A tool for quickly installing a steel column with a cup-shaped foundation and a construction method thereof
By designing a tooling including auxiliary tools and wedges, the problem of cup-mouthed foundation steel columns cannot be effectively fixed during installation is solved, and the rapid installation and positioning of steel columns is achieved, construction risks are reduced, and the recyclability of parts is improved.
Patent Information
- Application Number
- CN202010468590.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-05-28
- Publication Date
- 2025-04-11
- Estimated Expiration
- 2040-05-28
AI Technical Summary
In the prior art, the steel columns of cup-mouth foundations cannot be effectively fixed during installation, and are prone to displacement or tilt, and the parts cannot be recycled, which consumes a large amount.
A tooling including a cup base, auxiliary tools and wedges is designed. The auxiliary tools are composed of a first positioning member and a second positioning member. The wedges restrict the horizontal movement of the steel column to ensure the positioning and fixation of the steel column during the installation process.
It realizes rapid installation and positioning of steel columns, reduces the risk factor during construction, saves installation and adjustment time, and can be reused, and is suitable for the installation of large and long double-post steel columns.
Smart Images

Figure CN111535354B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of industrial building engineering, and in particular relates to a tool for quickly installing a steel column with a cup-shaped foundation and a construction method thereof. Background Art
[0002] During the installation of the steel column of the cup-mouth type foundation, the cup-mouth size is generally set to a square, and the upper mouth size is large and the lower mouth size is small, mainly for the convenience of demoulding during civil construction. During the steel column installation process, due to the large distance between the column wall and the cup-mouth size, the steel column inserted into the cup-mouth part is in an active state when installing the steel column, and is positioned on all sides with steel wedges, and fixed on the top with a hand winch and a wire rope. During the alignment process, it is necessary to repeatedly adjust the position of the four steel wedges, which is very cumbersome, and any change in the steel wedges on any of the four sides may cause the entire steel column to shift and tilt. Due to the cumbersome positioning of the steel columns, the installation speed of the steel columns is slow, with an average of 4 steel columns installed per working day. At the same time, when the cup-mouth concrete is poured after the steel column is installed, if the steel wedge is displaced or falls off due to the vibration of the vibrating rod, the overall displacement of the steel column will be caused, which will bring inconvenience to the subsequent structural construction or require reinstallation, and even cause quality accidents such as steel column dumping.
[0003] Disadvantages of existing technology
[0004] 1. Since the steel column has no anchor bolts, it cannot be effectively fixed when inserted into the cup mouth, which has a high risk factor;
[0005] 2. Each steel column is fixed by four positioning steel wedges, and the alignment process is very difficult;
[0006] 3. During the concrete grouting process, the steel column is prone to displacement or even tilt;
[0007] 4. After grouting, the steel wedges are poured into the concrete, making them difficult to remove. Summary of the invention
[0008] The technical problem to be solved by the present invention is to provide a tooling for quickly installing a steel column with a cup-shaped foundation and a construction method thereof, so as to solve the problems in the prior art that the steel column cannot be fixed and is prone to displacement or even tilting, has a high risk factor, and components cannot be recycled and have a high consumption.
[0009] In order to solve the above technical problems, the technical solution adopted by the present invention is:
[0010] A tool for quickly installing a steel column with a cup-shaped foundation, comprising a cup-shaped foundation and a cup-shaped foundation arranged on the cup-shaped foundation, an auxiliary tool being installed at the entrance of the cup-shaped, the auxiliary tool comprising a first positioning member and a second positioning member, the first positioning member and the second positioning member being perpendicular to each other and fixed together, the first positioning member and the second positioning member being at equal distances from a center line of the cup-shaped foundation and being equal to a radius of the steel column, the first positioning member and the second positioning member cooperating to locate the installation position of the steel column, a first wedge block and a second wedge block being further inserted at the entrance of the cup-shaped foundation, the first wedge block being inserted between the steel column and a side surface of the cup-shaped foundation parallel to the first positioning member, the first degree of freedom of horizontal movement of the steel column being limited by the cooperation of the first wedge block and the first positioning member, the second wedge block being inserted between the steel column and a side surface of the cup-shaped foundation parallel to the second positioning member, the second wedge block and the second positioning member cooperating to limit the second degree of freedom of horizontal movement of the steel column.
[0011] The bottom of the cup mouth is provided with a plurality of pads for supporting the steel column, and the top surfaces of all the pads are located on the same plane.
[0012] The cross-sections of the first wedge block and the second wedge block are both right-angled trapezoids, and the right-angle waists of the first wedge block and the second wedge block fit with the steel column.
[0013] The length of the first positioning member is greater than twice the maximum size of the cup mouth, and bolt holes for fixing the first positioning member are arranged at both ends of the first positioning member.
[0014] There are multiple second positioning members that are spaced apart and arranged in parallel with each other. When the auxiliary tool is installed and fixed, each second positioning member extends away from one end of the first positioning member and is supported on the side wall at the entrance of the cup mouth, and a bolt hole is provided on the end for fixing the second positioning member.
[0015] The distance between the two second positioning members is equal to the distance between the center lines of two adjacent cup openings.
[0016] The construction method of the tooling for quickly installing a steel column with a cup-shaped foundation comprises the following steps:
[0017] Step 1: Use a total station to accurately locate and measure each cup mouth foundation, and draw the center line of the cup mouth on each cup mouth foundation;
[0018] Step 2: Draw the edge lines of the steel column in two perpendicular directions according to the radius of the steel column to be installed;
[0019] Step 3, take the auxiliary tool, make the two edges of the right-angle inner sides of the first positioning workpiece and the second positioning workpiece of the auxiliary tool coincide with the edge lines of the steel column drawn in step 2, and fix the auxiliary tool on the cup mouth foundation;
[0020] Step 4: Adjust and install the shim at the bottom of the cup mouth, and then place the steel column on the shim by hoisting it, and the steel column is tangent to the first positioning workpiece and the second positioning workpiece at the same time;
[0021] Step 5, take the first wedge and the second wedge, insert the first wedge between the steel column and the side parallel to the cup opening and the first positioning piece, insert the second wedge between the steel column and the side parallel to the cup opening and the second positioning piece, align the center line of the steel column and then wedge the first wedge and the second wedge to fix them;
[0022] Step 6: Start grouting. When the grouting strength reaches 40%-60%, remove the auxiliary tools, the first wedge and the second wedge, and continue grouting until the steel column is installed.
[0023] The beneficial effects of the present invention are as follows: the parts of the present invention are simple to manufacture and low in cost, and are flexible to install and use, easy to operate, and can be installed at the entrance of the cup mouth, and are easy to position and remove, thereby saving time for installing and adjusting the steel column. Auxiliary tools cooperate with the first wedge block and the second wedge block to fix the iron column, reducing the risk factor during the construction process, and can achieve simultaneous positioning and installation of double steel columns or more steel columns. The parts of the present invention can be reused and can be adapted to the installation of large and extra-long double-pillar steel columns. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 It is a top view of the present invention in the installed state.
[0025] Figure 2 It is a cross-sectional view of the present invention in the installed matching state.
[0026] Figure 3 It is a structural schematic diagram of the auxiliary tool in the present invention.
[0027] Figure 4 It is a schematic diagram of the structure of the wedge block in the present invention.
[0028] Graphic markings: 1. Cup-shaped foundation, 2. Cup-shaped, 3. Steel wedge, 4. Steel column, 5. Auxiliary tools, 6. Expansion bolt, 7. Washer. DETAILED DESCRIPTION
[0029] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0030] A tool for quickly installing a steel column with a cup-mouth type foundation, comprising a cup-mouth foundation 1 and a cup-mouth 2 arranged on the cup-mouth foundation 1, wherein the bottom of the cup-mouth 2 is provided with a plurality of washers 7 for supporting the steel column, and the top surfaces of all washers 7 are located on the same plane. An auxiliary tool 5 is installed at the entrance of the cup-mouth 2, and the auxiliary tool 5 comprises a first positioning member and two second positioning members, the first positioning member and the second positioning member are perpendicular to each other and are welded and fixed together, the first positioning member is made of 16 channel steel, the length of which exceeds the maximum size of the two cup-mouths, and a bolt hole is respectively arranged at both ends, each second positioning member is made of 16 channel steel, the length of each second positioning member exceeds the edge of the cup-mouth in another direction, and a bolt hole is arranged, that is, each second positioning member extends away from one end of the first positioning member and is supported on the side wall at the entrance of the cup-mouth, and the end is provided with a bolt hole for fixing the second positioning member. The distance between the two second positioning members is determined according to the center size of the two steel columns. The spacing between the two second positioning members is equal to the distance between the center lines of two adjacent cup mouths. The distances from the first positioning member and the second positioning member to the center line of the cup mouth are equal and equal to the radius of the steel column. The first positioning member and the second positioning member cooperate to locate the installation position of the steel column. A first wedge block and a second wedge block are also inserted at the entrance of the cup mouth. The first wedge block is inserted between the steel column and a side surface of the cup mouth parallel to the first positioning member. The first degree of freedom of horizontal movement of the steel column is limited by the cooperation of the first wedge block and the first positioning member. The second wedge block is inserted between the steel column and a side surface of the cup mouth parallel to the second positioning member. The second wedge block and the second positioning member cooperate to limit the second degree of freedom of horizontal movement of the steel column.
[0031] The cross-sections of the first wedge block and the second wedge block are both right-angled trapezoids, and the right-angle waists of the first wedge block and the second wedge block fit with the steel column. The first wedge block and the second wedge block have the same specifications and are both made of steel wedges 3 by cutting scrap steel plates on site. The steel wedge 3 is characterized by being wide at the top and narrow at the bottom.
[0032] The construction method of the tooling for quickly installing a steel column with a cup-shaped foundation comprises the following steps:
[0033] Step 1: According to the intersection of the cup mouth 2, use the total station to accurately locate and measure each cup mouth foundation 1, and draw the center line of the cup mouth 2 on each cup mouth foundation 1;
[0034] Step 2: According to the outer dimensions of the steel column 4 to be installed, that is, the radius of the steel column 4, draw the edge lines of the steel column 4 in two directions perpendicular to each other, that is, draw the horizontal and vertical edge lines of the steel column respectively, and draw the horizontal and vertical edge lines A of the steel column in two directions of the center line according to the drawn center line and the outer dimensions of the steel column 4;
[0035] Step 3, take a welded auxiliary tool 5, and make several sets of quick installation auxiliary tools offline (according to the actual installation situation, generally install about 10 per day, make 20 and reuse them, which is more suitable for projects with more steel frame columns). The distance B between the two transverse channel steels is determined according to the center distance between the two column steel pipes of each group of steel frame columns. Make the two edges of the right angle inside of the first positioning workpiece and the second positioning workpiece of the auxiliary tool 5 coincide with the edge lines of the steel column drawn in step 2, and then pass the expansion bolts through the bolt holes on the auxiliary tool and fix the auxiliary tool 5 on the cup mouth foundation;
[0036] Step 4: adjust and install the shim 7 at the bottom of the cup mouth 2, then hoist the steel column by a crane and slowly place it on the shim 7, and the steel column 4 is tangent to the first positioning workpiece and the second positioning workpiece at the same time;
[0037] Step 5, take the first wedge and the second wedge, insert the first wedge between the steel column 4 and the side of the cup 2 parallel to the first positioning piece, insert the second wedge between the steel column 4 and the side of the cup 2 parallel to the second positioning piece, align the center line of the steel column 4, and then wed the first wedge and the second wedge to fix the steel column;
[0038] Step six, after the center line of steel column 4 is aligned and the technical requirements such as verticality and elevation meet the specifications, secondary grouting can be carried out. Start grouting. When the grouting strength reaches 50%, remove the auxiliary tools, the first wedge and the second wedge, and continue grouting until the steel column 4 is installed. After all steel columns 4 are installed, the auxiliary tools 5 can be reused to make pipe supports, etc. to ensure that materials are not wasted.
[0039] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A tool for quickly installing a steel column with a cup-shaped foundation, comprising a cup-shaped foundation and a cup-shaped foundation arranged on the cup-shaped foundation, characterized in that: An auxiliary tool is installed at the entrance of the cup mouth, and the auxiliary tool includes a first positioning piece and a second positioning piece. The first positioning piece and the second positioning piece are perpendicular to each other and fixed together. The distances from the first positioning piece and the second positioning piece to the center line of the cup mouth are equal and equal to the radius of the steel column. The first positioning piece and the second positioning piece cooperate to locate the installation position of the steel column. A first wedge block and a second wedge block are also inserted at the entrance of the cup mouth. The first wedge block is inserted between the steel column and a side surface of the cup mouth parallel to the first positioning piece. The first degree of freedom of horizontal movement of the steel column is limited by the cooperation of the first wedge block and the first positioning piece. The second wedge block is inserted between the steel column and a side surface of the cup mouth parallel to the second positioning piece. The second wedge block and the second positioning piece cooperate to limit the second degree of freedom of horizontal movement of the steel column.
2. A tool for quick installation of a steel column with a cup-shaped foundation according to claim 1, characterized in that: The bottom of the cup mouth is provided with a plurality of pads for supporting the steel column, and the top surfaces of all the pads are located on the same plane.
3. The tooling for quick installation of a steel column with a cup-shaped foundation according to claim 1, characterized in that: The cross-sections of the first wedge block and the second wedge block are both right-angled trapezoids, and the right-angle waists of the first wedge block and the second wedge block fit with the steel column.
4. The tooling for quick installation of a steel column with a cup-shaped foundation according to claim 1, characterized in that: The length of the first positioning member is greater than twice the maximum size of the cup mouth, and bolt holes for fixing the first positioning member are arranged at both ends of the first positioning member.
5. The tooling for quick installation of a steel column with a cup-shaped foundation according to claim 1, characterized in that: There are multiple second positioning members that are spaced apart and arranged in parallel with each other. When the auxiliary tool is installed and fixed, each second positioning member extends away from one end of the first positioning member and is supported on the side wall at the entrance of the cup mouth, and a bolt hole is provided on the end for fixing the second positioning member.
6. A tool for quick installation of a steel column with a cup-shaped foundation according to claim 5, characterized in that: The distance between two of the second positioning members is equal to the distance between the center lines of two adjacent cup openings.
7. A construction method using a tool for quickly installing a steel column with a cup-shaped foundation according to any one of claims 1 to 6, characterized in that: The steps include: Step 1: Use a total station to accurately locate and measure each cup mouth foundation, and draw the center line of the cup mouth on each cup mouth foundation; Step 2: Draw the edge lines of the steel column in two perpendicular directions according to the radius of the steel column to be installed; Step 3, take the auxiliary tool, make the two edges of the right-angle inner sides of the first positioning workpiece and the second positioning workpiece of the auxiliary tool coincide with the edge lines of the steel column drawn in step 2, and fix the auxiliary tool on the cup mouth foundation; Step 4: Adjust and install the shim at the bottom of the cup mouth, and then place the steel column on the shim by hoisting it, and the steel column is tangent to the first positioning workpiece and the second positioning workpiece at the same time; Step 5, take the first wedge and the second wedge, insert the first wedge between the steel column and the side parallel to the cup opening and the first positioning piece, insert the second wedge between the steel column and the side parallel to the cup opening and the second positioning piece, align the center line of the steel column and then wedge the first wedge and the second wedge to fix them; Step 6: Start grouting. When the grouting strength reaches 40%-60%, remove the auxiliary tools, the first wedge and the second wedge, and continue grouting until the steel column is installed.
Citation Information
Patent Citations
Tool for quickly mounting steel column with cup-shaped foundation
CN212477795U