A three-piece combined planetary frame processing method

Through the combination of precision bolt holes and boring fixtures, the problem of large machining errors of three-piece combined planetary frames is solved, the processing accuracy and efficiency are improved, and it is suitable for mass production.

CN111468902BActive Publication Date: 2024-12-03HARBIN FIRST MACHINERY GRP
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202010371979.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-05-06
Publication Date
2024-12-03
Estimated Expiration
2040-05-06

AI Technical Summary

Technical Problem

The original processing method of the three-piece combined planetary frame has problems such as large processing errors, easy parts deformation, large assembly errors, low grinding accuracy and boring accuracy.

Method used

Use precision bolt holes and precision bolts for positioning, use alloy tips and boring fixtures for finishing, scraper rods and scraper for scraper finishing, code marking coaxial installation positions, and use positioning pins when boring Restrict workpiece rotation and perform spring groove processing to improve accuracy.

Benefits of technology

It significantly reduces coaxial assembly errors, avoids the influence of part deformation and grinding accuracy, improves boring accuracy and processing efficiency, improves assembly accuracy, and is suitable for mass production.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111468902B_ABST
    Figure CN111468902B_ABST
Patent Text Reader

Abstract

A three-piece combined planetary frame processing method belongs to the field of planetary frame processing. The present invention comprises the following steps: 1. After the bearing seat, planetary frame and output shaft are coaxially assembled and installed, precision bolt holes are processed and precision bolts are installed in the precision bolt holes; 2. When the bearing seat, planetary frame and output shaft are clamped, the alloy tip is installed inside the output shaft, and the top of the alloy tip is installed in contact with the inside of the output shaft; 3. The outer circle of the bearing seat support and the outer circle of the output shaft support are finely processed; 4. The bearing seat, planetary frame and output shaft are installed on a boring fixture; 5. The planetary gear shaft hole is finely bored; 6. The planetary gear shaft hole is finely processed by scraping the surface with a scraping tool bar and a scraping tool; 7. The installation positions of the bearing seat, planetary frame and output shaft during processing are marked, and the planetary frame and output shaft are fixedly clamped on the boring fixture; 8. The retaining ring groove is processed on the planetary gear shaft hole of the planetary frame. The present invention reduces the coaxial error of the assembly, improves the manufacturing accuracy of the frame, and avoids the influence of the assembly error on the outer circle grinding process.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a three-piece combined planetary frame processing method, and belongs to the field of planetary frame processing. Background Art

[0002] Planetary reducers are important components of large heavy-duty mechanical travel drives, with compact structure, large load-bearing capacity, high transmission accuracy and efficiency. The main components of planetary reducers include center wheels, planetary wheels, planetary frames, planetary wheel shafts and bearings. The planetary frame is one of the important components of planetary transmission, and its processing accuracy directly affects the performance of the planetary reduction mechanism. Planetary carriers can be roughly divided into five types, namely, integral frame structure, welded structure, cast structure, cantilever structure with detachable side plates, integral structure with single-side plate planetary wheel shaft cantilever and combined structure. When designing a planetary carrier, its structural type should be selected according to its functional requirements, manufacturing methods and assembly conditions of the planetary gear reducer.

[0003] A three-piece combined planetary frame belongs to a combined planetary gear frame in a combined structure, which is specifically composed of a bearing seat, a planetary frame, and an output shaft. For a three-piece combined planetary frame, its original processing method has the following problems:

[0004] 1. The processing technology is complicated, the precision of the processed parts is not high, and there is no suitable processing tool. When the processed bearing seat, planetary carrier and output shaft are assembled, there will be a large coaxial assembly error;

[0005] 2. After the original processing and clamping method is used, the top hole of the bearing seat is too thin, so the top hole is bound to be deformed. The deformation of the top hole will seriously affect the grinding accuracy of the outer circle and affect the assembly and use of the planetary frame;

[0006] 3. After the combination is adopted, the two outer circles are ground against each other. It is easy to bump into each other during transportation after grinding, causing the two outer circles to be misaligned and produce coaxial errors;

[0007] 4. When the countersunk hole on the planetary carrier is combined with the precision boring of the planetary gear shaft hole, the boring accuracy will be affected due to intermittent cutting.

[0008] Therefore, it is urgent to propose a three-piece combined planetary frame processing method to solve the above technical problems. Summary of the invention

[0009] The purpose of the present invention is to solve the problem that the original processing method of a three-piece combined planetary frame has large processing errors and is prone to unexpected deformation. A brief overview of the present invention is given below to provide a basic understanding of certain aspects of the present invention. It should be understood that this overview is not an exhaustive overview of the present invention. It is not intended to identify the key or important parts of the present invention, nor is it intended to limit the scope of the present invention.

[0010] The technical solution of the present invention:

[0011] A three-piece combined planetary frame processing method, the processing steps are:

[0012] Step a, after the bearing seat, the planet carrier and the output shaft are coaxially assembled and installed, two or more precision bolt holes are processed on the bearing seat, the planet carrier and the output shaft, and precision bolts are installed in the precision bolt holes;

[0013] Step b, clamping the bearing seat, the planet carrier and the output shaft, during which the alloy tip is installed inside the output shaft, the output shaft is processed with an installation chamfer, and the top of the alloy tip is in contact with the inside of the output shaft for installation;

[0014] Step c, after the bearing seat, the planet carrier and the output shaft are clamped, the outer circle of the bearing seat support and the outer circle of the output shaft support are respectively fine-machined;

[0015] Step d, after processing, the bearing seat, the planet carrier and the output shaft are mounted on the boring fixture;

[0016] Step e, precision boring a plurality of planetary gear shaft holes on the bearing seat, the planetary carrier and the output shaft;

[0017] Step f, using a scraping tool bar and a scraping tool to perform scraping and finishing on the planetary gear shaft hole;

[0018] Step g, using codes to mark the combined installation positions of the bearing seat, the planet carrier and the output shaft during coaxial processing, and after removing the bearing seat, fixing and clamping the planet carrier and the output shaft on a boring fixture;

[0019] Step h, using a keyway milling cutter to machine retaining ring grooves on multiple planetary gear shaft holes of the planetary carrier.

[0020] Preferably: the boring fixture includes a pressure plate, a fixing bolt, a supporting bolt, a base and a positioning pin. The support bolt mounting holes and the fixing bolt mounting holes are symmetrically processed on the left and right sides of the upper end surface of the base. The lower ends of the two fixing bolts are respectively installed in the fixing bolt mounting holes, and the lower ends of the two supporting bolts are respectively installed in the supporting bolt mounting holes. The two pressure plates are respectively installed in cooperation with the two symmetrical fixing bolts on the left and right ends. The lower end surfaces of the two pressure plates are installed in contact with the upper end surfaces of the supporting bolts. A plurality of limiting holes are processed with a circular distribution at the center position of the upper end surface of the base, the positioning pin is installed in the limiting hole, a frame mounting hole is processed at the center of the upper end surface of the base, and the bearing seat, planetary carrier and output shaft are installed in the frame mounting hole.

[0021] Preferably, when the bearing seat, the planet carrier and the output shaft are assembled in cooperation, they are assembled according to the relative mounting positions of the bearing seat and the output shaft marked in step g during machining.

[0022] Preferably: in the steps e to h, during boring, the locating pin is installed in the precision bolt hole. The present invention has the following beneficial effects:

[0023] 1. The three-piece combined planetary frame processing method of the present invention has a simple processing technology. The bearing seat, the planetary frame and the output shaft are assembled and processed, which greatly reduces the large coaxial assembly error caused by separate processing;

[0024] 2. The alloy top installation position of the present invention avoids deformation during processing due to the small wall thickness at the top hole of the bearing seat of the part, which seriously affects the grinding accuracy of the outer circle and affects the assembly and use of the planetary frame;

[0025] 3. In the processing method of the three-piece combined planetary frame of the present invention, when grinding the two outer circles after assembly, precision bolts are used for precise positioning to avoid collision during transportation after grinding, which may cause misalignment of the two outer circles and coaxial error;

[0026] 4. In the three-piece combined planetary frame processing method of the present invention, when designing the boring tooling, positioning pins are used to limit the rotational freedom of the workpiece, so as to solve the problem of hole and tool centering, avoid the trouble of aligning each part during processing, and greatly improve the processing efficiency;

[0027] 5. The three-piece combined planetary frame processing method of the present invention has been maturely applied, is simple to operate, and has a clever design. It also greatly improves the assembly accuracy of the three-piece combined planetary frame and is suitable for mass production process promotion and use. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 It is a simplified assembly diagram of a three-piece planetary frame;

[0029] Figure 2 It is the front view of the bearing seat;

[0030] Figure 3 It is the left side cross-sectional view of the bearing seat;

[0031] Figure 4 It is the main view of the output shaft;

[0032] Figure 5 It is the left side cross-sectional view of the output shaft;

[0033] Figure 6 It is the main cross-section of the planetary frame;

[0034] Figure 7 It is the left view of the planetary frame;

[0035] Figure 8 This is a diagram of the innovative clamping method for top grinding outer circle;

[0036] Fig. 9 This is a diagram of the traditional clamping method for top grinding outer circle;

[0037] Fig.10 This is a top view of the precision bolt assembly;

[0038] Fig.11 It is the main cross-sectional view of the precision bolt assembly;

[0039] Fig.12 This is a top view showing the use of the boring tool;

[0040] Fig.13 This is a schematic front view cross-sectional view of the boring tooling in use;

[0041] Fig.14 This is a left-side cross-sectional view showing the use of a boring tool;

[0042] Fig.15 It is a schematic front cross-sectional view of the combined scraping process;

[0043] In the figure, 1-bearing seat, 2-planetary carrier, 3-output shaft, 4-planetary gear shaft, 5-planetary gear, 6-alloy top, 7-boring fixture, 8-locating pin, 9-scraping tool rod, 10-scraping tool, 11-planetary gear shaft hole, 12-precision bolt hole, 13-precision bolt, 1-1-bearing seat support outer circle, 3-1-output shaft support outer circle, 3-2-installation chamfer, 71-pressure plate, 72-fixing bolt, 73-support bolt, 74-base, 741-limiting hole, 742-frame mounting hole, 743-support bolt mounting hole, 744-fixing bolt mounting hole. DETAILED DESCRIPTION

[0044] In order to make the purpose, technical scheme and advantages of the present invention clearer, the present invention is described below by the specific embodiments shown in the accompanying drawings. However, it should be understood that these descriptions are only exemplary and are not intended to limit the scope of the present invention. In addition, in the following description, the description of well-known structures and technologies is omitted to avoid unnecessary confusion of the concept of the present invention.

[0045] The connection mentioned in the present invention is divided into fixed connection and detachable connection. The fixed connection is a non-detachable connection including but not limited to conventional fixed connection methods such as folding connection, rivet connection, bonding connection and welding connection. The detachable connection includes but not limited to conventional detachable methods such as threaded connection, snap connection, pin connection and hinge connection. When the specific connection method is not clearly defined, it is assumed that at least one connection method can always be found in the existing connection methods to achieve the function. Those skilled in the art can choose according to their needs. For example: a fixed connection is selected as a welding connection, and a detachable connection is selected as a hinge connection.

[0046] Specific implementation method 1: Combination Figure 1-Figure 15 This embodiment is described. This embodiment is a three-piece combined planetary frame processing method, and its processing steps are:

[0047] Step a, after the bearing seat 1, the planetary carrier 2 and the output shaft 3 are coaxially assembled and installed, two or more precision bolt holes 12 are processed on the bearing seat 1, the planetary carrier 2 and the output shaft 3, and precision bolts 13 are installed in the precision bolt holes, which can effectively avoid the impact during transportation, which may cause the two support outer circles to be misaligned and cause the coaxial error problem;

[0048] Step b, clamping the bearing seat 1, the planetary carrier 2 and the output shaft 3, during which the alloy tip 6 is installed inside the output shaft 3, the output shaft 3 is processed with an installation chamfer 3-2, and the top of the alloy tip 6 is installed in contact with the inside of the output shaft 3. If the traditional clamping method of grinding the outer circle is adopted, the wall thickness of the tip hole of the bearing seat 1 is too small, and the tip hole will inevitably be deformed after the assembly, and the deformation of the tip hole will seriously affect the grinding accuracy of the supporting outer circle of the bearing seat 1;

[0049] Step c, after the bearing seat 1, the planetary carrier 2 and the output shaft 3 are clamped, the outer circle 1-1 of the bearing seat support and the outer circle 3-1 of the output shaft support are respectively fine-machined, and the outer circle of the support of the bearing seat 1 and the outer circle of the bearing support of the output shaft 3 are combined and machined, which greatly reduces the assembly coaxial error and improves the frame manufacturing accuracy;

[0050] Step d, after processing, the bearing seat 1, the planet carrier 2 and the output shaft 3 are mounted on the boring fixture 7;

[0051] Step e, precision boring a plurality of planetary gear shaft holes 11 on the bearing seat 1, the planetary carrier 2 and the output shaft 3;

[0052] Step f, use the scraping tool bar 9 and the scraping knife 10 to scrape and finish the planetary gear shaft hole 11. In order to ensure the verticality and parallelism of the installation positions of the two end surfaces of the planetary carrier 2 and the planetary gear 5, a combined scraping process is arranged in the process. After boring, use the special scraping tool bar 9 and the scraping knife 10 to perform "window" scraping and finishing to ensure dimensional accuracy and form and position tolerance;

[0053] Step g, use codes to mark the combined installation positions of the bearing seat 1, planetary carrier 2 and output shaft 3 during coaxial processing. After the bearing seat 1 is disassembled, the planetary carrier 2 and output shaft 3 are fixed and clamped on the boring fixture 7. The purpose of marking is to ensure that the bearing seat 1, planetary carrier 2 and output shaft 3 combined together are the parts for coaxial combined processing during processing when they are disassembled and reassembled. Because the base number is large during factory production, when the parts are disassembled and processed, the parts with the same name are put together, which is easy to mix and difficult to identify the matching relationship during coaxial combined processing. However, only the coaxially combined bearing seat 1, planetary carrier 2 and output shaft 3 are the most matched and have the best coaxiality. Therefore, the bearing seat 1, planetary carrier 2 and output shaft 3 are respectively coded and marked when they are combined, and the marks have matching meanings. When the final assembly is used, the coaxially combined parts are found according to the marking content and assembled.

[0054] Step h, using a keyway milling cutter to machine retaining ring grooves on the plurality of planetary gear shaft holes 11 of the planet carrier 2, and arranging the retaining ring groove milling process after boring to avoid the problem that intermittent cutting may affect the boring accuracy to a certain extent.

[0055] Specific implementation method 2: Combination Figure 1-Figure 4 The present embodiment is described, based on the specific embodiment 1, a three-piece combined planetary frame processing method of the present embodiment, the boring fixture 7 comprises a pressure plate 71, a fixing bolt 72, a supporting bolt 73, a base 74 and a positioning pin 8, the upper end surface of the base 74 is symmetrically processed with supporting bolt mounting holes 743 and fixing bolt mounting holes 744 on the left and right sides, the lower ends of the two fixing bolts 72 are respectively installed in the fixing bolt mounting holes 744, and the lower ends of the two supporting bolts 73 are respectively installed in the supporting bolt mounting holes 743, the two pressure plates 71 are respectively installed with the two fixing bolts 72 symmetrically on the left and right ends, the lower end surfaces of the two pressure plates 71 are contacted and installed with the upper end surfaces of the supporting bolts 73, a plurality of limiting holes 741 are processed with a circular distribution at the center position of the upper end surface of the base 74, the positioning pin 8 is installed in the limiting hole 741, a frame mounting hole 742 is processed at the center of the upper end surface of the base 74, and the bearing seat 71, the planetary carrier 72 and the output shaft 73 are installed in the frame mounting hole 742.

[0056] Specific implementation method three: Combination Figure 1-Figure 4 This embodiment is described based on specific embodiment one. This embodiment is a three-piece combined planetary frame processing method. When the bearing seat 1, planetary frame 2 and output shaft 3 are used for matching installation, they are installed according to the relative installation positions of the bearing seat 1 and the output shaft 3 marked in step g during processing, thereby avoiding matching errors caused by different positions during installation.

[0057] Specific implementation method four: Combination Figure 1-Figure 4 The present embodiment is described based on the specific embodiment one. The present embodiment is a three-piece combined planetary frame processing method. In the steps e to h, when boring, the locating pin 8 is installed in the precision bolt hole 12. The locating pin 8 is installed in the planetary gear shaft hole 11 to limit the rotational freedom of the workpiece, solve the hole and tool centering problem, avoid the trouble of aligning each part during processing, and greatly improve the processing efficiency.

[0058] Specific implementation method five: Combination Figure 1-Figure 4 This embodiment is described based on the specific embodiment 1. In this embodiment, a three-piece combined planetary frame processing method is used. Step c combines the fine processing of the bearing seat support outer circle 1-1 and the output shaft support outer circle 3-1. The error analysis is as follows:

[0059] 1. The outer circle 1-1 of the bearing seat support and the outer circle 3-1 of the output shaft support are processed as a single piece. The coaxial error analysis after combination is as follows:

[0060] The coaxiality tolerance between the stop and the outer circle of the bearing seat 1 is 0.05;

[0061] The stopper positioning fit between the bearing seat 1 and the planet carrier 2 is φ138H7 / f7, and the maximum clearance = maximum hole - minimum shaft = 0.04 + 0.083 = 0.123;

[0062] The coaxiality tolerance between the output shaft support outer circle 3-1 and the output shaft stop is 0.05;

[0063] The output shaft 3 and the planet carrier 2 stopper positioning fit is φ138H7 / f7, the maximum clearance = maximum hole - minimum shaft = 0.04 + 0.083 = 0.123;

[0064] After assembly, the maximum coaxiality error between the bearing seat support outer circle 1-1 and the output shaft support outer circle 3-1 is:

[0065] 0.05+0.123+0.05=0.223; only one stopper is counted, and the minimum is 0.043;

[0066] 2. The outer circle of the bearing seat support 1-1 and the outer circle of the output shaft support 3-1 are processed together, and then the planetary gear shaft hole 11 is finely bored. When disassembled, they are reassembled according to the marks of the relative installation position during processing in step c. The error analysis during reassembly is as follows:

[0067] The tolerance of the four planetary gear shaft holes 11 is 0.021;

[0068] The deviation of the planetary gear shaft 4 is +0.015+0.002;

[0069] Since the fit clearance between the planetary wheel shaft hole 11 and the planetary wheel shaft 4 is smaller than the minimum clearance 0.043 of the stopper positioning fit φ138H7 / f7, the maximum fit clearance between the planetary wheel shaft hole 11 and the planetary wheel shaft 4 is the maximum coaxial error of the two bearing support circles when the frame is assembled;

[0070] Maximum coaxial error = maximum hole - minimum axis = 0.021-0.002 = 0.019;

[0071] By comparing the above two maximum coaxial error values ​​of 0.223 and 0.019, it can be seen that the frame assembly accuracy can be greatly improved by combined processing of the bearing seat support outer circle 1-1 and the output shaft support outer circle 3-1.

[0072] It should be noted that in the above embodiments, as long as the technical solutions are not contradictory, they can be arranged and combined, and those skilled in the art can exhaust all possibilities based on the mathematical knowledge of arrangement and combination. Therefore, the present invention will no longer describe the technical solutions after arrangement and combination one by one, but it should be understood that the technical solutions after arrangement and combination have been disclosed by the present invention.

[0073] This implementation is only an exemplary description of this patent and does not limit its protection scope. Those skilled in the art may also make partial changes to it, as long as they do not exceed the spirit of this patent, they are all within the protection scope of this patent.

Claims

1. A three-piece combined planetary frame processing method, the processing steps are: Step a, after the bearing seat (1), the planet carrier (2) and the output shaft (3) are coaxially assembled and installed, two or more precision bolt holes (12) are processed on the bearing seat (1), the planet carrier (2) and the output shaft (3), and precision bolts (13) are installed in the precision bolt holes; Step b, clamping the bearing seat (1), the planet carrier (2) and the output shaft (3), during which the alloy tip (6) is installed inside the output shaft (3), the output shaft (3) is processed with a mounting chamfer (3-2), and the top end of the alloy tip (6) is installed in contact with the inside of the output shaft (3); Step c, after the bearing seat (1), the planet carrier (2) and the output shaft (3) are clamped, the outer circle of the bearing seat support (1-1) and the outer circle of the output shaft support (3-1) are respectively fine-machined; Step d, after processing, the bearing seat (1), the planet carrier (2) and the output shaft (3) are mounted on a boring fixture (7); Step e, precision boring a plurality of planetary gear shaft holes (11) on the bearing seat (1), the planetary carrier (2) and the output shaft (3); Step f, using a scraping tool rod (9) and a scraping tool (10) to perform scraping and finishing on the planetary wheel shaft hole (11); Step g, using codes to mark the combined installation positions of the bearing seat (1), the planet carrier (2) and the output shaft (3) during coaxial processing, after the bearing seat (1) is removed, the planet carrier (2) and the output shaft (3) are fixedly clamped on the boring fixture (7); Step h, using a keyway milling cutter to machine retaining ring grooves on a plurality of planetary wheel shaft holes (11) of the planetary carrier (2); The boring fixture (7) comprises a pressing plate (71), a fixing bolt (72), a supporting bolt (73), a base (74) and a positioning pin (8). The upper end surface of the base (74) is symmetrically processed with supporting bolt mounting holes (743) and fixing bolt mounting holes (744) on both sides. The lower ends of the two fixing bolts (72) are respectively mounted in the fixing bolt mounting holes (744). The lower ends of the two supporting bolts (73) are respectively mounted in the supporting bolt mounting holes (743). The two pressing plates (71) The two pressing plates (71) are respectively installed in cooperation with two fixing bolts (72) symmetrically arranged at the left and right ends, the lower end surfaces of the two pressing plates (71) are contacted with the upper end surfaces of the supporting bolts (73) for installation, a plurality of limiting holes (741) are processed in a circumferential distribution at the center position of the upper end surface of the base (74), the positioning pin (8) is installed in the limiting hole (741), a frame installation hole (742) is processed in the center of the upper end surface of the base (74), and the bearing seat (1), the planetary carrier (2) and the output shaft (3) are installed in the frame installation hole (742); When the bearing seat (1), the planet carrier (2) and the output shaft (3) are used for matching installation, they are installed according to the relative installation positions of the bearing seat (1) and the output shaft (3) marked in step g during processing; In the steps e to h, the locating pin (8) is installed in the precision bolt hole (12) during boring.