A grab-type underwater dredging device and construction method thereof

Through the grab-type underwater dredging device, using an above-water construction platform and a variety of crane devices, the problem of strict requirements on sludge particle size in the existing technology has been solved, and the efficient cleaning and transportation of sludge with a wide particle size has been achieved, which is convenient River clearing in areas with poor transportation access.

CN111392583BActive Publication Date: 2024-10-18CHINA HYDROPOWER ELEVENTH ENG BUREAU (ZHENGZHOU) CO LTD +1
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202010194342.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-03-19
Publication Date
2024-10-18
Estimated Expiration
2040-03-19

AI Technical Summary

Technical Problem

Existing river dredging technology has strict requirements on sludge particle size and length, which can easily cause equipment damage and siltation back, and it is difficult to effectively clean wide-particle size sludge in areas with inconvenient transportation.

Method used

A grab-type underwater dredging device is designed, including an above-water construction platform, an eight-petal grab, a slag carrier and a slag lifting device. The mobile platform is driven by a floating tank connection and a winch, and is carried out using fixed and tire-type cranes. The capture and transportation of sludge is combined with the steel structure funnel tank to achieve efficient sludge cleaning.

Benefits of technology

It achieves efficient cleaning of wide particle size sludge, is convenient for transportation and lifting, is suitable for areas with inconvenient transportation, and the construction method is simple and practical.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111392583B_ABST
    Figure CN111392583B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of river channel dredging, and in particular to a grab-type underwater dredging device and a construction method thereof. The device comprises an above-water construction platform, a grab, a slag transport ship and a slag lifting device. The above-water construction platform is connected by pontoons, and the pontoons are connected by shafts. A fixed slewing crane is installed on the above-water construction platform, and a boom is arranged on the fixed slewing crane, and the boom is connected to the grab through a winch and a wire rope; the grab is an eight-petal grab, and the grab can place materials into the slag transport ship, and the slag transport ship is driven to move by a paddle machine, and n aggregate hoppers are arranged on the slag transport ship, n>1, and a lifting lug is arranged on the upper end of the side wall of the aggregate hopper; the slag lifting device comprises a tire crane, and the tire crane is connected to the lifting lug through a wire rope, and a steel structure funnel trough is arranged on the upper end of the dump truck. The dredging device has a reasonable structure, is easy to assemble and transport, can clean slag with a wide range of slag particle sizes, is convenient to transport and lift slag, and has strong practicality.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of river channel dredging, and in particular to a grab-type underwater dredging device and a construction method thereof. Background Art

[0002] In the current stage of river dredging and underwater silt removal in my country, pump suction silt removal and cutter suction silt removal technologies are widely used. However, the above silt removal technologies have strict requirements on the particle size and length of the cleaned objects, and have obvious limitations. Cleaning gravel and debris with a diameter greater than 50 mm can easily cause equipment damage and pipeline blockage. In addition, pump suction silt removal can easily suck out a large amount of river water, making subsequent slag transportation difficult. At the same time, when the underwater garbage is complex and of different sizes, it is easy to cause blockage of the mud suction port. Ordinary cutter suction silt removal methods can easily cause the spread of pollutants and sediment in the bottom mud, and there will also be more serious siltation. Moreover, this method is only suitable for the cleaning of silt and sediment with smaller particle sizes. A Chinese patent (patent number 201620346831.9) discloses a pontoon grabbing device, which can be used to carry out construction using a grab dredging method. However, the grabbing device mainly uses a grab to repeatedly grab powdered materials in the cabin into the pontoon hopper instead of grabbing the silt in the river channel. In actual construction, it is unknown whether it can be used for cleaning rivers with a wide range of sludge particle sizes.

[0003] The river 300m upstream and downstream of Jinping Secondary Inlet Reservoir is about 28,000m 2 Within the water area, through measurement, calculation and diving exploration, it is known that the total amount of underwater sediment is about 74,000m 3 The silt particle size is 20mm-500mm of gravel and large stones. At the same time, the reservoir in this area is close to the mountain on one side and adjacent to the permanent road on the other side. There is no road leading to the river. Due to the narrow river channel, equipment transportation is inconvenient, and the silt particle size range is wide, conventional dredging technology cannot achieve a good dredging effect. Summary of the invention

[0004] The purpose of the present invention is to overcome the shortcomings of the prior art and to provide a grab-type underwater dredging device and a construction method thereof. The dredging device has a reasonable structure, is easy to assemble and transport, can clean sludge with a wide range of sludge particle sizes, is convenient to transport and lift sludge, and has strong practicality.

[0005] The present invention is realized by adopting the following measures: a grab-type underwater dredging device, comprising an above-water construction platform, a grab, a slag transport ship and a slag lifting device, wherein the above-water construction platform is formed by connecting at least two pontoons, the pontoons are connected by shafts, the above-water construction platform is driven to move by a slurry hanging machine, a fixed slewing crane is installed on the above-water construction platform, a boom is arranged on the fixed slewing crane, and the boom is connected to the grab through a winch and a wire rope; the grab is an eight-petal grab, and the grab can The materials are placed in a slag transport ship, which is driven to move by a paddle machine. The slag transport ship is provided with n aggregate hoppers, n>1, and the aggregate hoppers are provided with lifting ears; the slag lifting device includes a tire crane arranged on the shore, and the tire crane can be connected to the lifting ears of the aggregate hopper by a wire rope. The aggregate hopper transfers the materials to a dump truck through the tire crane, and a steel structure funnel trough is provided at the upper end of the dump truck, and the steel structure funnel trough is fixed to the upper end of the aggregate bin of the dump truck through a bracket.

[0006] Preferably, a pontoon connection mechanism is provided at the edge of the pontoon of the above-water construction platform, and the pontoon connection mechanism includes two symmetrical sleeves I arranged at the edge of the pontoon, a gap is arranged between the two sleeves I, the sleeve I is fixedly connected to the top surface of the pontoon through reinforcing ribs, and a sleeve II matching the gap between the two sleeves I is provided at the edge of the adjacent pontoon, and the sleeve I and sleeve II are connected by an axis.

[0007] Preferably, a fixing block is provided at one end of the shaft, the size of which is larger than the inner diameters of sleeves I and II, and a threaded rod is provided at the other end of the shaft, and a matching bolt is provided on the threaded rod.

[0008] Preferably, the pontoon connection mechanism is evenly distributed on the upper and lower surfaces of adjacent pontoons; winches are respectively provided on both sides of the above-water construction platform, and anchor piles are provided on both sides of the river channel, and the anchor piles are connected to the corresponding sides of the above-water construction platform through winches and steel wire ropes.

[0009] Preferably, a base I is fixedly provided near the front end of the above-water construction platform, a base II is provided at the lower end of the fixed slewing crane, an upper end of the base I and a lower end of the base II are respectively provided with outer edges, the base I and the base II are fixed by bolts provided on the outer edges, a gear is provided on the periphery of the base II, a drive motor is vertically provided on the fixed slewing crane, a pinion is provided at the output end of the drive motor, and the pinion rotates in meshing with the gear.

[0010] Preferably, the front of the collecting hopper is a right-angled trapezoidal structure, the upper surface of the collecting hopper is larger than the lower surface, the lifting ears are arranged at the top of the angled wall of the collecting hopper and at the lower part of the opposite right-angled wall, and the winch for suspending the lifting ears at the lower part of the right-angled wall and the winch for suspending the lifting ears at the top of the angled wall are two different winches.

[0011] Preferably, the steel structure funnel trough includes a bracket and a funnel, a reinforcing rod is provided on the outer side of the bracket, a rectangular support rod is provided on the top of the bracket, a hanging groove matching the rectangular support rod is provided on the top outer edge of the funnel, and a support rod for supporting the bottom of the funnel is also provided on the bracket. The bracket is located as a whole at the upper end of the dump truck, and the dump truck can pass under the bracket.

[0012] A grab-type underwater dredging construction method comprises the following steps:

[0013] (1) Equipment assembly: Assemble the water construction platform and install a fixed slewing crane and grab bucket on the water construction platform;

[0014] (2) Underwater silt salvage: Start the slurry machine and adjust the wire rope connecting the anchor pile and the water construction platform to move the water construction platform to the designated position. Control the fixed slewing crane and the wire rope controlling the grab bucket to fully open the grab bucket and put it into the water until the grab bucket is in full contact with the underwater sludge. Tighten the wire rope controlling the grab bucket to close the grab bucket. After the grab bucket is fully closed, lift the grab bucket and rotate the crane boom to turn the grab bucket to the direction where the slag transport ship is docked. When the grab bucket moves to the upper end of the aggregate hopper on the slag transport ship, loosen the wire rope controlling the grab bucket to fully open the grab bucket and let the sludge fall into the aggregate hopper.

[0015] (3) Slag transportation: Drive the slag transport ship to move and dock near the slag lifting device, connect the collecting hopper to the tire crane with a wire rope, start the tire crane to lift the collecting hopper to the upper end of the steel structure hopper trough;

[0016] (4) Slag unloading: By tightening the wire rope of the lower lifting lug of the suspended right-angle wall and loosening the wire rope of the top lifting lug of the suspended oblique angle wall, the collecting hopper is turned over, and the sludge in the collecting hopper falls into the dump truck through the steel structure funnel.

[0017] The beneficial effects of the present invention are as follows: the present invention discloses a grab-type underwater dredging device and a construction method thereof. The dredging device has a novel structure and a reasonable design. The water construction platform is a spliced ​​and assembled type, which is convenient for transportation in reservoir areas where transportation is inconvenient. The size of the construction platform is adjusted, and the water construction platform is connected to anchor piles on both sides of the river channel through a winch and a steel wire rope to assist in the movement and stability of the construction platform. The grab is an octagonal type, which can grab sludge of different particle sizes. After the grab grabs the sludge, it is put into the collecting hopper of a slag transport ship, and the slag transport ship is moved to the slag unloading area. The collecting hopper is hoisted to the upper part of a dump truck by a tire crane, and falls into the dump truck through a steel structure funnel trough. The construction method is simple and practical. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 This is a schematic diagram of the overhead structure of the water construction platform.

[0019] Figure 2 This is a schematic diagram of the connection structure of adjacent pontoons on the water construction platform.

[0020] Figure 3 This is the front view of the fixed slewing crane and the water construction platform.

[0021] Figure 4 This is a schematic diagram of the connection structure between the fixed slewing crane and the water construction platform.

[0022] Figure 5 It is a top view of the gear connection structure of a fixed slewing crane.

[0023] Figure 6 This is an overhead view of the slag transport ship.

[0024] Figure 7 This is the front view of the aggregate hopper.

[0025] Figure 8 It is a schematic diagram of the main structure of the slag lifting device.

[0026] Fig. 9 It is a side view structural diagram of the steel structure funnel trough.

[0027] In the figure: 1-water construction platform, 2-grab bucket, 3-slag transport ship, 4-floating box, 5-casing I, 6-reinforcement rib, 7-casing II, 8-shaft, 9-fixed block, 10-threaded rod, 11-nut, 13-anchor pile, 14-aggregate hopper, 15-fixed slewing crane, 16-base I, 17-base II, 18-outer edge, 19-gear, 20-drive motor, 21-pinion, 22-jib, 23-lifting ear, 24-tyre crane, 25-dump truck, 26-steel structure funnel trough, 28-aggregate silo, 29-bracket, 30-funnel, 31-reinforcement rod, 32-rectangular support rod, 33-suspension groove, 34-support rod. DETAILED DESCRIPTION

[0028] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0029] Embodiment: A grab-type underwater dredging device, such as Figure 1-8 As shown, it includes an above-water construction platform 1, a grab bucket 2, a slag transport ship 3 and a slag lifting device. A detachable fence is arranged on the periphery of the above-water construction platform 1 to play a role in safety protection. The above-water construction platform 1 is connected by at least two pontoons 4, and the pontoons 4 are connected by an axis 8, so that the above-water construction platform 1 is easy to disassemble and install, and it is also convenient for the transportation of the above-water construction platform 1. A pontoon connecting mechanism is arranged at the edge of the pontoon 4 of the above-water construction platform 1. The pontoon connecting mechanism includes two symmetrical sleeves Ⅰ5 arranged at the edge of the pontoon 1, and a gap is arranged between the two sleeves Ⅰ5. The sleeve Ⅰ5 is fixedly connected to the top surface of the pontoon 4 through a reinforcing rib 6, so that the sleeve Ⅰ5 is firmly connected to the top surface of the pontoon 4. The edges of adjacent pontoons 4 are provided with sleeves Ⅱ7 matching the gap between the two sleeves Ⅰ5. The sleeves Ⅰ5 and the sleeves Ⅱ7 are connected by the axis 8, so that the adjacent pontoons 4 are connected together. In order to ensure that the shaft is firmly connected to the sleeve I5 and the sleeve II7 and prevent the shaft 8 from falling off, a fixing block 9 is provided at one end of the shaft 8. The size of the fixing block 9 is larger than the inner diameter of the sleeve I5 and the sleeve II6. A threaded rod 10 is provided at the other end of the shaft 8. A matching nut 11 is provided on the threaded rod 10. The nut 11 is threadedly connected to the threaded rod 10 and fixed with the fixing block 9 to ensure that adjacent buoyancy tanks are firmly connected. The buoyancy tank connection mechanism is evenly distributed on the upper and lower surfaces of the adjacent buoyancy tanks 4 to ensure that the buoyancy tanks are firmly connected.

[0030] Winches are respectively provided on both sides of the water construction platform 1, and anchor piles 13 are provided on both sides of the river channel. The anchor piles 13 are connected to the corresponding sides of the water construction platform 1 through winches and steel wire ropes. Since the anchor piles 13 are fixed on both sides of the river channel, the steel wire ropes are tightened and loosened by the winch of the water construction platform 1, thereby assisting the movement and position fixation of the water construction platform 1. The water construction platform 1 is driven to move by a slurry hanging machine. A fixed slewing crane 15 is installed on the water construction platform 1. A base Ⅰ16 is fixedly arranged near the front end of the water construction platform 1. A base Ⅱ17 is arranged at the lower end of the fixed slewing crane 15. The upper end of the base Ⅰ16 and the lower end of the base Ⅱ17 are respectively provided with outer edges 18. The base Ⅰ16 and the base Ⅱ17 are fixed by bolts arranged on the outer edge 18, so that the base Ⅰ16 and the base Ⅱ17 are firmly connected. A gear 19 is arranged on the periphery of the base Ⅱ17. A drive motor 20 is vertically arranged on the fixed slewing crane 15. A pinion 21 is arranged at the output end of the drive motor 20. The pinion 21 meshes with the gear 19 to rotate. When the drive motor 20 is running, the output end drives the pinion 21 to rotate. Since the drive motor 20 is arranged vertically, the pinion 21 is horizontally arranged on the output end, and meshes with the gear 19 on the periphery of the base Ⅱ17 so that the fixed slewing crane 15 can rotate in the horizontal direction. The fixed slewing crane 15 is provided with a boom 22, which is connected to the grab 2 through a winch and a wire rope. There are two winches, one winch controls the lifting and lowering of the grab 2, and the other winch controls the opening and closing of the grab. The grab 2 is an eight-petal grab. Each petal of the eight-petal grab is thinner and sharper than that of the two-petal, four-petal and six-petal grabs. It can grab granular silt and other sludge that has a large contact with the bottom of the water, and clean the sludge more thoroughly.

[0031] The grab 2 can place the material into the slag transport ship 3, which is driven to move by the slurry hanging machine. The slag transport ship 3 is provided with n collecting hoppers 14, n>1, and the number of collecting hoppers 14 is based on the size of the slag transport ship 3. Preferably, there are 5 collecting hoppers 14, and the collecting hopper 14 is provided with a lifting lug 23. The collecting hopper 14 can be suspended by hanging the lifting lug 23 with a wire rope; the slag hanging device includes a tire crane 24 arranged on the shore, and the tire crane 24 can be connected to the slag transport ship 3 by a wire rope. The collecting hopper 14 is connected to the ear 23, and the front of the collecting hopper 14 is a right-angled trapezoidal structure. The upper end opening of the collecting hopper 14 is larger than the area of ​​the lower surface. The ear 23 is arranged at the top of the beveled wall of the collecting hopper 14 and the lower part of the right-angled wall opposite. The winch for suspending the ear 23 at the lower part of the right-angled wall and the winch for suspending the ear 23 at the top of the beveled wall are two different winches. By tightening the ear 23 at the top of the right-angled wall and loosening the ear 23 at the top of the beveled wall, the material in the collecting hopper 14 can be poured out. The collecting hopper 14 transfers the materials to the dump truck 25 through the tire crane 24. A steel structure funnel trough 26 is provided at the upper end of the dump truck 25. The steel structure funnel trough 26 is fixed to the upper end of the collecting bin 28 of the dump truck 25 through the bracket 29. The tire crane 24 suspends the collecting hopper 14 to the upper end of the steel structure funnel trough 26, and pours the sludge into the collecting bin 28 of the dump truck 25 through the steel structure funnel trough 26 to prevent the sludge from falling outside the dump truck 25. The steel structure funnel trough 26 includes a bracket 29 and a funnel 30. A reinforcing rod 31 is arranged on the outer side of the bracket 29. The lower end of the reinforcing rod 31 is supported by the ground, and the upper end is connected to the bracket 29 to reinforce the bracket 29. A rectangular support rod 32 is arranged on the top of the bracket 29. A hanging groove 33 matching the rectangular support rod 32 is arranged on the top outer edge of the funnel 30. The funnel 30 is supported on the rectangular support rod 32 through the hanging groove 33. A support rod 34 supporting the bottom of the funnel 30 is also arranged on the bracket 29. The support rod 34 and the rectangular support rod 32 support the funnel 30 as a whole, so that the funnel 30 is firmly installed. The bracket 29 is located as a whole at the upper end of the dump truck 25, and the dump truck 25 can pass under the bracket 29, which is convenient for transporting sludge.

[0032] A grab-type underwater dredging construction method comprises the following steps:

[0033] (1) Equipment assembly: Assemble the water construction platform and install a fixed slewing crane and grab bucket on the water construction platform;

[0034] (2) Underwater silt salvage: Start the slurry machine, adjust the wire rope connecting the anchor pile and the water construction platform to move the water construction platform to the designated position, control the fixed slewing crane to rotate, adjust the up and down position of the grab bucket by controlling the wire rope for lifting and lowering the grab bucket, fully open the grab bucket and put it into the water by controlling the wire rope for opening and closing the grab bucket until the grab bucket is in full contact with the underwater sludge, tighten the wire rope for controlling the opening and closing of the grab bucket to close the grab bucket, and after the grab bucket is fully closed, lift the grab bucket, rotate the crane boom, turn the grab bucket to the direction of the slag transport ship, and move the slag transport ship to the right below the grab bucket. When the grab bucket moves to the upper end of the aggregate hopper on the slag transport ship, loosen the wire rope for controlling the opening and closing of the grab bucket to fully open the grab bucket and let the sludge fall into the aggregate hopper.

[0035] (3) Slag transportation: Drive the slag transport ship to move and dock near the slag lifting device, connect the collecting hopper to the tire crane with a wire rope, start the tire crane to lift the collecting hopper on the slag transport ship to the upper end of the steel structure hopper trough;

[0036] (4) Slag unloading: By tightening the wire rope of the lower lifting lug of the suspended right-angle wall and loosening the wire rope of the top lifting lug of the suspended oblique angle wall, the collecting hopper is turned over, and the sludge in the collecting hopper falls into the dump truck through the steel structure funnel.

Claims

1. A grab-type underwater dredging device, comprising an above-water construction platform, a grab, a slag transport ship and a slag lifting device, characterized in that: The above-water construction platform is formed by connecting at least two pontoons, which are connected by shafts. The above-water construction platform is driven to move by a slurry hanging machine. A fixed slewing crane is installed on the above-water construction platform. A boom is provided on the above-water slewing crane, and the boom is connected to a grab bucket by a winch and a wire rope. The grab bucket is an eight-petal grab bucket, which can place materials into a slag transport ship, which is driven to move by a slurry hanging machine. The above-water slag transport ship is provided with n aggregate hoppers, n>1, and a lifting lug is provided on the aggregate hopper. The slag lifting device includes a tire crane provided on the shore, which can be connected to the lifting lug of the aggregate hopper by a wire rope, and the aggregate hopper transfers materials to a dump truck by the tire crane. A steel structure funnel trough is provided on the upper end of the dump truck, and the steel structure funnel trough is fixed to the upper end of the aggregate bin of the dump truck by a bracket. A pontoon connection mechanism is provided at the edge of the pontoon of the water construction platform, and the pontoon connection mechanism includes two symmetrical sleeves I provided at the edge of the pontoon, a gap is provided between the two sleeves I, the sleeve I is fixedly connected to the top surface of the pontoon through a reinforcing rib, and a sleeve II matching the gap between the two sleeves I is provided at the edge of the adjacent pontoon, and the sleeve I and the sleeve II are connected through a shaft; A fixing block is disposed at one end of the shaft, the size of which is larger than the inner diameters of the sleeves I and II, and a threaded rod is disposed at the other end of the shaft, and a matching bolt is disposed on the threaded rod; The pontoon connection mechanism is evenly distributed on the upper and lower surfaces of adjacent pontoons; winches are respectively provided on both sides of the above-water construction platform, and anchor piles are provided on both sides of the river channel, and the anchor piles are connected to the corresponding sides of the above-water construction platform through winches and steel wire ropes; A base I is fixedly arranged near the front end of the above-water construction platform, a base II is arranged at the lower end of the fixed slewing crane, an outer edge is arranged at the upper end of the base I and the lower end of the base II respectively, the base I and the base II are fixed by bolts arranged on the outer edge, a gear is arranged at the periphery of the base II, a driving motor is vertically arranged on the above-water slewing crane, a pinion is arranged at the output end of the driving motor, and the pinion rotates in meshing with the gear; The front of the collecting hopper is a right-angled trapezoidal structure, the upper surface of the collecting hopper is larger than the lower surface, the lifting lugs are arranged at the top of the oblique angle wall of the collecting hopper and at the lower part of the right-angle wall opposite thereto, and the winch for suspending the lifting lug at the lower part of the right-angle wall and the winch for suspending the lifting lug at the top part of the oblique angle wall are two different winches; The steel structure funnel trough includes a bracket and a funnel, a reinforcing rod is arranged on the outer side of the bracket, a rectangular support rod is arranged on the top of the bracket, a hanging groove matching the rectangular support rod is arranged on the outer edge of the top of the funnel, and a support rod for supporting the bottom of the funnel is also arranged on the bracket. The bracket is located as a whole at the upper end of the dump truck, and the dump truck can pass under the bracket.

2. A grab-type underwater dredging construction method according to claim 1, characterized in that: The following steps are involved: (1) Equipment assembly: Assemble the water construction platform and install a fixed slewing crane and grab bucket on the water construction platform; (2) Underwater silt salvage: Start the slurry machine and adjust the wire rope connecting the anchor pile and the water construction platform to move the water construction platform to the designated position. Control the fixed slewing crane and the wire rope controlling the grab bucket to fully open the grab bucket and put it into the water until the grab bucket is in full contact with the underwater sludge. Tighten the wire rope controlling the grab bucket to close the grab bucket. After the grab bucket is fully closed, lift the grab bucket and rotate the crane boom to turn the grab bucket to the direction where the slag transport ship is docked. When the grab bucket moves to the upper end of the aggregate hopper on the slag transport ship, loosen the wire rope controlling the grab bucket to fully open the grab bucket and let the sludge fall into the aggregate hopper. (3) Slag transportation: Drive the slag transport ship to move and dock near the slag lifting device, connect the collecting hopper to the tire crane with a wire rope, start the tire crane to lift the collecting hopper to the upper end of the steel structure hopper trough; (4) Slag unloading: By tightening the wire rope of the lower lifting lug of the suspended right-angle wall and loosening the wire rope of the top lifting lug of the suspended oblique angle wall, the collecting hopper is turned over, and the sludge in the collecting hopper falls into the dump truck through the steel structure funnel.

Citation Information

Patent Citations

  • Extracting device is grabbed on landing stage

    CN205634271U

  • Marine fixed-amplitude hydraulic crane

    CN103663178A

  • City internal river watercourse desilting construction process

    CN1632244A

  • Floating crane ship with block stone lifting bucket device

    CN203998717U

  • Grab bucket type underwater dredging device

    CN212050192U