneficial effect of adopting the above technical solution is that the anchor bolts and the fixing sleeves can be fixed on the wooden formwork, so that the structural stability of the cantilever steel beam fixing device is good. At the same time, a matching plastic tube is sleeved on the outside of the fixing sleeves and the anchor bolts to prevent the fixing sleeves and the anchor bolts from contacting with the concrete when pouring concrete, which facilitates the later removal and reuse of the fixing sleeves and the anchor bolts.
[0012] Furthermore, there are multiple fixing sleeves, anchor bolts, nuts, plastic pipes, channel steels and angle steels, and multiple fixing sleeves are evenly arranged on the wooden formwork and the concrete floor, multiple anchor bolts and multiple plastic pipes are evenly arranged on the concrete floor, multiple nuts are evenly arranged on multiple anchor bolts, multiple channel steels are evenly arranged on both sides of the web of the cantilevered I-beam main beam, and multiple angle steels are evenly arranged on the top wing plate of the cantilevered I-beam main beam.
[0013] The beneficial effect of adopting the above technical solution is that the channel steel can fix the cantilever I-beam main beam in the horizontal direction, and the angle steel can fix the cantilever I-beam main beam in the vertical direction, which further improves the structural stability of the cantilever steel beam fixing device and makes it convenient, quick and easy to operate during installation.
[0014] Furthermore, the fixed sleeve includes a first sleeve and a second sleeve that are integrally connected, the first sleeve is arranged at the bottom of the second sleeve, the first sleeve and the second sleeve are arranged concentrically and the aperture of the first sleeve is larger than the aperture of the second sleeve; the head diameter of the anchor bolt is larger than the aperture of the second sleeve and smaller than the aperture of the first sleeve, and the bolt portion of the anchor bolt passes through the second sleeve and extends outward; a positioning plate extending outward is also formed on the bottom side wall of the first sleeve, and a positioning hole is opened on the positioning plate for bolting the first sleeve to the wooden formwork.
[0015] Furthermore, the aperture of the first sleeve is 25 mm and the height is 2 mm, and the aperture of the second sleeve is 13.5 mm and the height is 2.5 mm.
[0016] The beneficial effect of adopting the above technical solution is that it is easy to fix the fixing sleeve and the anchor bolts on the wooden formwork, and it is also easy to dismantle and reuse the fixing sleeve and the anchor bolts at a later time.
[0017] Furthermore, there are multiple positioning plates, and the multiple positioning plates are evenly arranged on the same circumferential surface.
[0018] The beneficial effect of adopting the above technical solution is that the stability of the connection between the fixed sleeve and the wooden formwork is improved, thereby improving the stability and firmness of the overall structure of the cantilever steel beam fixing device, ensuring construction safety.
[0019] Furthermore, through holes are formed on the side walls of the channel steel and the angle steel, the anchor bolts pass through the through holes, and the nuts are threadedly connected to the anchor bolts, so as to fix the channel steel and the angle steel to the cantilevered I-beam main beam, and to fix the cantilevered I-beam main beam to the wooden formwork and the concrete floor slab.
[0020] The beneficial effect of adopting the above technical solution is that the cantilever I-beam main beam can be effectively fixed on the concrete floor and is easy to disassemble and install, so that the overall structural design of the cantilever steel beam fixing device is reasonable and the installation is convenient and simple to operate.
[0021] Furthermore, it also includes a fourth fixing member, which includes a fastening bolt and a fastening nut. A fixing hole is also opened in the middle of the channel steel. The fastening bolt passes through the fixing hole and abuts against the web of the cantilevered I-beam main beam. The fastening nut is threadedly connected to the fastening bolt and is used to press and fix the cantilevered I-beam main beam.
[0022] The beneficial effect of adopting the above technical solution is that it can effectively prevent the cantilever I-beam main beam from moving in the horizontal and vertical directions, avoid the risk of it overturning, and further improve the structural stability of the cantilever steel beam fixing device.
[0023] Furthermore, the second fixing member includes a main beam clamp and a connecting beam clamp, one end of the connecting beam clamp and the main beam clamp are fixedly connected to the top wing plate at the other end of the cantilevered I-beam main beam by bolts, and the other end of the connecting beam clamp is bolted to the bottom wing plate of the cantilevered I-beam connecting beam.
[0024] The beneficial effect of adopting the above technical solution is that the cantilever I-beam connecting beam can be effectively fixed on the cantilever I-beam main beam and is easy to disassemble and install, thereby making the overall structural design of the cantilever steel beam fixing device reasonable, and the installation is convenient and the operation is simple.
[0025] Furthermore, there are multiple main beam clamps and multiple connecting beam clamps, and the multiple main beam clamps and the multiple connecting beam clamps are evenly arranged on both sides of the web of the cantilevered I-beam connecting beam.
[0026] The beneficial effect of adopting the above technical solution is that the structural stability of the cantilever steel beam fixing device is further improved, while making the installation thereof convenient, quick and simple to operate.
[0027] Furthermore, the third fixing member includes a vertical pole fixing member and a clamping column, the clamping column is vertically fixed to the top center of the vertical pole fixing member, and the vertical pole is sleeved and fixed on the clamping column, and the vertical pole fixing member is bolted to the top wing plate of the cantilevered I-beam coupling beam.
[0028] The beneficial effect of adopting the above technical solution is that it is easy to install the scaffolding poles on the clamping columns, thereby achieving effective fixation of the scaffolding poles.
[0029] Furthermore, the clamping column is welded to the upright pole fixing piece.
[0030] The beneficial effect of adopting the above technical solution is that the structural stability of the cantilever steel beam fixing device is further improved, which ensures construction safety while reducing construction costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying creative work.
[0032] Figure 1 The accompanying drawing is a structural schematic diagram of a novel quick-install welding-free cantilever steel beam fixing device provided by the present invention;
[0033] Figure 2 The accompanying drawing is a structural schematic diagram of a first fixing member in a novel quick-installation welding-free cantilever steel beam fixing device provided by the present invention;
[0034] Figure 3 The accompanying drawing is a structural schematic diagram of a fixing sleeve in a novel quick-install welding-free cantilever steel beam fixing device provided by the present invention;
[0035] Figure 4 The accompanying drawing is a structural schematic diagram of a channel steel in a novel quick-install welding-free cantilever steel beam fixing device provided by the present invention;
[0036] Figure 5 The accompanying drawing is a structural schematic diagram of an angle steel in a novel quick-install welding-free cantilever steel beam fixing device provided by the present invention;
[0037] Figure 6 The accompanying drawing is a structural schematic diagram of a second fixing member in a novel quick-installation welding-free cantilever steel beam fixing device provided by the present invention;
[0038] Figure 7 The accompanying drawing is a schematic structural diagram of a third fixing member in a novel quick-install welding-free cantilever steel beam fixing device provided by the present invention.
[0039] Among them: 1-cantilevered I-beam main beam, 2-first fixing piece, 21-fixing sleeve, 211-first sleeve, 212-second sleeve, 213-positioning plate, 214-positioning hole, 22-anchor bolt assembly, 221-anchor bolt, 222-nut, 23-plastic pipe, 24-channel steel, 241-fixing hole, 25-angle steel, 26-through hole, 3-cantilevered I-beam connecting beam, 4-second fixing piece, 41-main beam clamp, 42-connecting beam clamp, 5-vertical pole, 6-third fixing piece, 61-vertical pole fixing piece, 62-clamp column, 7-fourth fixing piece, 100-wooden formwork, 200-concrete floor. DETAILED DESCRIPTION
[0040] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, and should not be construed as limiting the present invention.
[0041] In the description of the present invention, it is necessary to understand that the terms "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0042] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0043] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0044] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.
[0045] The present invention discloses a novel fast-installed welding-free cantilever steel beam fixing device, which is fixed on a wooden formwork 100 and a concrete floor slab 200, comprising:
[0046] A cantilever I-beam main beam 1, a first fixing piece 2, a cantilever I-beam coupling beam 3, a second fixing piece 4, a vertical pole 5 and a third fixing piece 6. The first fixing piece 2 is used to detachably connect one end of the cantilever I-beam main beam 1 to a wooden formwork 100 and a concrete floor slab 200. The cantilever I-beam coupling beam 3 is detachably connected to the top of the other end of the cantilever I-beam main beam 1 by using the second fixing piece 4. The vertical pole 5 is detachably connected to the cantilever I-beam coupling beam 3 by using the third fixing piece 6.
[0047] like Figure 1 and Figure 2 As shown, according to an optional embodiment of the present invention, the first fixing member 2 includes a fixing sleeve 21, an anchor bolt assembly 22, a plastic pipe 23, a channel steel 24 and an angle steel 25, the anchor bolt assembly 22 includes an anchor bolt 221 and a nut 222, one end of the anchor bolt 221 is arranged in the fixing sleeve 21, the fixing sleeve 21 is bolted to the wooden formwork 100, the plastic pipe 23 is adapted to be arranged outside the fixing sleeve 21 and the anchor bolt 221, and the concrete floor 200 is cast outside the plastic pipe 23, the bottom wing plate of the cantilevered I-beam main beam 1 and the channel steel 24 are both arranged on the top surface of the concrete floor 200, and the channel steel 24 is arranged along the height direction of the web of the cantilevered I-beam main beam 1. On both sides of the cantilevered I-beam main beam 1, angle steels 25 are arranged on the top wing plates of the cantilevered I-beam main beam 1, and the other ends of the anchor bolts 221 pass through the channel steels 24 and the angle steels 25 from bottom to top in sequence, and the nuts 222 are threadedly connected to the anchor bolts 221, which are used to fix one end of the cantilevered I-beam main beam 1 to the concrete floor 200 and the wooden formwork 100; thereby, the anchor bolts and the fixing sleeves can be fixed to the wooden formwork, so that the structural stability of the cantilevered steel beam fixing device is good, and at the same time, an adapted plastic tube is sleeved on the outside of the fixing sleeves and the anchor bolts, which can prevent the fixing sleeves and the anchor bolts from contacting with the concrete when pouring concrete, and facilitate the removal and reuse of the fixing sleeves and the anchor bolts in the later stage.
[0048] like Figure 1 and Figure 2 As shown, according to an optional embodiment of the present invention, there are multiple fixing sleeves 21, anchor bolts 221, nuts 222, plastic pipes 23, channel steels 24 and angle steels 25, and multiple fixing sleeves 21 are evenly arranged on the wooden formwork 100 and the concrete floor 200, multiple anchor bolts 221 and multiple plastic pipes 23 are evenly arranged on the concrete floor 200, multiple nuts 222 are evenly arranged on multiple anchor bolts 221, multiple channel steels 24 are evenly arranged on both sides of the web of the cantilevered I-beam main beam 1, and multiple angle steels 25 are evenly arranged on the top wing plate of the cantilevered I-beam main beam 1. The channel steel can fix the cantilevered I-beam main beam in the horizontal direction, and the angle steel can fix the cantilevered I-beam main beam in the vertical direction, which further improves the structural stability of the cantilevered steel beam fixing device and makes it convenient and quick to install and simple to operate.
[0049] like Figure 3 As shown, according to an optional embodiment of the present invention, the fixing sleeve 21 includes a first sleeve 211 and a second sleeve 212 that are integrally connected, the first sleeve 211 is arranged at the bottom of the second sleeve 212, the first sleeve 211 and the second sleeve 212 are arranged concentrically, and the aperture of the first sleeve 211 is larger than the aperture of the second sleeve 212; the head diameter of the anchor bolt 221 is larger than the aperture of the second sleeve 212 and smaller than the aperture of the first sleeve 211, and the bolt portion of the anchor bolt 221 passes through the second sleeve 212 and extends outward. A positioning plate 213 extending outward is also formed on the bottom side wall of the first sleeve 211, and a positioning hole 214 is opened on the positioning plate 213 for bolting the first sleeve 211 to the wooden formwork 100; specifically, the aperture of the first sleeve 211 is 25 mm and the height is 2 mm, and the aperture of the second sleeve 212 is 13.5 mm and the height is 2.5 mm, so that it is convenient to fix the fixing sleeve and the anchor bolt on the wooden formwork, and it is also convenient to dismantle and reuse the fixing sleeve and the anchor bolt at a later time.
[0050] like Figure 3 As shown, according to an optional embodiment of the present invention, there are two positioning plates 213, and the two positioning plates 213 are evenly arranged on the same circumferential surface, thereby improving the stability of the connection between the fixed sleeve and the wooden formwork, thereby improving the stability and firmness of the overall structure of the cantilever steel beam fixing device, and ensuring construction safety.
[0051] like Figure 4 and Figure 5As shown, according to an optional embodiment of the present invention, through holes 26 are formed on the side walls of the channel steel 24 and the angle steel 25, and the anchor bolts 221 pass through the through holes 26. The nuts 222 are threadedly connected to the anchor bolts 221, which are used to fix the channel steel 24 and the angle steel 25 on the cantilever I-beam main beam 1, and to fix the cantilever I-beam main beam 1 on the wooden formwork 100 and the concrete floor 200, so that the cantilever I-beam main beam can be effectively fixed on the concrete floor and is easy to disassemble and install, thereby making the overall structural design of the cantilever steel beam fixing device reasonable, convenient to install, and simple to operate.
[0052] like Figure 1 and Figure 2 As shown, according to an optional embodiment of the present invention, it also includes a fourth fixing member 7, the fourth fixing member 7 includes a fastening bolt and a fastening nut, and a fixing hole 241 is also opened in the middle of the channel steel 24. The fastening bolt passes through the fixing hole 241 and abuts against the web of the cantilevered I-beam main beam 1. The fastening nut is threadedly connected to the fastening bolt, which is used to press and fix the cantilevered I-beam main beam 1, thereby effectively preventing the cantilevered I-beam main beam from moving in the horizontal and vertical directions, avoiding the risk of overturning, and further improving the structural stability of the cantilevered steel beam fixing device.
[0053] like Figure 1 and Figure 6 As shown, according to an optional embodiment of the present invention, the second fixing member 4 includes a main beam clamp 41 and a connecting beam clamp 42, one end of the connecting beam clamp 42 and the main beam clamp 41 are fixedly connected to the top wing plate at the other end of the cantilever I-beam main beam 1 by bolts, and the other end of the connecting beam clamp 42 is bolted to the bottom wing plate of the cantilever I-beam connecting beam 3, so that the cantilever I-beam connecting beam can be effectively fixed to the cantilever I-beam main beam and is easy to disassemble and install, thereby making the overall structural design of the cantilever steel beam fixing device reasonable, convenient to install, and simple to operate.
[0054] like Figure 1 As shown, according to an optional embodiment of the present invention, there are two main beam clamps 41 and two connecting beam clamps 42, and the two main beam clamps 41 and the two connecting beam clamps 42 are evenly arranged on both sides of the web of the cantilevered I-beam connecting beam 3, thereby further improving the structural stability of the cantilevered steel beam fixing device and making it convenient, quick and easy to operate during installation.
[0055] like Figure 1 and Figure 7As shown, according to an optional embodiment of the present invention, the third fixing member 6 includes a vertical pole fixing member 61 and a clamping column 62, the clamping column 62 is vertically fixed at the top center of the vertical pole fixing member 61, and the vertical pole 5 is sleeved and fixed on the clamping column 62, and the vertical pole fixing member 61 is bolted to the top wing plate of the cantilevered I-beam beam 3, so as to facilitate the installation of the scaffolding vertical pole on the clamping column, thereby realizing effective fixation of the scaffolding vertical pole.
[0056] According to an optional embodiment of the present invention, the clamping column 62 is welded to the vertical pole fixing member 61, thereby further improving the structural stability of the cantilever steel beam fixing device, ensuring construction safety while reducing construction costs.
[0057] The invention discloses a novel quick-install welding-free cantilever steel beam fixing device. By utilizing a first fixing piece, one end of a cantilever I-beam main beam can be fixed on a wooden formwork and a concrete floor slab and is easy to disassemble. By utilizing a second fixing piece, a cantilever I-beam connecting beam can be fixed on the other end of the cantilever I-beam main beam and is easy to disassemble. By utilizing a third fixing piece, a scaffolding upright can be fixed on the cantilever I-beam connecting beam and is easy to disassemble. The novel quick-installation welding-free cantilever steel beam fixing device of the present invention can realize the recycling of anchor bolts and reduce the use and waste of wood by utilizing the first fixing member, the second fixing member and the third fixing member detachably connected with the cantilever I-beam main beam, the cantilever I-beam connecting beam and the vertical pole, thereby realizing the welding-free integrated construction of the cantilever beam and effectively reducing the loss and waste of cantilever I-beam material during the construction process and maximizing the turnover number of I-beams. The cantilever steel beam fixing device has a simple structure, a reasonable design, simple operation and convenient and quick installation. While ensuring construction safety, it can also effectively reduce construction costs and realize green and sustainable construction, and has good application prospects.
[0058] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine different embodiments or examples described in this specification.
[0059] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present invention.
Claims
1. A novel quick-install welding-free cantilever steel beam fixing device, fixed on a wooden formwork (100) and a concrete floor slab (200), It is characterized in that include: A cantilevered I-beam main beam (1), a first fixing member (2), a cantilevered I-beam coupling beam (3), a second fixing member (4), a vertical rod (5) and a third fixing member (6), wherein the first fixing member (2) is used to detachably connect one end of the cantilevered I-beam main beam (1) to the wooden formwork (100) and the concrete floor slab (200), the cantilevered I-beam coupling beam (3) is detachably connected to the top of the other end of the cantilevered I-beam main beam (1) by means of the second fixing member (4), and the vertical rod (5) is detachably connected to the cantilevered I-beam coupling beam (3) by means of the third fixing member (6); The first fixing member (2) comprises a fixing sleeve (21), an anchor bolt assembly (22), a plastic pipe (23), a channel steel (24) and an angle steel (25); the anchor bolt assembly (22) comprises an anchor bolt (221) and a nut (222); one end of the anchor bolt (221) is arranged in the fixing sleeve (21); the fixing sleeve (21) is bolted to the wooden formwork (100); the plastic pipe (23) is adapted to be arranged outside the fixing sleeve (21) and the anchor bolt (221); the concrete floor slab (200) is cast outside the plastic pipe (23); the cantilevered I-beam main beam (1) The bottom wing plate and the channel steel (24) are both arranged on the top surface of the concrete floor (200), and the channel steel (24) is arranged on both sides of the cantilever I-beam main beam (1) along the height direction of the web of the cantilever I-beam main beam (1), the angle steel (25) is arranged on the top wing plate of the cantilever I-beam main beam (1), the other end of the anchor bolt (221) passes through the channel steel (24) and the angle steel (25) in sequence from bottom to top, and the nut (222) is threadedly connected to the anchor bolt (221) and is used to fix one end of the cantilever I-beam main beam (1) to the concrete floor (200) and the wooden formwork (100); The fixing sleeve (21), the anchor bolt (221), the nut (222), the plastic pipe (23), the channel steel (24) and the angle steel (25) are all multiple, and the multiple fixing sleeves (21) are evenly arranged on the wooden formwork (100) and the concrete floor (200), the multiple anchor bolts (221) and the multiple plastic pipes (23) are evenly arranged on the concrete floor (200), the multiple nuts (222) are evenly arranged on the multiple anchor bolts (221), the multiple channel steels (24) are evenly arranged on both sides of the web of the cantilevered I-beam main beam (1), and the multiple angle steels (25) are evenly arranged on the top wing plate of the cantilevered I-beam main beam (1); The fixing sleeve (21) comprises a first sleeve (211) and a second sleeve (212) which are integrally connected, the first sleeve (211) being arranged at the bottom of the second sleeve (212), the first sleeve (211) and the second sleeve (212) being arranged concentrically, and the aperture of the first sleeve (211) is larger than the aperture of the second sleeve (212); the head diameter of the anchor bolt (221) is larger than the aperture of the second sleeve (212) and smaller than the aperture of the first sleeve (211), and the bolt portion of the anchor bolt (221) passes through the second sleeve (212) and protrudes outward; a positioning plate (213) extending outward is also formed on the bottom side wall of the first sleeve (211), and a positioning hole (214) is formed on the positioning plate (213) for bolting the first sleeve (211) to the wooden formwork (100); The second fixing member (4) comprises a main beam clamp (41) and a coupling beam clamp (42), one end of the coupling beam clamp (42) and the main beam clamp (41) being fixedly connected to the top wing plate at the other end of the cantilevered I-beam main beam (1) by means of bolts, and the other end of the coupling beam clamp (42) being bolted to the bottom wing plate of the cantilevered I-beam coupling beam (3); There are a plurality of the main beam clamps (41) and the coupling beam clamps (42), and the plurality of the main beam clamps (41) and the plurality of the coupling beam clamps (42) are evenly arranged on both sides of the web of the cantilevered I-beam coupling beam (3); The third fixing member (6) comprises a vertical pole fixing member (61) and a clamping column (62), wherein the clamping column (62) is vertically fixed at the top center of the vertical pole fixing member (61), and the vertical pole (5) is sleeved and fixed on the clamping column (62), and the vertical pole fixing member (61) is bolted to the top wing plate of the cantilevered I-beam coupling beam (3).
2. According to claim 1, a novel quick-install welding-free cantilever steel beam fixing device, It is characterized in that There are a plurality of positioning plates (213), and the plurality of positioning plates (213) are evenly arranged on the same circumferential surface.
3. According to the novel quick-install welding-free cantilever steel beam fixing device of claim 1, It is characterized in that Through holes (26) are formed on the side walls of the channel steel (24) and the angle steel (25); the anchor bolts (221) pass through the through holes (26); and the nuts (222) are threadedly connected to the anchor bolts (221) for fixing the channel steel (24) and the angle steel (25) to the cantilevered I-beam main beam (1), and for fixing the cantilevered I-beam main beam (1) to the wooden formwork (100) and the concrete floor slab (200).
4. According to the novel quick-install welding-free cantilever steel beam fixing device of claim 3, It is characterized in that It also includes a fourth fixing member (7), the fourth fixing member (7) including a fastening bolt and a fastening nut, a fixing hole (241) is also opened in the middle of the channel steel (24), the fastening bolt passes through the fixing hole (241) and abuts against the web of the cantilevered I-beam main beam (1), and the fastening nut is threadedly connected to the fastening bolt for pressing and fixing the cantilevered I-beam main beam (1).
