A large-span cantilever support system for a corridor between high-rise units and a construction method thereof

By designing a large-span cantilever support system for high-rise units, including the construction of embedded parts, oblique braces and beams, the problem that traditional support systems are difficult to support high-rise large-section beams is solved, and construction is simplified and efficiency improvement is achieved.

CN111456399BActive Publication Date: 2024-11-01MCC TIANGONG GROUP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010417947.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-05-18
Publication Date
2024-11-01
Estimated Expiration
2040-05-18

AI Technical Summary

Technical Problem

The traditional support system is difficult to meet the construction needs of large cantilever beams at high altitudes in high-rise residential buildings, especially in terms of support of large section beams, the structure of climbing frames and cantilever scaffolding is difficult to meet the economic and stability requirements.

Method used

A large-span cantilever support system for high-rise inter-unit corridors is designed, including first and second embedded parts, main oblique braces, secondary oblique braces, main beams and secondary beams. The supporting frame is formed by the construction of these components. It also uses auxiliary structures such as positioning steel bars, wire ropes and anchor rings to improve stability and convenience.

Benefits of technology

This support system simplifies the construction process, reduces installation difficulty and cost, improves construction efficiency, and solves the problems of the complexity and construction cycle of the support frame.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111456399B_ABST
    Figure CN111456399B_ABST
Patent Text Reader

Abstract

A large-span cantilever support system for corridors between high-rise units and a construction method thereof, the system comprising: a first embedded part for installing a main diagonal bracing beam; the first embedded part is arranged on the exterior wall floor; a second embedded part for installing a secondary diagonal bracing beam; the second embedded part is arranged on the exterior wall floor and is located above the first embedded part; a main diagonal bracing beam for supporting a main beam; the first end of the main diagonal bracing beam is connected to the first embedded part; a secondary diagonal bracing beam for supporting the main beam; the first end of the secondary diagonal bracing beam is connected to the second embedded part; a main beam for supporting a secondary beam; the bottom of the main beam is respectively supported by the second end of the main diagonal bracing beam and the second end of the secondary diagonal bracing beam, and both ends are respectively inserted into the floor; a secondary beam is used to build a frame together with the main beam to install a safety net; the secondary beam is supported on the main beam. The present application is simple to manufacture, easy to install, and conducive to turnover; it effectively solves the problems of complicated support frames during the construction of outdoor large-section beams.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of high-rise corridor construction, and in particular relates to a large-span cantilever support system for a corridor between high-rise units and a construction method thereof. Background Art

[0002] In recent years, with the continuous increase in building height, the appearance of buildings has become increasingly diversified and complex. The traditional support system is difficult to meet the construction needs of large-scale high-altitude cantilever beams in high-rise residential buildings. The external support and maintenance systems of high-rise buildings are mostly based on climbing frames or cantilever scaffolding. However, considering the economy of climbing frames, the structural forms of general climbing frames and cantilever scaffolding are difficult to meet the support of large-section beams. Summary of the invention

[0003] In order to solve the above problems, the present invention provides a large-span cantilever support system for high-rise unit corridors, comprising:

[0004] A first embedded part is used to install the main diagonal bracing beam; the first embedded part is arranged on the exterior wall floor;

[0005] A second embedded part, used for installing a secondary diagonal bracing beam; the second embedded part is arranged on the exterior wall floor slab and is located above the first embedded part;

[0006] A main diagonal bracing beam, used to support the main beam; a first end of the main diagonal bracing beam is connected to the first embedded part;

[0007] A secondary diagonal bracing beam is used to support the main beam; a first end of the secondary diagonal bracing beam is connected to the second embedded part;

[0008] A main beam, used to support the secondary beam; the bottom of the main beam is supported by the second end of the main diagonal bracing beam and the second end of the secondary diagonal bracing beam, and both ends are respectively inserted into the floor slab;

[0009] The secondary beam is used to build a frame together with the main beam to install the safety net; the secondary beam is supported on the main beam.

[0010] Preferably, it also includes: a main beam pressure beam, and the main beam pressure beam is connected to the bottom of all the main beams in sequence.

[0011] Preferably, it also includes: positioning steel bars and steel bar pull rings, wherein the steel bar pull ring is arranged on the secondary beam, the first end of the positioning steel bar is fixed on the top floor slab and the second end is fixed in the steel bar pull ring.

[0012] Preferably, it further comprises: an oblique support, wherein two ends of the oblique support are respectively connected to two adjacent secondary beams.

[0013] Preferably, it also includes: a connecting plate, which is connected to the bottoms of two adjacent main beams in sequence.

[0014] Preferably, it further comprises: an inclined beam support, wherein a first end of the inclined beam support is fixed to the main inclined bracing beam and a second end of the inclined beam support is fixed to the adjacent secondary inclined bracing beam.

[0015] Preferably, it also includes: a steel wire rope, a first end of which is connected to the main structure of the floor slab and a second end of which is connected to the main beam.

[0016] Preferably, it further comprises: an anchor ring, which is arranged on the steel beam and through which the steel wire rope passes.

[0017] The present invention also provides a method for constructing a large-span cantilever support system for a high-rise unit corridor, characterized in that the large-span cantilever support system for a high-rise unit corridor comprises the large-span cantilever support system for a high-rise unit corridor as described above, and the method comprises the steps of:

[0018] A first embedded part and a second embedded part are arranged on the exterior wall floor, wherein the second embedded part is located above the first embedded part;

[0019] Welding the first end of the main diagonal bracing beam at the first embedded part;

[0020] Welding the first end of the secondary bracing beam at the second embedded part;

[0021] A main beam is welded at the second end of the main diagonal bracing beam and the second end of the secondary diagonal bracing beam, and both ends of the main beam are respectively inserted into the floor slab;

[0022] A secondary beam is welded on the main beam.

[0023] The present application provides a large-span cantilever support system for a corridor between high-rise units and a construction method thereof, which solves the problem of difficult construction of cantilever corridors. The support system is simple to manufacture, easy to install, and conducive to turnover; it effectively solves the problems of complicated support frames, difficult installation and disassembly, and high construction cycle costs during the construction of large-section outdoor beams. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0025] Figure 1 It is a schematic diagram of the top view of the structure of a large-span cantilever support system for a corridor between high-rise units provided by the present invention;

[0026] Figure 2 It is a three-dimensional structural schematic diagram of a large-span cantilever support system for a high-rise unit corridor provided by the present invention;

[0027] Figure 3 The present invention is a schematic diagram of the side structure of a large-span cantilever support system for a corridor between high-rise units. DETAILED DESCRIPTION

[0028] In order to make the purpose, technical scheme and advantages of the present invention clearer, the present invention is further described in detail below in conjunction with specific embodiments and with reference to the accompanying drawings. It should be understood that these descriptions are only exemplary and are not intended to limit the scope of the present invention. In addition, in the following description, the description of well-known structures and technologies is omitted to avoid unnecessary confusion of the concept of the present invention.

[0029] like Figure 1-3 In an embodiment of the present application, the present application provides a large-span cantilever support system for a corridor between high-rise units, including: a first embedded part 1, a second embedded part 2, a main diagonal bracing beam 3, a secondary diagonal bracing beam 4, a main beam 5 and a secondary beam 6, and each part is described in detail below.

[0030] like Figure 1-3 In an embodiment of the present application, the present application provides a high-rise unit corridor large-span cantilever support system, including:

[0031] A first embedded part 1 is used to install a main diagonal bracing beam 3; the first embedded part 1 is arranged on the exterior wall floor;

[0032] A second embedded part 2 is used to install a secondary diagonal bracing beam 4; the second embedded part 2 is arranged on the exterior wall floor and is located above the first embedded part 1;

[0033] A main diagonal bracing beam 3 is used to support the main beam 5; a first end of the main diagonal bracing beam 3 is connected to the first embedded part 1;

[0034] A secondary diagonal bracing beam 4 is used to support the main beam 5; a first end of the secondary diagonal bracing beam 4 is connected to the second embedded part 2;

[0035] The main beam 5 is used to support the secondary beam 6; the bottom of the main beam 5 is supported by the second end of the main diagonal bracing beam 3 and the second end of the secondary diagonal bracing beam 4, and both ends are inserted into the floor slab respectively;

[0036] The secondary beam 6 is used to build a frame together with the main beam 5 to install the safety net; the secondary beam 6 is supported on the main beam 5.

[0037] When using this high-rise unit corridor long-span cantilever support system, after the main beam 5 and the secondary beam 6 are built according to the above structure, the safety net is fixed on the main beam 5 and the secondary beam 6.

[0038] like Figure 1-3In the embodiment of the present application, the large-span cantilever support system for the high-rise unit corridor provided by the present application further includes: a main beam pressure beam 7, which is sequentially connected to the bottom of all the main beams 5. The main beam pressure beam 7 can fix all the main beams 5 together to maintain the stability of the overall frame.

[0039] like Figure 1-3 In the embodiment of the present application, the present application provides a high-rise unit corridor large-span cantilever support system further comprising: positioning steel bars 8 and steel bar pull rings 9, wherein the steel bar pull rings 9 are arranged on the secondary beams 6, the first end of the positioning steel bars 8 is fixed to the top floor slab and the second end is fixed to the steel bar pull rings 9. The steel bar pull rings 9 are used to fix the positioning steel bars 8, and the positioning steel bars 8 can be used to fix safety nets or other supporting components.

[0040] like Figure 1-3 In the embodiment of the present application, the large-span cantilever support system for a high-rise unit corridor provided by the present application further includes: an inclined support 10, and both ends of the inclined support 10 are respectively connected to two adjacent secondary beams 6. The inclined support 10 can connect two adjacent secondary beams 6, which can keep the two adjacent secondary beams 6 fixed on the one hand, and can also keep the distance between the two secondary beams 6 constant on the other hand.

[0041] like Figure 1-3 In the embodiment of the present application, the large-span cantilever support system for the high-rise unit corridor provided by the present application further includes: a connecting plate 11, which is sequentially connected to the bottoms of two adjacent main beams 5. The connecting plate 11 can be used to fix the two adjacent main beams 5 to maintain the stability between the two.

[0042] like Figure 1-3 In the embodiment of the present application, the large-span cantilever support system for a high-rise unit corridor provided by the present application further includes: an inclined beam support 12, wherein the first end of the inclined beam support 12 is fixed to the main inclined bracing beam 3 and the second end is fixed to the adjacent secondary inclined bracing beam 4. The inclined beam support 12 can be used to fix the main inclined bracing beam 3 and the secondary inclined bracing beam 4, thereby maintaining the stability between the two.

[0043] like Figure 1-3 In the embodiment of the present application, the large-span cantilever support system for high-rise unit corridors provided by the present application further includes: a steel wire rope 13, the first end of the steel wire rope 13 is connected to the main structure of the floor slab and the second end is connected to the main beam 5. The steel wire rope 13 can be used to install a safety net or other supporting components.

[0044] like Figure 1-3In the embodiment of the present application, the large-span cantilever support system for high-rise unit corridor provided by the present application further includes: an anchor ring 14, which is arranged on the steel beam, and the steel wire rope 13 passes through the anchor ring 14. The anchor ring 14 can be used to change the direction of the steel wire rope 13, so as to meet the installation requirements of different safety nets.

[0045] The present invention also provides a method for constructing a large-span cantilever support system for a high-rise unit corridor, characterized in that the large-span cantilever support system for a high-rise unit corridor comprises: Figure 1-3 The method of the large-span cantilever support system for the high-rise unit corridor comprises the following steps:

[0046] A first embedded part 1 and a second embedded part 2 are arranged on the exterior wall floor, wherein the second embedded part 2 is located above the first embedded part 1;

[0047] Welding the first end of the main diagonal bracing beam 3 at the first embedded part 1;

[0048] Welding the first end of the secondary bracing beam 4 at the second embedded part 2;

[0049] A main beam 5 is welded to the second end of the main diagonal bracing beam 3 and the second end of the secondary diagonal bracing beam 4, and both ends of the main beam 5 are respectively inserted into the floor slab;

[0050] The secondary beam 6 is welded to the main beam 5 .

[0051] In the embodiment of the present application, all parts can be made of steel, so as to have better stability.

[0052] The present application provides a large-span cantilever support system for a corridor between high-rise units and a construction method thereof, which solves the problem of difficult construction of cantilever corridors. The support system is simple to manufacture, easy to install, and conducive to turnover; it effectively solves the problems of complicated support frames, difficult installation and disassembly, and high construction cycle costs during the construction of large-section outdoor beams.

[0053] It should be understood that the above specific embodiments of the present invention are only used to illustrate or explain the principles of the present invention, and do not constitute a limitation of the present invention. Therefore, any modifications, equivalent substitutions, improvements, etc. made without departing from the spirit and scope of the present invention should be included in the protection scope of the present invention. In addition, the appended claims of the present invention are intended to cover all changes and modifications that fall within the scope and boundaries of the appended claims, or the equivalent forms of such scope and boundaries.

Claims

1. A large-span cantilever support system for corridors between high-rise units, characterized in that: include: A first embedded part is used to install the main diagonal bracing beam; the first embedded part is arranged on the exterior wall floor; The second embedded part is used to install the secondary diagonal bracing beam; The second embedded part is arranged on the exterior wall floor and is located above the first embedded part; The main diagonal bracing beam is used to support the main beam; the first end of the main diagonal bracing beam is connected to the first embedded part; The secondary diagonal bracing beam is used to support the main beam; The first end of the secondary diagonal bracing beam is connected to the second embedded part; The main beam is used to support the secondary beam; the bottom of the main beam is supported by the second end of the main diagonal bracing beam and the second end of the secondary diagonal bracing beam, and both ends are respectively inserted into the exterior wall floor; The secondary beam is used to build a frame together with the main beam to install the safety net; the secondary beam is supported on the main beam; A main beam pressure beam, the main beam pressure beam is sequentially connected to the bottoms of all the main beams; A connecting plate, the connecting plate being connected to the bottoms of two adjacent main beams in sequence; Positioning steel bars and steel bar pull rings, wherein the steel bar pull rings are arranged on the secondary beams, the first ends of the positioning steel bars are fixed to the top floor slabs and the second ends are fixed to the steel bar pull rings; An oblique support, wherein both ends of the oblique support are respectively connected to two adjacent secondary beams; An inclined beam support, wherein a first end of the inclined beam support is fixed to the main inclined bracing beam and a second end of the inclined beam support is fixed to an adjacent secondary inclined bracing beam; A steel wire rope, wherein a first end of the steel wire rope is connected to the main structure of the floor slab and a second end of the steel wire rope is connected to the main beam; An anchor ring is arranged on the steel beam, and the steel wire rope passes through the anchor ring.

2. A method for constructing a large-span cantilever support system for a high-rise unit corridor, characterized in that: The long-span cantilever support system for high-rise unit corridors comprises the long-span cantilever support system for high-rise unit corridors as claimed in claim 1, and the method comprises the steps of: A first embedded part and a second embedded part are arranged on the exterior wall floor, wherein the second embedded part is located above the first embedded part; Welding the first end of the main diagonal bracing beam at the first embedded part; Welding the first end of the secondary bracing beam at the second embedded part; A main beam is welded at the second end of the main diagonal bracing beam and the second end of the secondary diagonal bracing beam, and both ends of the main beam are respectively inserted into the exterior wall floor slab; A secondary beam is welded on the main beam.