A multi-hole box culvert double-layer interchange structure connecting well

Through the full underground double-layer interchange structure and control gate scheduling, a connection well without permanent land occupation and low cost is achieved, supporting bidirectional flow of water bodies and single-hole maintenance, solving the problem that the existing technology cannot meet the lack of permanent land occupation and adapt to the flow direction of the water flow in the existing technology The problem.

CN111794137BActive Publication Date: 2024-11-01TIANJIN WATER CONSERVANCY SURVEYING & DESIGNING INST
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010730419.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-07-27
Publication Date
2024-11-01
Estimated Expiration
2040-07-27

AI Technical Summary

Technical Problem

The existing connecting well structure cannot meet the needs of no permanent land occupation, low cost and adapt to various water flow directions, and it is difficult to achieve single-hole maintenance function.

Method used

Adopt a full underground double-layer interchange structure, including a one-shaped overcurrent box culvert and an L-shaped overcurrent box culvert, a common middle partition plate and a communication hole. One end of the L-shaped overcurrent box culvert is closed, and the water body is realized through the control gate scheduling. It flows in both directions and flows in both directions between the main line and the branch line ends, and supports single-hole maintenance of any hole box culvert.

Benefits of technology

It realizes a connecting well structure without permanent land and low cost, supports two-way flow of water bodies and single-hole maintenance, convenient construction and easy management, and reduces engineering investment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111794137B_ABST
    Figure CN111794137B_ABST
Patent Text Reader

Abstract

The present invention discloses a multi-hole box culvert double-layer overpass structure connecting shaft, which is completely underground and adopts a double-layer overpass structure, including a straight-line flow box culvert on the upper layer and an L-shaped flow box culvert on the lower layer. The straight-line flow box culvert and the L-shaped flow box culvert share a middle partition; the middle partition is provided with connecting holes corresponding to the upper and lower culverts, so that the straight-line flow box culvert and the corresponding culverts of the L-shaped flow box culvert are connected; one end of the L-shaped flow box culvert is closed. The present invention divides the connecting shaft into upper and lower layers, and connects them with a single hole to realize the spatial overpass layout, so that the connecting shaft reduces the setting of the control gate on the basis of ensuring the functions of the connecting shaft of the single-layer level crossing layout, and eliminates the permanent land occupation required for setting the control gate, saving investment, reasonable layout, convenient construction and convenient management.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of porous box culvert connection wells, and in particular to a porous box culvert double-layer overpass structure connection well which is fully underground, has no control gate, can adapt to various water flow directions, and can realize a single-hole maintenance function. Background Art

[0002] There are many ways to construct water diversion and regulation projects, such as water culverts and channels. Among them, for water culverts with closure requirements and low internal pressure, cast-in-place reinforced concrete box culverts have the characteristics of large overall structural rigidity, good adaptability to soft soil foundations and uneven foundation settlement, convenient adjustment of cross-sectional types, simple construction technology, easy to ensure construction quality, and low cost, so they are widely used. Some water diversion and regulation projects need to set up connecting wells on the main box culverts due to multiple water sources or multiple water users, and connect them to the branch box culverts. Compared with the traditional single-layer connecting wells, the double-layer overpass structure connecting wells are all underground, without permanent land occupation and management problems, and have low costs. However, the existing structural connection wells cannot meet the requirements. Summary of the invention

[0003] The purpose of the present invention is to provide a connecting well structure which does not require permanent land and has low construction cost in view of the defects existing in the existing connecting well structure.

[0004] The technical solution adopted to achieve the purpose of the present invention is:

[0005] A porous box culvert double-layer overpass structure connecting shaft is entirely underground and adopts a double-layer overpass structure, including a straight-line flow box culvert on the upper layer and an L-shaped flow box culvert on the lower layer. The straight-line flow box culvert and the L-shaped flow box culvert share a middle partition; the middle partition is provided with connecting holes corresponding to the upper and lower culverts, connecting the straight-line flow box culvert with the corresponding culverts above and below the L-shaped flow box culvert; one end of the L-shaped flow box culvert is closed.

[0006] Among them, the upstream and downstream of the I-shaped flow culvert are connected to the main water supply culvert, the L-shaped flow culvert is connected to the branch water supply tank, and control gates are respectively provided at both ends of the main line and the end of the branch line.

[0007] Wherein, the communicating hole is arranged at a position near one end of the middle partition plate.

[0008] The present invention is a fully underground, control-gate-free, multi-hole box culvert double-layer interchange structure connecting well that can adapt to various water flow directions and realize the single-hole maintenance function. Through the upper and lower interchange layout of the connecting well, combined with the actual operating conditions and the control of the control gates at each end of the box culvert, the water body can flow in both directions in the main box culvert, between the main starting point and the branch end, and between the main end and the branch end. In addition, the full-line single-hole maintenance of any hole box culvert can be realized, the layout is reasonable, there is no permanent occupation, the project investment is small, the process is simple, the construction is convenient, and it is easy to manage. BRIEF DESCRIPTION OF THE DRAWINGS

[0009] Figure 1 It is a schematic diagram of the plan layout of a water diversion and regulation project using the connecting well of the present invention.

[0010] Figure 2 It is a structural diagram of the connecting well of the present invention.

[0011] Figure 3 It is an exploded structural diagram of the connecting well of the present invention. DETAILED DESCRIPTION

[0012] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0013] See also Figure 1-3 As shown, a multi-hole box culvert double-layer interchange structure connecting shaft 1 includes an upper I-shaped flow box culvert 2 and a lower L-shaped flow box culvert 3. The upper I-shaped flow box culvert 2 and the lower L-shaped flow box culvert 3 share a middle partition 4, and a connecting hole 41 is provided between the upper and lower layers of each hole box culvert on the middle partition 4; one end of the hole of the lower L-shaped flow box culvert 3 is closed by a closing plate 34.

[0014] Among them, the upper I-shaped flow culvert 2 is composed of a top plate 20, an upper middle wall 21, an upper side wall 22 and a middle partition 4. The upper middle wall 21 is located on the inner side of the upper side wall 22 and is fixed to the middle partition 4. The upper end is fixed to the top plate 20 to form a plurality of straight or I-shaped culverts. The upstream and downstream of the upper I-shaped flow culvert are connected to the first trunk water culvert 11 and the second trunk water culvert 12; the ends of the first trunk water culvert 11 and the second trunk water culvert 12 are provided with a first control gate 14 and a second control gate 15.

[0015] The lower L-shaped flow culvert 3 is composed of a lower middle wall 31, a lower side wall 32 and a bottom plate 33. The lower middle wall 31 and the lower side wall 32 are both L-shaped structures, arranged at intervals, and cooperate with the middle partition plate 4 on the top and the closing plate 34 on one side to form an L-shaped hole culvert connected to the branch water tank 13. A third control gate 16 is provided at the end of the branch water tank 13.

[0016] Combined with the dispatching, the connecting well 1 and the first trunk water delivery culvert 11, the first trunk water delivery culvert 12 and the branch water delivery culvert 13 connected thereto can complete the following functions (taking the control gate 14 end as the high water level end as an example, the rest are the same):

[0017] (1) The first control gate 14, the second control gate 15 and the third control gate 16 are fully opened, and water can flow from the first control gate 14 through the first trunk water culvert 11, the connecting well 1, the second trunk water culvert 12 and the branch water culvert 13 to the second control gate 15 and the third control gate 16;

[0018] (2) The first control gate 14 and the second control gate 15 are fully opened, and the third control gate 16 is fully closed. Water can flow from the first control gate 14 through the first trunk water culvert 11, the connecting well 1, and the second trunk water culvert 12 to the second control gate 15;

[0019] (3) The first control gate 14 and the third control gate 16 are fully opened, and the second control gate 15 is fully closed. Water can flow from the first control gate 14 through the first trunk water culvert 11, the connecting well 1, and the branch water culvert 13 to the third control gate 16;

[0020] In the above three working conditions, if one or several holes need to be inspected and repaired, and the other holes continue to supply water, it is only necessary to close the gates of the hole at the first control gate 14, the second control gate 15, and the third control gate 16 corresponding to the water supply culvert that needs to be inspected, and drain the water in the culvert of the hole, without affecting the normal water supply of other holes.

[0021] It can be seen that the present invention can control the water body by scheduling the control gate, that is, it can flow in both directions within the main culvert, it can flow in both directions between the starting point of the main line and the end point of the branch line, it can also flow in both directions between the end point of the main line and the end point of the branch line, and it can also realize the full-line single-hole maintenance of any hole box culvert.

[0022] In this embodiment, the diameter and number of holes of the connecting wells, the diameter and number of holes of the main and branch water delivery boxes, and their sizes all need to be calculated and determined according to the scale of the project.

[0023] Traditional connecting shafts are mostly arranged in a single-layer horizontal intersection, with an intersection shaft connected to each hole at the intersection, and a control gate is required at the intersection of each branch and the intersection shaft. The present invention divides the connecting shaft into two layers, upper and lower, and connects them with a single hole to realize a spatial interchange layout.

[0024] The spatial overpass technology of the present invention reduces the setting of control gates while ensuring the functions of the connecting well in a single-layer level crossing arrangement, eliminates the permanent land required for the control gates, saves investment, has a reasonable layout, and is convenient for construction and management.

[0025] The above is only a preferred embodiment of the present invention. It should be pointed out that, for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. A porous box culvert double-layer interchange structure connecting shaft, characterized in that: All are underground, with a double-layer interchange structure, including a straight-line flow culvert on the upper layer and an L-shaped flow culvert on the lower layer. The straight-line flow culvert and the L-shaped flow culvert share a middle partition; the middle partition is provided with connecting holes corresponding to the upper and lower culverts, connecting the straight-line flow culvert with the corresponding culverts on the upper and lower layers of the L-shaped flow culvert; one end of the L-shaped flow culvert is closed; The upper I-shaped flow box culvert is composed of a top plate, an upper middle wall, an upper side wall and a middle partition; the upper middle wall is located on the inner side of the upper side wall and is fixed on the middle partition; the upper ends of the upper middle wall and the upper side wall are fixed to the top plate to form a plurality of I-shaped culverts; The lower L-shaped flow box culvert is composed of a lower middle wall, a lower side wall and a bottom plate. The lower middle wall and the lower side wall are both L-shaped structures, arranged at intervals, and form an L-shaped hole culvert after cooperating with the middle partition plate on the top and the closed plate on one side.

2. The porous box culvert double-layer interchange structure connecting well as claimed in claim 1 is characterized in that: The upstream and downstream of the I-shaped flow culvert are connected to the main water supply culvert, and the L-shaped flow culvert is connected to the branch water supply tank. Control gates are respectively provided at both ends of the main water supply culvert and the end of the branch water supply tank.