Incinerator with residual material blowing device

By installing a purge mechanism on the feeding trolley of the incinerator, the problem of fuel residue accumulation when the furnace is shut down is solved, complete fuel combustion and environmental protection are achieved, and smoke return and pollution are avoided.

CN111828980BActive Publication Date: 2024-10-11ZHENGZHOU DONGXING ENVIRONMENTAL ENERGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010785155.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-08-06
Publication Date
2024-10-11
Estimated Expiration
2040-08-06

AI Technical Summary

Technical Problem

Existing incinerators tend to accumulate fuel residue during the shutdown process, resulting in incomplete combustion of the fuel, causing safety risks of smoke return and environmental pollution.

Method used

An incinerator with a residual material purging device is designed. By setting the first and second purging mechanisms on the feeding trolley, the wind mechanism is used to purge the residual fuel so that it falls to the front of the feeding trolley and passes through The hydraulic device pushes the combustion onto the grate to ensure that the fuel is completely burned out.

Benefits of technology

It effectively avoids the positive pressure in the furnace and the overflow of flue gas to the boiler room after shutdown, improves the working environment, ensures complete combustion of fuel, and reduces safety and environmental pollution risks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111828980B_ABST
    Figure CN111828980B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of garbage disposal equipment, and in particular to an incinerator with a residual material blowing device, comprising a feeding hopper, a chute is provided at the discharge end of the feeding hopper, a feeding platform for conveying fuel is provided at the bottom of the chute, a plurality of evenly distributed feeding trolleys for pushing fuel are provided on the feeding platform, parallel tracks are provided at the bottom of the feeding trolleys, a hydraulic device for providing power to the feeding trolley is provided on the outer side of the feeding trolley, and a mechanical grate for burning fuel is provided on the inner side of the feeding platform. The purpose is to overcome the deficiencies in the prior art and provide an incinerator with a residual material blowing device, which can fully burn fuel, improve the working environment of the boiler room when the furnace is shut down, and avoid the safety hazard of smoke returning from a garbage pit when the furnace is shut down.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of garbage processing equipment, and in particular to an incinerator with a residual material blowing device. Background Art

[0002] When the existing incinerator is operating normally, the fuel on the feeding platform passes through the front of the feeding trolley of the feeder, and the fermented garbage that is qualified is pushed to the grate for combustion under the drive of the hydraulic device; however, during the shutdown process, when the feeding trolley of the feeder is back in place, it is easy to accumulate fuel residue; the first part: there is a plane dead angle between the upper panel of the feeding trolley on the side of the feeding platform and the chute, leaving residual fuel; the second part: the residual fuel accumulates on the upper part of the feeding trolley because the friction force generated by the garbage on the feeding trolley due to the action of gravity is greater than the thrust of the reciprocating motion transmission of the hydraulic device of the feeder; it cannot fall normally to the pushing area in the front of the feeding trolley, and is pushed onto the grate; the fuel cannot be completely burned, bringing various hidden dangers, such as: the smoke is returned to the garbage pit through the receiving hopper, and the garbage pit has safety hazards; the smoke generated by this part of the fuel cannot be purified and treated, and there is a hidden danger of environmental pollution; after the boiler is shut down, the furnace is under positive pressure, and the smoke passes through the loose part of the boiler and overflows to the boiler room, polluting the working environment. Summary of the invention

[0003] The purpose of the present invention is to overcome the deficiencies in the prior art and to provide an incinerator with a residual material blowing device that can fully burn fuel, improve the working environment of the boiler room when the furnace is shut down, and avoid the safety hazard of smoke returning from the garbage pit when the furnace is shut down.

[0004] The present invention is realized by the following technical scheme: an incinerator with a residual material blowing device, comprising a feeding hopper, a chute is provided at the discharge end of the feeding hopper, a feeding platform for conveying fuel is provided at the bottom of the chute, a plurality of evenly distributed feeding trolleys for pushing fuel are provided on the feeding platform, parallel tracks are provided at the bottom of the feeding trolley, a hydraulic device for providing power to the feeding trolley is provided on the outside of the feeding trolley, and a mechanical grate for burning fuel is provided on the inside of the feeding platform;

[0005] The feeding trolley comprises a first platform and a second platform, the first platform and the second platform are arranged in a stepped manner, a first through hole is provided at the connection between the first platform and the second platform, the first platform is located above the second platform, a first purge mechanism for blowing fuel is arranged below the first platform, a working end of the first purge mechanism is communicated with the first through hole, a second purge mechanism is arranged above the feeding trolley, a working end of the second purge mechanism is communicated with the inner wall of the chute, a first power mechanism for providing wind force is arranged outside the first purge mechanism and the second purge mechanism, the first power mechanism comprises a filter, a muffler, a first rubber expansion joint, an adjusting baffle, and a fan which are arranged in sequence, a second rubber expansion joint and a pressure gauge are connected to the air outlet of the fan, the first power mechanism is communicated with the first purge mechanism and the second purge mechanism respectively through an exhaust pipe, a pneumatic main valve is arranged at the air outlet of the fan, a first purge manual main valve is arranged at the connection between the front end of the first purge mechanism and the exhaust pipe, and a second purge manual main valve is arranged at the connection between the front end of the second purge mechanism and the exhaust pipe.

[0006] Furthermore, the first purge mechanism includes a first connecting pipe, a first valve is provided on the first connecting pipe, one end of the first connecting pipe is communicated with the exhaust pipe, the other end of the first connecting pipe is connected to a ventilation hose, the other end of the ventilation hose is connected to the first exhaust pipe, a pressure nozzle is provided at the connection between the first exhaust pipe and the through hole, a plurality of evenly distributed second through holes for exhaust are provided on the outer wall of the pressure nozzle, the pressure nozzle is communicated with the second through hole, fixings are provided at the connection between the ventilation hose and the first connecting pipe and the first exhaust pipe, a slide is provided under the two fixings, and the first connecting pipe, the ventilation hose, the first exhaust pipe and the fixings are all connected by threads.

[0007] Furthermore, a first anchoring device is provided at the connection between the first connecting pipe and the fixing member, a second anchoring device is provided on the ventilation hose, and a spring for providing tension to the ventilation hose is provided between the first anchoring device and the second anchoring device.

[0008] Furthermore, the second anchoring device is located at two-thirds of the ventilation hose away from the first connecting pipe.

[0009] Furthermore, the first anchoring device and the second anchoring device are both steel hoops.

[0010] Furthermore, the second purge mechanism includes a second connecting pipe, a second valve is arranged on the second connecting pipe, one end of the second connecting pipe is connected to the exhaust pipe, the other end of the second connecting pipe is connected to a second exhaust pipe, the second exhaust pipe extends to the inside of the chute, and the outer wall of the second exhaust pipe is provided with a plurality of evenly distributed third through holes for purging residual materials.

[0011] Furthermore, a pneumatic propeller is arranged between the second connecting pipe and the second exhaust pipe, the fixed end of the pneumatic propeller is connected to the outer wall of the chute, the working end of the pneumatic propeller is connected to the second exhaust pipe, one end of the second exhaust pipe passes through the chute and can slide on the chute, and a limiting baffle is arranged at the connection between the second exhaust pipe and the propeller.

[0012] Furthermore, a sealing device is provided at the connection between the second exhaust pipe and the chute, and the sealing device includes a sleeve arranged between the second exhaust pipe and the chute, the outer wall of the sleeve is tightly fitted with the chute, and the outer wall of the sleeve is provided with a joint for connecting the sealing pipe, and the outside of the joint is connected to a second power mechanism for providing sealing air, and the second power mechanism has the same structure as the first power mechanism.

[0013] Furthermore, the second exhaust pipe is inclined to the inner wall of the chute, and the angle between the second exhaust pipe and the chute is 90°-180°.

[0014] Furthermore, a plurality of evenly distributed partition plates are arranged above the second platform, a cross beam for installing the partition plates is arranged between two adjacent feeding trolleys, the partition plates are arranged above the cross beam, vertical beams for fixing the partition plates are arranged on both sides of the partition plates, the vertical beams are connected to the partition plates by bolts, the height of the partition plates is 500-1500mm, and the thickness of the partition plates is 20-100mm.

[0015] The beneficial effect of the present invention is that by arranging the first purge mechanism and the second purge mechanism, the fuel remaining on the first platform and the second platform can be purged to the front of the feeding trolley respectively, and finally reaches the mechanical grate for combustion under the push of the feeding trolley, thereby ensuring the goal of burning out the fuel in the furnace, avoiding positive pressure in the furnace after the combustion furnace is shut down, and avoiding the smoke overflowing to the boiler room through the loose parts of the incinerator, thereby polluting the working environment. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a structural schematic diagram of the main view of the present invention;

[0017] Figure 2 for Figure 1 The enlarged structural diagram at A in the middle;

[0018] Figure 3 It is a schematic diagram of the arrangement structure of the first purge mechanism and the second purge mechanism in the present invention;

[0019] Figure 4 for Figure 3 The enlarged structural diagram at B in the middle;

[0020] Figure 5 for Figure 3 A schematic diagram of the structure of the first purge mechanism;

[0021] Figure 6 is a schematic structural diagram of the second purge mechanism in Example 1;

[0022] Figure 7 Schematic diagram of the structure of the second purge mechanism in Example 2;

[0023] Figure 8 is a schematic diagram of the structure of the pneumatic propeller in Example 2;

[0024] Fig. 9 is a schematic structural diagram of the sealing device in Example 2;

[0025] Fig.10 It is a partially enlarged structural schematic diagram of the first exhaust pipe;

[0026] Fig.11 This is an enlarged structural diagram of the partition board installation.

[0027] Among them: 1-feeding hopper, 2-chute, 3-mechanical grate, 4-feeding trolley, 5-parallel track, 6-hydraulic device, 7-limiting wheel, 8-first platform, 9-second platform, 10-anti-slip fin, 11-feeding platform, 12-first through hole, 13-first purge mechanism, 131-first valve, 132-manual valve, 133-first connecting pipe, 134-spring, 135-ventilation hose, 136-slide, 137-fixing part, 138-first anchoring device, 139-second anchoring device, 1310-first exhaust pipe, 14-second purge mechanism, 141-first Second valve, 142-second connecting pipe, 143-second exhaust pipe, 15-pneumatic main valve, 16-first purge manual main valve, 17-second purge manual main valve, 18-exhaust pipe; 19-filter, 20-muffler, 21-first rubber expansion joint, 22-adjusting baffle, 23-fan, 24-second rubber expansion joint, 25-pressure gauge, 26-second power mechanism, 27-sleeve, 28-connector, 29-pneumatic propeller, 30-limit baffle, 31-third through hole, 32-second through hole, 33-pressurized nozzle, 34-cross beam, 35-vertical beam, 36-partition plate. DETAILED DESCRIPTION

[0028] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0029] The following will be combined with the drawings in the embodiments of the invention to clearly and completely describe the technical solutions in the embodiments of the invention. Obviously, the described embodiments are only part of the embodiments of the invention, not all of the embodiments. Based on the embodiments of the invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the invention.

[0030] Example 1

[0031] like Figure 1-6 As shown in Figures 10 and 11, an incinerator with a residual material blowing device comprises a feeding hopper 1, a chute 2 is installed at the discharge end of the feeding hopper 1, a feeding platform 11 for conveying fuel is installed at the bottom of the chute 2, 8 feeding trolleys 4 for pushing fuel are installed on the feeding platform 11, and during the fuel pushing process, the feeding trolley 4 pushes the fuel on the feeding platform 11 onto the mechanical grate 3, parallel tracks 5 are installed at the bottom of the feeding trolley 4, the feeding trolley 4 moves on the parallel tracks 5, and limiting wheels 7 for limiting the moving distance of the feeding trolley 4 are installed on the parallel tracks 5 to prevent the feeding trolley 4 from leaving the parallel tracks 5, a hydraulic device 6 for providing power to the feeding trolley 4 is installed on the outer side of the feeding trolley 4, and a mechanical grate 3 for burning fuel is installed on the inner side of the feeding platform 11;

[0032] The feeding trolley 4 includes a first platform 8 and a second platform 9. The first platform 8 and the second platform 9 are arranged in a stepped manner. A first through hole 12 is provided at the connection between the first platform 8 and the second platform 9. The first platform 8 is located above the second platform 9. A plurality of evenly distributed anti-skid fins 10 are installed above the second platform 9. The anti-skid fins 10 are triangular in shape. The arrangement of the anti-skid fins 10 can reduce the amount of garbage in the chute 2 that directly enters the mechanical grate 3 due to gravity squeezing, thereby slowing down the occurrence of the sliding phenomenon. The inner side height of the anti-skid fins 10 is lower than the outer side height. A first purge mechanism 13 for blowing clean the fuel is installed under the first platform 8. The first purge mechanism 13 is installed in the feeding trolley 4. The working end of the first purge mechanism 13 is connected to the first purge mechanism 13. A through hole 12 is connected, a second purge mechanism 14 is installed above the feeding trolley 4, and the working end of the second purge mechanism 14 is connected to the inner wall of the chute 2. A first power mechanism for providing wind force is installed outside the first purge mechanism 13 and the second purge mechanism 14. The first power mechanism includes a filter 19, a muffler 20, a first rubber expansion joint 21, an adjustment baffle 22, and a fan 23 installed in sequence. The second rubber expansion joint 24 is connected to the air outlet of the fan 23. The first power mechanism is connected to the first purge mechanism 13 and the second purge mechanism 14 through an exhaust pipe 18. A pneumatic main valve 15 is installed at the air outlet of the fan 23. The pneumatic main valve 15 is located behind the second rubber expansion joint 24. The front end of the first purge mechanism 13 is installed at the connection with the exhaust pipe 18 There is a first manual purge main valve 16, a second manual purge main valve 17 is installed at the connection between the front end of the second purge mechanism 14 and the exhaust pipe 18, the first purge mechanism 13 includes a first connecting pipe 133, a first valve 131 is installed on the first connecting pipe 133, one end of the first connecting pipe 133 is connected to the exhaust pipe 18, the other end of the first connecting pipe 133 is detachably connected to a ventilation hose 135, the other end of the ventilation hose 135 is connected to a plurality of first exhaust pipes 1310, a pressurizing nozzle 33 is connected to the end of the first exhaust pipe 1310, the pressurizing nozzle is connected to the first through hole 12, and a plurality of evenly distributed second through holes 32 for exhaust are opened on the outer wall of the pressurizing nozzle 33, and the setting of the second through holes 32 can reduce the dead angle of purge. During operation, the fuel above the first platform 8 is purged through the pressurized nozzle. A fixing part 137 is installed at the connection between the ventilation hose 135, the first connecting pipe 133 and the pressurized nozzle. A slideway 136 is installed under the two fixing parts 137. The slideway 136 is an H-shaped channel steel. The setting of the slideway 136 can limit the moving direction of the fixing part 137. The first connecting pipe 133, the ventilation hose 135 and the fixing part 137 are all connected by threads. A first anchoring device 138 is installed at the connection between the first connecting pipe 133 and the fixing part 137. A second anchoring device 139 is installed on the ventilation hose 135. A spring 134 for providing tension to the ventilation hose 135 is installed between the first anchoring device 138 and the second anchoring device 139.When the feeding trolley 4 moves forward, the hose follows the feeding trolley 4 in the H-shaped slideway 136, and the spring 134 is stretched at this time; when the feeding trolley 4 moves backward, under the action of the tension of the spring 134, the ventilation hose 135 moves backward on the H-shaped slideway 136 to avoid the ventilation hose 135 from moving in disorder during purging. The second anchoring device 139 is located at two-thirds of the ventilation hose 135 away from the first connecting pipe 133 to ensure that the ventilation hose 135 can be completely retracted to avoid entanglement and extrusion. The first anchoring device 138 and the second anchoring device 139 are both steel hoops. The second purge mechanism 14 includes a plurality of second connecting pipes 142, on which a second valve 141 is installed. One end of the second connecting pipe 142 is connected to the exhaust pipe 18, and the other end of the second connecting pipe 142 is connected to a second exhaust pipe 143, which extends to the inside of the chute 2. The second exhaust pipe 143 is tilted, and the angle between the second exhaust pipe 143 and the chute is 120°. The outer wall of the second exhaust pipe is provided with a plurality of evenly distributed third through holes 31 for purging residual materials. The arrangement of the third through holes 31 can reduce the purging dead angle.

[0033] The first valve 131 and the second valve 141 are both pneumatic valves. In order to ensure the air tightness of the first connecting pipe 133 and the second connecting pipe 142 when the furnace is shut down, a manual valve 132 is provided at the outlet end of the first valve 131 and the second valve 141 and the air outlet end of the ventilation hose 135. The manual valve 132 is opened when fuel needs to be purged during the shutdown process and remains closed when the purging is stopped.

[0034] In order to alleviate the slippage of the second platform 9 during the process of feeding materials onto the second platform 9, a plurality of evenly distributed partition plates 36 are installed above the second platform 9, and a crossbeam 34 for fixing the position of the partition plate 36 is installed between two adjacent feeding carts 4, and the partition plate 36 is installed on the crossbeam 34. A spacing is reserved between the partition plate 36 and the outer side of the crossbeam 34, which can prevent the partition plate 36 from being baked by flames for a long time, causing the strength of the partition plate 36 to decrease. Vertical beams 35 for fixing the partition plates are installed on both sides of the partition plates 36, and a plurality of evenly distributed bolt holes are opened on the partition plates. The vertical beams 35 and the partition plates 36 are connected by bolts, and the height of the partition plates 36 is 700mm.

[0035] Example 2

[0036] like Figure 1-11As shown, the difference from Example 1 is that a pneumatic propeller 29 is arranged between the second connecting pipe 142 and the second exhaust pipe 143. The pneumatic propeller 29 is a propeller of model XHT-21 produced by Xuzhou Kerong Environmental Resources Co., Ltd. The fixed end of the pneumatic propeller 29 is connected to the outer wall of the chute 2, and the working end of the pneumatic propeller 29 is connected to the second exhaust pipe 143. One end of the second exhaust pipe 143 passes through the chute 2 and can slide in the chute 2. A limit baffle 30 is arranged at the connection between the second exhaust pipe 143 and the pneumatic propeller 29. The setting of the limit baffle 30 can The length of the second exhaust pipe 143 extending into the chute 2 is limited, and a sealing device is provided at the connection between the second exhaust pipe 143 and the chute 2. The sealing device includes a sleeve 27 installed between the second exhaust pipe 143 and the chute 2. The outer wall of the sleeve 27 is tightly fitted with the chute 2. A joint 28 for connecting a sealing pipe is installed on the outer wall of the sleeve 27. The outside of the joint 28 is connected to a second power mechanism 26 for providing sealing air. The second power mechanism 26 has the same structure as the first power mechanism. By providing the second power mechanism 26, the sleeve 27 and the second exhaust pipe 143 can be kept in a sealed state.

[0037] In the above embodiments, program control or single control can be used for the residual material purging process, wherein the program control logic is as follows: first, the garbage on the first platform 8 is purged by the second purging mechanism 14; the number of the second purging mechanism 14 is 8, numbered A1, A2, A3, A4, A5, A6, A7, A8, and the purging order is A1, A2, A3, A4, A5, A6, A7, A8; each second purging mechanism 14 purges for 1 minute each time; after the purging is completed, the next one is purged; after the purging of the residual material on the first platform 8 is completed, the residual material on the second platform 9 begins to be purged; at this time, the first purging mechanism 13 starts to work, and the number of the first purging mechanism 13 is 8, the 8 first purge mechanisms 13 are numbered B1, B2, B3, B4, B5, B6, B7, B8, and the purge order is B1, B2, B3, B4, B5, B6, B7, B8; each first purge mechanism 13 purges for 1 minute each time; after the purge is completed, the garbage residue is completely cleaned up; in single-control control, the single-control control logic is as follows: click the control mode and select single-control control; select the first valve 131 on the first cleaning purge mechanism and the second valve 141 on the second purge mechanism 14 corresponding to the purge; set the purge pressure and purge time; click start to enter automatic single purge program control; after the purge is completed, close the pneumatic main valve 15.

[0038] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. An incinerator with a residual material blowing device, comprising a feeding hopper, characterized in that: The discharge end of the feeding hopper is provided with a chute, the bottom of the chute is provided with a feeding platform for conveying fuel, a plurality of evenly distributed feeding trolleys for pushing fuel are provided on the feeding platform, parallel tracks are provided at the bottom of the feeding trolleys, a hydraulic device for providing power to the feeding trolley is provided on the outside of the feeding trolley, and a mechanical grate for burning fuel is provided on the inside of the feeding platform; The feeding trolley comprises a first platform and a second platform, the first platform and the second platform are arranged in a stepped manner, a first through hole is provided at the connection between the first platform and the second platform, the first platform is located above the second platform, a first purge mechanism for blowing fuel is arranged below the first platform, a working end of the first purge mechanism is communicated with the first through hole, a second purge mechanism is arranged above the feeding trolley, a working end of the second purge mechanism is communicated with the inner wall of the chute, a first power mechanism for providing wind force is arranged outside the first purge mechanism and the second purge mechanism, the first power mechanism comprises a filter, a muffler, a first rubber expansion joint, an adjustment baffle, and a fan which are arranged in sequence, a second rubber expansion joint and a pressure gauge are connected to the air outlet of the fan, the first power mechanism is communicated with the first purge mechanism and the second purge mechanism respectively through an exhaust pipe, a pneumatic main valve is arranged at the air outlet of the fan, a first purge manual main valve is arranged at the connection between the front end of the first purge mechanism and the exhaust pipe, and a second purge manual main valve is arranged at the connection between the front end of the second purge mechanism and the exhaust pipe; The first purge mechanism includes a first connecting pipe, a first valve is arranged on the first connecting pipe, one end of the first connecting pipe is communicated with the exhaust pipe, the other end of the first connecting pipe is connected to a ventilation hose, the other end of the ventilation hose is connected to the first exhaust pipe, a pressure nozzle is arranged at the connection between the first exhaust pipe and the through hole, a plurality of evenly distributed second through holes for exhaust are opened on the outer wall of the pressure nozzle, the pressure nozzle is communicated with the second through hole, fixings are arranged at the connection between the ventilation hose and the first connecting pipe and the first exhaust pipe, slideways are arranged under the two fixings, the first connecting pipe, the ventilation hose, the first exhaust pipe and the fixing are all connected by threads; a first anchoring device is arranged at the connection between the first connecting pipe and the fixing, a second anchoring device is arranged on the ventilation hose, and a spring for providing tension to the ventilation hose when it retreats is arranged between the first anchoring device and the second anchoring device; The second purge mechanism includes a second connecting pipe, on which a second valve is provided, one end of the second connecting pipe is communicated with the exhaust pipe, the other end of the second connecting pipe is connected to a second exhaust pipe, the second exhaust pipe extends to the inner side of the chute, and a plurality of evenly distributed third through holes for purging residual materials are provided on the outer wall of the second exhaust pipe; a pneumatic propeller is provided between the second connecting pipe and the second exhaust pipe, a fixed end of the pneumatic propeller is connected to the outer wall of the chute, a working end of the pneumatic propeller is connected to the second exhaust pipe, one end of the second exhaust pipe passes through the chute and can slide on the chute, and a limiting baffle is provided at the connection between the second exhaust pipe and the propeller.

2. The incinerator with a residual material blowing device according to claim 1, characterized in that: The second anchoring device is located at two-thirds of the ventilation hose away from the first connecting pipe.

3. The incinerator with a residual material blowing device according to claim 1, characterized in that: The first anchoring device and the second anchoring device are both steel hoops.

4. The incinerator with a residual material blowing device according to claim 1, characterized in that: A sealing device is provided at the connection between the second exhaust pipe and the chute, and the sealing device includes a sleeve arranged between the second exhaust pipe and the chute, the outer wall of the sleeve is tightly fitted with the chute, and the outer wall of the sleeve is provided with a joint for connecting the sealing pipe, and the outside of the joint is connected to a second power mechanism for providing sealing air, and the second power mechanism has the same structure as the first power mechanism.

5. The incinerator with a residual material blowing device according to claim 1, characterized in that: The second exhaust pipe is inclined to the inner wall of the chute, and the angle between the second exhaust pipe and the chute is 90°-180°.

6. The incinerator with a residual material blowing device according to claim 1, characterized in that: A plurality of evenly distributed partition plates are arranged above the second platform, a cross beam for installing the partition plates is arranged between two adjacent feeding trolleys, the partition plates are arranged above the cross beam, vertical beams for fixing the partition plates are arranged on both sides of the partition plates, the vertical beams are connected to the partition plates by bolts, the height of the partition plates is 500-1500mm, and the thickness of the partition plates is 20-100mm.