Dynamic optimization and display method of cooling schedule for ice storage system

By establishing an optimization problem model, allocating the ice melting, base load and duplex cooling time periods of the ice cooling system, optimizing the operating time schedule of the ice cooling system, solving the low yield of ice melting and insufficient cooling capacity in the existing technology. The problems released have improved the operating efficiency and cost efficiency of the system.

CN111754049BActive Publication Date: 2024-12-03NANJING YOUZHU INTELLIGENT TECH
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202010672632.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-07-14
Publication Date
2024-12-03
Estimated Expiration
2040-07-14

AI Technical Summary

Technical Problem

The existing ice cooling system fails to fully consider the load demand at different time points in the day and the efficiency of different refrigeration systems when optimizing the ice melting and cooling schedule, resulting in low yield on ice melting or insufficient cooling capacity, increasing operation. cost.

Method used

Establish an optimal problem model for melting ice, base-load refrigeration and duplex refrigeration during non-cooling periods of ice cooling systems. By calculating the time-by-time load level, return water temperature and unit refrigeration cost of different refrigeration systems, the optimal refrigeration time period is allocated To optimize the running schedule.

Benefits of technology

It improves the operating efficiency of the ice cooling system, simplifies the operating process, and effectively makes use of the cost difference between cooling during low-price periods and cooling during high-price periods, reducing daily operating costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111754049B_ABST
    Figure CN111754049B_ABST
Patent Text Reader

Abstract

The present invention specifically relates to a method for dynamically optimizing and displaying a cooling schedule of an ice storage system, comprising: establishing an optimization problem model for the cooling capacity of ice storage system using ice melting, base load refrigeration subsystem and dual-condition refrigeration subsystem during non-cold storage period; solving the optimization problem model; and drawing an optimal operation schedule of the ice storage system according to the solution result; the method for dynamically optimizing and displaying a cooling schedule of an ice storage system of the present invention uses hourly load level data, hourly return water temperature, and calculated unit cooling capacity cost of ice melting at different times, different load levels and different return water temperatures, unit cooling capacity cost of base load refrigeration subsystem, unit cooling capacity cost of dual-condition refrigeration subsystem and other data to establish an optimization problem to solve the optimal schedule of ice storage system using ice melting, base load refrigeration and dual-condition refrigeration during non-cold storage period, thereby effectively improving the operation efficiency of the ice storage system and simplifying the work of operators.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of building automation, and in particular relates to a method for dynamically optimizing and displaying a cooling schedule of an ice storage system. Background Art

[0002] The ice storage system uses electricity to make ice and stores it in the ice storage device during the night when the electricity load is low. The ice is melted during the day to release the stored cold, thereby reducing the air conditioning power load and air conditioning system installed capacity during the peak period of the power grid. In some areas, the electricity price during the peak period is several times that during the off-peak period, so the use of ice storage system can reduce the electricity cost of refrigeration.

[0003] In order to maximize the benefits of ice storage systems, users currently generally operate according to the following rules:

[0004] 1) During the low electricity price period (usually from 10:00 p.m. to 6:00 a.m. the next day), turn on the dual-mode chiller (this chiller can cool the refrigerant to the normal temperature of 5-17°C, and can also be forced to cool to below zero) to cool the refrigerant (usually a glycol solution of a certain concentration) to below zero (because the return water temperature is usually low, the efficiency of the chiller is only 60% of that of normal cooling), and the relevant pump group circulates it into the ice storage tank, so that the water or other ice storage materials in the ice storage tank freeze; if there is an external cooling demand at this time, the base load chiller (this chiller can only cool the refrigerant to the normal temperature of 5-17°C) is usually run to meet the demand.

[0005] 2) When the parity period arrives (usually 6:00-8:00 in the morning, 11:00-13:00 in the afternoon, 15:00-18:00 in the afternoon, and 21:00-22:00 in the evening), the ice storage subsystem including the dual-condition chiller is shut down. If there is an external cooling demand at this time, the base load chiller is usually used to meet it. Sometimes the cooling capacity of the base load chiller is not enough, so the dual-condition chiller is started to participate in cooling. Due to the existence of plate exchange separation of the refrigerant medium for ice making and the refrigerant medium for conventional refrigeration (usually water), the direct cooling efficiency of the dual-condition chiller is only about 80% of that of the conventional unit. Therefore, in some control schemes, when the cooling capacity of the base load chiller is insufficient, the relevant water pump will be started first to release the cold stored in the ice storage tank. If it is still not enough, the dual-condition chiller is turned on.

[0006] 3) When the high-price period arrives, if there is still cold capacity in the ice storage tank, start the relevant water pump to release the cold capacity stored in the ice storage tank. If it is still not enough, start the base load refrigeration machine for cooling, or start the dual-mode refrigeration machine to participate in cooling.

[0007] Engineers will design several different operating schedules based on the ratio of ice storage to total load during non-ice storage periods (see Figure 1), for example, when the ice storage capacity can cope with the load of the non-ice storage period of the whole day (usually called 100% working condition), the ice melting subsystem is used for cooling in all periods; when the ice storage capacity can only cope with 25% of the load of the non-ice storage period of the whole day (usually called 25% working condition), the ice melting subsystem is used for cooling only in the morning when the electricity price is high. Usually, operation schedules with different ratios are given for 25%, 50%, 75% and 100%. The operator performs ice melting operations according to the estimated ratio and the corresponding operation schedule.

[0008] The cost of ice storage system is not low. Users need to use the low electricity price period for cooling and the high electricity price period for cooling to recover the cost and continuously reduce the daily operation cost. Increasing the income of ice melting stage will help achieve the above goals.

[0009] The current mainstream ice melting control strategy mainly refers to electricity price and ice storage capacity. When the ice storage is not exhausted, ice is melted during high electricity price periods, and base load chillers or dual-mode chillers are used during other periods. Not considering the load demand at different times of the day, the cost of ice storage, and the cooling efficiency of the base load chiller subsystem and dual-mode chiller subsystem at different times may result in:

[0010] A. There is no available ice melting capacity during the time period with the highest ice melting rate (during the evening period with high electricity prices, shopping malls often have to use base load or dual-mode refrigeration units for cooling because the ice storage capacity has been used up);

[0011] B. Not willing to release the cold when the ice melting rate is still good, and there is still cold that has not been released at the end of the day (this situation is prone to occur in the transition season).

[0012] The highest electricity price is usually three times the lowest. Ice storage consumes 50% more electricity than conventional refrigeration, and dual-mode chillers directly supply 20% more electricity than conventional refrigeration. However, the ice storage system is constrained by construction costs and space, and the storage capacity is limited. It can usually only bear 50% or even less of the cooling capacity of the whole day. Therefore, it is necessary to plan the ice melting and cooling period to improve the efficiency of the ice storage system. Summary of the invention

[0013] The object of the present invention is to provide a method for dynamically optimizing and displaying a cooling schedule of an ice storage system.

[0014] In order to solve the above technical problems, the present invention provides a method for dynamically optimizing and displaying a cooling schedule of an ice storage system, including: establishing an optimization problem model for the cooling capacity of the ice storage system using ice melting, base load refrigeration subsystem and dual-mode refrigeration subsystem during the non-storage period; solving the optimization problem model; and drawing an optimal operation schedule of the ice storage system based on the solution results.

[0015] Furthermore, the method for establishing the optimization problem model of the cooling capacity of the ice storage system using the ice melting refrigeration subsystem, the base load refrigeration subsystem and the dual-mode refrigeration subsystem during the non-storage period includes:

[0016] Step S1, calculating the load level l(t) at different times t in a day;

[0017] Step S2, calculating the return water temperature Tr(t) at different times t in a day, and Tr(t)=T(day of the week, t);

[0018] Step S3, calculating the unit cooling cost S of ice storage, where S is equal to the average or weighted average of multiple ice storage costs s, and

[0019]

[0020] in:

[0021] Q is the change in the coldness of the ice storage tank during the entire ice storage process, that is, Q is equal to the coldness in the ice storage tank at the end of the ice storage process minus the coldness in the ice storage tank at the beginning of the ice storage process;

[0022] E is the power consumption of the ice storage subsystem during the entire ice storage process;

[0023] Step S4, calculating the unit refrigeration cost r(t,l) of ice melting at time t, and r(t,l)=S;

[0024] Step S5, calculate the unit cooling capacity cost b(t, l) of the base load cooling subsystem at time t, and

[0025] b(t,l)=l*f(l,Tr)*P(t);

[0026] Where: l is the load level at time t; Tr is the return water temperature at time t; P(t) is the electricity price at that time; f(l,Tr) is the system efficiency of the base chiller subsystem at different load levels and different return water temperatures;

[0027] Step S6, calculating the unit cooling capacity cost d(t,l) of the dual-mode refrigeration subsystem at time t, and

[0028] d(t,l)=l*θ(l,Tr)*P(t);

[0029] Where: l is the load level at time t; Tr is the return water temperature at time t; P(t) is the electricity price at that time; θ(l,Tr) is the system efficiency of the dual-mode refrigeration subsystem at different load levels and different return water temperatures;

[0030] Step S7,

[0031] The non-ice storage period is divided into n segments of length Δ, and Cr is seti , Cb i , Cd i At different times t i The cooling capacity of ice melting, the cooling capacity of the base load refrigeration subsystem and the cooling capacity of the dual-mode refrigeration subsystem, the optimization problem model J is:

[0032]

[0033] in:

[0034]

[0035] Cr i +Cb i +Cd i = l(t i );

[0036] 0≤Cr i ≤r max_i ; 0≤Cb i ≤ b max_i ; 0≤Cd i ≤d max_i ;

[0037] r max_i >0, b max_i >0,d max_i >0;

[0038] i=0,1,…,n-1;

[0039] r max_i 、b max_i ,d max_i At different times t i The maximum value of ice melting cooling capacity, the maximum cooling capacity of the base load refrigeration subsystem and the maximum cooling capacity of the dual-mode refrigeration subsystem.

[0040] Further, the method for solving the optimization problem model J includes:

[0041] Step S11, allocating ice-melting time periods;

[0042] Step S12, allocating a base load cooling time period; and

[0043] Step S13, allocating a dual-mode cooling time period.

[0044] Further, the method of allocating ice-melting time periods in step S11 includes:

[0045] Step S111: if for all i, Cr i = l i , indicating that all load level requirements have been met, then exit;

[0046] Step S112, if the total cold storage ColdStorage = 0, it means that the cold storage is exhausted, then go to step S12;

[0047] Step S113: If i does not exist, Cr i =0 and l i >0, indicating that the load level demand during this period has not been met and the ice melting cooling capacity has not been allocated, then go to S12;

[0048] Step S114, otherwise find i, corresponding to Cr i =0 and l i >0, then

[0049] Let c = Min(l i , r max_i , ColdStorage), where Min() represents the minimum value among the load level, the maximum value of ice melting refrigeration capacity and the current cold storage capacity at that moment, so that b(t i ,c)-r(t i ,c) maximum, i.e., the period when the cost saving of ice melting is the largest relative to the base load refrigeration subsystem;

[0050] Let Cr i =c, ColdStorage=ColdStorage-c, return to execute step S11.

[0051] Further, the method of allocating the base load cooling time period in step S12 includes:

[0052] Step S121, if for all i, Cr i +Cb i = l i , indicating that all load level requirements have been met, then exit;

[0053] Step S122, if i does not exist, Cb i =0 and Cr i <l i , indicating that the load level demand during this period has not been met and the base load cooling capacity has not been allocated, then go to step S13;

[0054] Step S123, otherwise find i, corresponding to Cb i =0 and Cr i <l i ,

[0055] Let c = Min(l i -Cr i ,b max_i ), where Min() represents the smaller value between the load level gap that cannot be satisfied by ice melting at this moment and the maximum cooling capacity of the base load, so that d(ti ,c)-b(t i ,c) Maximum, i.e., the period when the base load refrigeration subsystem saves the most cost relative to the dual-mode refrigeration subsystem;

[0056] Let Cb i =c, return to execute step S12.

[0057] Further, the method of allocating the dual-mode cooling time period in step S13 includes:

[0058] Step S131: if for all i, Cr i +Cb i +Cd i = l i , indicating that all load level requirements have been met, then exit;

[0059] Step S132, if i does not exist, Cd i =0 and Cr i +Cb i <l i , indicating that the load level demand during this period has not been met and the dual-effect cooling capacity has not been allocated, then exit;

[0060] Step S133, otherwise find i, corresponding to Cd i =0 and Cr i +Cb i <l i ,

[0061] Let c = Min(l i -Cr i -Cb i ,d max_i ), where Min() represents the smaller value between the load level gap that cannot be satisfied by ice melting and base load cooling at that moment and the maximum cooling capacity value of dual working conditions;

[0062] Let Cd i =c, return to execute step S13.

[0063] Further, the method of drawing the optimal operation schedule of the ice storage system according to the solution results includes: i , Cb i , Cd i Plot the optimal operating schedule for the ice storage system.

[0064] The beneficial effect of the present invention is that the dynamic optimization and display method of the cooling schedule of the ice storage system of the present invention utilizes hourly load level data, hourly return water temperature, and calculated unit cooling capacity cost of ice melting at different times, different load levels and different return water temperatures, unit cooling capacity cost of the base load refrigeration subsystem, unit cooling capacity cost of the dual-condition refrigeration subsystem and other data to establish an optimization problem to solve the best schedule of ice melting, base load refrigeration and dual-condition refrigeration during the non-storage period of the ice storage system, thereby effectively improving the operating efficiency of the ice storage system and simplifying the work of the operating personnel.

[0065] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or understood by practicing the present invention. The purpose and other advantages of the present invention are realized and obtained by the structures particularly pointed out in the description, claims and drawings.

[0066] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, preferred embodiments are given below and described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0067] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0068] Figure 1 It is the existing schedule for arranging the operation of the ice storage system according to the electricity price;

[0069] Figure 2 It is a flow chart of the method for dynamically optimizing and displaying the cooling schedule of the ice storage system of the present invention.

[0070] Figure 3 It is the operation schedule of the ice thermal storage system obtained according to the dynamic optimization and display method of the ice thermal storage system cooling schedule of the present invention. DETAILED DESCRIPTION

[0071] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0072] Example 1

[0073] like Figure 2 As shown, this embodiment 1 provides a method for dynamically optimizing and displaying a cooling schedule of an ice storage system, including: establishing an optimization problem model for the cooling capacity of the ice storage system using ice melting, base load refrigeration subsystem and dual-mode refrigeration subsystem during the non-storage period; solving the optimization problem model; and drawing an optimal operation schedule of the ice storage system based on the solution results.

[0074] In this embodiment, the method for establishing the optimization problem model of the cooling capacity of the ice melting refrigeration subsystem, the base load refrigeration subsystem and the dual-mode refrigeration subsystem during the non-storage period of the ice storage system includes:

[0075] Step S1, calculate the load level l(t) at different times t in a day, and l(t) = L(parameter, t), where parameter represents various parameters that affect the load level, and l(t) can be obtained by referring to patent ZL201510164711.7 "Air conditioning load prediction method based on indoor average temperature".

[0076] Step S2, calculate the return water temperature Tr(t) at different times t in a day, and Tr(t)=T(day of the week, t), which can be obtained by the following method: assuming that today is Wednesday, calculate the average return water temperature at time t every Wednesday in recent weeks.

[0077] Step S3, calculate the unit cooling cost S (unit: yuan / unit cooling capacity) of ice storage, and S is equal to the average or weighted average of multiple ice storage costs s, and

[0078]

[0079] in:

[0080] Q is the change in the coldness of the ice storage tank during the entire ice storage process, that is, Q is equal to the coldness in the ice storage tank at the end of the ice storage process minus the coldness in the ice storage tank at the beginning of the ice storage process;

[0081] E is the power consumption of the ice storage subsystem (including dual-mode chiller, ethylene glycol circulation pump, cooling water pump and cooling tower fan) during the entire ice storage process. In addition, since the ice storage subsystem and the base load refrigeration subsystem usually share the cooling water pump and cooling tower fan, the power consumption of the cooling water pump and cooling tower fan needs to be split between the two subsystems according to the heat dissipation of the two subsystems.

[0082] Step S4, calculating the unit refrigeration cost r(t,l) (unit: yuan / unit refrigeration) of ice melting at time t, and r(t,l)=S.

[0083] Specifically, when the unit cooling capacity cost r(t,l) of ice melting at time t is actually calculated, the power required for the ice storage subsystem to release unit cooling capacity (mainly consumed by the cooling water pump) e(t) at different return water temperatures and different ice storage capacities can be counted, that is, r(t,l)=S+e(t). When calculated in kWh, the power consumption of the water pump during ice melting is usually less than 10% of the cooling capacity, and the parameters that affect the ice melting efficiency, such as the ice storage tank temperature (usually -5 to 0 degrees) and the return water temperature (usually 13 to 18 degrees), usually do not change dramatically. Therefore, in this embodiment, r(t,l)=S can be taken.

[0084] Step S5, calculate the unit cooling capacity cost b(t,l) of the base load cooling subsystem at time t (unit: yuan / unit cooling capacity), and

[0085] b(t,l)=l*f(l,Tr)*P(t);

[0086] Where: l is the load level at time t; Tr is the return water temperature at time t; P(t) is the electricity price at that time.

[0087] Specifically, when actually calculating the unit cooling capacity cost b(t,l) of the base load refrigeration subsystem at time t, a variety of methods can be used to obtain it: for example, recording the system efficiency of the base load refrigeration subsystem under different load levels l (unit: power consumption / unit cooling capacity), and using a mathematical regression method to obtain the efficiency curve η=f(l) under different load levels, or recording the system efficiency of the base load refrigeration subsystem under different load levels l and different return water temperatures Tr, and using a mathematical regression method to obtain the efficiency curve η=f(l, Tr) under different load levels; other influencing factors such as weather may also be considered.

[0088] Specifically, this embodiment uses a method of referring to the return water temperature, that is, according to the load level l at time t, the return water temperature Tr and the electricity price P(t) at that time, b(t,l)=l*f(l,Tr)*P(t) can be calculated.

[0089] Step S6, calculating the unit cooling capacity cost d(t,l) (in units: yuan / unit cooling capacity) of the dual-mode refrigeration subsystem at time t, and

[0090] d(t,l)=l*θ(l,Tr)*P(t);

[0091] Where: l is the load level at time t; Tr is the return water temperature at time t; P(t) is the electricity price at that time;

[0092] Specifically, when actually calculating the unit cooling capacity cost d(t,l) of the dual-condition refrigeration subsystem at time t, a variety of methods can be used to obtain it: for example, recording the system efficiency of the dual-condition refrigeration subsystem under different load levels l (unit: power consumption / unit cooling capacity), and using a mathematical regression method to obtain the efficiency curve θ=g(l) under different load levels, or recording the system efficiency of the dual-condition refrigeration subsystem under different load levels l and different return water temperatures Tr, and using a mathematical regression method to obtain the efficiency curve θ=g(l, Tr) under different load levels. Of course, other influencing factors such as weather can also be considered.

[0093] Specifically, this embodiment tends to use the method of referring to the return water temperature, that is, knowing the load level l, the return water temperature Tr and the electricity price P(t) at time t, d(t, l) = l*θ(l, Tr)*P(t) can be calculated.

[0094] Step S7: Divide the non-ice storage period into n segments of length Δ, and set Cr i , Cb i , Cd i At different times t i The cooling capacity of ice melting, the cooling capacity of the base load refrigeration subsystem and the cooling capacity of the dual-mode refrigeration subsystem, the optimization problem model J is:

[0095]

[0096] in:

[0097]

[0098] Cr i +Cb i +Cd i = l(t i );

[0099] 0≤Cr i ≤r max_i ; 0≤Cb i ≤ b max_i ; 0≤Cd i ≤d max_i ;

[0100] r max_i >0, b max_i >0,d max_i >0;

[0101] i=0,1,…,n-1;

[0102] r max_i 、b max_i d max_i At different times t iThe maximum value of ice melting cooling capacity, the maximum cooling capacity of the base load refrigeration subsystem and the maximum cooling capacity of the dual-mode refrigeration subsystem.

[0103] Specifically, in order to avoid using complex methods to solve the optimization problem model J, according to the characteristics of the cost function: that is, under reasonable usage, the maximum value of the unit cooling capacity cost of the ice-melting subsystem in the non-off-peak electricity price period is < the minimum value of the unit cooling capacity cost of the base load refrigeration subsystem; and the maximum value of the unit cooling capacity cost of the base load refrigeration subsystem is < the minimum value of the unit cooling capacity cost of the dual-mode refrigeration subsystem. Therefore, the following simplified method can be used to solve the optimization problem model J, that is, the method for solving the optimization problem model J includes: step S11, allocating ice-melting time periods; step S12, allocating base load refrigeration time periods; and step S13, allocating dual-mode refrigeration time periods.

[0104] Specifically, in this embodiment, the method of allocating ice-melting time periods in step S11 includes:

[0105] Step S111: if for all i, Cr i = l i , indicating that all load level requirements have been met, then exit;

[0106] Step S112, if the total cold storage ColdStorage = 0, it means that the cold storage is exhausted, then go to step S12;

[0107] Step S113: If i does not exist, Cr i =0 and l i >0, indicating that the load level demand during this period has not been met and the ice melting cooling capacity has not been allocated, then go to S12;

[0108] Step S114, otherwise find i, corresponding to Cr i =0 and l i >0, then

[0109] Let c = Min(l i , r max_i , ColdStorage), where Min() represents the minimum value among the load level, the maximum value of ice melting refrigeration capacity and the current cold storage capacity at that moment, so that b(t i ,c)-r(t i ,c) maximum, i.e., the period when the cost saving of ice melting is the largest relative to the base load refrigeration subsystem;

[0110] Let Cr i =c, ColdStorage=ColdStorage-c, return to execute step S11.

[0111] Specifically, the method of allocating the base load cooling time period in step S12 includes:

[0112] Step S121, if for all i, Cr i +Cb i = l i , indicating that all load level requirements have been met, then exit;

[0113] Step S122, if i does not exist, Cb i =0 and Cr i <l i , indicating that the load level demand during this period has not been met and the base load cooling capacity has not been allocated, then go to step S13;

[0114] Step S123, otherwise find i, corresponding to Cb i =0 and Cr i <l i ,

[0115] Let c = Min(l i -Cr i ,b max_i ), where Min() represents the smaller value between the load level gap that cannot be satisfied by ice melting at this moment and the maximum cooling capacity of the base load, so that d(t i ,c)-b(t i ,c) maximum, i.e., the period when the baseload refrigeration subsystem saves the most cost relative to the dual-mode refrigeration subsystem;

[0116] Let Cb i =c, return to execute step S12.

[0117] Specifically, in this embodiment, the method of allocating the dual-mode cooling time period in step S13 includes:

[0118] Step S131: if for all i, Cr i +Cb i +Cd i = l i , indicating that all load level requirements have been met, then exit;

[0119] Step S132, if i does not exist, Cd i =0 and Cr i +Cb i <l i , indicating that the load level demand during this period has not been met and the dual-effect cooling capacity has not been allocated, then exit;

[0120] Step S133, otherwise find i, corresponding to Cd i =0 and Cr i +Cb i <l i ,

[0121] Let c = Min(l i -Cr i -Cb i ,d max_i ), where Min() represents the smaller value between the load level gap that cannot be satisfied by ice melting and base load cooling at that moment and the maximum cooling capacity value of dual working conditions;

[0122] Let Cd i =c, return to execute step S13.

[0123] Further, the method of drawing the optimal operation schedule of the ice storage system according to the solution results includes: i , Cb i , Cd i Drawing the best operation schedule of the ice storage system improves the benefits of the ice storage system and is convenient for operators to refer to or send directly to the corresponding control system.

[0124] As time goes by, the total amount of cold storage remaining in the above calculation process, the predicted hourly load level data and the hourly return water temperature will change. At the same time, the unit cooling capacity cost of ice storage and ice melting, the unit cooling capacity cost of the base load refrigeration subsystem, the unit cooling capacity cost of the dual-condition refrigeration subsystem, etc. at different times, load levels and return water temperatures will also change over time. The present invention recalculates Cr for the remaining non-cold storage time period of the day at a certain time interval (for example, 10 minutes, 15 minutes, etc.) or when the working conditions change significantly (for example, the temperature suddenly drops). i , Cb i , Cd i , i=k,…,n-1, where k corresponds to the starting point of the recalculation, and k≥0, and the future ice melting schedule is regenerated according to the calculation results. This schedule can be directly sent to the corresponding control system while being convenient for the operator to refer to. That is, the dynamic optimization and display method of the ice storage system cooling schedule can recalculate at different time points using updated data and update the optimal operation schedule according to the calculation results. The optimal schedule can be in the following form: First, use a bar to divide Cr i Displayed in a coordinate system with time as the horizontal axis, where i=0,…,23 and cooling power as the vertical axis, the left side of the bar corresponds to the starting time point, the right side corresponds to the end of the time period, the length of the bar corresponds to the size of the ice melting and cooling power, and then the base load cooling Cb is superimposed i Finally, the dual-condition cooling Cd is displayed. i .

[0125] In summary, the dynamic optimization and display method of the cooling schedule of the ice storage system uses the hourly load level data, the hourly return water temperature, and the calculated unit cooling capacity cost of ice melting at different times, different load levels and different return water temperatures, the unit cooling capacity cost of the base load refrigeration subsystem, and the unit cooling capacity cost of the dual-condition refrigeration subsystem to establish an optimization problem to solve the optimal schedule of ice melting, base load refrigeration and dual-condition refrigeration in the non-storage period of the ice storage system, such as Figure 3 As shown, the operating efficiency of the ice storage system is effectively improved and the work of the operators is simplified.

[0126] The various device components selected in this application are all universal standard parts or components known to those skilled in the art, and their structures and principles can be known to those skilled in the art through technical manuals or conventional experimental methods.

[0127] In the description of the embodiments of the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0128] Based on the above ideal embodiments of the present invention, the relevant staff can make various changes and modifications without departing from the technical concept of the present invention through the above description. The technical scope of the present invention is not limited to the contents of the specification, and its technical scope must be determined according to the scope of the claims.

Claims

1. A method for dynamically optimizing and displaying a cooling schedule of an ice storage system, characterized in that: include: Establish the optimization model of the cooling capacity of the ice storage system using ice melting, base load refrigeration subsystem and dual-mode refrigeration subsystem during the non-storage period; Solve optimization problem models; as well as Draw the optimal operation schedule of the ice storage system based on the solution results; Methods for establishing an optimization problem model for the cooling capacity of the ice storage system using the ice melting refrigeration subsystem, the base load refrigeration subsystem and the dual-mode refrigeration subsystem during the non-storage period include: Step S1, calculating the load level l(t) at different times t in a day; Step S2, calculating the return water temperature Tr(t) at different times t in a day, and Tr(t)=T(day of the week, t); Step S3, calculating the unit cooling cost S of ice storage, where S is equal to the average or weighted average of multiple ice storage costs s, and in: Q is the change in the coldness of the ice storage tank during the entire ice storage process, that is, Q is equal to the coldness in the ice storage tank at the end of the ice storage process minus the coldness in the ice storage tank at the beginning of the ice storage process; E is the power consumption of the ice storage subsystem during the entire ice storage process; Step S4, calculating the unit refrigeration cost r(t,l) of ice melting at time t, and r(t,l)=S; Step S5, calculate the unit cooling capacity cost b(t,l) of the base load cooling subsystem at time t, and b(t,l)=l*f(l,Tr)*P(t); Where: l is the load level at time t; Tr is the return water temperature at time t; P(t) is the electricity price at that time; f(l,Tr) is the system efficiency of the base chiller subsystem at different load levels and return water temperatures; Step S6, calculating the unit cooling capacity cost d(t,l) of the dual-mode refrigeration subsystem at time t, and d(t, l)=l*θ(l, Tr)*P(t); Where: l is the load level at time t; Tr is the return water temperature at time t; P(t) is the electricity price at that time; θ(l, Tr) is the system efficiency of the dual-mode refrigeration subsystem at different load levels and different return water temperatures; Step S7: Divide the non-ice storage period into n segments of length Δ, and set Cr i , Cb i , Cd i At different times t i The cooling capacity of ice melting, the cooling capacity of the base load refrigeration subsystem and the cooling capacity of the dual-mode refrigeration subsystem, the optimization problem model J is: in: Cr i +Cb i +Cd i =l(t i ); 0≤Cr i ≤r max_i ;0≤Cb i ≤b max_i ;0≤Cd i ≤d max_i ; r max_i >0、b max_i >0、d max_i >0; i=0, 1, ..., n-1; r max_i 、b max_i d max_i At different times t i The maximum value of ice melting cooling capacity, the maximum cooling capacity of the base load refrigeration subsystem and the maximum cooling capacity of the dual-mode refrigeration subsystem.

2. The method for dynamically optimizing and displaying a cooling schedule of an ice storage system according to claim 1, characterized in that: Methods for solving the optimization problem model J include: Step S11, allocating ice-melting time periods; Step S12, allocating a base load cooling time period; and Step S13, allocating a dual-mode cooling time period.

3. The method for dynamically optimizing and displaying a cooling schedule of an ice storage system according to claim 2, characterized in that: The method of allocating ice-melting time periods in step S11 includes: Step S111: if for all i, Cr i = l i , indicating that all load level requirements have been met, then exit; Step S112, if the total cold storage ColdStorage = 0, it means that the cold storage is exhausted, then go to step S12; Step S113: If i does not exist, Cr i =0 and l i >0, indicating that the load level demand during this period has not been met and the ice melting cooling capacity has not been allocated, then go to S12; Step S114, otherwise find i, corresponding to Cr i =0 and l i >0, then Let c = Min(l i , r max_i , ColdStorage), where Min( ) represents the minimum value among the load level, the maximum value of ice melting refrigeration capacity and the current cold storage capacity at that moment, so that b(t i ,c)-r(t i , c) maximum, i.e., the period of time when the cost savings of ice melting are the greatest relative to the base load refrigeration subsystem; Let Cr i =c, ColdStorage=ColdStorage-c, return to execute step S11.

4. The method for dynamically optimizing and displaying a cooling schedule of an ice storage system according to claim 3, characterized in that: The method of allocating the base load cooling time period in step S12 includes: Step S121, if for all i, Cr i +Cb i = l i , indicating that all load level requirements have been met, then exit; Step S122, if i does not exist, Cb i =0 and Cr i <l i , indicating that the load level demand during this period has not been met and the base load cooling capacity has not been allocated, then go to step S13; Step S123, otherwise find i, corresponding to Cb i =0 and Cr i <l i , Let c = Min(l i -Cr i , b max_i ), where Min( ) represents the smaller value between the load level gap that cannot be satisfied by ice melting at this moment and the maximum cooling capacity of the base load, so that d(t i , c)-b(t i , c) maximum, i.e., the period during which the base load refrigeration subsystem saves the most cost relative to the dual-mode refrigeration subsystem; Let Cb i =c, return to execute step S12.

5. The method for dynamically optimizing and displaying a cooling schedule of an ice storage system according to claim 4, characterized in that: The method of allocating dual-mode cooling time periods in step S13 includes: Step S131: if for all i, Cr i +Cb i +Cd i = l i , indicating that all load level requirements have been met, then exit; Step S132, if i does not exist, Cd i =0 and Cr i +Cb i <l i , indicating that the load level demand during this period has not been met and the dual-effect cooling capacity has not been allocated, then exit; Step S133, otherwise find i, corresponding to Cd i =0 and Cr i +Cb i <l i , Let c = Min(l i -Cr i -Cb i ,d max_i ), where Min() represents the smaller value between the load level gap that cannot be satisfied by ice melting and base load cooling at that moment and the maximum cooling capacity value of dual working conditions; Let Cd i =c, return to execute step S13.

6. The method for dynamically optimizing and displaying a cooling schedule of an ice storage system according to claim 5, characterized in that: Methods for drawing the optimal operation schedule of the ice storage system based on the solution results include: According to Cr i , Cb i , Cd i Plot the optimal operating schedule for the ice storage system.

Citation Information

Patent Citations

  • Air conditioning load prediction method based on indoor average temperature

    CN104729024A

  • Cooling load prediction based optimal control method of ice-storage system

    CN103574845A

  • Internal-melt ice storage air-conditioning system and operating method thereof

    CN104613577A

  • Micro-grid optimal scheduling method considering ice-storage air conditioning and having power and cooling coupled characteristic

    CN105631557A

  • Cold load demand prediction and ice storage air conditioner load distribution methods and systems

    CN111076376A