A large diameter combined air reverse circulation down-the-hole hammer

By improving the shape of the drill bit and adding a gas distribution pipe assembly and a planetary gear diverter, the problem of low efficiency and difficulty in installation of the large-diameter combined DTH hammer in medium-hard and hard rock formations has been solved, and efficient drilling and Low energy consumption improves the overall performance of the drilling tool.

CN111594039BActive Publication Date: 2024-10-08JILIN UNIVERSITY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010607895.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-06-30
Publication Date
2024-10-08
Estimated Expiration
2040-06-30

AI Technical Summary

Technical Problem

When existing large-diameter combined down-the-hole hammers are used in medium-hard and hard rock formations, they have problems such as low rock penetration efficiency, large energy waste, easy drilling deviation, difficulty in installation, and high maintenance costs.

Method used

Using a large-diameter combined air reverse circulation down-the-hole hammer, by improving the shape of the drill bit, adding a gas distribution pipe assembly and a planetary gear diverter, the overall performance of the drilling tool is improved, achieving high mechanical drilling speed, easy return of cuttings, and clean bottom of the hole. , the circulating medium is evenly distributed, the energy consumption is small and the structure is compact.

Benefits of technology

It improves drilling efficiency and drilling quality, extends drill bit life, simplifies operation, reduces installation and maintenance costs, and avoids the formation of hole inclination and rock columns.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111594039B_ABST
    Figure CN111594039B_ABST
Patent Text Reader

Abstract

A large-diameter combined air reverse circulation down-the-hole hammer, including a gas distribution joint assembly, a planetary gear flow divider, a center hammer, a side hammer, a bell-shaped shield, a connecting shield and a casing; the gas distribution joint assembly transmits torque through a floating spline, and realizes the function switching of rotary percussion drilling and drilling and strong blowing to remove slag by changing the position of the floating upper shaft. High-pressure gas is evenly distributed to each side hammer and the center hammer through the planetary gear flow divider, and the side hammers are evenly arranged around the center hammer. The bottom lip surface of the center hammer drill bit is ahead of the bottom lip surface of the side hammer drill bit. The shape of the bottom lip surface of the center hammer drill bit and the shape of the bottom lip surface of the side hammer drill bit are combined to form a complete circular cross-section. Each side hammer drill bit is installed with a T-slot structure and can float along the axial direction. The center drill bit is installed with a key-type spline shaft. The down-the-hole hammer drill tool has an integral outer casing, and the upper gas distribution section has a bell-shaped shield. The down-the-hole hammer of the present invention has stable gas distribution, compact structure, convenient maintenance, high rock crushing efficiency, and can realize a variety of drilling process methods.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a large-diameter combined down-the-hole hammer drill tool for rock and soil drilling construction, in particular to a large-diameter combined air reverse circulation down-the-hole hammer suitable for deep foundation construction of buildings in medium-hard and hard rock formations. Background Art

[0002] As my country's urban above-ground and underground buildings gradually develop towards super-high and super-deep, how to efficiently carry out large-diameter pile foundation construction has become a hot issue. The most commonly used machine for pile foundation construction is the reverse circulation pneumatic down-the-hole hammer, which has an efficient rock crushing mechanism and a wide range of stratum applicability. Large-diameter combined down-the-hole hammers are often used in large-diameter pile foundation construction, such as the combined down-the-hole hammer produced by Ingersoll-Rand Company in the United States, a large-diameter down-the-hole hammer product with patent number 4,429,439, and the combined down-the-hole hammer produced by a domestic company, a large-diameter down-the-hole hammer product with patent number 201010298838.5. One of the common points of the above two combined down-the-hole hammers is that the working hammer faces of the impactors installed are in the same plane. When working, all impactors are in contact with the rock formation at the same time, and then the rock formation is broken by high-frequency impact. Although this type of combined down-the-hole hammer can achieve rock penetration construction, since the working surfaces of all the impactors are in the same plane, the entire large-diameter rock surface at the bottom of the borehole needs to be hammered, crushed, and slag removed simultaneously during operation, which has the disadvantages of low rock penetration efficiency, large energy waste, and easy drilling deviation.

[0003] In order to solve the above-mentioned shortcomings of large-diameter combined down-the-hole hammer drill tools, a domestic company proposed a combined down-the-hole hammer drill tool product with a patent number of 201320841607.3. The invention adopts a design in which a central impactor is placed in the middle of the bottom surface of the drill tool and an external impactor is placed on the periphery. The drill bit of the central impactor is ahead of the external impactor, so that the central impactor first breaks the rock, and then the external impactor breaks the rock. This design can disperse a large-diameter rock surface into several small rock surfaces to break the rock, which can greatly reduce the energy consumption of the down-the-hole hammer and improve the efficiency of drilling tools entering the rock.

[0004] However, the disadvantages of the combined down-the-hole hammer described in the invention are:

[0005] 1. Limited by the shape and spatial arrangement of the middle impactor drill bit and the outer impactor drill bit, the broken rock surface formed by the down-the-hole hammer drill is not a complete broken rock surface. A large-diameter unbroken rock column will be formed between every two impactors to resist the drilling tool's penetration. This will cause the drill tool to impact and rotate more times to completely break the rock and drill deeper, reducing the drilling speed.

[0006] 2. The compressed air is not evenly distributed when it is delivered to the impactor through the pipeline. The impact work generated by different impactors is uneven, and the depth of the rock holes generated during drilling is different, which can easily cause the hole to be tilted. In addition, each impactor needs a set of pipelines to be connected to the air compressor separately, which increases the difficulty of installation and certain risks.

[0007] 3. The drilling tool structure is not compact enough and the installation reliability is poor, which leads to the difficulty of drilling tool installation and high maintenance cost. Summary of the invention

[0008] The purpose of the present invention is to propose a large-diameter combined air reverse circulation down-the-hole hammer in view of the problems existing in the prior art. The comprehensive performance of the down-the-hole hammer is improved by improving the drill bit shape of the down-the-hole hammer drill, adding an air distribution pipe assembly, and adding a planetary gear diverter. The invention has the advantages of high mechanical drilling speed, easy return of cuttings, clean hole bottom, uniform distribution of circulating medium, low energy consumption, compact structure, and convenient installation and maintenance.

[0009] The technical solution adopted by the present invention to achieve the above-mentioned purpose is: a large-diameter combined air reverse circulation down-the-hole hammer, characterized in that it includes: a gas distribution joint assembly, a planetary gear splitter, a center hammer, a side hammer, a bell-shaped shield, a connecting shield and a casing;

[0010] The gas distribution joint assembly includes a high-pressure gas supply joint, a side hammer hole cleaning gas supply joint, a floating upper shaft, an inner pipe joint, a gas distribution outer pipe, a sealing flange cover, a drive pipeline and a side hammer hole cleaning pipeline. The high-pressure gas supply joint connects the gas distribution outer pipe and the drive pipeline through a thread; the side hammer hole cleaning gas supply joint connects the gas distribution outer pipe and the side hammer hole cleaning pipeline through a thread; the floating upper shaft sleeve is arranged on the outside of the inner pipe joint, and the inner wall of the floating upper shaft and the outer wall of the inner pipe joint form an annular gap, and the lower part of the floating upper shaft and the outer wall of the inner pipe joint are connected by a sealing ring Sealed connection, at the same time, the floating upper shaft is passed through the inside of the gas distribution outer pipe and connected with the spline thereof, and the floating upper shaft and the gas distribution outer pipe move relative to each other in the vertical direction; the gas distribution outer pipe is connected to the diverter box, the connection cover, the middle chuck, the nylon sleeve, the flange gasket, and the nylon flange respectively through the connecting parts composed of long bolts and nuts; the sealing flange cover is arranged above the gas distribution outer pipe and connected with the gas distribution outer pipe by bolts, the sealing flange cover is used to fix the gas distribution outer pipe, and a sealing ring is installed between the sealing flange cover and the floating upper shaft;

[0011] The floating upper shaft is a hollow spline shaft with a reduced outer diameter, and a step and a spline are provided on the outer wall of the floating upper shaft, and exhaust holes are evenly distributed along the circumferential direction of the floating upper shaft, and the exhaust holes penetrate radially through the floating upper shaft, and an annular gas distribution groove connected with the exhaust holes is provided on the outer wall of the floating upper shaft; a spline groove is provided inside the gas distribution outer tube, and the gas distribution outer tube is sleeved on the outside of the floating upper shaft through a spline connection, and the gas distribution outer tube is suspended and installed by cooperating with the spline of the outer wall of the floating upper shaft through the step provided on the upper part of the inner wall thereof, and a drive pipeline air supply hole and a side hammer hole cleaning air supply hole are provided on the gas distribution outer tube, and when the drilling tool is in the impact rotary drilling condition, the exhaust hole of the floating upper shaft and the drive pipeline air supply hole on the gas distribution outer tube are kept in a normally connected state; when the drilling tool is lifted, the exhaust hole of the floating upper shaft and the side hammer hole cleaning air supply hole on the gas distribution outer tube are kept in a normally connected state, and at the same time, the lower end of the gas distribution outer tube has circumferentially evenly distributed air distribution holes, and the air distribution holes are connected with the annular groove located inside the nylon sleeve;

[0012] The planetary gear diverter includes a planetary gear, a driven gear, a double-flow distribution pneumatic motor, a center hammer high-pressure air intake pipeline and a side hammer high-pressure air intake pipeline. The double-flow distribution pneumatic motor is installed on the diverter housing by bolts, and its output shaft passes through the axial prefabricated hole of the diverter housing. There are at least two double-flow distribution pneumatic motors, and at least two double-flow distribution pneumatic motors are evenly arranged in a ring shape along the circumference of the diverter housing. The air inlet of the double-flow distribution pneumatic motor is connected to the drive pipeline through a pipe joint. Among the exhaust ports of at least two double-flow distribution pneumatic motors, one exhaust port is connected to the center hammer high-pressure air intake through a pipe joint. The other exhaust ports are connected to the side hammer high-pressure air intake pipeline through pipe joints, and the end of the center hammer high-pressure air intake pipeline away from the double-flow distribution air motor is connected to the nylon sleeve through a threaded pipe joint and supplies air to the center hammer; the end of the side hammer high-pressure air intake pipeline away from the double-flow distribution air motor is connected to the side hammer high-pressure air supply port through a threaded pipe joint; the number of planetary gears is consistent with the number of double-flow distribution air motors, and they correspond one to one. Each planetary gear is installed on the output shaft of the corresponding double-flow distribution air motor through a flat key and a shaft end fastening nut, and the planetary gear is meshed with the driven gear to form a planetary gear system;

[0013] The center hammer comprises a center core tube, a nylon sleeve, a center chuck, an anvil on the center hammer, an adjusting ring, a center hammer impact piston, a center hammer inner cylinder, a center hammer middle spacer sleeve, a center hammer gas sleeve, a center hammer lower spacer sleeve, a center hammer drill bit, a center hammer drill bit key, a center outer tube and a center hammer lower joint. The center core tube is installed below the inner tube joint in the gas joint assembly by insertion. The center core tube is a tubular structure with a reduced outer diameter and a stepped outer wall. The center core tube is located inside the gas outer tube, the anvil on the center hammer, the adjusting ring, the center hammer impact piston, the center hammer inner cylinder, the center hammer middle spacer sleeve and the center hammer gas sleeve, and the center core tube is simultaneously connected to the gas outer tube, the anvil on the center hammer, the adjusting ring, the center hammer impact piston, the center hammer inner cylinder , the center hammer middle spacer sleeve and the center hammer gas distribution sleeve are matched with annular gaps, the center core tube is divided into an upper shaft section and a lower shaft section, the diameter of the lower shaft section is smaller than the diameter of the upper shaft section, and the annular gap between the lower shaft section of the center core tube and the center hammer punch piston is the piston upper cavity exhaust channel; the nylon sleeve is installed on the outer wall of the lower end circumference of the gas distribution outer tube, the inner wall of the nylon sleeve has an annular groove, and the nylon sleeve and the gas distribution outer tube are connected by long bolts and nuts; the middle chuck is located below the nylon sleeve, and the middle chuck and the nylon sleeve are connected by long bolts and nuts; the upper anvil of the center hammer is located below the middle chuck and the upper end face of the upper anvil of the center hammer is close to the step surface of the center core tube, the lower end of the upper anvil of the center hammer is inserted into the inner cylinder of the center hammer, and the upper anvil of the center hammer A sealing ring is arranged between the anvil and the inner cylinder of the center hammer, and an upper end of the upper anvil of the center hammer is processed with circumferentially evenly distributed oblique holes; an adjusting ring is installed above the upper anvil of the center hammer, and is limited by the steps of the middle and outer tubes; the center hammer impact piston is a hollow shaft with a variable diameter, which is divided into an upper shaft section and a lower shaft section, the diameter of the upper shaft section is larger than the diameter of the lower shaft section, and the upper shaft section has grooves evenly distributed along the annular direction, and the lower shaft section is a step-type, and the center hammer impact piston is located below the upper anvil of the center hammer, and a piston upper cavity is formed between the center hammer impact piston and the upper anvil of the center hammer, and the center hammer impact piston is located inside the inner cylinder of the center hammer, the center hammer middle spacer sleeve and the center hammer gas sleeve, and the groove of the upper shaft section of the center hammer impact piston cooperates with the step of the inner cylinder of the center hammer to form a The air inlet passage of the upper and lower chambers of the piston, the annular gap formed between the lower shaft section of the center hammer impact hammer piston and the center hammer middle spacer sleeve serves as the piston lower chamber; the center hammer inner cylinder is installed below the center hammer upper anvil, and the center hammer inner cylinder is processed with vent holes evenly distributed along its annular direction, a sealing ring is arranged between the center hammer inner cylinder and the center hammer upper anvil, and the center hammer middle spacer sleeve, the center hammer gas distribution sleeve and the center hammer lower spacer sleeve are installed in sequence below the center hammer inner cylinder; the upper end of the center hammer gas distribution sleeve is provided with annularly evenly distributed oblique hole grooves, and annularly evenly distributed through holes are arranged inside the center hammer gas distribution sleeve, and a sealing ring is arranged between the center hammer gas distribution sleeve and the middle and outer tubes; the center hammer lower spacer sleeve is sleeved on the outer side of the center hammer drill bit, and is used to limit the center hammer drill bit key;The center hammer drill bit has a step in the middle, the upper end of the center hammer drill bit is a spline shaft and is processed with circumferentially uniformly distributed spline grooves, the center hammer drill bit is inserted into the inner part of the ring hammer center shaft, the ring hammer center shaft is limited by the step, the center hammer drill bit is located below the center hammer gas sleeve, the upper end of the center hammer drill bit is plugged into the lower end of the core tube, the center hammer drill bit is connected to the center hammer lower joint through a spline, and the center hammer drill bit is limited by the cooperation of the center hammer half ring clamp key and the center hammer lower joint, the bottom lip surface of the center hammer drill bit is ahead of the bottom lip surface of the side hammer drill bit, and the shape of the bottom lip surface of the center hammer drill bit is the same as the shape of the bottom lip surface of the side hammer drill bit The combination forms a circular cross section, and alloy teeth are inlaid on the rock crushing surface of the center hammer drill bit and connected by welding; the middle and outer pipe sleeves are arranged on the outer sides of the center hammer upper anvil, the center hammer inner cylinder, the center hammer middle spacer sleeve, the center hammer gas distribution sleeve and the center hammer lower spacer sleeve, and the middle and outer pipes are matched with the annular gaps of the center hammer upper anvil, the center hammer inner cylinder, the center hammer middle spacer sleeve, the center hammer gas distribution sleeve and the center hammer lower spacer sleeve at the same time. The middle and outer pipes are matched with the gas distribution outer pipe through a key card slot, and a groove is provided on the upper end of the middle and outer pipes, which is matched with the lower step of the middle chuck for hanging installation and positioning; the center hammer lower joint is installed below the middle and outer pipes through a threaded connection;

[0014] Among them, a plurality of rock cuttings return inlets are processed at the bottom of the center hammer drill bit, and the rock cuttings return inlets are connected to the rock cuttings speed increasing channel at the center of the center hammer drill bit axis, and a plurality of exhaust holes are evenly distributed around the center axis at the bottom of the center hammer drill bit;

[0015] The side hammers are evenly arranged around the center hammer, and the side hammers include a side hammer drill bit, a lower end plate, a side hammer lower anvil, a side hammer lower joint, a side hammer impact piston, a side hammer core tube, an upper end plate, a side hammer mounting key, a side hammer internal air inlet joint, a side hammer outer tube, a side hammer inner cylinder, a side hammer upper anvil, a side hammer air distribution sleeve, a side hammer middle spacer sleeve, a side hammer lower spacer sleeve and a side hammer cover plate. The rock crushing surface of the side hammer drill bit is inlaid with alloy teeth and connected by welding, and the side hammer drill bit is threadedly connected to the bottom of the side hammer lower anvil; the upper end of the side hammer lower anvil is inserted into the interior of the side hammer lower joint and extends upward, and the side hammer lower anvil is installed in the hollow area of ​​the side hammer outer tube in an insertion manner and can move in the vertical direction. The upper end of the side hammer lower anvil is processed with side hammer lower anvil air collecting holes evenly distributed in annularly, and the side hammer lower anvil air collecting holes are connected to the side hammer drill bit through the screw thread. The side hammer cleaning jet hole on the head is connected; the side hammer lower joint is installed under the side hammer outer tube through a threaded connection, and the upper end of the side hammer lower joint is processed with annularly evenly distributed side hammer lower joint air holes; the side hammer outer tube is suspended and installed in position through a step that cooperates with the side hammer installation key, and the side hammer outer tube sleeve is arranged on the outside of the side hammer inner cylinder, the side hammer upper anvil, the side hammer air distribution sleeve, the side hammer middle spacer sleeve and the side hammer lower spacer sleeve and the annular gap cooperates; the lower end plate is installed under the side hammer lower anvil, and the lower end plate is located above the step surface of the ring hammer center axis, and the lower end plate is connected to the ring hammer center axis through bolts and center axis keys. When the side hammer drill bit and the center hammer drill bit are at the upper dead point of vertical displacement, the lower end face of the ring hammer center axis contacts the center hammer drill bit; the side hammer core tube is a tubular structure with a reduced outer diameter and a step on the outer diameter, and the upper The end is suspended and installed in cooperation with the side hammer upper anvil through a step, and the lower end of the side hammer core tube is installed in the hollow area of ​​the side hammer lower anvil by insertion, and a sealing ring is arranged between the side hammer core tube and the side hammer lower anvil; the side hammer upper anvil is provided with circumferentially uniformly distributed inclined holes, the lower end of the side hammer upper anvil is inserted into the side hammer inner cylinder, and a sealing ring is installed between the side hammer upper anvil and the side hammer inner cylinder; the side hammer inner cylinder is installed below the side hammer upper anvil, and the inner wall of the side hammer inner cylinder is processed with circumferentially uniformly distributed air holes, and the side hammer middle spacer sleeve, the side hammer air distribution sleeve and the side hammer lower spacer sleeve are installed in sequence below the side hammer inner cylinder; the side hammer lower spacer sleeve is located outside the side hammer lower anvil, and the clearance is matched; the side hammer impact hammer piston is a variable diameter hollow shaft, which is divided into an upper shaft section and a lower shaft section, the diameter of the upper shaft section is larger than the diameter of the lower shaft section, and the upper shaft section has a circumferentially uniform diameter. Uniformly distributed grooves, the lower shaft section is a step type, the side hammer impact hammer piston is located below the side hammer upper anvil, the side hammer impact hammer piston is located inside the side hammer inner cylinder, the side hammer middle spacer sleeve, the side hammer air sleeve and the side hammer lower spacer sleeve and has a clearance fit, and at the same time, the inner wall of the side hammer impact hammer piston has a clearance fit with the side hammer core tube, a sealing ring is provided between the side hammer impact hammer piston and the side hammer core tube, and a piston upper chamber is formed between the side hammer impact hammer piston and the side hammer upper anvil, the upper shaft section groove of the side hammer impact hammer piston is matched with the step of the side hammer inner cylinder to form an air intake channel for the upper and lower chambers of the piston, and the annular gap formed between the lower shaft section of the side hammer impact hammer piston and the side hammer middle spacer sleeve serves as the piston lower chamber; the side hammer key is a pair of semi-ring keys with steps, which are installed above the upper end plate through bolts, nuts and steps, and the side hammer outer tube is installed by hanging through the steps;The upper end plate is welded below the connection cover; the air inlet joint inside the side hammer is installed above the side hammer core tube through threaded connection, and the air inlet joint inside the side hammer connects and connects the side hammer hole cleaning pipeline with the side hammer core tube through threads; the side hammer cover plate is simultaneously connected to the side hammer installation key and the upper end plate through bolts, and the side hammer cover plate is respectively connected to the side hammer hole cleaning pipeline and the side hammer high-pressure air inlet pipeline through threaded pipe joints;

[0016] The number of the side hammer drill bits is at least two, and the at least two side hammer drill bits are evenly distributed in the circumferential direction along the central axis of the drilling tool as a whole, forming a complete circular cross section; the circular cross section and the cross section of the center hammer drill bit together form a complete circular cross section;

[0017] The bell-shaped shield includes a shield and a diverter housing. The shield is located outside the drive pipeline and the side hammer hole cleaning pipeline. The upper end of the shield is connected to the guide ring by bolts, and the two are integrally mounted on the outside of the gas distribution outer pipe. The diverter housing is located below the shield and is arranged outside the planetary gear diverter. The upper end of the diverter housing is connected to the lower end of the shield by bolts, and the diverter housing is connected to the gas distribution outer pipe in the gas distribution joint assembly by long bolts and nuts. A pipe joint hole is processed on the diverter housing, and an intermediate pipe joint is installed on the pipe joint hole. The intermediate pipe joint connects the two pipe sections of the drive pipeline with the two pipe sections of the side hammer hole cleaning pipeline to form a complete pipeline.

[0018] The casing is located on the outside of the side hammer. The upper and lower end faces of the casing have grooves around the center axis. The grooves cooperate with the keys of the sleeve end plates. There are two sleeve end plates, which are respectively located on the upper and lower sides of the casing. The two sleeve end plates are respectively connected to the upper end plate and the lower end plate by bolts. One side of the outer wall of the casing is installed with a hole expansion thread by welding.

[0019] Furthermore, the driven gear is provided with steps respectively matching with the flange gasket and the nylon flange. The driven gear is installed between the flange gasket and the nylon flange through the steps machined thereon and can rotate around the flange gasket.

[0020] As a preferred technical solution of the present invention, the cross section of the center hammer drill bit is plum blossom-shaped.

[0021] The number of the side hammer drill bits is at least two, and the cross-sections of at least two side hammer drill bits are in the shape of plum blossom petals and are evenly distributed on the outside of the center hammer drill bit. At least two side hammer drill bits are evenly distributed in annular direction along the central axis of the drill tool as a whole, forming a complete circular cross-section; the circular cross-section and the cross-section of the center hammer drill bit together constitute a complete circular cross-section.

[0022] As a preferred technical solution of the present invention, the side hammer drill bit is connected to the lower anvil of the side hammer through a thread, and the structure of the side hammer drill bit is a fan ring, and a T-shaped groove is processed on one side of the inner diameter of the fan ring, which cooperates with the T-shaped key processed on the outer diameter of the ring hammer center axis, so that the side hammer drill bit rotates with the ring hammer center axis and is displaced in the vertical direction of the T-shaped key of the ring hammer center axis.

[0023] As a preferred technical solution of the present invention, the casing is located outside the side hammer, and the upper and lower end faces of the casing have T-shaped grooves around the central axis, which cooperate with the T-shaped keys of the sleeve end plates located on the upper and lower sides of the casing. The casing is clamped between the two sleeve end plates and rotates with the drilling tool.

[0024] As a preferred technical solution of the present invention, the upper and lower end surfaces of the casing are processed with fan-shaped grooves, and the casing is clamped between the two sleeve end plates and rotates with the drilling tool through the cooperation of the fan-shaped grooves and the keys of the two sleeve end plates.

[0025] Furthermore, the hole-expanding thread is an alloy strip, and the hole-expanding thread is installed on the outside of the casing by welding.

[0026] Through the above design scheme, the present invention can bring the following beneficial effects:

[0027] 1. The large-diameter combined air reverse circulation down-the-hole hammer of the present invention has the technical advantages of high drilling efficiency, high drilling quality, fast drilling speed, long drill bit life, simple operation, high drilling cleanliness and not easy to get stuck.

[0028] 2. A planetary gear flow divider is used to forcefully divide the compressed air and deliver it to the center hammer and side hammer, thereby improving the utilization rate of air and the drilling efficiency.

[0029] 3. The bottom lip of the center hammer drill bit is ahead of the bottom lip of the side hammer drill bit, so that the rock cavity formed by the center hammer when the down-the-hole hammer breaks the rock can restrain the center hammer. The center hammer can guide the drill tool, reduce the inclination of the drill hole, and improve the quality of the drill hole; the shape of the bottom lip of the center hammer drill bit and the shape of the bottom lip of the side hammer drill bit are combined to form a complete circular cross-section. Therefore, when the center hammer and the side hammer work at the same time, the rock crushing surface produced by the combined down-the-hole hammer is a complete circular cross-section. Compared with the conventional combined down-the-hole hammer with a non-circular cross-section rock crushing surface, it reduces the repeated crushing of rocks and reduces the obstruction of the rock column produced by the down-the-hole hammer to the penetration of the down-the-hole hammer, thereby increasing the drilling speed and extending the life of the drill bit.

[0030] 4. The drilling gas distribution function and the borehole cleaning function of the present invention are realized by the coordination of the gas distribution joint assembly with the drilling, drill lifting or hole sweeping actions. The floating upper shaft of the gas distribution joint assembly is connected to the drill rod. During drilling, under the action of drilling pressure, the floating upper shaft is located at the lower end to distribute air to the center hammer and the side hammer for air reverse circulation impact rotary drilling. When the drill is lifted or the hole is swept up and down, the floating upper shaft is located at the upper end to introduce air into the rock chip cleaning hole of the side hammer to clean the rock chips in the borehole. The gas distribution process and operation are simple. When the drill is lifted, the air fully cleans the borehole, which can effectively prevent drill burial and drill jamming accidents. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of the present application. The exemplary embodiments of the present invention and their descriptions are used to understand the present invention and do not constitute improper limitations of the present invention. In the drawings:

[0032] Figure 1 It is a cross-sectional view of a large diameter combined air reverse circulation down-the-hole hammer;

[0033] Figure 2 It is a schematic diagram of the bottom lip surface of a large-diameter combined air reverse circulation down-the-hole hammer without a center hammer drill bit;

[0034] Figure 3 It is a top view of the planetary gear flow divider of a large diameter combined air reverse circulation down-the-hole hammer;

[0035] Figure 4 This is an axonometric view of the planetary gear flow divider inside the bell-shaped guard of a large-diameter combined air reverse circulation down-the-hole hammer;

[0036] Figure 5 It is an axonometric view of a large diameter combined air reverse circulation down-the-hole hammer;

[0037] Figure 6 It is a cross-sectional view of the center hammer structure of a large-diameter combined air reverse circulation down-the-hole hammer;

[0038] Figure 7 It is a cross-sectional view of the side hammer structure of a large-diameter combined air reverse circulation down-the-hole hammer.

[0039] The marks in the figure are as follows: 1-center hammer drill bit; 2-side hammer drill bit; 3-alloy tooth; 4-center hammer punch piston; 5-ring hammer center axis; 6-center axis clamp key; 7-center hammer lower joint; 8-casing; 9-hole expansion thread; 10-lower end plate; 11-side hammer lower anvil; 12-side hammer lower joint; 13-side hammer punch piston; 14-center hammer half ring clamp key; 15-side hammer core tube; 16-upper end plate; 17-side hammer installation clamp key; 18-side Hammer internal air inlet connector; 19-pipe connector; 20-distributor housing; 21-connection cover; 22-middle chuck; 23-nylon shaft sleeve; 24-flange gasket; 25-nylon flange; 26-shield; 27-high-pressure air supply connector; 28-side hammer hole cleaning air supply connector; 29-floating upper shaft; 30-inner pipe connector; 31-guide ring; 32-gas distribution outer pipe; 33-sealing flange cover; 34-long bolt; 35-planetary gear; 36-driven gear wheel; 37-driving pipeline; 38-center core pipe; 39-double flow distribution pneumatic motor; 40-center hammer high pressure air inlet pipeline; 41-side hammer hole cleaning pipeline; 42-side hammer high pressure air inlet pipeline; 43-center hammer upper anvil; 44-adjusting ring; 45-center hammer inner cylinder; 46-center hammer middle spacer sleeve; 47-center hammer air distribution sleeve; 48-center hammer lower spacer sleeve; 49-middle and outer pipes; 50-sleeve end plate; 51-side hammer outer pipe; 52-side hammer inner Cylinder; 53-side hammer upper anvil; 54-side hammer air sleeve; 55-side hammer middle spacer sleeve; 56-side hammer lower spacer sleeve; 57-side hammer cover plate; k-side hammer internal air flow channel; n-side hammer cleaning jet hole; g-drive pipeline air supply hole; f-side hammer hole cleaning air supply hole; i-exhaust hole; p-side hammer high-pressure air supply port; a-cuttings return inlet; b-cuttings speed increasing channel; e-air supply annulus; h-center hammer high-pressure air storage chamber; q-side hammer lower joint air distribution hole. DETAILED DESCRIPTION

[0040] In order to explain the present invention more clearly, the present invention is further described below in conjunction with preferred embodiments and drawings. It should be understood by those skilled in the art that the content described below is illustrative rather than restrictive, and should not be used to limit the scope of protection of the present invention.

[0041] like Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 5 , Figure 6 and Figure 7 As shown, the large-diameter combined air reverse circulation down-the-hole hammer includes an air distribution joint assembly, a planetary gear diverter, a center hammer, a side hammer, a bell-shaped shield, a connecting shield 21 and a casing 8.

[0042] The gas distribution joint assembly is located at the uppermost end of the entire large-diameter combined air reverse circulation down-the-hole hammer, and the gas distribution joint assembly includes a high-pressure gas supply joint 27, a side hammer hole cleaning gas supply joint 28, a floating upper shaft 29, an inner pipe joint 30, a gas distribution outer pipe 32, a sealing flange cover 33, a drive pipeline 37 and a side hammer hole cleaning pipeline 41. The high-pressure gas supply joint 27 connects the gas distribution outer pipe 32 and the drive pipeline 37 through threads to transport the gas to the planetary gear diverter; the side hammer hole cleaning gas supply joint 28 connects the gas distribution outer pipe 32 and the side hammer hole cleaning pipeline 41 through threads to transport the air to the internal air flow channel k of the side hammer and spray out through the side hammer cleaning jet hole n located on the side hammer drill bit 2; the floating upper shaft 29 is sleeved on the outside of the inner pipe joint 30, and the lower part of the floating upper shaft 29 is sealed and connected to the outer wall of the inner pipe joint 30 through a sealing ring, and the inner wall of the floating upper shaft 29 and the outer wall of the inner pipe joint 30 form an annular gap, and the annular gap is Figure 1 The floating upper shaft 29 is arranged inside the gas distribution outer pipe 32 and connected with the gas distribution outer pipe 32 by a spline. The floating upper shaft 29 and the gas distribution outer pipe 32 can move relative to each other in the vertical direction. The floating upper shaft 29 and the gas distribution outer pipe 32 are connected by a spline to transmit the rock crushing torque. The gas distribution outer pipe 32 is connected to the diverter housing 20, the connecting cover 21, the middle chuck 22, the nylon sleeve 23, the flange gasket 24, and the nylon flange 25 through the connecting parts formed by the long bolts 34 and the nuts. The sealing flange cover 33 is arranged above the gas distribution outer pipe 32 and connected with the gas distribution outer pipe 32 by bolts. The sealing flange cover 33 is used to fix the gas distribution outer pipe 32. At the same time, a sealing ring is installed between the sealing flange cover 33 and the floating upper shaft 29. When the floating upper shaft 29 is subjected to torque, the floating upper shaft 29 transmits the torque to the gas distribution outer pipe 32 through the spline, and the gas distribution outer pipe 32 transmits the torque to the connecting cover 21 through the bolts and nuts.

[0043] The floating upper shaft 29 is a hollow spline shaft with a variable outer diameter, and the outer wall of the floating upper shaft 29 is provided with steps and splines, and exhaust holes i are evenly distributed along the floating upper shaft 29 in the circumferential direction, and the exhaust holes i penetrate along the radial direction of the floating upper shaft 29, and the outer wall of the floating upper shaft 29 is provided with an annular gas distribution groove connected with the exhaust holes i; the gas distribution outer pipe 32 has a spline groove inside, and the gas distribution outer pipe 32 is installed on the outer wall of the floating upper shaft 29 through a spline connection, and a driving pipeline air supply hole g and a side hammer cleaning hole air supply hole f are opened on the gas distribution outer pipe 32, and at the same time, the lower end of the gas distribution outer pipe 32 has an annularly evenly distributed gas distribution hole, which is connected with the annular groove located inside the nylon sleeve 23;

[0044] The annular air distribution groove on the floating upper shaft 29 ensures that when the drill tool is in the impact rotary drilling condition, the exhaust hole i of the floating upper shaft 29 and the drive pipeline air supply hole g on the air distribution outer tube 32 remain in a normal state; when the drill tool is lifted, the exhaust hole i of the floating upper shaft 29 and the side hammer cleaning air supply hole f on the air distribution outer tube 32 remain in a normal state.

[0045] The planetary gear diverter includes a planetary gear 35, a driven gear 36, a double-flow distribution pneumatic motor 39, a center hammer high-pressure air intake pipeline 40 and a side hammer high-pressure air intake pipeline 42. The double-flow distribution pneumatic motor 39 is installed on the diverter housing 20 by bolts, and its output shaft passes through the axial prefabricated hole of the diverter housing 20. There are at least two double-flow distribution pneumatic motors 39, and at least two double-flow distribution pneumatic motors 39 are evenly arranged in a ring shape along the circumference of the diverter housing 20. The air inlet of the double-flow distribution pneumatic motor 39 is connected to the drive pipeline 37 through a pipe joint 19. Among the exhaust ports of at least two double-flow distribution pneumatic motors 39, one exhaust port is connected to the center hammer high-pressure air intake pipeline 40 through a pipe joint 19, and the remaining exhaust ports are connected to the side hammer high-pressure air intake pipeline 42 through a pipe joint 19. The center hammer high-pressure air intake pipeline 40 is away from the double-flow distribution pneumatic motor One end of the hammer 39 is connected to the nylon sleeve 23 through a threaded pipe joint and supplies air to the center hammer; the end of the side hammer high-pressure air intake pipeline 42 away from the double-flow distribution air motor 39 is connected to the side hammer high-pressure air supply port p through a threaded pipe joint; the number of planetary gears 35 is consistent with the number of double-flow distribution air motors 39, and they correspond one to one. Each planetary gear 35 is installed on the output shaft of the corresponding double-flow distribution air motor 39 through a flat key and a shaft end fastening nut, and the planetary gear 35 is meshed with the driven gear 36 to form a planetary gear system; the planetary gear system, the double-flow distribution air motor 39, the drive pipeline 37, the center hammer high-pressure air intake pipeline 40, and the side hammer high-pressure air intake pipeline 42 are combined to form a set of planetary gear forced diversion mechanism; the drive pipeline 37 and the internal volume of the double-flow distribution air motor 39 and the side hammer high-pressure air intake pipeline 42 form a closed air supply path;

[0046] The dual-flow distribution pneumatic motor 39 of the planetary gear splitter is connected to the drive pipeline 37, the center hammer high-pressure air intake pipeline 40, and the side hammer high-pressure air intake pipeline 42 to respectively receive high-pressure air, distribute air to the center hammer, and distribute air to the side hammers;

[0047] The driven gear 36 is provided with steps respectively matched with the flange gasket 24 and the nylon flange 25. The driven gear 36 is installed between the flange gasket 24 and the nylon flange 25 through the steps processed thereon, and can rotate around the flange gasket 24. The driven gear 36 is matched with the flange gasket 24 through the steps to prevent the lower end surface of the driven gear 36 from interfering with the diverter housing 20. The driven gear 36 is matched with the nylon flange 25 through the steps. The nylon flange 25, the flange gasket 24, the diverter housing 20, the nylon sleeve 23, the middle chuck 22 and the connecting cover 21 are tightly connected from top to bottom through the long bolts 34 and the nuts, which limits the displacement of the driven gear 36 in the vertical direction and ensures the installation stability of the driven gear 36.

[0048] The center hammer comprises a center core tube 38, a nylon sleeve 23, a center chuck 22, a center hammer upper anvil 43, an adjusting ring 44, a center hammer punch piston 4, a center hammer inner cylinder 45, a center hammer middle spacer sleeve 46, a center hammer gas sleeve 47, a center hammer lower spacer sleeve 48, a center hammer drill bit 1, a center hammer drill bit key 14, a middle outer tube 49 and a center hammer lower joint 7. The center core tube 38 is installed below the inner tube joint 30 in the gas joint assembly by insertion. The center core tube 38 is a tubular structure with a reduced outer diameter and a stepped outer wall. The center core tube 38 is located inside the gas outer tube 32, the center hammer upper anvil 43, the adjusting ring 44, the center hammer punch piston 4, the center hammer inner cylinder 45, the center hammer middle spacer sleeve 46 and the center hammer gas sleeve 47, and the center core tube 38 is matched with the annular gap of the gas distribution outer tube 32, the anvil seat 43 on the center hammer, the adjusting ring 44, the center hammer punch piston 4, the center hammer inner cylinder 45, the center hammer middle spacer sleeve 46 and the center hammer gas distribution sleeve 47 at the same time. The center core tube 38 is divided into an upper shaft section and a lower shaft section. The diameter of the lower shaft section is smaller than the diameter of the upper shaft section, and the annular gap between the lower shaft section of the center core tube 38 and the center hammer punch piston 4 is the exhaust channel of the piston upper cavity; the nylon sleeve 23 is installed on the outer wall of the lower end of the gas distribution outer tube 32, and the inner wall of the nylon sleeve 23 has an annular groove. The nylon sleeve 23 and the gas distribution outer tube 32 are connected by a long bolt 34 with a nut; the middle chuck 22 is located below the nylon sleeve 23, and the middle chuck 22 and the nylon sleeve 23 are connected by a long bolt 34 with a nut The center hammer upper anvil 43 is located below the middle chuck 22 and the upper end surface of the center hammer upper anvil 43 is close to the step surface of the center core tube 38. The lower end of the center hammer upper anvil 43 is inserted into the center hammer inner cylinder 45. A sealing ring is provided between the center hammer upper anvil 43 and the center hammer inner cylinder 45. The upper end of the center hammer upper anvil 43 is processed with circumferentially uniformly distributed oblique holes; the adjusting ring 44 is installed above the center hammer upper anvil 43 and is limited by the steps of the middle and outer tubes 49; the center hammer punch piston 4 is a hollow shaft with a variable diameter, which is divided into an upper shaft section and a lower shaft section. The diameter of the upper shaft section is larger than the diameter of the lower shaft section, and the upper shaft section has grooves uniformly distributed along the circumferential direction. The lower shaft section is a step-type. The center hammer punch piston 4 is located below the center hammer upper anvil 43. The center hammer punch piston 4 and the center An upper piston cavity is formed between the center hammer anvil 43, the center hammer plunger piston 4 is located inside the center hammer inner cylinder 45, the center hammer middle spacer sleeve 46 and the center hammer gas sleeve 47, the groove of the upper shaft section of the center hammer plunger piston 4 cooperates with the step of the center hammer inner cylinder 45 to form an air inlet channel for the upper and lower piston cavities, and the annular gap formed between the lower shaft section of the center hammer plunger piston 4 and the center hammer middle spacer sleeve 46 serves as the piston lower cavity; the center hammer inner cylinder 45 is installed below the center hammer upper anvil 43, and the center hammer inner cylinder 45 is processed with air holes evenly distributed along its annular direction, a sealing ring is arranged between the center hammer inner cylinder 45 and the center hammer upper anvil 43, and the center hammer middle spacer sleeve 46, the center hammer gas sleeve 47 and the center hammer lower spacer sleeve 48 are sequentially installed below the center hammer inner cylinder 45;The upper end of the center hammer gas distribution sleeve 47 is provided with an annularly uniformly distributed inclined hole groove, and an annularly uniformly distributed through hole is provided inside the center hammer gas distribution sleeve 47, and a sealing ring is provided between the center hammer gas distribution sleeve 47 and the middle and outer tubes 49; the center hammer lower spacer sleeve 48 is sleeved on the outer side of the center hammer drill bit 1, which is used to limit the center hammer drill bit key 14; the middle part of the center hammer drill bit 1 has a step, and the upper end of the center hammer drill bit 1 is a spline shaft and is processed with an annularly uniformly distributed spline groove. The center hammer drill bit 1 is inserted into the inside of the ring hammer center axis 5, and the ring hammer center axis 5 is limited by the step. The ring hammer center axis 5 plays a guiding role for the center hammer drill bit 1 when the drilling tool is drilling. The center hammer drill bit 1 is located below the center hammer gas distribution sleeve 47, and the upper end of the center hammer drill bit 1 is plugged into the lower end of the core tube 38. The center hammer drill bit 1 is connected to the center hammer lower joint 7 through a spline, and is connected to the center hammer lower joint 7 through the center hammer half-ring key 14. The center hammer drill bit 1 is limited, the bottom lip surface of the center hammer drill bit 1 is ahead of the bottom lip surface of the side hammer drill bit 2, and the shape of the bottom lip surface of the center hammer drill bit 1 and the shape of the bottom lip surface of the side hammer drill bit are combined to form a circular cross-section, and the rock crushing surface of the center hammer drill bit 1 is inlaid with alloy teeth 3 and connected by welding; the middle and outer tubes 49 are sleeved on the outer sides of the center hammer upper anvil 43, the center hammer inner cylinder 45, the center hammer middle spacer sleeve 46, the center hammer gas distribution sleeve 47 and the center hammer lower spacer sleeve 48, and the middle and outer tubes 49 are simultaneously matched with the annular gap of the center hammer upper anvil 43, the center hammer inner cylinder 45, the center hammer middle spacer sleeve 46, the center hammer gas distribution sleeve 47 and the center hammer lower spacer sleeve 48, and the middle and outer tubes 49 are matched with the gas distribution outer tube 32 through a key slot, and a groove is provided on the upper end of the middle and outer tubes 49, which is matched with the lower step of the middle chuck 22 for suspension installation and positioning; the center hammer lower joint 7 is installed below the middle and outer tubes 49 through a threaded connection;

[0049] Among them, the cross-section of the center hammer drill bit 1 is in a plum blossom shape, and a number of rock chip return inlets a are processed at the bottom of the center hammer drill bit 1. The rock chip return inlet a is connected to the rock chip speed-increasing channel b at the axis of the center hammer drill bit 1. A number of exhaust holes are evenly distributed around the center axis at the bottom of the center hammer drill bit 1. The diameter of the rock chip return inlet a gradually decreases from bottom to top, and the diameter of the top of the rock chip return inlet a is consistent with the diameter of the rock chip speed-increasing channel b; after the rock chips enter the rock chip speed-increasing channel b, the flow rate increases due to the decrease in the flow area.

[0050] The side hammer comprises a side hammer drill bit 2, a lower end plate 10, a side hammer lower anvil 11, a side hammer lower joint 12, a side hammer impact piston 13, a side hammer core tube 15, an upper end plate 16, a side hammer installation key 17, a side hammer internal air inlet joint 18, a side hammer outer tube 51, a side hammer inner cylinder 52, a side hammer upper anvil 53, a side hammer air distribution sleeve 54, a side hammer middle spacer sleeve 55, a side hammer lower spacer sleeve 56 and a side hammer cover plate 57. The rock crushing surface of the side hammer drill bit 2 is inlaid with alloy teeth 3 and connected by welding. The side hammer drill bit 2 is threadedly connected to the bottom of the side hammer lower anvil 11; the upper end of the side hammer lower anvil 11 is inserted into the interior of the side hammer lower joint 12 and extends upward, and the side hammer lower anvil 11 is inserted into the The hammer 14 is installed in the hollow area of ​​the hammer outer tube 51 in an inserted manner and can move in the vertical direction. The upper end of the hammer lower anvil 11 is processed with circumferentially uniformly distributed hammer lower anvil air collecting holes y, and the hammer lower anvil air collecting holes y are communicated with the hammer cleaning jet holes n located on the hammer drill bit 2; the hammer lower joint 12 is installed below the hammer outer tube 51 through a threaded connection, and the upper end of the hammer lower joint 12 is processed with circumferentially uniformly distributed hammer lower joint air distribution holes q; the hammer outer tube 51 is suspended and installed in position by cooperating with the step of the hammer installation key 17, and the hammer outer tube 51 is sleeved on the hammer inner cylinder 52, the hammer upper anvil 53, the hammer air distribution sleeve 54, the hammer middle spacer sleeve 55 and the hammer lower spacer sleeve 56. 6 and the annular gap fits; the lower end plate 10 is installed below the side hammer lower anvil 11, and the lower end plate 10 is located above the step surface of the ring hammer center axis 5, and the lower end plate 10 is connected to the ring hammer center axis 5 by bolts and the center axis clamp key 6. When the side hammer drill bit 2 and the center hammer drill bit 1 are at the upper dead point of the vertical displacement, the lower end surface of the ring hammer center axis 5 contacts the center hammer drill bit 1, and the side hammer lower anvil 11 is limited by the step of the side hammer lower anvil 11 and the cooperation of the lower end plate 10; the side hammer core tube 15 is a tubular structure with a reduced outer diameter and a step on the outer diameter. The upper end of the side hammer core tube 15 is suspended and installed by cooperating with the side hammer upper anvil 53 through the step, and the side hammer core tube 1 The lower end of 5 is installed in the hollow area of ​​the side hammer lower anvil 11 by insertion, and a sealing ring is arranged between the side hammer core tube 15 and the side hammer lower anvil 11; the side hammer upper anvil 53 is provided with circumferentially uniformly distributed oblique holes, the lower end of the side hammer upper anvil 53 is inserted into the side hammer inner cylinder 52, and a sealing ring is installed between the side hammer upper anvil 53 and the side hammer inner cylinder 52; the side hammer inner cylinder 52 is installed below the side hammer upper anvil 53, and the inner wall of the side hammer inner cylinder 52 is processed with circumferentially uniformly distributed vents, and the side hammer middle spacer sleeve 55, the side hammer air distribution sleeve 54 and the side hammer lower spacer sleeve 56 are installed in sequence below the side hammer inner cylinder 52; the side hammer lower spacer sleeve 56 is located outside the side hammer lower anvil 11, and the clearance fits;The side hammer piston 13 is a hollow shaft with a variable diameter, which is divided into an upper shaft section and a lower shaft section. The diameter of the upper shaft section is larger than that of the lower shaft section, and the upper shaft section has grooves uniformly distributed along the circumferential direction. The lower shaft section is a step-type. The side hammer piston 13 is located below the side hammer upper anvil 53. The side hammer piston 13 is located inside the side hammer inner cylinder 52, the side hammer middle spacer sleeve 55, the side hammer gas sleeve 54 and the side hammer lower spacer sleeve 56 and is clearance-matched to form an annular gap. At the same time, the inner wall of the side hammer piston 13 is clearance-matched with the side hammer core tube 15, and a sealing ring is arranged between the side hammer piston 13 and the side hammer core tube 15. A piston upper cavity is formed between the side hammer piston 13 and the side hammer upper anvil 53. The groove of the upper shaft section of the side hammer piston 13 is formed by matching with the step of the side hammer inner cylinder 52 to form an active space. The air inlet passage of the upper and lower chambers is plugged, and the annular gap formed between the lower shaft section of the side hammer impact hammer piston 13 and the side hammer middle spacer sleeve 55 serves as the piston lower chamber; the side hammer key 17 is a pair of semi-ring keys with steps, which are installed above the upper end plate 16 through bolts and nuts and the steps, and the side hammer outer tube 51 is installed by hanging through the steps; the upper end plate 16 is welded below the connecting cover 21; the side hammer internal air intake joint 18 is installed above the side hammer core tube 15 through threaded connection, and the side hammer internal air intake joint 18 connects and connects the side hammer hole cleaning pipeline 41 with the side hammer core tube 15 through threads; the side hammer cover plate 57 is simultaneously connected to the side hammer installation key 17 and the upper end plate 16 by bolts, and the side hammer cover plate 57 is respectively connected to the side hammer hole cleaning pipeline 41 and the side hammer high-pressure air intake pipeline 42 through threaded pipe joints;

[0051] Among them, the number of the side hammer drill bits 2 is at least two, the cross-sections of at least two side hammer drill bits 2 are in the shape of plum blossom petals and are evenly distributed on the outside of the center hammer drill bit 1, and at least two side hammer drill bits 2 are evenly distributed circumferentially along the central axis of the drill tool as a whole, forming a complete circular cross-section; the circular cross-section and the cross-section of the center hammer drill bit 1 together constitute a complete circular cross-section. In summary, the side hammer drill bit 2 and the center hammer drill bit 1 constitute a split full-section valve drill bit.

[0052] The side hammer drill bit 2 is connected to the side hammer lower anvil 11 through a thread. The structure of the side hammer drill bit 2 is a fan-shaped ring cylinder, and a T-shaped groove is processed on one side of the inner diameter of the fan-shaped ring cylinder, which cooperates with the T-shaped key processed at the outer diameter of the ring hammer center axis 5. The side hammer drill bit 2 receives the torque from the drilling rig through its T-shaped groove and the T-shaped key of the ring hammer center axis 5, so that the side hammer drill bit 2 rotates with the ring hammer center axis 5 and is displaced in the vertical direction of the T-shaped key of the ring hammer center axis 5; the lower stop point of the vertical displacement of the side hammer drill bit 2 is limited by the step of the side hammer lower anvil 11 and the lower end plate 10; the impact stroke of the side hammer lower anvil 11 is limited by the lower end plate 10, thereby controlling the lower stop point of the vertical displacement of the side hammer drill bit 2.

[0053] The number and arrangement of the alloy teeth 3 on the center hammer drill bit 1 and the side hammer drill bit 2 are designed according to the rock properties and the drill bit shape.

[0054] The bell-shaped shield includes a shield 26 and a diverter housing 20. The shield 26 is located outside the drive pipeline 37 and the side hammer hole cleaning pipeline 41. The upper end of the shield 26 is connected to the guide ring 31 by bolts, and the two are integrally mounted on the outside of the gas distribution outer pipe 32. The diverter housing 20 is located below the shield 26 and is arranged outside the planetary gear diverter. The upper end of the diverter housing 20 is connected to the lower end of the shield 26 by bolts. The diverter housing 20 is connected to the gas distribution outer pipe 32 in the gas distribution joint assembly by long bolts 34 with nuts. The diverter housing 20 is processed with a pipe joint hole, and an intermediate pipe joint is installed on the pipe joint hole. The intermediate pipe joint connects the two pipe sections of the drive pipeline 37 with the two pipe sections of the side hammer hole cleaning pipeline 41 to form a complete pipeline. The bell-shaped shield plays the role of carrying and installing various functional modules of the drilling tool and encapsulating the planetary gear diverter to prevent rock debris generated during the operation of the drilling tool from contaminating the planetary gear system and causing failures. The diverter housing 20 is connected to the connection cover 21, the upper end plate 16, and the gas distribution outer pipe 32 of the gas distribution joint assembly through bolts and nuts. Through the bolt connection, the three can rotate synchronously under the rotation of the drill pipe and the torque is transmitted from top to bottom.

[0055] The casing 8 is located on the outside of the side hammer, and the upper and lower end faces of the casing 8 have a groove around the center axis, and the groove cooperates with the key of the sleeve end plate 50. There are two sleeve end plates 50, which are respectively located on the upper and lower sides of the casing 8. The two sleeve end plates 50 are respectively connected to the upper end plate 16 and the lower end plate 10 by bolts, and one side of the outer wall of the casing 8 is installed with a hole expansion thread 9 by welding; the hole expansion thread 9 is an alloy strip, and the hole expansion thread 9 is installed on the outside of the casing 8 by welding.

[0056] Preferably, the casing 8 is located outside the side hammer, and the upper and lower end surfaces of the casing 8 both have T-shaped grooves around the central axis, which cooperate with the T-shaped keys of the sleeve end plates 50 located on the upper and lower sides of the casing 8.

[0057] Preferably, the upper and lower end surfaces of the casing 8 are machined with fan-shaped grooves, and through the key cooperation between the fan-shaped grooves and the two sleeve end plates 50, the casing 8 is clamped between the two sleeve end plates 50 and rotates with the drilling tool.

[0058] After all parts are assembled according to their correct installation methods, the working process of the large diameter combined air reverse circulation down-the-hole hammer is as follows:

[0059] When a large-diameter borehole is being drilled and hard rock is encountered, an impact rotary drilling process is required. The large-diameter combined air reverse circulation down-the-hole hammer is threadedly connected to the drilling rig drill rod and the floating upper shaft 29. Under the rotation and downward feed of the drill rod, the large-diameter combined air reverse circulation down-the-hole hammer moves back and forth toward the bottom of the borehole. At this time, the floating upper shaft 29 is located at the upper end of the inner part of the gas distribution outer tube 32, and the exhaust hole i and the annular gas distribution groove of the floating upper shaft 29 are connected with the side hammer hole cleaning air supply hole f on the gas distribution outer tube 32. When the bottom lip surface of the down-the-hole hammer drill bit has not reached the bottom of the borehole and contacted the rock, no air is supplied to the drill tool. When the down-the-hole hammer drill reaches the bottom of the borehole and the bottom lip surfaces of the center hammer drill bit 1 and the side hammer drill bit 2 come into contact with the rock, the floating upper shaft 29 is located at the lower end of the inner part of the gas distribution outer tube 32, and the exhaust hole i and the annular gas distribution groove of the floating upper shaft 29 are connected to the drive pipeline air supply hole g on the gas distribution outer tube 32. The air compressor on the ground starts to work to supply air to the drill, driving the center hammer and the side hammer to perform impact rotary drilling.

[0060] During the drilling process, compressed air is delivered from the air compressor to the drill tool and drives the drill tool to drill as follows: Since the drilling process used by the large-diameter combined air reverse circulation down-the-hole hammer is air reverse circulation impact rotary drilling, the drill rod matched with the drill tool is a double-layer drill rod, the inner drill rod is connected to the inner pipe joint 30, which serves as an upward discharge channel for the cuttings generated during drilling under the action of air, and the outer drill rod is connected to the floating upper shaft 29. The outer drill rod is driven to rotate by the drilling rig and drives the floating upper shaft 29 to rotate. The floating upper shaft 29 is connected to the gas distribution outer pipe 32 through a spline, and the drill rod rotation torque is transmitted to the gas distribution outer pipe 32 and then to the entire drilling tool. When the floating upper shaft 29 is located at the lower end of the gas distribution outer pipe 32 under the action of drilling pressure, the compressed air from the air compressor is delivered to the air supply annulus e between the floating upper shaft 29 and the inner pipe joint 30 through the dual-channel gas tap, and is delivered to the drive pipeline 37 through the exhaust hole i of the floating upper shaft 29, the annular gas distribution groove of the floating upper shaft 29 and the drive pipeline supply hole g on the gas distribution outer pipe 32. The compressed air is delivered to the drive pipeline 37 and then delivered to the double-flow distribution pneumatic motor 39. The double-flow distribution pneumatic motor 39 drives the planetary gear 35 to rotate. The driven gear 36 is in an external meshing relationship with the planetary gear 35. Compared with the rotation direction of the planetary gear 35, the driven gear 36 rotates in the opposite direction. The planetary gear 35 is restricted by the driven gear 36, resulting in the rotation speed of each planetary gear 35 and the double-flow distribution pneumatic motor 39 being equal. According to the principle of the distribution pneumatic motor, the gas flow output by each double-flow distribution pneumatic motor 39 is equal. The dual-flow distribution pneumatic motor 39 distributes the compressed air equally to the center hammer and the side hammer through the center hammer high-pressure air intake pipeline 40 and the side hammer high-pressure air intake pipeline 42 respectively.The compressed air that drives the center hammer to work is transported to the internal annular groove of the nylon sleeve 23 through the center hammer high-pressure air intake pipeline 40, and then the compressed air passes through the air distribution hole at the lower end of the air distribution outer tube 32 to reach the center hammer high-pressure air storage chamber h formed by the annular gap between the core tube 38 and the air distribution outer tube 32. In the center hammer high-pressure air storage chamber h, the air is stored and pressurized and then transported to the annular gap formed between the center hammer inner cylinder 45 and the middle and outer tubes 49 through the inclined hole of the center hammer upper anvil 43. Then the air enters the lower chamber of the piston through the air vent of the center hammer inner cylinder 45 and the air intake channel formed by the center hammer punch piston 4 and the center hammer inner cylinder 45 to lift the center hammer punch piston 4. When the center hammer punch piston 4 is lifted to the bottom of the center hammer upper anvil 43, the air intake channel formed by the center hammer punch piston 4 and the center hammer inner cylinder 45 and the channel seal of the lower chamber of the piston are closed. The air in the piston upper chamber is closed and connected at the same time, and air enters the piston upper chamber, pushing the center hammer piston 4 to move downward and impact the center hammer drill bit 1 to break the rock. At the same time, the air in the piston upper chamber enters the annular gap between the center hammer piston 4 and the center core tube 38 through the annular gap between the center hammer piston 4 and the center core tube 38, and the air in the piston lower chamber enters the annular gap between the center core tube 38 and the center hammer gas sleeve 47 through the annular gap between the center hammer piston 4 and the center hammer gas sleeve 47. The exhaust gas in the annular gap between the center core tube 38 and the center hammer gas sleeve 47 enters the spline groove evenly distributed annularly on the upper part of the drill bit, and is discharged from the exhaust hole of the center hammer drill bit 1 through the channel reserved at the bottom of the spline groove of the center hammer drill bit 1, carrying the rock cuttings at the bottom of the borehole through the rock cuttings return inlet a, the rock cuttings speed increase channel b, and the rock cuttings return channel c back to the surface; the above-mentioned air flow path completes the air reverse circulation process of the center hammer. When the center hammer piston 4 impacts the center hammer drill bit 1 to complete one impact action, the compressed air will once again pass through the air hole of the center hammer inner cylinder 45 to lift the center hammer piston 4 to perform the next cycle of impact action.

[0061] The compressed air that drives the side hammer to work lifts the side hammer impact piston 13 to move upward through the side hammer high-pressure air inlet p, the inclined hole of the side hammer upper anvil 53, the annular gap between the side hammer inner cylinder 52 and the side hammer outer tube 51, and the air vent of the side hammer inner cylinder 52. When the side hammer impact piston 13 rises to below the side hammer upper anvil 53, the annular gap between the side hammer inner cylinder 52 and the side hammer impact piston 13 and the connecting channel of the piston lower chamber are closed and connected to the piston upper chamber at the same time. Air enters the piston upper chamber, pushing the side hammer impact piston 13 to move downward and impact the side hammer drill bit 2 to break the rock. At the same time, the air in the piston upper chamber enters through the annular gap between the side hammer impact piston 13 and the side hammer core tube 15 The air in the piston upper chamber enters the annular gap between the side hammer lower spacer sleeve 56 and the side hammer lower anvil 11 through the annular gap between the side hammer punch piston 13 and the side hammer gas sleeve 54, and the waste gas in the annular gap between the side hammer lower spacer sleeve 56 and the side hammer lower anvil 11 is discharged through the side hammer lower joint gas hole q, the side hammer lower anvil gas collecting hole y and the side hammer cleaning jet hole n of the side hammer drill bit 2, and the air discharged from the center hammer drill bit 1 carries the rock chips back to the surface through the rock chip return inlet a, the rock chip speed increasing channel b and the rock chip return channel c of the center hammer drill bit; the above air flow path completes the air reverse circulation process of the side hammer. When the side hammer punch piston 13 impacts the side hammer drill bit 2 to complete an impact, the compressed air will once again lift the side hammer punch piston 13 through the air vent of the side hammer inner cylinder 52 to perform the next cycle of impact.

[0062] After the center hammer and the side hammer receive the compressed air from the planetary gear diverter, the impact drilling of the two is carried out simultaneously and uninterruptedly. Affected by the shapes of the center hammer drill bit 1 and the side hammer drill bit 2, the rock crushing surface formed by the large-diameter combined air down-the-hole hammer is a complete circle, which can greatly reduce the repeated crushing of the rock by the drilling tool.

[0063] During the drilling process, the impact power transmission path of the center hammer and the side hammer of the large-diameter combined air down-the-hole hammer is as follows: under the action of drilling pressure, the center hammer drill bit 1 and the side hammer drill bit 2 are in close contact with the rock at the bottom of the borehole. When the center hammer hammer piston 4 is lifted by compressed air, the gravitational potential energy of the center hammer hammer piston 4 increases. When the center hammer hammer piston 4 falls under the action of its own weight and air thrust, the kinetic energy of the center hammer hammer piston 4 increases rapidly. Finally, when the hammer piston 4 falls and collides with the upper end of the center hammer drill bit 1, the kinetic energy of the center hammer hammer piston 4 is converted into the impact power of the center hammer drill bit 1 on the rock. Since the structure of the side hammer is similar to that of the center hammer, the path for the side hammer to transmit the impact power is similar to that of the center hammer. The two parts are essentially the same, except that when the side hammer piston 13 moves to the lower dead point of the piston stroke, the side hammer piston 13 will collide with the side hammer lower anvil 11. Since the side hammer drill bit 2 is threadedly connected to the bottom of the side hammer lower anvil 11, the kinetic energy of the side hammer piston 13 will be converted into the impact work of the side hammer drill bit 2 on the rock; the impact work of the center hammer drill bit 1 and the side hammer drill bit 2 on the rock will have an impact and destructive effect on the rock, causing cracks in the rock. The high-frequency impact work will gradually develop the rock cracks and cause the rock to break. The rock fragments will be broken into small pieces under the high-frequency impact, and the rock fragments will be brought out of the borehole under the action of air reverse circulation, thereby achieving the cleaning effect of the borehole.

[0064] During the drilling process, the drilling pressure and torque transmission process of the large-diameter combined air down-the-hole hammer is as follows:

[0065] When the large-diameter combined air reverse circulation down-the-hole hammer drill tool contacts the rock and starts drilling under the action of its own weight and the feeding of the drill pipe, the floating upper shaft 29 generates a downward thrust on the gas distribution outer tube 32, and the gas distribution outer tube 32 transmits the thrust to the diverter box 20 through its own step structure. The gas distribution outer tube 32 is respectively connected to the connecting cover 21, the middle chuck 22, the nylon sleeve 23, the flange gasket 24, and the nylon flange 25 through the cooperation of long bolts 34 and nuts, and transmits the thrust downward through the nylon sleeve 23, the middle chuck 22, and the connecting cover 21 in sequence. Since the connecting cover 21 is connected to the upper end plate 16 by welding, the sleeve end plate 50 at the upper end of the casing 8 is connected to the upper end plate 16 by bolts, and is connected to the upper end surface groove of the casing 8 by a key, the sleeve end plate 50 at the lower end of the casing 8 is connected to the lower end plate 10 by bolts, and the sleeve end plate 50 is connected to the groove of the lower end plate 10 of the casing 8 by a key. This thrust is transmitted to the upper end plate 16 through the connecting cover 21, and is transmitted to the sleeve end plate 50 on the upper part of the casing 8 through the upper end plate 16, and then to the casing 8, the sleeve end plate 50, and the lower end plate 10; since the lower end plate 10 is located above the upper end surface of the large outer diameter shaft section of the ring hammer center axis 5, and the ring hammer center axis 5 is installed below the lower end plate 10 through bolts and the center axis clamping key 6, the thrust will be transmitted to the ring hammer center axis 5. When the center hammer drill bit 1 and the side hammer drill bit 2 contact the rock, both drill bits are at the upper dead point of vertical displacement, and the lower end surface of the ring hammer center axis 5 contacts the center hammer drill bit 1, transmitting the thrust to the center hammer drill bit 1. The center hammer drill bit 1 generates drilling pressure when transmitting the thrust to the rock through its bottom lip surface. At the same time, the thrust from the lower end plate 10 is transmitted to the side hammer drill bit 2 through the side hammer drill bit 2 contacting the lower end surface of the lower end plate 10, and the side hammer drill bit 2 generates drilling pressure when transmitting the thrust to the rock through its bottom lip surface.

[0066] When the drill pipe starts to rotate during drilling, the floating upper shaft 29 rotates synchronously with the drill pipe due to the threaded connection between the drill pipe and the floating upper shaft 29. The floating upper shaft 29 is connected to the gas distribution outer tube 32 through a spline. The floating upper shaft 29 transmits the rotational torque to the gas distribution outer tube 32 through the spline. As mentioned above, the gas distribution outer tube 32 is connected to the connecting cover 21, the middle chuck 22, the nylon sleeve 23, the flange gasket 24, and the nylon flange 25 through the long bolts 34 and nuts. The gas distribution outer tube 32 transmits the rotational torque to the middle chuck 22, the diverter box 20 and the connecting cover 21. The middle chuck 22, the diverter box 20 and the connecting cover 21 The outer gas distribution pipe 32 rotates synchronously with the inner gas distribution pipe 32, and the inner gas distribution pipe 32 is connected with the inner and outer pipes 49 through a slot and a key. The lower end of the inner and outer pipes 49 is connected with the lower joint 7 of the center hammer through a thread. The inner diameter of the lower joint 7 of the center hammer is a spline sleeve structure, which is installed in conjunction with the spline shaft of the center hammer drill bit 1. Therefore, the rotational torque is transmitted to the inner and outer pipes 49 through the outer gas distribution pipe 32, and finally transmitted to the center hammer drill bit 1 through the lower joint 7 of the center hammer. Since the double-flow distribution pneumatic motor 39 of the planetary gear splitter is installed on the splitter housing 20, the driven gear 36 of the planetary gear splitter is installed at the outer diameter of the flange gasket 24 through a step, and the planetary gear 35 is on the double-flow distribution pneumatic motor The drive of the drive 39 rotates under the rotation of the diverter housing 20, and the driven gear 36 meshing with it rotates around the flange gasket 24 in the opposite direction of the rotation of the planetary gear 35; since the connecting cover 21 is connected to the upper end plate 16 by welding, the side hammer mounting key 17 is installed on the upper end plate 16 by bolts, nuts and steps, and the side hammer outer tube 51 is suspended and installed by its inner diameter step. At the lower end of the side hammer, the side hammer lower anvil 11 is installed at the inner diameter of the side hammer lower joint 12 by splines, and is inserted into the concentric holes aligned with the sleeve end plate 50 and the lower end plate 10. The casing 8 is connected to the two sleeve end plates 50 at the upper and lower ends by keys. The sleeve end plates 50 at both ends are connected with the upper end plate 16 and the lower end plate 10 respectively by bolts, so the upper end plate 16 directly transmits the rotational torque to the side hammer outer tube 51, and then to the side hammer drill bit 2. At the same time, in order to prevent the large-diameter combined air reverse circulation down-the-hole hammer drill from getting a drill stuck in the borehole, the upper end plate 16 transmits the rotational torque to the sleeve end plate 50 above the casing 8. The sleeve end plate 50 drives the casing 8 to rotate together with the reaming thread 9 welded to the outer diameter of the casing 8 through the card key, and transmits the rotational torque to the reaming thread 9. The rotating reaming thread 9 can prevent the rock from falling off the borehole wall and keep the borehole diameter unchanged.

[0067] The principle of using a large-diameter combined air down-the-hole hammer to clean the borehole wall, clean the rock cuttings, and forcefully blow air into the borehole when the drill is lifted is as follows:

[0068] When the rock on the hole wall above the drill tool in the borehole is extremely broken and unstable, and rock cuttings fall, it is necessary to use the forced blowing and hole cleaning function of the large-diameter combined air down-the-hole hammer to clean the borehole. The specific operation method is to use the drill rod to lift the drill tool, and the floating upper shaft 29 is vertically displaced upward relative to the gas distribution outer pipe 32. When the floating upper shaft 29 moves to the upper dead point, the exhaust hole i and the annular gas distribution groove on the floating upper shaft 29 are connected to the side hammer hole cleaning air supply hole f processed on the gas distribution outer pipe 32, and the compressed air from the ground air compressor will pass through the air supply annulus e, the exhaust hole i on the floating upper shaft 29 and the annular gas distribution groove. The air supply holes f on the air trough and the air distribution outer pipe 32 are transported to the side hammer hole cleaning pipeline 41, and then the compressed air is transported to the side hammer internal air flow channel k of the side hammer core tube 15 through the side hammer internal air inlet joint 18. After being pressurized in the side hammer hole cleaning booster chamber m, the compressed air is finally ejected at high speed through the center hole of the side hammer lower anvil 11 and the side hammer cleaning jet hole n of the side hammer drill bit 2, flushing the rock debris that has fallen at the bottom of the borehole, and bringing it into the rock debris return inlet a, and returning to the surface through the rock debris speed increaser channel b, the rock debris return channel c, and the gas channel d inside the core tube, completing the rock debris cleaning work.

Claims

1. Large diameter combined air reverse circulation down-the-hole hammer, characterized by: include: A gas distribution joint assembly, a planetary gear flow divider, a center hammer, a side hammer, a bell-shaped shield, a connecting shield (21) and a casing (8); The gas distribution joint assembly comprises a high-pressure gas supply joint (27), a side hammer hole cleaning gas supply joint (28), a floating upper shaft (29), an inner pipe joint (30), a gas distribution outer pipe (32), a sealing flange cover (33), a drive pipeline (37) and a side hammer hole cleaning pipeline (41). The high-pressure gas supply joint (27) connects the gas distribution outer pipe (32) and the drive pipeline (37) through threads; the side hammer hole cleaning gas supply joint (28) connects the gas distribution outer pipe (32) and the side hammer hole cleaning pipeline (41) through threads; the floating upper shaft (29) is sleeved on the outside of the inner pipe joint (30), the inner wall of the floating upper shaft (29) and the outer wall of the inner pipe joint (30) form an annular gap, and the lower part of the floating upper shaft (29) and the outer wall of the inner pipe joint (30) are sealed. The gas distribution outer pipe (32) is connected with the gas distribution outer pipe (32) by a sealing ring, and the floating upper shaft (29) is inserted into the gas distribution outer pipe (32) and connected with the gas distribution outer pipe (32) by a spline, and the floating upper shaft (29) and the gas distribution outer pipe (32) are relatively movable in the vertical direction; the gas distribution outer pipe (32) is connected with the diverter housing (20), the connecting cover (21), the middle chuck (22), the nylon sleeve (23), the flange gasket (24), and the nylon flange (25) respectively through a connecting piece formed by a long bolt (34) and a nut; the sealing flange cover (33) is arranged above the gas distribution outer pipe (32) and connected with the gas distribution outer pipe (32) by bolts, and the sealing flange cover (33) is used to fix the gas distribution outer pipe (32), and a sealing ring is installed between the sealing flange cover (33) and the floating upper shaft (29); The floating upper shaft (29) is a hollow spline shaft with a variable outer diameter, and the outer wall of the floating upper shaft (29) is provided with steps and splines, and exhaust holes (i) are evenly distributed along the circumferential direction of the floating upper shaft (29), and the exhaust holes (i) penetrate along the radial direction of the floating upper shaft (29), and the outer wall of the floating upper shaft (29) is provided with an annular gas distribution groove connected with the exhaust holes (i); the gas distribution outer pipe (32) has a spline groove inside, and the gas distribution outer pipe (32) is sleeved on the outside of the floating upper shaft (29) through a spline connection, and the gas distribution outer pipe (32) is connected to the outer wall of the floating upper shaft (29) through a step set on the upper part of its inner wall. The spline of the gas distribution outer tube (32) is matched for suspension installation, and a driving pipeline air supply hole (g) and a side hammer hole cleaning air supply hole (f) are opened on the gas distribution outer tube (32). When the drilling tool is in the impact rotary drilling condition, the exhaust hole (i) of the floating upper shaft (29) and the driving pipeline air supply hole (g) on ​​the gas distribution outer tube (32) are kept in a normal state; when the drilling tool is lifted, the exhaust hole (i) of the floating upper shaft (29) and the side hammer hole cleaning air supply hole (f) on the gas distribution outer tube (32) are kept in a normal state, and at the same time, the lower end of the gas distribution outer tube (32) has circumferentially uniformly distributed air distribution holes, which are connected to the annular groove located inside the nylon sleeve (23); The planetary gear flow divider comprises a planetary gear (35), a driven gear (36), a double-flow distribution pneumatic motor (39), a center hammer high-pressure air intake pipeline (40) and a side hammer high-pressure air intake pipeline (42). The double-flow distribution pneumatic motor (39) is mounted on the flow divider housing (20) by bolts, and its output shaft passes through the axial prefabricated hole of the flow divider housing (20). The number of the double-flow distribution pneumatic motors (39) is at least two, and at least two double-flow distribution pneumatic motors (39) are evenly arranged in a ring shape along the circumference of the flow divider housing (20). The air inlet of the double-flow distribution pneumatic motor (39) is connected to the drive pipeline (37) through a pipe joint (19). Among the exhaust ports of at least two double-flow distribution pneumatic motors (39), one exhaust port is connected to the center hammer high-pressure air intake pipeline (37) through a pipe joint (19). The air intake pipe (40) is connected to the side hammer, and the other exhaust ports are connected to the side hammer high-pressure air intake pipe (42) through a pipe joint (19); the end of the center hammer high-pressure air intake pipe (40) away from the double-flow distribution air motor (39) is connected to the nylon sleeve (23) through a threaded pipe joint and supplies air to the center hammer; the end of the side hammer high-pressure air intake pipe (42) away from the double-flow distribution air motor (39) is connected to the side hammer high-pressure air supply port (p) through a threaded pipe joint; the number of planetary gears (35) is consistent with the number of double-flow distribution air motors (39) and corresponds one to one, each planetary gear (35) is installed on the output shaft of the corresponding double-flow distribution air motor (39) through a flat key and a shaft end fastening nut, and the planetary gear (35) is meshed with the driven gear (36) to form a planetary gear system; The center hammer comprises a center core tube (38), a nylon sleeve (23), a center chuck (22), a center hammer upper anvil (43), an adjustment ring (44), a center hammer impact piston (4), a center hammer inner cylinder (45), a center hammer middle spacer sleeve (46), a center hammer gas distribution sleeve (47), a center hammer lower spacer sleeve (48), a center hammer drill bit (1), a center hammer drill bit clamping key (14), a middle and outer tube (49) and a center hammer lower joint (7). The center core tube (38) is installed below the inner tube joint (30) in the gas distribution joint assembly by insertion. The center core tube (38) is A tubular structure with a variable outer diameter and a stepped outer wall, wherein a central core tube (38) is located inside a gas distribution outer tube (32), a center hammer upper anvil (43), an adjusting ring (44), a center hammer punch piston (4), a center hammer inner cylinder (45), a center hammer middle spacer sleeve (46) and a center hammer gas distribution sleeve (47), and the central core tube (38) is simultaneously matched with an annular clearance of the gas distribution outer tube (32), the center hammer upper anvil (43), the adjusting ring (44), the center hammer punch piston (4), the center hammer inner cylinder (45), the center hammer middle spacer sleeve (46) and the center hammer gas distribution sleeve (47) The center core tube (38) is divided into an upper shaft section and a lower shaft section, wherein the diameter of the lower shaft section is smaller than that of the upper shaft section, and the annular gap between the lower shaft section of the center core tube (38) and the center hammer piston (4) is an exhaust passage for the piston upper chamber; the nylon sleeve (23) is installed on the outer wall of the lower end of the gas distribution outer tube (32), the inner wall of the nylon sleeve (23) has an annular groove, and the nylon sleeve (23) and the gas distribution outer tube (32) are connected by a long bolt (34) and a nut; the center chuck (22) is located below the nylon sleeve (23), and the center chuck (22) and the nylon sleeve (23) are connected to each other. ) are connected by long bolts (34) and nuts; the center hammer upper anvil (43) is located below the middle chuck (22) and the upper end surface of the center hammer upper anvil (43) is close to the step surface of the center core tube (38), the lower end of the center hammer upper anvil (43) is inserted into the center hammer inner cylinder (45), a sealing ring is provided between the center hammer upper anvil (43) and the center hammer inner cylinder (45), and the upper end of the center hammer upper anvil (43) is processed with circumferentially uniformly distributed oblique holes; the adjustment ring (44) is installed above the center hammer upper anvil (43) and is limited by the steps of the middle and outer tubes (49);The center hammer piston (4) is a hollow shaft with a variable diameter, which is divided into an upper shaft section and a lower shaft section. The diameter of the upper shaft section is larger than that of the lower shaft section, and the upper shaft section has grooves uniformly distributed along the circumferential direction. The lower shaft section is a step-type. The center hammer piston (4) is located below the center hammer upper anvil (43). An upper piston cavity is formed between the center hammer piston (4) and the center hammer upper anvil (43). The center hammer piston (4) is located inside the center hammer inner cylinder (45), the center hammer middle spacer sleeve (46) and the center hammer gas distribution sleeve (47). The groove of the upper shaft section of the center hammer piston (4) cooperates with the step of the center hammer inner cylinder (45) to form an air intake channel for the upper and lower piston cavities. The annular gap formed between the lower shaft section of the center hammer piston (4) and the center hammer middle spacer sleeve (46) serves as a gas distribution sleeve. The center hammer inner cylinder (45) is installed below the center hammer upper anvil (43), and the center hammer inner cylinder (45) is processed with vent holes evenly distributed along the circumferential direction thereof, and a sealing ring is arranged between the center hammer inner cylinder (45) and the center hammer upper anvil (43), and a center hammer middle spacer sleeve (46), a center hammer gas distribution sleeve (47) and a center hammer lower spacer sleeve (48) are arranged in sequence below the center hammer inner cylinder (45); the upper end of the center hammer gas distribution sleeve (47) is provided with annularly evenly distributed oblique hole grooves, and annularly evenly distributed through holes are arranged inside the center hammer gas distribution sleeve (47), and a sealing ring is arranged between the center hammer gas distribution sleeve (47) and the middle and outer tubes (49); the center hammer lower spacer sleeve (48) is sleeved on the outer side of the center hammer drill bit (1) and is used to insert the center hammer drill bit key (14) into the center hammer drill bit. The center hammer drill bit (1) has a step in the middle, the upper end of the center hammer drill bit (1) is a spline shaft and is processed with circumferentially uniformly distributed spline grooves, the center hammer drill bit (1) is inserted into the inside of the ring hammer center shaft (5), and the ring hammer center shaft (5) is limited by the step, the center hammer drill bit (1) is located below the center hammer gas sleeve (47), the upper end of the center hammer drill bit (1) is plugged into the lower end of the core tube (38), the center hammer drill bit (1) is connected to the center hammer lower joint (7) through a spline, and the center hammer drill bit (1) is limited by the cooperation of the center hammer drill bit clamping key (14) and the center hammer lower joint (7), the bottom lip surface of the center hammer drill bit (1) is ahead of the bottom lip surface of the side hammer drill bit (2), and the shape of the bottom lip surface of the center hammer drill bit (1) is similar to that of the side hammer drill bit The shape of the bottom lip surface is combined to form a circular cross section. The rock crushing surface of the center hammer drill bit (1) is inlaid with alloy teeth (3) and connected by welding. The middle and outer tubes (49) are sleeved on the outer sides of the center hammer upper anvil (43), the center hammer inner cylinder (45), the center hammer middle spacer sleeve (46), the center hammer gas distribution sleeve (47) and the center hammer lower spacer sleeve (48). The middle and outer tubes (49) are simultaneously matched with the center hammer upper anvil (43), the center hammer inner cylinder (45), the center hammer middle spacer sleeve (46), the center hammer gas distribution sleeve (47) and the center hammer lower spacer sleeve (48) in annular clearance. The middle and outer tubes (49) are matched with the gas distribution outer tube (32) through a key and a slot. The upper end of the middle and outer tubes (49) is provided with a groove, and the groove is matched with the lower step of the middle chuck (22) for hanging installation and positioning.The center hammer lower joint (7) is installed below the middle and outer pipes (49) through threaded connection; The bottom of the center hammer drill bit (1) is processed with a plurality of rock chip return inlets (a), the rock chip return inlets (a) are connected with a rock chip speed increasing channel (b) at the axis of the center hammer drill bit (1), and the bottom of the center hammer drill bit (1) is evenly distributed in a circumferential direction around the center axis. The side hammers are evenly arranged around the central hammer, and the side hammers include a side hammer drill bit (2), a lower end plate (10), a side hammer lower anvil (11), a side hammer lower joint (12), a side hammer impact piston (13), a side hammer core tube (15), an upper end plate (16), a side hammer installation key (17), a side hammer inner air inlet joint (18), a side hammer outer tube (51), a side hammer inner cylinder (52), a side hammer upper anvil (53), a side hammer air distribution sleeve (54), a side hammer middle spacer sleeve (55), a side hammer lower spacer sleeve (56) and a side hammer cover plate (57). The rock crushing surface of the side hammer drill bit (2) is inlaid with alloy teeth (3) and connected by welding. The side hammer drill bit (2) is connected to the lower side hammer anvil (11) by threading; the upper end of the side hammer lower anvil (11) is inserted into the side hammer. The side hammer lower joint (12) is installed inside and extends upward, the side hammer lower anvil (11) is installed in the hollow area of ​​the side hammer outer tube (51) in an inserted manner and can move in the vertical direction, the side hammer lower anvil (11) is processed with circumferentially evenly distributed side hammer lower anvil air collecting holes (y) on the upper end, and the side hammer lower anvil air collecting holes (y) are communicated with the side hammer cleaning air jet holes (n) located on the side hammer drill bit (2); the side hammer lower joint (12) is installed below the side hammer outer tube (51) through threaded connection, and the side hammer lower joint (12) is processed with circumferentially evenly distributed side hammer lower joint air distribution holes (q) on the upper end; the side hammer outer tube (51) is suspended and installed in a position by cooperating with the step of the side hammer installation key (17), and the side hammer outer tube (51) is sleeved on the side hammer inner cylinder (52) and the side hammer upper anvil (53), the side hammer gas sleeve (54), the side hammer middle spacer sleeve (55) and the side hammer lower spacer sleeve (56) are matched with the outside and annular clearance; the lower end plate (10) is installed below the side hammer lower anvil (11), and the lower end plate (10) is located above the step surface of the ring hammer center axis (5), the lower end plate (10) is connected to the ring hammer center axis (5) through bolts and the center axis clamp key (6), and the lower end surface of the ring hammer center axis (5) contacts the center hammer drill bit (1) when the side hammer drill bit (2) and the center hammer drill bit (1) are at the upper dead point of vertical displacement; the side hammer core tube (15) is a tubular structure with a variable outer diameter and an outer diameter with a step, the upper end of the side hammer core tube (15) is suspended and installed by matching with the side hammer upper anvil (53) through the step, and the lower end of the side hammer core tube (15) is connected to the ring hammer center axis (5) through bolts and the center axis clamp key (6). The end is installed in the hollow area of ​​the side hammer lower anvil (11) by insertion, and a sealing ring is arranged between the side hammer core tube (15) and the side hammer lower anvil (11); the side hammer upper anvil (53) is provided with circumferentially uniformly distributed oblique holes, the lower end of the side hammer upper anvil (53) is inserted into the side hammer inner cylinder (52), and a sealing ring is installed between the side hammer upper anvil (53) and the side hammer inner cylinder (52); the side hammer inner cylinder (52) is installed below the side hammer upper anvil (53), and the inner wall of the side hammer inner cylinder (52) is processed with circumferentially uniformly distributed ventilation holes, and the side hammer middle spacer sleeve (55), the side hammer air distribution sleeve (54) and the side hammer lower spacer sleeve (56) are installed in sequence below the side hammer inner cylinder (52); the side hammer lower spacer sleeve (56) is located outside the side hammer lower anvil (11) and has a clearance fit;The side hammer piston (13) is a hollow shaft with a variable diameter, which is divided into an upper shaft section and a lower shaft section. The diameter of the upper shaft section is larger than that of the lower shaft section, and the upper shaft section has grooves uniformly distributed along the circumferential direction. The lower shaft section is a step-type. The side hammer piston (13) is located below the side hammer upper anvil (53). The side hammer piston (13) is located inside the side hammer inner cylinder (52), the side hammer middle spacer sleeve (55), the side hammer gas sleeve (54) and the side hammer lower spacer sleeve (56) and is clearance-matched. At the same time, the inner wall of the side hammer piston (13) is clearance-matched with the side hammer core tube (15). A sealing ring is provided between the side hammer piston (13) and the side hammer core tube (15). A piston upper cavity is formed between the side hammer piston (13) and the side hammer upper anvil (53). The groove of the upper shaft section of the side hammer piston (13) is matched with the step of the side hammer inner cylinder (52) to form the inlet and outlet of the piston upper and lower cavities. The side hammer has an air passage, and the annular gap formed between the lower shaft section of the side hammer piston (13) and the side hammer middle spacer sleeve (55) serves as the piston lower chamber; the side hammer key (17) is a pair of semi-ring keys with steps, which are installed above the upper end plate (16) through bolts, nuts and steps, and the side hammer outer tube (51) is suspended and installed through the steps; the upper end plate (16) is welded below the connecting cover (21); the side hammer inner air intake joint (18) is installed above the side hammer core tube (15) through threaded connection, and the side hammer inner air intake joint (18) connects and connects the side hammer hole cleaning pipeline (41) and the side hammer core tube (15) through threads; the side hammer cover plate (57) is simultaneously connected to the side hammer installation key (17) and the upper end plate (16) through bolts, and the side hammer cover plate (57) is respectively connected to the side hammer hole cleaning pipeline (41) and the side hammer high-pressure air intake pipeline (42) through threaded pipe joints; The number of the side hammer drill bits (2) is at least two, and the at least two side hammer drill bits (2) are evenly distributed in the circumferential direction along the central axis of the drilling tool as a whole, forming a complete circular cross section; the circular cross section and the cross section of the center hammer drill bit (1) together form a complete circular cross section; The bell-shaped shield comprises a shield (26) and a diverter housing (20), wherein the shield (26) is located outside the driving pipeline (37) and the side hammer hole cleaning pipeline (41), the upper end of the shield (26) is connected to the guide ring (31) by bolts, and the two are integrally mounted on the outside of the gas distribution outer pipe (32); the diverter housing (20) is located below the shield (26) and is arranged outside the planetary gear diverter, the upper end of the diverter housing (20) is connected to the lower end of the shield (26) by bolts, and the diverter housing (20) is connected to the gas distribution outer pipe (32) in the gas distribution joint assembly by long bolts (34) and nuts; a pipe joint hole is processed on the diverter housing (20), and an intermediate pipe joint is installed on the pipe joint hole, and the intermediate pipe joint connects two pipe sections of the driving pipeline (37) and two pipe sections of the side hammer hole cleaning pipeline (41) to form a complete pipeline; The casing (8) is located outside the side hammer, and the upper end face and the lower end face of the casing (8) both have a groove around the central axis, and the groove cooperates with the key of the sleeve end plate (50). There are two sleeve end plates (50), and the two sleeve end plates (50) are respectively located on the upper and lower sides of the casing (8). The two sleeve end plates (50) are respectively connected to the upper end plate (16) and the lower end plate (10) by bolts, and a hole expansion thread (9) is installed on one side of the outer wall of the casing (8) by welding.

2. The large diameter combined air reverse circulation down-the-hole hammer according to claim 1, characterized in that: The driven gear (36) is provided with steps respectively matching with the flange gasket (24) and the nylon flange (25). The driven gear (36) is installed between the flange gasket (24) and the nylon flange (25) through the steps machined thereon and can rotate around the flange gasket (24).

3. The large diameter combined air reverse circulation down-the-hole hammer according to claim 1, characterized in that: The cross section of the center hammer drill bit (1) is in the shape of a plum blossom.

4. The large diameter combined air reverse circulation down-the-hole hammer according to claim 2, characterized in that: The number of the side hammer drill bits (2) is at least two, the cross-sections of the at least two side hammer drill bits (2) are in the shape of plum blossom petals and are evenly distributed outside the center hammer drill bit (1), and the at least two side hammer drill bits (2) are evenly distributed in the circumferential direction along the central axis of the drill tool as a whole, forming a complete circular cross-section; the circular cross-section and the cross-section of the center hammer drill bit (1) together form a complete circular cross-section.

5. The large diameter combined air reverse circulation down-the-hole hammer according to claim 3, characterized in that: The side hammer drill bit (2) is connected to the side hammer lower anvil (11) through a thread. The side hammer drill bit (2) has a fan-shaped structure. A T-shaped slot is processed on one side of the inner diameter of the fan ring, which cooperates with a T-shaped key processed on the outer diameter of the ring hammer center axis (5), so that the side hammer drill bit (2) rotates with the ring hammer center axis (5) and moves in the vertical direction of the T-shaped key of the ring hammer center axis (5).

6. The large diameter combined air reverse circulation down-the-hole hammer according to claim 1, characterized in that: The casing (8) is located outside the side hammer. The upper and lower end surfaces of the casing (8) are both provided with T-shaped slots around the central axis, which cooperate with the T-shaped keys of the sleeve end plates (50) located on the upper and lower sides of the casing (8). The casing (8) is clamped between the two sleeve end plates (50) and rotates with the drilling tool.

7. The large diameter combined air reverse circulation down-the-hole hammer according to claim 1, characterized in that: The hole-expanding thread (9) is an alloy strip, and the hole-expanding thread (9) is installed on the outside of the casing (8) by welding.