Integrated structure of foundation pit support and construction road and construction method
By inserting steel pipe piles around the foundation pit and integrating them with the construction road, an integrated structure is formed, which solves the instability problem of the foundation pit support structure under the narrow construction space and load, and achieves an efficient and safe foundation pit. Support reduces construction costs and the risk of affecting subsequent underground space development.
Patent Information
- Application Number
- CN202010488208.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-06-02
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2040-06-02
AI Technical Summary
The existing foundation pit support technology causes the support structure to be unstable due to the narrow construction space and load, which can easily cause cracks or fractures in the construction road. The construction period is long, the cost is high, and the support form is difficult to recycle, which affects subsequent underground space development. .
The integrated structure of foundation pit support and construction road is adopted. Steel pipe piles are inserted around the foundation pit and connected to the construction road structure layer at the upper part to form an overall structure. The upper part of the steel pipe pile is set with a tube and a cover plate. The cement concrete pavement bears the load and restraint, reducing the horizontal load on the supporting structure.
It improves the reliability and load-bearing capacity of the foundation pit support structure, reduces the safety distance requirements for construction vehicles, saves construction time and costs, and reduces the load pressure of construction roads. The recyclable steel pipe piles do not affect the development of underground space.
Smart Images

Figure CN111501782B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to an integrated structure for foundation pit support and a construction method, and in particular to an integrated structure for foundation pit support and construction road and a construction method. Background Art
[0002] At present, with the development of economy and the accelerated pace of urbanization, many cities are in the midst of a boom in real estate investment and municipal infrastructure construction. Underground buildings such as underground shopping malls, underground streets, underground substations, underground parking lots, drainage and sewage treatment systems have led to an increasing scale of foundation pit projects.
[0003] At present, the main forms of foundation pit support include soil nail wall, underground continuous wall, steel sheet pile, pile-anchor and other support forms. The soil nail wall support construction equipment is simple, the construction does not need to occupy a separate site, and the project cost is low, but its bearing capacity is not high, and it is generally only used for shallow foundation pit support; the underground continuous wall has a high bearing capacity and good water interception and anti-seepage performance, but its construction is more complicated and costly; the steel sheet pile is flexible in design and can be recycled for reuse, but its construction accuracy is high, and the pile body is easy to tilt during the piling process and is not easy to correct. Pile-anchor support has the advantages of strong bearing capacity, no influence from groundwater, and small space occupation. It is widely used in foundation pit projects with large excavation depth and poor soil conditions, but its overall design tends to be conservative and the project cost is high. For the existing foundation pit support technology, the support structure only bears horizontal loads. Under the combined effect of the soil pressure of the foundation itself and the construction load, the lower soil on one side of the foundation pit of the construction road is prone to loosening or even detaching, and the road forms a structure similar to a cantilever beam, which can easily cause cracks or even breaks in the construction road, inducing serious accidents such as the rollover of construction vehicles such as concrete pump trucks and the failure of the foundation pit support structure. When the foundation pit construction space is small and the safe distance between the vehicle and the pit edge cannot be guaranteed, such accidents often occur. In addition, the existing foundation pit support form is "support while excavating", which has a long construction period. At the same time, except for steel sheet piles, the above-mentioned support forms are difficult to recycle, which will become an obstacle to the future development of surrounding underground space.
[0004] How to ensure the reliability of the support structure while taking into account other requirements such as construction period, project cost, and environmental protection is exactly the requirement of the current foundation pit project for new support technology. Summary of the invention
[0005] The main purpose of the present invention is to solve the problem of how to ensure the reliability of the support structure in foundation pit projects with narrow construction space on the pit side;
[0006] Another purpose of the present invention is to solve the problem that the soil at the bottom of one side of the foundation pit of the construction road becomes loose or even detached due to the large horizontal displacement of the foundation pit support structure caused by the foundation pit excavation and the construction road load, which may easily cause cracks or even breaks in the construction road, and induce serious accidents such as the rollover of the construction vehicle;
[0007] In order to solve the above problems and achieve the above purposes, the present invention provides an integrated structure of foundation pit support and construction road and a construction method.
[0008] The integrated structure of foundation pit support and construction road provided by the present invention is a foundation pit support structure and a construction road formed as an integral structure, wherein the foundation pit support structure includes several rows of steel pipe piles, and the several rows of steel pipe piles are inserted in the soil around the foundation pit, and the upper parts of adjacent steel pipe piles are connected by the structural layer of the construction road, and the upper parts of the steel pipe piles and the structural layer of the construction road form an integral structure.
[0009] The upper part of the steel pipe pile is provided with a first sleeve and a second sleeve, the top end cover of the first sleeve is provided with a cover plate, the second sleeve is arranged on the top surface of the cover plate, the upper end of the second sleeve is provided with a top cover, and the first sleeve, the cover plate, the second sleeve and the top cover are all arranged in the structural layer of the construction road.
[0010] The inner diameters of the first sleeve and the second sleeve are the same, the outer diameter of the second sleeve is larger than the outer diameter of the first sleeve, the cover plate is made of steel plate, a circular hole with the same outer diameter as the steel pipe pile is opened in the middle of the cover plate, and the top cover is prefabricated with cement concrete.
[0011] The structural layer of the construction road is a cement concrete structure with transverse and longitudinal steel bars. The transverse and longitudinal steel bars are threaded steel bars with a diameter of not less than 12mm, a spacing between longitudinal steel bars of not more than 350mm, and a spacing between transverse steel bars of not more than 600mm. The longitudinal steel bars are located within the 1 / 3-1 / 2 thickness range below the top surface of the surface layer, the transverse steel bars are located below the longitudinal steel bars, the distance from the edge steel bars to the free edge is 100-150mm, the maximum particle size of aggregate in cement concrete is not more than 26.5mm, and the fineness modulus of sand in cement concrete is not less than 2.5.
[0012] The present invention provides an integrated structure of foundation pit support and construction road and a construction method, and the method is as follows:
[0013] Step 1: Site leveling: Level the construction site to ensure smooth entry and exit of machinery and equipment and facilitate the positioning of the pile driver;
[0014] Step 2: Measure and lay out: According to the construction drawings, use the theodolite to lay out and locate the steel pipe piles. The positioning error of the steel pipe piles is less than 10mm. After verification, protect the on-site pile position and start the next step of construction;
[0015] Step 3: Driving steel pipe piles:
[0016] ① Move the pile driver to the pile position, lift the steel pipe pile, and put the pile top into the pile cap. Before lifting, a detailed appearance inspection of each section of the steel pipe pile is required, especially the ovality. Only those that meet the requirements can be lifted;
[0017] ② Align the bottom end of the steel pipe pile with the marked line at the pile position, and use two theodolites to monitor the verticality of the guide rod at right angles in front of and on the side of the pile driver, so that the pile hammer, pile cap and pile body are in a vertical line;
[0018] ③ The steel pipe pile, pile cap and pile hammer will gradually sink the steel pipe pile into the soil by their own weight. During this period, the quality of the pile sinking will be tracked and observed at any time;
[0019] ④ After confirming that the self-sinking quality of the steel pipe pile is good, carry out normal continuous hammering until the top of the steel pipe pile is hammered to 60-80cm above the ground and then stop hammering;
[0020] ⑤Precisely cut the steel pipe piles according to the designed height;
[0021] Step 4: Insert the first sleeve: Sleeve the first sleeve on the lower part of the steel pipe pile exposed above the ground, with the bottom of the first sleeve close to the ground;
[0022] Step 5: Install the cover plate and the second sleeve: Pass the cover plate through the steel pipe pile, so that the bottom surface of the cover plate is in close contact with the top of the first sleeve, and then put the second sleeve on the steel pipe pile, so that the bottom end of the second sleeve is in close contact with the top surface of the cover plate;
[0023] Step 6: Casting of the construction road structural layer: The structural layer of the construction road adopts a cement concrete structure. First, tie the steel bars, cast the cement concrete, reserve the holes for the top cover, perform maintenance, and then remove the mold;
[0024] Step 7. Put on the top cover: Put the top cover on the top end of the second sleeve, and the top cover is prefabricated with cement concrete.
[0025] In step two, the "theodolite" used for measurement and positioning and the measuring instruments of the control quality inspection equipment within their use cycle are subject to metrological inspection and control according to the secondary metrological standards.
[0026] The steel bars in step six are threaded steel bars with a diameter of not less than 12mm, the spacing between longitudinal steel bars is not more than 350mm, the spacing between transverse steel bars is not more than 600mm, the longitudinal steel bars are located within the 1 / 3-1 / 2 thickness range below the top surface of the surface layer, the transverse steel bars are located under the longitudinal steel bars, the distance from the edge steel bars to the free edge is 100-150mm, the maximum particle size of aggregate in cement concrete is not more than 26.5mm, and the fineness modulus of sand in cement concrete is not less than 2.5.
[0027] The working principle of the present invention is as follows:
[0028] The foundation pit support and construction road integrated structure provided by the present invention adopts a recyclable steel pipe pile support structure, which is composed of steel pipe piles, a first sleeve, a cover plate, a second sleeve, a cement concrete pavement and a prefabricated concrete top cover. The steel pipe piles directly bear the pavement load and lateral soil pressure, and the cement concrete pavement provides upper constraints. Because the pavement load can be converted into horizontal soil pressure acting on the support structure, it is now directly borne by the steel pipe piles, that is, the horizontal soil pressure acting on the support structure is reduced, and the structure can bear a larger pavement load to achieve the purpose of stabilizing the foundation pit. During operation, the pavement load is diffused to the pile periphery and deep soil body according to the transmission path of cement concrete pavement → cover plate → steel pipe pile; the lateral soil pressure acts on the steel pipe piles, and is transmitted from the steel pipe piles to the soil body around the piles to balance the lateral soil pressure. The construction of the present invention adopts the "support-excavation" operation mode, and support is carried out before excavation. If there is no special situation, no support is required after excavation.
[0029] Beneficial effects of the present invention:
[0030] The foundation pit support and construction road integrated structure and construction method provided by the present invention have high reliability, and steel pipe piles are used to directly bear the vertical load of the road surface, which gives full play to the vertical bearing capacity of the support structure, and the horizontal load acting on the foundation pit support structure is also effectively reduced. The support structure directly bears the vertical load, which can effectively reduce the demand for construction space around the foundation pit, especially the demand for construction vehicles such as concrete pump trucks to be at a safe distance from the pit edge, thereby avoiding the occurrence of vehicle overturning accidents. Save construction time. The construction of the present invention adopts the "support-excavation" operation form, and support is carried out before excavation, and excavation can be done in one step. Compared with the existing "excavation and support" operation, it can effectively save construction time. In addition, the steel pipe piles of the present invention are directly hammered in continuously by a pile driver, which further saves construction time compared to support structures such as soil nail walls, underground continuous walls, pile-anchors, etc. that require digging holes and grouting. Low cost. Compared with underground continuous walls and pile-anchor support technologies, the steel pipe piles of the present invention do not require digging holes and grouting, saving materials and reducing the requirements for construction machinery. At the same time, the steel pipe piles can be recycled, and the cement concrete pavement can still be used after the foundation pit is backfilled, which effectively reduces the construction cost. Ecological and environmental protection. The steel pipe piles, sleeves, cover plates, and concrete top covers used in the present invention are all detachable, simple to make, and convenient to transport. They can be flexibly assembled on site according to actual requirements; the steel pipe piles can be recycled after the project is completed, and have no impact on the development of adjacent underground space. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] Figure 1 It is the overall structural front view of the integrated structure of foundation pit support and construction road described in the present invention.
[0032] Figure 2 It is a top view of the overall structure of the integrated structure of foundation pit support and construction road described in the present invention.
[0033] Figure 3It is a schematic diagram of the enlarged structure of a single steel pipe pile according to the present invention.
[0034] Figure 4 It is a schematic diagram of the arrangement sequence of a single steel pipe pile structure according to the present invention.
[0035] Figure 5 This is a top view of the cover plate of the present invention.
[0036] Figure 6 This is a schematic diagram of the driven state of the steel pipe pile according to the present invention.
[0037] The annotations in the image above are as follows:
[0038] 1. Construction road 2. Steel pipe pile 3. Foundation pit 4. First sleeve 5. Cover plate
[0039] 6. Second sleeve 7. Top cover 8. Pile driver 9. Pile cap 10. Round hole
[0040] 11. Pile hammer. DETAILED DESCRIPTION
[0041] See also Figures 1 to 6 As shown:
[0042] The integrated structure of foundation pit support and construction road provided by the present invention is that the foundation pit support structure and the construction road 1 form an integral structure, wherein the foundation pit support structure includes several rows of steel pipe piles 2, and the several rows of steel pipe piles 2 are inserted in the soil around the foundation pit 3. The upper parts of adjacent steel pipe piles 2 are connected by the structural layer of the construction road 1, and the upper parts of the steel pipe piles 2 and the structural layer of the construction road 1 form an integral structure.
[0043] The upper part of the steel pipe pile 2 is sleeved with a first sleeve 4 and a second sleeve 6, the top end cover of the first sleeve 4 is provided with a cover plate 5, the second sleeve 6 is arranged on the top surface of the cover plate 5, and the upper end of the second sleeve 6 is provided with a top cover 7, and the first sleeve 4, the cover plate 5, the second sleeve 6 and the top cover 7 are all arranged in the structural layer of the construction road 1.
[0044] The first sleeve 4 and the second sleeve 6 have the same inner diameter, the second sleeve 6 has a larger outer diameter than the first sleeve 4, the cover plate 5 is made of steel plate, a circular hole 10 having the same outer diameter as the steel pipe pile 2 is provided in the middle portion of the cover plate 5, and the top cover 7 is prefabricated with cement concrete.
[0045] The structural layer of construction road 1 is a cement concrete structure, in which transverse and longitudinal steel bars are arranged. The transverse and longitudinal steel bars are threaded steel bars with a steel bar diameter of not less than 12 mm, a longitudinal steel bar spacing of not more than 350 mm, and a transverse steel bar spacing of not more than 600 mm. The longitudinal steel bars are arranged within the 1 / 3-1 / 2 thickness range below the top surface of the surface layer, the transverse steel bars are located below the longitudinal steel bars, the distance from the edge steel bars to the free edge is 100-150 mm, the maximum particle size of aggregate in cement concrete is not more than 26.5 mm, and the fineness modulus of sand in cement concrete is not less than 2.5.
[0046] The present invention provides an integrated structure of foundation pit support and construction road and a construction method, and the method is as follows:
[0047] Step 1: Site leveling: Level the construction site to ensure smooth entry and exit of machinery and equipment and facilitate the positioning of the pile driver 8;
[0048] Step 2: Measure and lay out: According to the construction drawings, use the theodolite to lay out and locate the position of the steel pipe pile 2. The positioning error of the steel pipe pile 2 is less than 10mm. After verification, protect the on-site pile position and start the next step of construction;
[0049] Step 3: Driving steel pipe pile 2:
[0050] ① Move the pile driver 8 to the pile position, lift the steel pipe pile 2, and make the pile top fit into the pile cap 9. Before lifting, make a detailed appearance inspection of each section of the steel pipe pile 2, especially pay attention to the ovality. Only those that meet the requirements can be lifted;
[0051] ② Align the bottom end of the steel pipe pile 2 with the marked line at the pile position, and use two theodolites to monitor the verticality of the guide rod in front of and on the side of the pile driver 8 at right angles, so that the pile hammer 11, pile cap 9 and pile body are in a vertical line;
[0052] ③ The steel pipe pile 2, pile cap 9 and pile hammer 11 are weighted to gradually sink the steel pipe pile 2 into the soil. During this period, the quality of the pile sinking is tracked and observed at any time.
[0053] ④ After confirming that the self-sinking quality of the steel pipe pile 2 is good, carry out normal continuous hammering until the top of the steel pipe pile 2 is hammered to 60-80cm above the ground and then stop hammering;
[0054] ⑤Precisely cut the steel pipe pile 2 according to the designed height;
[0055] Step 4: insert the first sleeve 4: place the first sleeve 4 on the lower part of the steel pipe pile 2 exposed above the ground, with the bottom of the first sleeve 4 close to the ground;
[0056] Step 5, install the cover plate 5 and the second sleeve 6: pass the cover plate 6 through the steel pipe pile 2, so that the bottom surface of the cover plate 6 is in close contact with the top of the first sleeve 4, and then put the second sleeve 6 on the steel pipe pile 2, and the bottom end of the second sleeve 6 is in close contact with the top surface of the cover plate 5;
[0057] Step 6: Casting of the structural layer of the construction road 1: The structural layer of the construction road 1 adopts a cement concrete structure. First, tie the steel bars, cast the cement concrete, reserve the holes for the top cover 7, perform maintenance, and then remove the mold;
[0058] Step 7, cover the top cover 7: Cover the top end of the second sleeve 6 with the top cover 7, which is prefabricated with cement concrete.
[0059] In step two, the "theodolite" used for measurement and positioning and the measuring instruments of the control quality inspection equipment within their use cycle are subject to metrological inspection and control according to the secondary metrological standards.
[0060] The steel bars in step six are threaded steel bars with a diameter of not less than 12mm, the spacing between longitudinal steel bars is not more than 350mm, the spacing between transverse steel bars is not more than 600mm, the longitudinal steel bars are located within the 1 / 3-1 / 2 thickness range below the top surface of the surface layer, the transverse steel bars are located under the longitudinal steel bars, the distance from the edge steel bars to the free edge is 100-150mm, the maximum particle size of aggregate in cement concrete is not more than 26.5mm, and the fineness modulus of sand in cement concrete is not less than 2.5.
[0061] The working principle of the present invention is as follows:
[0062] The foundation pit support and construction road integrated structure provided by the present invention adopts a recyclable steel pipe pile 2 support structure, which is composed of a steel pipe pile 2, a first sleeve 4, a cover plate 5, a second sleeve 6, a cement concrete pavement and a prefabricated concrete top cover 7. The steel pipe pile 2 directly bears the pavement load and lateral soil pressure, and the cement concrete pavement provides upper constraints. Because the pavement load can be converted into horizontal soil pressure acting on the support structure, it is now directly borne by the steel pipe pile 2, that is, the horizontal soil pressure acting on the support structure is reduced, and the structure can bear a larger pavement load to achieve the purpose of stabilizing the foundation pit. During operation, the pavement load is diffused to the pile periphery and deep soil body according to the transmission path of cement concrete pavement → cover plate 5 → steel pipe pile 2; the lateral soil pressure acts on the steel pipe pile 2, and is transmitted from the steel pipe pile 2 to the soil body around the pile to balance the lateral soil pressure. The construction of the present invention adopts the "support-excavation" operation form, and support is carried out before excavation. If there is no special situation, no support is required after excavation.
Claims
1. A construction method for an integrated structure of foundation pit support and construction road, Features: The method is as follows: The foundation pit support structure and the construction road form an integral structure, wherein the foundation pit support structure includes several rows of steel pipe piles, which are inserted in the soil around the foundation pit, and the upper parts of adjacent steel pipe piles are connected by the structural layer of the construction road, and the upper parts of the steel pipe piles and the structural layer of the construction road form an integral structure, and the upper parts of the steel pipe piles are sleeved with a first sleeve and a second sleeve, and the top cover of the first sleeve is provided with a cover plate, and the second sleeve is arranged on the top surface of the cover plate, and the upper end of the second sleeve is provided with a top cover, and the first sleeve, the cover plate, the second sleeve and the top cover are all arranged in the structural layer of the construction road; the first sleeve and the second sleeve have the same inner diameter, and the outer diameter of the second sleeve is larger than the outer diameter of the first sleeve, and the cover plate is made of steel plate, and a circular hole with the same outer diameter as the steel pipe pile is opened in the middle part of the cover plate, and the top cover is prefabricated with cement concrete, and the specific method is as follows: Step 1: Site leveling: Level the construction site to ensure smooth entry and exit of machinery and equipment and facilitate the positioning of the pile driver; Step 2: Measure and lay out: According to the construction drawings, use the theodolite to lay out and locate the steel pipe piles. The positioning error of the steel pipe piles is less than 10mm. After verification, protect the on-site pile position and start the next step of construction; Step 3: Driving steel pipe piles: ① Move the pile driver to the pile position, lift the steel pipe pile, and put the pile top into the pile cap. Before lifting, a detailed appearance inspection of each section of the steel pipe pile is required, and attention should be paid to the ovality. Only those that meet the requirements can be lifted; ② Align the bottom end of the steel pipe pile with the marked line at the pile position, and use two theodolites to monitor the verticality of the guide rod at right angles in front of and on the side of the pile driver, so that the pile hammer, pile cap and pile body are in a vertical line; ③ The steel pipe pile, pile cap and pile hammer will gradually sink the steel pipe pile into the soil by their own weight. During this period, the quality of the pile sinking will be tracked and observed at any time; ④ After confirming that the self-sinking quality of the steel pipe pile is good, carry out normal continuous hammering until the top of the steel pipe pile is hammered to 60-80cm above the ground and then stop hammering; ⑤Precisely cut the steel pipe piles according to the designed height; Step 4: Insert the first sleeve: Sleeve the first sleeve on the lower part of the steel pipe pile exposed above the ground, with the bottom of the first sleeve close to the ground; Step 5: Install the cover plate and the second sleeve: Pass the cover plate through the steel pipe pile, so that the bottom surface of the cover plate is in close contact with the top of the first sleeve, and then put the second sleeve on the steel pipe pile, so that the bottom end of the second sleeve is in close contact with the top surface of the cover plate; Step 6: Casting of the construction road structural layer: The structural layer of the construction road adopts a cement concrete structure. First, tie the steel bars, cast the cement concrete, reserve the holes for the top cover, perform maintenance, and then remove the mold; Step 7. Put on the top cover: Put the top cover on the top end of the second sleeve, and the top cover is prefabricated with cement concrete.
2. A construction method for an integrated structure of foundation pit support and construction road according to claim 1, Features: In the step 2, the "theodolite" used for measurement and positioning and the measuring instruments of the control quality inspection equipment within the use cycle are subject to measurement inspection and control according to the secondary measurement standard.
3. The construction method of the integrated structure of foundation pit support and construction road according to claim 1, Features: The steel bars in step six are threaded steel bars with a diameter of not less than 12 mm, a spacing of not more than 350 mm between longitudinal steel bars, and a spacing of not more than 600 mm between transverse steel bars. The longitudinal steel bars are arranged within a thickness range of 1 / 3-1 / 2 below the top surface of the surface layer, the transverse steel bars are located below the longitudinal steel bars, the distance from the edge steel bars to the free edge is 100-150 mm, the maximum particle size of aggregate in cement concrete is not more than 26.5 mm, and the fineness modulus of sand in cement concrete is not less than 2.5.
Citation Information
Patent Citations
Multistage supporting structure of bridge pier foundation pit
CN109706936A
Foundation pit supporting and construction road integrated structure
CN212270962U