A protective device for the main cylinder of a hydraulic radial forging machine
By designing the external protective sleeve, slag barrier ring, inner protective sleeve and purge air duct in the main cylinder of the hydraulic diameter forging machine, the problem of invasion of iron oxide chips and solid particles is solved, and the cooling and cooling of the main cylinder plunger is achieved. The reliability of the system has been improved, which significantly reduces maintenance costs and pollution risks.
Patent Information
- Application Number
- CN202010653199.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-07-08
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2040-07-08
AI Technical Summary
During the forging process, the main cylinder of the hydraulic diameter forging machine is prone to oil leakage, system pollution and wear of hydraulic control components, resulting in reduced equipment reliability and ineffective prevention of invasion of iron oxide chips and solid particles, causing fire risk.
A protective device is designed, including a plunger outer protective sleeve, a slag stop ring, a plunger inner protective sleeve and a plunger plunger plunger. By forming a blowing passage and a plunger plunger, the negative pressure between the inner sleeve and the plunger is eliminated. Prevent fine particles from invading and cool the plunger through a compressed air source.
It effectively avoids the inhalation of iron oxide filings and solid particulate matter, improves system reliability, reduces maintenance costs and pollution risks, saves copper sleeve sealing costs and fuel consumption, and significantly improves the working efficiency and safety of the equipment.
Smart Images

Figure CN111790867B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of hydraulic cylinder protection, and in particular to a protection device for a main cylinder of a hydraulic radial forging machine. Background Art
[0002] The hydraulic radial forging machine is a fast and precise automatic forging equipment, which uses a symmetrical hammer to automatically forge metal blanks at high frequencies in the radial direction. The hammer is completed by the reciprocating motion of a symmetrical main cylinder.
[0003] The inventors found in actual production that the existing technology still has the following defects and deficiencies:
[0004] (1) During the forging process, the heating of the metal billet will produce a large amount of iron oxide. Due to the structural characteristics and design defects of the radial forging machine itself, when the master cylinder is working, foreign solid particles can easily invade the bottom of the master cylinder during the reciprocating motion of the master cylinder. The iron oxide chips adsorbed on the surface of the plunger can easily cause the plunger surface to be strained, the copper sleeve to be worn, the copper sleeve seal to be damaged, and the master cylinder to leak oil. Once the master cylinder leaks oil, it is very easy to cause a major fire under the influence of high temperature.
[0005] (2) Iron oxide chips and various solid particles that invade the master cylinder can also enter the main oil tank through the oil, causing system pollution.
[0006] (3) System contamination will greatly reduce the reliability of the system and easily cause wear and jam of hydraulic control components. Summary of the invention
[0007] In view of the deficiencies in the prior art, the present invention provides a protective device for the master cylinder of a hydraulic radial forging machine, which solves the technical problems of poor protective performance, inability to eliminate the negative pressure between the inner sleeve and the master cylinder plunger, and inability to dissipate the heat accumulated on the surface of the master cylinder plunger.
[0008] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a protective device for the main cylinder of a hydraulic radial forging machine, the radial forging machine comprising: a main cylinder, a main cylinder plunger telescopically arranged in the main cylinder, a hammer head seat fixedly mounted on the main cylinder plunger, and a slag blocking cavity for blocking slag formed at the upper end of the plunger cavity of the main cylinder, the protective device comprising a plunger outer protective sleeve fixedly mounted on the hammer head seat, the plunger outer protective sleeve is sleeved on the main cylinder plunger, and the lower end of the plunger outer protective sleeve is located in the slag blocking cavity; the protective device also comprises a slag blocking ring fixedly mounted on the inner wall of the slag blocking cavity, the slag blocking ring is sleeved on the plunger outer protective sleeve; the protective device also comprises a plunger inner protective sleeve and an inner protective sleeve flange arranged in the slag blocking cavity, the plunger inner protective sleeve is sleeved on the main cylinder plunger, the upper end of the plunger inner protective sleeve is inserted between the plunger outer protective sleeve and the main cylinder plunger, and the inner protective sleeve flange is sleeved on the lower end of the plunger inner protective sleeve.
[0009] Preferably, the inner protective sleeve flange is welded to the plunger inner protective sleeve or the inner protective sleeve flange and the plunger inner protective sleeve are integrally formed.
[0010] Preferably, the lower end of the plunger inner protective sleeve and the lower end of the inner protective sleeve flange are both arranged in contact with the inner bottom wall of the slag blocking cavity.
[0011] Preferably, the radial forging machine includes an intermediate sleeve mounted on the main cylinder plunger, the intermediate sleeve is L-shaped, the transverse portion of the intermediate sleeve is fixedly installed in the slag blocking cavity, and the vertical portion of the intermediate sleeve is arranged between the main cylinder and the main cylinder plunger; the lower end portion of the inner protective sleeve of the plunger and the inner protective sleeve flange are both installed on the transverse portion.
[0012] Preferably, the protective device also includes an air blowing channel and a purge air duct, the air blowing channel is formed on the inner protective sleeve flange and the plunger inner protective sleeve or is formed by the bottom wall of the slag blocking cavity and the inner protective sleeve flange and the plunger inner protective sleeve, one end of the air blowing channel opens to a surface of the inner protective sleeve flange, and the other end of the air blowing channel opens to a surface of the plunger inner protective sleeve facing the main cylinder plunger; the inner cavity of the purge air duct is connected to the inner cavity of the air channel at the surface of the inner protective sleeve flange, one end of the purge air duct is connected to the inner protective sleeve flange, and the other end is connected to the compressed air source through the slag blocking ring.
[0013] Preferably, the protective device also includes an air blowing channel and a purge air duct, the air blowing channel is formed by the lateral part, the inner protective sleeve flange and the plunger inner protective sleeve, one end of the air blowing channel opens to a surface of the inner protective sleeve flange, and the other end of the air blowing channel opens to a surface of the plunger inner protective sleeve facing the main cylinder plunger; the inner cavity of the purge air duct is connected to the inner cavity of the air blowing channel at the surface of the inner protective sleeve flange, one end of the purge air duct is connected to the inner protective sleeve flange, and the other end is connected to the compressed air source through a slag retaining ring.
[0014] Preferably, the blowing channel includes: at least one second air vent hole for ventilation is formed on the inner protective sleeve flange, and at least one first air vent hole for ventilation is formed on the plunger inner protective sleeve; the first air vent hole is connected to the second air vent hole, the second air vent hole is L-shaped or straight-shaped, and the inner cavity of the second air vent hole is connected to the inner cavity of the purge air duct.
[0015] Preferably, the blowing channel includes: at least one second ventilation hole for ventilation is formed on the inner protective sleeve flange, and at least one first ventilation pipe for ventilation is formed between the plunger inner protective sleeve and the inner bottom wall of the slag blocking chamber; the first ventilation pipe is connected to the second ventilation hole, and the inner cavity of the second ventilation hole is connected to the inner cavity of the purge air duct.
[0016] Preferably, the blowing channel includes: at least one second ventilation duct for ventilation is formed between the inner protective sleeve flange and the inner bottom wall of the slag blocking chamber, at least one first ventilation hole for ventilation is formed on the plunger inner protective sleeve or a first ventilation duct for ventilation is formed between the plunger inner protective sleeve and the inner bottom wall of the slag blocking chamber; the second ventilation duct is connected to the first ventilation hole or the first ventilation duct, and the inner cavity of the second ventilation duct is connected to the inner cavity of the purge air duct.
[0017] Preferably, the blowing channel includes: at least one second ventilation hole for ventilation is formed on the inner protective sleeve flange, and at least one third ventilation duct for ventilation is formed between the plunger inner protective sleeve and the transverse part; the third ventilation duct is connected to the second ventilation hole, and the inner cavity of the second ventilation hole is connected to the inner cavity of the purge air duct.
[0018] Preferably, the blowing channel includes: at least one fourth ventilation duct for ventilation is formed between the inner protective sleeve flange and the transverse portion, at least one first ventilation hole for ventilation is formed on the plunger inner protective sleeve or at least one third ventilation duct for ventilation is formed between the plunger inner protective sleeve and the transverse portion; the fourth ventilation duct is connected to the first ventilation hole or the third ventilation duct, and the inner cavity of the fourth ventilation duct is connected to the inner cavity of the purge air duct.
[0019] Preferably, one end of the purge air duct is threadedly connected to the inner protective sleeve flange, and the diameter of the first vent hole is smaller than the diameter of the second vent hole.
[0020] The technical solution provided by the embodiment of the present invention has the following beneficial effects:
[0021] The present invention can effectively eliminate the negative pressure phenomenon between the inner sleeve and the plunger by arranging a purge device in the slag blocking cavity, completely avoid the invasion of fine particles (iron oxide scale), and at the same time achieve the cooling effect of the main cylinder plunger.
[0022] Before the present invention was adopted, the copper sleeve seal of the main cylinder was replaced once a month on average, and each replacement required 18-20 hours of downtime for maintenance. At the same time, hydraulic failures caused by system pollution occurred frequently, and the replacement cycle of the main system circulation filter element was less than 1 month. After the installation of the present invention, the cost of the copper sleeve seal of the main cylinder can be saved by about 11 sets * 50,000 = 550,000 yuan / year; the main engine hot downtime can be saved by 8 hours per month, and the invisible production can be increased by 42.672 tons / month, with an annualized benefit of 42.672*2000*12 = 1.024 million yuan / year; the labor cost can be saved by 8*200*12 = 19,200 yuan / year; the fuel consumption can be saved by 96 barrels / year, with a total cost saving of 96*3141 yuan = 301,500 yuan / year; the total annualized benefit is 1.8947 million yuan per year.
[0023] In short, before the present invention is adopted, the equipment maintenance cost is huge and the potential pollution risk of the system is high.
[0024] The invention has the advantages of simple structure, good performance and convenient use, and mainly solves the problem of negative wind pressure of the inner and outer protective sleeves of the main cylinder, thereby avoiding the inhalation of solid particles (iron oxide sheets). BRIEF DESCRIPTION OF THE DRAWINGS
[0025] The drawings constituting a part of the present application are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. Among them:
[0026] Figure 1 is a cross-sectional view of the master cylinder of the present invention;
[0027] Figure 2 A cross-sectional view of the present invention after adding an intermediate sleeve;
[0028] Figure 3 for Figure 1 Volume change comparison chart;
[0029] Figure 4 for Figure 1 Volume change comparison chart;
[0030] Figure 5 for Figure 2 A cross-sectional view of an embodiment for eliminating negative pressure phenomenon;
[0031] Figure 6 It is a schematic diagram of compressed air flow of the present invention;
[0032] Figure 7 is a cross-sectional view of the present invention in use;
[0033] Figure 8 for Figure 1 A cross-sectional view of an embodiment for eliminating negative pressure phenomenon;
[0034] Fig. 9 for Figure 1 A cross-sectional view of an embodiment for eliminating negative pressure phenomenon;
[0035] Fig.10 for Figure 1 A cross-sectional view of an embodiment for eliminating negative pressure phenomenon;
[0036] Fig.11 for Figure 1 A cross-sectional view of an embodiment for eliminating negative pressure phenomenon;
[0037] Fig.12 for Figure 2 A cross-sectional view of an embodiment for eliminating negative pressure phenomenon;
[0038] Fig.13 for Figure 2 A cross-sectional view of an embodiment for eliminating negative pressure phenomenon;
[0039] Fig.14 for Figure 2 A cross-sectional view of an embodiment for eliminating negative pressure phenomenon.
[0040] Description of reference numerals:
[0041] Main cylinder plunger 1, inner protective sleeve flange 2, plunger inner protective sleeve 3, slag stop ring 4, plunger outer protective sleeve 5, hammer head seat 6, purge air duct 7, main cylinder 8, intermediate sleeve 9, vertical part 91, upper transverse part 92, slag stop cavity 10, upper end 11, lower end 12, first volume 13, second volume 14, solid particles 15, third volume 16, fourth volume 17, first ventilation hole 18, second ventilation hole 19, first ventilation pipe 20, second ventilation pipe 21, third ventilation pipe 22, fourth ventilation pipe 23. DETAILED DESCRIPTION
[0042] The present invention will be described in detail below with reference to the accompanying drawings and in conjunction with embodiments. Each example is provided by way of explanation of the present invention and does not limit the present invention. In fact, it will be clear to those skilled in the art that modifications and variations may be made in the present invention without departing from the scope or spirit of the present invention. For example, a feature shown or described as a part of one embodiment may be used in another embodiment to produce yet another embodiment. Therefore, it is desired that the present invention encompasses such modifications and variations within the scope of the appended claims and their equivalents.
[0043] In the description of the present invention, the terms "longitudinal", "lateral", "upper", "lower", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings. They are only for the convenience of describing the present invention and do not require that the present invention must be constructed and operated in a specific orientation. Therefore, they cannot be understood as limitations on the present invention. The terms "connected", "connected" and "set" used in the present invention should be understood in a broad sense. For example, it can be a fixed connection or a detachable connection; it can be a direct connection or an indirect connection through an intermediate component; it can be a wired electrical connection, a radio connection, or a wireless communication signal connection. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to specific circumstances.
[0044] See also Figures 1 to 14 As shown, according to an embodiment of the present invention, a protective device for the main cylinder 8 of a hydraulic radial forging machine is provided. The radial forging machine includes a main cylinder 8, a main cylinder plunger 1 telescopically arranged in the main cylinder 8, a hammer head seat 6 fixedly mounted on the main cylinder plunger 1, and a slag blocking cavity 10 for blocking slag formed at the upper end of the plunger cavity of the main cylinder 8.
[0045] The protective device includes a plunger outer protective sleeve 5 fixedly mounted on the hammer head seat 6, the plunger outer protective sleeve 5 is sleeved on the main cylinder plunger 1, and the lower end of the plunger outer protective sleeve 5 is located in the slag blocking cavity 10; the protective device also includes a slag blocking ring 4 fixedly mounted on the inner wall of the slag blocking cavity 10, and the slag blocking ring 4 is sleeved on the plunger outer protective sleeve 5; the protective device also includes a plunger inner protective sleeve 3 and an inner protective sleeve flange 2 arranged in the slag blocking cavity 10, the plunger inner protective sleeve 3 is sleeved on the main cylinder plunger 1, the upper end 11 of the plunger inner protective sleeve 3 is inserted between the plunger outer protective sleeve 5 and the main cylinder plunger 1, the inner protective sleeve flange 2 is sleeved on the plunger inner protective sleeve 3, and the plunger outer protective sleeve 5 is slidably connected relative to the plunger inner protective sleeve 3. The lower end 12 of the plunger inner protective sleeve 3 and the lower end of the inner protective sleeve flange 2 are both arranged in contact with the inner bottom wall of the slag blocking cavity 10.
[0046] The plunger outer protective sleeve 5 of the present invention is fixedly mounted on the hammer head seat 6 and sleeved on the master cylinder plunger 1, and the slag retaining ring 4 is fixedly mounted on the inner wall of the slag retaining cavity 10 and sleeved on the plunger outer protective sleeve 5, so that the present invention forms a first protective layer; the plunger inner protective sleeve 3 of the present invention is sleeved on the master cylinder plunger 1, and the upper end of the plunger inner protective sleeve 3 is inserted between the plunger outer protective sleeve 5 and the master cylinder plunger 1 and the inner protective sleeve flange 2 is sleeved on the plunger inner protective sleeve 3, thereby forming a second protective layer; the first protective layer and the second protective layer enable the present invention to effectively solve the technical problems that the iron oxide chips adsorbed on the master cylinder plunger 1 easily cause the surface of the master cylinder plunger 1 to be strained, the copper sleeve to be worn, the copper sleeve to be damaged, the master cylinder to leak oil, and the iron oxide chips and various solid particles that invade the inside of the master cylinder 8 will also invade the main oil tank through the oil, causing system pollution. The system after using the present invention greatly improves the reliability of the system operation, and there will be no wear and jamming of the hydraulic control components.
[0047] In the embodiment of the present invention, the inner protective sleeve flange 2 can be welded to the plunger inner protective sleeve 3 , or can be formed integrally with the plunger inner protective sleeve 3 .
[0048] See also Figure 2 As shown, in one embodiment, in order to further prevent the iron oxide chips and various solid particles from invading the main cylinder 8, the radial forging machine of the present invention also includes an intermediate sleeve 9 mounted on the plunger 1 of the main cylinder 8. The shape of the intermediate sleeve 9 is L-shaped (strictly speaking, it is an inverted L-shape, i.e., '-shaped). The horizontal portion 92 of the intermediate sleeve 9 is fixedly installed in the slag blocking cavity 10. The vertical portion 91 of the intermediate sleeve 9 is arranged between the main cylinder 8 and the main cylinder plunger 1 as shown in the figure; the lower end portion 12 of the plunger inner protective sleeve 3 and the inner protective sleeve flange 2 can be installed on the horizontal portion 92. See Figure 3 When the master cylinder 8 moves rapidly from the starting position to the working position, the internal volume changes from the second volume 14 to the first volume 13 , and the volume of the second volume 14 is smaller than that of the first volume 13 .
[0049] See also Figure 4 In the process of the second volume 14 changing to the first volume 13 , a certain negative pressure will be formed, and at this time, the negative pressure chamber may inhale the gas carrying the solid particles 15 .
[0050] In the embodiment of the present invention, in order to effectively eliminate the negative pressure phenomenon between the inner sleeve and the plunger, the present invention completely avoids the invasion of fine particles (iron oxide scale), and at the same time can achieve the cooling effect of the main cylinder plunger 1. The protective device of the present invention also includes a blowing channel and a purge air duct 7. The blowing channel is formed on the inner protective sleeve flange 2 and the plunger inner protective sleeve 3, or is formed by the bottom wall of the slag retaining cavity 10 and the inner protective sleeve flange 2 and the plunger inner protective sleeve 3, or is formed by the transverse part and the inner protective sleeve flange 2 and the plunger inner protective sleeve 3. One end of the blowing channel opens on one side of the inner protective sleeve flange 2, and another end of the blowing channel opens on the side of the plunger inner protective sleeve 3 facing the main cylinder plunger; the inner cavity of the purge air duct 7 is connected to the inner cavity of the blowing channel, one end of the purge air duct 7 is threadedly connected to the inner protective sleeve flange 2, and the other end is connected to the compressed air source through the slag retaining ring 10.
[0051] Please also see Figure 1 and Fig.11 In one embodiment, the blowing channel includes two second vent holes 19 for ventilation formed on the inner protective sleeve flange 2, and two first vent holes 18 for ventilation formed on the plunger inner protective sleeve 3. The first vent hole 18 is connected to the second vent hole 19, and the diameter of the first vent hole 18 is smaller than the diameter of the second vent hole 19. In this embodiment, the present invention sets the shape of the second vent hole 19 to be L-shaped, and one end of the L-shaped through hole opens on the upper surface of the flange 2, that is, a surface facing the slag retaining ring 4. In other embodiments, the shape of the second vent hole 19 can also be set to be a straight line (in this case, one end of the through hole opens to a surface of the flange 2 facing the inner wall of the slag retaining cavity). The inner cavity of the purge air duct 7 is connected to the inner cavity of the second vent hole 19. At this time, the connection between the purge air duct 7 and the flange surface can adopt any connection method under the existing technology.
[0052] Please also see Figure 1 and see Figure 8 It can be understood that in another embodiment, the blowing channel includes two second ventilation holes 19 for ventilation formed on the inner protective sleeve flange 2, and a first ventilation duct 20 for two ventilations is formed between the plunger inner protective sleeve 3 and the inner bottom wall of the slag retaining cavity 10. The first ventilation duct 20 is connected to the second ventilation hole 19. In this embodiment, the present invention sets the shape of the second ventilation hole 19 to be L-shaped, and one end of the L-shaped through hole is opened on the upper surface of the flange 2, that is, the surface facing the slag retaining ring 4. In other embodiments, the shape of the second ventilation hole 19 can also be set to be straight. The inner cavity of the purge air duct 7 is connected to the inner cavity of the second ventilation hole 19.
[0053] Please also see Figure 1 and Fig. 9It can be understood that in another embodiment, the blowing channel includes two second ventilation pipes 21 for ventilation formed between the inner protective sleeve flange 2 and the inner bottom wall of the slag blocking chamber 10, and two first ventilation holes 18 for ventilation are formed on the plunger inner protective sleeve 3. The second ventilation pipe 21 is connected to the first ventilation hole 18. The inner cavity of the purge air duct 7 is connected to the inner cavity of the second ventilation pipe 21.
[0054] Please also see Figure 1 and Fig.10 It can be understood that in another embodiment, the blowing channel includes two second ventilation pipes 21 formed between the inner protective sleeve flange 2 and the inner bottom wall of the slag blocking cavity 10 for passing through, and a first ventilation pipe 20 formed between the plunger inner protective sleeve 3 and the inner bottom wall of the slag blocking cavity 10 for passing through. The second ventilation pipe 21 is connected to the first ventilation pipe 20. The inner cavity of the purge air duct 7 is connected to the inner cavity of the second ventilation pipe 21.
[0055] Please also see Figure 2 and Figure 5 It can be understood that in another embodiment, the blowing channel includes two second vent holes 19 for ventilation formed on the inner protective sleeve flange 2, and two first vent holes 18 for ventilation are formed on the plunger inner protective sleeve 3. The first vent hole 18 is connected to the second vent hole 19, and the diameter of the first vent hole 18 is preferably smaller than the diameter of the second vent hole 19. In this embodiment, the present invention sets the shape of the second vent hole 19 to be L-shaped, and one end of the L-shaped through hole is opened on the upper surface of the flange 2, that is, the surface facing the slag ring 4. In other embodiments, the shape of the second vent hole 19 can also be set to be straight. The inner cavity of the purge air duct 7 is connected to the inner cavity of the second vent hole 19.
[0056] Please also see Figure 2 and Fig.12 It can be understood that in another embodiment, the blowing channel includes two second ventilation holes 19 for ventilation formed on the inner protective sleeve flange 2, and two third ventilation pipes 22 for ventilation are formed between the inner protective sleeve 3 of the plunger and the transverse portion 92. The third ventilation pipe 22 is connected to the second ventilation hole 19. In this embodiment, the present invention sets the shape of the second ventilation hole 19 to be L-shaped, and one end of the L-shaped through hole is opened on the upper surface of the flange 2, that is, the surface facing the slag ring 4. In other embodiments, the shape of the second ventilation hole 19 can also be set to be straight. The inner cavity of the purge air duct 7 is connected to the inner cavity of the second ventilation hole 19.
[0057] Please also see Figure 2 and Fig.13It can be understood that in another embodiment, the blowing channel includes two fourth ventilation pipes 23 for ventilation formed between the inner protective sleeve flange 2 and the transverse portion 92, and two first ventilation holes 18 for ventilation are formed on the plunger inner protective sleeve 3. The fourth ventilation pipe 23 is connected to the first ventilation hole 18. The inner cavity of the purge air duct 7 is connected to the inner cavity of the fourth ventilation pipe 23.
[0058] Please also see Figure 2 and Fig.14 It can be understood that in another embodiment, the blowing channel includes two fourth ventilation pipes 23 formed between the inner protective sleeve flange 2 and the transverse portion 92 for passing through, and two third ventilation pipes 22 formed between the plunger inner protective sleeve 3 and the transverse portion 92 for passing through. The fourth ventilation pipe 23 is connected to the third ventilation pipe 22. The inner cavity of the purge air duct 7 is connected to the inner cavity of the fourth ventilation pipe 23.
[0059] See also Figure 6 As shown, the flow direction of the compressed air source in the slag blocking chamber 10 is illustrated by taking the compressed air source flowing in the first vent 18 and the second vent 19 as an example. The compressed air source flowing in other formed vents has the same flow direction as the compressed air source flowing in the first vent 18 and the second vent 19. The present invention will not give examples one by one for illustration. The compressed air source first blows to the second vent 19 through the purge air duct 7, then blows to the first vent 18 through the second vent 19, and then blows to the third volume 16 through the first vent 18, wherein the third volume 1 6 is surrounded by the main cylinder plunger 1, the plunger inner protective sleeve 3, and the plunger outer protective sleeve 5, and then blows to the gap between the plunger inner protective sleeve 3 and the plunger outer protective sleeve 5 through the third volume 16, and then blows to the fourth volume 17 through the gap between the plunger inner protective sleeve 3 and the plunger outer protective sleeve 5, wherein the fourth volume 17 is surrounded by the plunger inner protective sleeve 3, the plunger outer protective sleeve 5, the inner protective sleeve flange 2, and the purge air duct 7, and then blows to the gap between the plunger outer protective sleeve 5 and the slag stop ring 4 through the fourth volume 17, and then blows to the outside through the gap between the plunger outer protective sleeve 5 and the slag stop ring 4.
[0060] The present invention blows air toward the third volume 16 and the fourth volume 17 through the purge air duct 7, the first air vent 18 and the second air vent 19, and the air pressure of the blown air must be greater than the negative air pressure value generated by the reciprocating motion. At the same time, the purge air duct 7, the first air vent 18 and the second air vent 19 are connected to each other, so that the present invention minimizes the possibility of fine solid particles entering the main cylinder 8 through the inner protective sleeve flange 2, the plunger inner protective sleeve 3 and the plunger outer protective sleeve 5, and at the same time has a cooling effect on the plunger. The use of the present invention not only greatly reduces the maintenance cost, but also eliminates a larger pollution source, with significant effect.
[0061] The present invention solves the following technical problems through the purge air duct 7, the intermediate sleeve 9, the second vent hole 19 provided on the inner protective sleeve flange 2 and connected to the purge air duct 7, the first vent hole 18 provided on the plunger inner protective sleeve 3, and the second vent hole 19 connected to each other:
[0062] (1) The existing anti-slag metal disc ring is not tight enough to resist fine solid particles, and it is difficult to install. During use, due to the weak sealing, it cannot block fine solid particles and cannot achieve the effect of complete protection.
[0063] (2) When the main cylinder is in reciprocating motion, the inner sleeve of the plunger will generate negative air pressure, just like a syringe sucking fine solid particles into the inner sleeve. It is also impossible to achieve complete protection. When the main cylinder moves quickly from the starting position to the working position, the internal volume changes from the second volume to the first volume, and the volume of the second volume is smaller than the volume of the first volume. In this process, a certain negative pressure will be formed in the yellow cavity, and the underpressure cavity will suck in the gas carrying solid particles.
[0064] (3) During the continuous production process of the radial forging machine, the high-temperature steel billet will transfer heat to the hammer head, the hammer head seat, and finally to the plunger. If the heat of the plunger cannot be dissipated in time, it will have an adverse effect on the plunger itself, the copper sleeve and the copper sleeve seal, eventually causing damage to the seal and deformation of the copper sleeve.
[0065] Before the present invention was adopted, the copper sleeve seal of the main cylinder was replaced once a month on average, and each replacement required 18-20 hours of downtime for maintenance. At the same time, hydraulic failures caused by system pollution occurred frequently, and the replacement cycle of the main system circulation filter element was less than 1 month. After the installation of the present invention, the cost of the copper sleeve seal of the main cylinder can be saved by about 11 sets * 50,000 = 550,000 yuan / year; the main engine hot downtime can be saved by 8 hours per month, and the invisible production can be increased by 42.672 tons / month, with an annualized benefit of 42.672*2000*12 = 1.024 million yuan / year; the labor cost can be saved by 8*200*12 = 19,200 yuan / year; the fuel consumption can be saved by 96 barrels / year, with a total cost saving of 96*3141 yuan = 301,500 yuan / year; the total annualized benefit is 1.8947 million yuan per year.
[0066] In short, the equipment maintenance cost is huge before the present invention is adopted, and the potential pollution risk of the system is high. The present invention has a simple structure, good performance, and is easy to use. It mainly solves the negative wind pressure problem of the inner and outer protective sleeves of the main cylinder 8 and avoids the inhalation of solid particles (iron oxide).
[0067] An embodiment of the protective device provided by the present invention relates to the optimization of the structure of the SMS16M radial forging machine. By improving the structure of the main cylinder end, a protective device for the main cylinder of a hydraulic radial forging machine is realized. The method for calculating the pressure value of the blown air includes:
[0068] First, the present invention first needs to solve the problem of negative wind pressure, and calculate the volume change caused by the maximum return amount of the master cylinder 8 (according to the action law of the master cylinder 8, this is the maximum negative wind pressure generated by the reciprocating action of the master cylinder 8). The air pressure value of the blown wind is selected according to the calculated data. The air pressure value must be greater than the negative wind pressure value generated by the reciprocating motion. As long as it is ensured that no negative wind pressure is generated in the protective sleeve 3 inside the plunger and the protective sleeve 5 outside the plunger or the positive wind pressure is maintained, the design purpose can be achieved. When the maximum return amount reaches the downward pressure position, the negative pressure generated by the protective sleeve 3 inside the master cylinder plunger and the protective sleeve 5 outside the plunger is approximately 2.298 bar. The calculation process does not take into account the gas flow resistance loss, that is, the air is completely converted into kinetic energy when it flows to the pipe mouth. Therefore, choosing a 5bar compressed air source can meet the requirements of this design.
[0069] Second, the purge device is designed according to the calculated intake pressure value. The structural characteristics of the main cylinder 8 must be considered during the design to avoid interference during the installation process. The purge air duct 7 is a delivery pipe with an inner diameter of φ16mm.
[0070] Third, debugging and verification, check the usage effect through a period of operation.
[0071] An embodiment of the protective device provided by the present invention, wherein the main technical features and technical parameters include:
[0072] First, the plunger inner protective sleeve 3 and the inner protective sleeve flange 2 are changed into an integrated type, and the upper fitting gap is fully welded on the existing basis to eliminate the possibility of fine particles entering.
[0073] Second, the upper surface of the inner protective sleeve flange 2 and the inner protective sleeve 3 of the plunger are radially connected through the symmetrical L-shaped through hole, the inner hole of the flange is formed into an M30 internal thread, and a φ20 hole is drilled horizontally to form an L shape with the M30 internal thread hole. The slag retaining ring 4 is symmetrically opened with φ32 double holes, and two purge air ducts 7 with M30 threads at the head are introduced and connected to the bottom inner protective sleeve flange 2. At this point, the positive air pressure purge air intake pipeline of the main cylinder inner sleeve is completed.
[0074] Third, an external 5 bar compressed air source is connected to the purge air duct 7, and compressed air is supplied continuously for 24 hours.
[0075] It is known from common technical knowledge that the present invention can be implemented by other embodiments that do not deviate from its spirit or essential features. Therefore, the above disclosed embodiments are only illustrative in all respects and are not exclusive. All changes within the scope of the present invention or within the scope equivalent to the present invention are included in the present invention.
Claims
1. A protective device for a main cylinder of a hydraulic forging machine, characterized in that: The radial forging machine comprises: Master cylinder, a master cylinder plunger telescopically disposed in the master cylinder, A hammer head seat fixedly mounted on the master cylinder plunger, and A slag blocking cavity for blocking slag is formed at the upper end of the plunger cavity of the main cylinder, The protective device comprises a plunger outer protective sleeve fixedly mounted on the hammer head seat, The plunger outer protective sleeve is sleeved on the master cylinder plunger, The lower end of the plunger outer protective sleeve is located in the slag blocking cavity; The protection device also includes a slag blocking ring fixedly mounted on the inner wall of the slag blocking cavity. The slag blocking ring is sleeved on the outer protective sleeve of the plunger; The protection device also includes a plunger inner protection sleeve and an inner protection sleeve flange arranged in the slag blocking cavity. The plunger inner protective sleeve is sleeved on the master cylinder plunger, The upper end of the plunger inner protective sleeve is inserted between the plunger outer protective sleeve and the master cylinder plunger. The inner protective sleeve flange is sleeved on the lower end of the inner protective sleeve of the plunger; The radial forging machine comprises an intermediate sleeve sleeved on the main cylinder plunger, The middle sleeve is in an L-shape. The transverse part of the intermediate sleeve is fixedly installed in the slag blocking cavity. The vertical portion of the intermediate sleeve is arranged between the master cylinder and the master cylinder plunger; The lower end of the plunger inner protective sleeve and the inner protective sleeve flange are both mounted on the transverse portion; The protective device also includes an air blowing channel and a purge air duct. The air blowing channel is formed by the inner protective sleeve flange and the plunger inner protective sleeve or by the bottom wall of the slag blocking cavity and the inner protective sleeve flange and the plunger inner protective sleeve. One end of the blowing channel opens to a surface of the inner protective sleeve flange. The other end of the blowing channel opens to a surface of the protective sleeve inside the plunger facing the plunger of the master cylinder; The inner cavity of the purge air duct and the inner cavity of the air blowing channel are connected and communicated at the one surface of the inner protective sleeve flange. One end of the purge air duct is connected to the inner protective sleeve flange, and the other end passes through the slag retaining ring and is connected to the compressed air source; or The protective device also includes an air blowing channel and a purge air duct. The blowing channel is formed by the transverse portion, the inner protective sleeve flange and the plunger inner protective sleeve, One end of the blowing channel opens to a surface of the inner protective sleeve flange. The other end of the blowing channel opens to a surface of the protective sleeve inside the plunger facing the plunger of the master cylinder; The inner cavity of the purge air duct and the inner cavity of the air blowing channel are connected and communicated at the one surface of the inner protective sleeve flange. One end of the purge air duct is connected to the inner protective sleeve flange, and the other end passes through the slag retaining ring and is connected to the compressed air source; The blowing channel comprises: At least one second vent hole for ventilation is formed on the inner protective sleeve flange. At least one first ventilation hole for ventilation is formed on the inner protective sleeve of the plunger; The first vent hole is connected to the second vent hole. The second vent hole is in an L-shape or a straight shape. The inner cavity of the second vent hole is connected to the inner cavity of the purge air duct.
2. The protective device according to claim 1, characterized in that: The inner protective sleeve flange is welded to the plunger inner protective sleeve or the inner protective sleeve flange and the plunger inner protective sleeve are formed integrally.
3. The protective device according to claim 1, characterized in that: The lower end of the plunger inner protective sleeve and the lower end of the inner protective sleeve flange are both arranged in contact with the inner bottom wall of the slag blocking cavity.
4. The protection device according to claim 1, characterized in that: The blowing channel comprises: At least one second vent hole for ventilation is formed on the inner protective sleeve flange. At least one first ventilation pipe for ventilation is formed between the plunger inner protective sleeve and the inner bottom wall of the slag blocking cavity; The first ventilation pipe is connected to the second ventilation hole. The inner cavity of the second vent hole is connected to the inner cavity of the purge air duct.
5. The protection device according to claim 1, characterized in that: The blowing channel comprises: At least one second ventilation pipe for ventilation is formed between the inner protective sleeve flange and the inner bottom wall of the slag blocking chamber. At least one first ventilation hole for ventilation is formed on the plunger inner protective sleeve, or a first ventilation pipe for ventilation is formed between the plunger inner protective sleeve and the inner bottom wall of the slag blocking cavity; The second ventilation duct is connected to the first ventilation hole or the first ventilation duct. The inner cavity of the second ventilation duct is connected to the inner cavity of the purge air duct.
6. The protection device according to claim 1, characterized in that: The blowing channel comprises: At least one second vent hole for ventilation is formed on the inner protective sleeve flange. At least one third ventilation channel for ventilation is formed between the plunger inner protective sleeve and the transverse portion; The third ventilation duct is connected to the second ventilation hole. The inner cavity of the second vent hole is connected to the inner cavity of the purge air duct.
7. The protection device according to claim 1, characterized in that: The blowing channel comprises: At least one fourth ventilation duct for ventilation is formed between the inner protective sleeve flange and the transverse portion, At least one first ventilation hole for ventilation is formed on the plunger inner protective sleeve or at least one third ventilation channel for ventilation is formed between the plunger inner protective sleeve and the transverse portion; The fourth ventilation duct is connected to the first ventilation hole or the third ventilation duct. The inner cavity of the fourth ventilation duct is connected to the inner cavity of the purge air duct.
8. The protection device according to claim 1, characterized in that: One end of the purge air duct is threadedly connected to the inner protective sleeve flange. A diameter of the first ventilation hole is smaller than a diameter of the second ventilation hole.
