Automatic loading and unloading equipment for boiler of steam ironing machine
By designing automatic loading and unloading equipment, using multi-axis manipulators, loading fixtures and other devices, the automated assembly of steam ironing machine boilers has been realized, solving the problems of low traditional assembly efficiency and uneven dispensing, and improving processing efficiency and accuracy. Spend.
Patent Information
- Application Number
- CN202010858914.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-08-24
- Publication Date
- 2024-10-08
- Estimated Expiration
- 2040-08-24
AI Technical Summary
The traditional steam ironing machine boiler assembly relies on manual operation, which is inefficient and uneven in glue dispensing, and lacks automated solutions.
An automatic loading and unloading equipment is designed, which uses a multi-axis manipulator and loading fixture, dispensing device, screwing device and riveting device to realize automated assembly of the boiler through cross activity trajectories, including feeding, dispensing and screwing. and cyclic transportation of riveting stations to improve assembly efficiency and dispensing accuracy.
It realizes the automation of boiler assembly, improves processing efficiency and dispensing accuracy, and reduces the uncertainty of manual operations.
Smart Images

Figure CN111843483B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of automated machinery, in particular to automatic loading and unloading equipment for a boiler used in a steam ironing machine. Background Art
[0002] The steam ironing machine is a dual-purpose machine for ironing and hanging ironing, making the ironing machine suitable for ironing more clothes and fabrics.
[0003] The steam ironing machine has an important component, which is a boiler. The boiler is used to generate heat. During the production process, the boiler needs to be screwed and installed, and sealed with glue to form a sealed structure.
[0004] The traditional method is manual operation, which has low assembly efficiency and uneven glue dispensing. Summary of the invention
[0005] In view of the deficiencies in the prior art, the technical problem to be solved by the present invention is to provide an automatic loading and unloading device for a boiler for a steam ironing machine. The purpose of designing the automatic loading and unloading device is to automate the assembly of the boiler and improve the efficiency of boiler assembly.
[0006] In order to solve the above technical problems, the present invention is implemented by the following scheme: an automatic loading and unloading device for a boiler for a steam ironing machine of the present invention comprises:
[0007] The first robot device performs the action of circulating and transporting the boiler to the feeding and dispensing station, the second set of screw locking station, and the riveting station in sequence;
[0008] A feeding and glue dispensing station equipment, comprising a first material loading fixture that moves in the X direction and a first glue dispensing device that moves in the YZ direction, wherein the first material loading fixture and the first glue dispensing device have intersecting moving tracks;
[0009] The first screw driving station equipment has a second material loading fixture that moves in the X direction and a screw driving device that moves in the YZ direction, and the second material loading fixture and the screw driving device have intersecting moving tracks;
[0010] The second screw-driving station equipment has the same structure as the first screw-driving station equipment and is located at the next station of the first screw-driving station equipment;
[0011] The riveting station equipment comprises a fourth frame, a hydraulic device installed on the fourth frame and having a lifting structure, a riveting head installed at the lower end of the hydraulic device, and a third material loading fixture installed on the fourth frame and directly below the riveting head;
[0012] The second manipulator equipment performs the action of circulating and transporting the boiler to the riveting station, the second group of glue dispensing stations, and the finished product discharging station in sequence;
[0013] A first glue dispensing station device and a second glue dispensing station device having the same structure as the feeding and glue dispensing station device;
[0014] Finished product receiving tray, used to receive and load the finished boilers.
[0015] Furthermore, the first manipulator device comprises:
[0016] A first frame having a packaging cavity and a first platen on the top, wherein a first electrical control system is arranged in the packaging cavity to control the operation of the first multi-axis manipulator;
[0017] The first multi-axis manipulator is installed on the first platform, and a first clamping mechanism is installed at the outer end of the first end axis of the first multi-axis manipulator.
[0018] Furthermore, the first multi-axis manipulator is a six-axis manipulator, and the six-axis manipulator includes:
[0019] A first shaft driving part is fixedly mounted on the first platen; the first shaft driving part is provided with a first servo motor and the first rotating part thereon is driven by the first servo motor to perform horizontal circular motion;
[0020] The second shaft driving part is fixedly mounted on the first rotating part, and its power source is a second servo motor. The second servo motor drives the second rotating part clamped on the second servo motor housing to rotate in the Z direction. The second rotating part drives the third rotating part to rotate in the Z direction through the transmission of the pulley and the gear.
[0021] The third shaft driving part has a third servo motor, and the two sides of the third servo motor housing are clamped by the outer ends of the third rotating part. The third rotating part drives the third servo motor to rotate in the Z direction through the transmission of the belt, and the driving end of the third servo motor drives the turntable assembly at its end to rotate in a circle;
[0022] One end of the first end shaft is connected to the turntable assembly, and the other end of the first end shaft is installed with the clamping mechanism.
[0023] Furthermore, coaxial driving gears are installed on the shaft holes on both sides of the second servo motor housing, and the two coaxial driving gears are respectively connected to the coaxial first passive gears through the first synchronous belt;
[0024] A first transmission shaft is fixed between the two coaxial first passive gears, a first transmission gear is sleeved on the first transmission shaft, a second transmission shaft is installed in one end of the outer shell of the third rotating part, and a second transmission gear meshing with the first transmission gear is sleeved on the second transmission shaft, and coaxial second passive gears are connected at both ends of the second transmission shaft;
[0025] The two second driven gears are connected to a coaxial third driven gear via a second synchronous belt, and the two third driven gears are respectively fixed to two sides of the third servo motor housing via shafts.
[0026] Furthermore, the first clamping mechanism drives the clamping jaws to loosen and clamp via a cylinder.
[0027] Furthermore, the feeding and dispensing station equipment includes:
[0028] Second rack;
[0029] A first X-axis mechanism having a first X-direction moving portion is disposed on the second frame;
[0030] At least one set of first loading fixtures installed on the first X-axis moving part and driven by the first X-axis mechanism to move in the X-axis, the first loading fixtures being used to load the boiler;
[0031] a first gantry mounted on the second frame;
[0032] A first YZ axis mechanism installed at the crossbeam on the first gantry and having a first Z-direction moving portion;
[0033] A first glue dispensing device is installed on the first Z-axis moving part and is driven by the first YZ-axis mechanism to move in the YZ direction, and the first glue dispensing device dispenses glue to the boiler on the first material carrier fixture.
[0034] Furthermore, the first screw driving station equipment includes:
[0035] The third rack;
[0036] Two sets of second X-axis mechanisms are arranged on the third frame, and the two sets of second X-axis mechanisms each have a second X-direction moving part;
[0037] At least one set of second loading fixtures installed on the second X-axis moving part and driven by the second X-axis mechanism to move in the X-axis, the second loading fixtures being used to load the boiler;
[0038] a second gantry mounted on the second frame;
[0039] A second YZ axis mechanism installed at the crossbeam on the second gantry and having a second Z-direction moving portion;
[0040] A screw driving device is installed on the second Z-axis moving part and driven by the second YZ-axis mechanism to move in the YZ direction, and the screw driving device drives screws on the boiler on the second loading fixture.
[0041] Furthermore, the second manipulator device comprises:
[0042] A fifth frame, having a packaging cavity and a second platform on the top, wherein a second electrical control system is arranged in the packaging cavity to control the operation of a second multi-axis manipulator;
[0043] The second multi-axis manipulator is installed on the second platform, and a second clamping mechanism is installed on the outer end of the second end axis of the second multi-axis manipulator.
[0044] Furthermore, the second multi-axis manipulator is a four-axis manipulator, and the four-axis manipulator includes:
[0045] The first axis power source is fixedly mounted on the second platform through a box structure; it is provided with a 1# servo motor and drives the first rotating axis thereon to perform horizontal circular motion through the 1# servo motor;
[0046] A second shaft power source, the shaft of which is connected to the upper side of the outer end of the first rotating shaft, wherein the power source in the housing of the second shaft power source is a 2# servo motor, and the 2# servo motor reversely drives the shaft rod to make horizontal circular motion;
[0047] The third axis power source is installed in the vertical hole at the outer end of the housing of the second axis power source, and its power source is a 3# servo motor, which drives a lifting rod to perform lifting motion;
[0048] One end of the second end shaft is connected to the lower end of the lifting rod, and the other end of the second clamping mechanism is installed.
[0049] Furthermore, the second clamping mechanism drives the clamping jaws to loosen and clamp via a cylinder.
[0050] Compared with the prior art, the beneficial effects of the present invention are as follows: the automatic loading and unloading equipment of the present invention uses automated mechanical equipment to sequentially deliver the boiler to the processing position according to the process, thereby improving the processing efficiency of the boiler and also improving the accuracy of glue dispensing. BRIEF DESCRIPTION OF THE DRAWINGS
[0051] Figure 1 It is a stereoscopic diagram of the overall structure of the automatic loading and unloading equipment of the present invention.
[0052] Figure 2 This is a layout diagram of the disassembled equipment of the automatic loading and unloading equipment of the present invention.
[0053] Figure 3 It is a schematic structural diagram of the first manipulator device of the present invention.
[0054] Figure 4 It is a schematic structural diagram of the first multi-axis manipulator of the present invention.
[0055] Figure 5 It is a structural schematic diagram of the first clamping mechanism of the present invention.
[0056] Figure 6It is a structural schematic diagram of the feeding and glue dispensing station equipment of the present invention.
[0057] Figure 7 It is a structural schematic diagram of the first screw driving station equipment of the present invention.
[0058] Figure 8 It is a structural schematic diagram of the riveting station equipment of the present invention.
[0059] Fig. 9 It is a schematic structural diagram of the second manipulator device of the present invention. DETAILED DESCRIPTION
[0060] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention, so that the advantages and features of the present invention can be more easily understood by those skilled in the art, thereby making a clearer and more explicit definition of the protection scope of the present invention. Obviously, the embodiments described in the present invention are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments in the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0061] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0062] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, it can also be the internal connection of two components, it can be a wireless connection, or it can be a wired connection. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0063] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.
[0064] Embodiment 1: The specific structure of the present invention is as follows:
[0065] Please refer to the attached Figure 1-9 The automatic loading and unloading equipment of a boiler for a steam ironing machine of the present invention comprises:
[0066] The first manipulator device 5 performs a circular transporting action of the boiler 7 to the feeding and dispensing station, the second set of screw locking stations, and the riveting station in sequence;
[0067] The feeding and glue dispensing station equipment 21 comprises a first material loading fixture 213 that moves in the X direction and a first glue dispensing device that moves in the YZ direction, wherein the first material loading fixture 213 and the first glue dispensing device have intersecting moving tracks;
[0068] The first screw driving station equipment 11 has a second material loading fixture 113 that moves in the X direction and a screw driving device 116 that moves in the YZ direction, and the second material loading fixture 113 and the screw driving device have intersecting moving tracks;
[0069] The second screw-driving station equipment 12 has the same structure as the first screw-driving station equipment 11 and is located at the next station of the first screw-driving station equipment 11;
[0070] The riveting station equipment 3 comprises a fourth frame 33, a hydraulic device 31 installed on the fourth frame 33 and having a lifting structure, a riveting head installed at the lower end of the hydraulic device 31, and a third material loading fixture 32 installed on the fourth frame 33 and directly below the riveting head;
[0071] The second manipulator device 6 performs a circular transporting action of the boiler 7 to the riveting station, the second group of glue dispensing stations, and the finished product discharging station in sequence;
[0072] A first glue dispensing station device 22 and a second glue dispensing station device 23 having the same structure as the feeding and glue dispensing station device 21;
[0073] The finished product receiving tray 4 is used to receive and load the boilers that have completed processing.
[0074] A preferred technical solution of this embodiment: the first manipulator device 5 includes:
[0075] The first frame 51 has a packaging cavity and a first platen on the top, and a first electrical control system is arranged in the packaging cavity to control the operation of the first multi-axis manipulator 52;
[0076] The first multi-axis robot 52 is installed on the first platform, and a first clamping mechanism 53 is installed at the outer end of the first end shaft 526 of the first multi-axis robot 52.
[0077] A preferred technical solution of this embodiment: the first multi-axis manipulator 52 is a six-axis manipulator, and the six-axis manipulator includes:
[0078] The first shaft driving part 521 is fixedly mounted on the first platen; it is provided with a first servo motor and the first rotating part thereon is driven by the first servo motor to make horizontal circular motion;
[0079] The second shaft driving part 522 is fixedly mounted on the first rotating part, and its power source is a second servo motor. The second servo motor drives the second rotating part 523 clamped on the second servo motor housing to rotate in the Z direction. The second rotating part 523 drives the third rotating part 524 to rotate in the Z direction through the transmission of the pulley and the gear.
[0080] The third shaft driving part 525 has a third servo motor, and the two sides of the third servo motor housing are clamped by the outer ends of the third rotating part 524. The third rotating part 524 drives the third servo motor to rotate in the Z direction through the transmission of the belt, and the driving end of the third servo motor drives the turntable assembly at its end to rotate in a circle;
[0081] One end of the first end shaft 526 is connected to the turntable assembly, and the other end thereof is mounted with the clamping mechanism 53 .
[0082] A preferred technical solution of this embodiment: coaxial driving gears are installed on the shaft holes on both sides of the housing of the second servo motor, and the two coaxial driving gears are respectively connected to the coaxial first passive gears through the first synchronous belt;
[0083] A first transmission shaft is fixed between the two coaxial first passive gears, a first transmission gear is sleeved on the first transmission shaft, a second transmission shaft is installed in one end of the outer shell of the third rotating part 524, and a second transmission gear meshing with the first transmission gear is sleeved on the second transmission shaft, and coaxial second passive gears are connected at both ends of the second transmission shaft;
[0084] The two second driven gears are connected to a coaxial third driven gear via a second synchronous belt, and the two third driven gears are respectively fixed to two sides of the third servo motor housing via shafts.
[0085] A preferred technical solution of this embodiment: the first clamping mechanism 53 drives the clamping jaws to loosen and clamp via a cylinder.
[0086] A preferred technical solution of this embodiment: the feeding and dispensing station equipment 21 includes:
[0087] A second frame 211;
[0088] A first X-axis mechanism 212 having a first X-axis moving portion is disposed on the second frame 211;
[0089] At least one set of first loading fixtures 213 installed on the first X-axis moving part and driven by the first X-axis mechanism 212 to move in the X-axis, wherein the first loading fixtures 213 are used to load the boiler;
[0090] A first gantry 214 mounted on the second frame 211;
[0091] A first YZ axis mechanism 215 installed at the crossbeam on the first gantry 214 and having a first Z-direction moving portion;
[0092] A first glue dispensing device is installed on the first Z-axis moving part and is driven by the first YZ-axis mechanism 215 to move in the YZ direction. The first glue dispensing device dispenses glue to the boiler on the first material loading fixture 213 .
[0093] A preferred technical solution of this embodiment: the first screw driving station equipment 11 includes:
[0094] The third rack 111;
[0095] Two sets of second X-axis mechanisms 112 are arranged on the third frame 111, and each of the two sets of second X-axis mechanisms 112 has a second X-direction moving part;
[0096] At least one set of second loading fixtures 113 installed on the second X-axis moving portion and driven by the second X-axis mechanism 112 to move in the X-axis, the second loading fixtures 113 being used to load the boiler;
[0097] A second gantry 114 mounted on the second frame 111;
[0098] A second YZ axis mechanism 115 installed at the crossbeam on the second gantry 114 and having a second Z-direction moving portion;
[0099] A screw driving device 116 is installed on the second Z-axis moving portion and driven by the second YZ-axis mechanism 115 to move in the YZ direction. The screw driving device 116 drives screws on the boiler on the second loading fixture 113 .
[0100] A preferred technical solution of this embodiment: the second manipulator device 6 includes:
[0101] A fifth frame 61 has a packaging cavity and a second platform 62 on the top, and a second electrical control system is arranged in the packaging cavity to control the operation of the second multi-axis manipulator;
[0102] The second multi-axis robot is installed on the second platform 62 , and a second clamping mechanism 610 is installed on the outer end of the second end shaft 69 of the second multi-axis robot.
[0103] A preferred technical solution of this embodiment: the second multi-axis manipulator is a four-axis manipulator, and the four-axis manipulator includes:
[0104] The first shaft power source 64 is fixed on the second platen 62 through a box structure; it is provided with a 1# servo motor and drives the first rotating shaft 65 thereon to make horizontal circular motion through the 1# servo motor;
[0105] The second shaft power source 66 is axially connected to the upper side of the outer end of the first rotating shaft 65. The power source in the housing of the second shaft power source is a 2# servo motor, and the 2# servo motor reversely drives the shaft rod to make horizontal circular motion;
[0106] The third shaft power source 67 is installed in the vertical hole at the outer end of the housing of the second shaft power source, and its power source is a 3# servo motor, which drives a lifting rod 68 to perform lifting motion;
[0107] One end of the second distal shaft 69 is connected to the lower end of the lifting rod 68 , and the other end of the second clamping mechanism 610 is installed.
[0108] A preferred technical solution of this embodiment: the second clamping mechanism 610 drives the clamping jaws to loosen and clamp via a cylinder.
[0109] Embodiment 2:
[0110] The present invention is applied to the working principle of the automatic loading and unloading equipment of the boiler for steam ironing machine:
[0111] Step 1: Clamp the boiler on the feeding conveyor line and feed it into the first loading fixture 213 on the feeding and dispensing station equipment 21 through the first multi-axis manipulator 52. The first loading fixture 213 is provided with two groups. When one group is dispensing, the other group is loading;
[0112] Step 2: The first YZ axis mechanism 215 drives the first glue dispensing device to move to the top of the first loading fixture 213 after the boiler is loaded and dispense glue;
[0113] Step 3: After the first loading fixture 213 on one side has finished dispensing, the first YZ-axis mechanism 215 drives the first dispensing device to move in the Y-axis direction to the top of the other first loading fixture 213. At this time, the first loading fixture 213 carries the boiler to be dispensed, and the boiler on the other side that has been dispensed is clamped by the first multi-axis manipulator 52 and sent to the second loading fixture 113 on the first screw-driving station;
[0114] Step 4: The second X-axis mechanism 112 drives the boiler to the screwing position, and the second YZ-axis mechanism 115 drives the screwing device to the top of the second loading fixture 113 and screws it. The second loading fixture 113 is provided with two groups, and screwing is performed alternately;
[0115] Step 5: The first multi-axis manipulator 52 clamps the boiler with screws already fastened and sends it to the riveting station equipment 3;
[0116] Step 6: The riveting station equipment 3 performs riveting processing on the riveted parts of the boiler. After the riveting is completed, the second multi-axis manipulator sequentially sends the boiler to the first glue dispensing station equipment 22 and the second glue dispensing station equipment 23 for dispensing of different glues;
[0117] Step seven, after the boiler dispensing in step six is completed, the second multi-axis manipulator sends the boiler to the finished product receiving tray 4 and arranges the tray.
[0118] Step 8: The above steps 1 to 7 are executed in a loop.
[0119] In summary, the automatic loading and unloading equipment of the present invention delivers the boiler to the processing position in sequence according to the process through automated mechanical equipment, thereby improving the processing efficiency of the boiler and also improving the accuracy of glue dispensing.
[0120] The above description is only a preferred embodiment of the present invention, and does not limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made by using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. An automatic loading and unloading device for a boiler for a steam ironing machine, characterized in that: include: The first manipulator device (5) performs a circular transporting action of the boiler (7) to the feeding and gluing station, the second set of screw locking stations, and the riveting station in sequence; A material feeding and glue dispensing station device (21) comprises a first material loading fixture (213) capable of moving in the X direction and a first glue dispensing device capable of moving in the YZ direction, wherein the first material loading fixture (213) and the first glue dispensing device have intersecting moving tracks; A first screw driving station device (11) comprises a second material loading fixture (113) capable of moving in the X direction and a screw driving device (116) capable of moving in the YZ direction, wherein the second material loading fixture (113) and the screw driving device have intersecting moving tracks; A second screw-driving station device (12) has the same structure as the first screw-driving station device (11), and is located at the next station of the first screw-driving station device (11); The riveting station equipment (3) comprises a fourth frame (33), a hydraulic device (31) mounted on the fourth frame (33) and having a lifting structure, a riveting head mounted on the lower end of the hydraulic device (31), and a third material loading fixture (32) mounted on the fourth frame (33) and located directly below the riveting head; The second manipulator device (6) performs a circular transporting action of the boiler (7) to the riveting station, the second group of glue dispensing stations, and the finished product discharging station in sequence; A first glue dispensing station device (22) and a second glue dispensing station device (23) having the same structure as the feeding and glue dispensing station device (21); A finished product receiving tray (4) for receiving and loading the boilers that have completed processing; The first manipulator device (5) comprises: A first frame (51) has a packaging cavity and a first platform on the top, wherein a first electrical control system is arranged in the packaging cavity to control the operation of a first multi-axis manipulator (52); A first multi-axis manipulator (52) is mounted on the first platform, and a first clamping mechanism (53) is mounted on the outer end of the first end axis (526); The first multi-axis manipulator (52) is a six-axis manipulator, and the six-axis manipulator comprises: A first shaft driving part (521) is fixedly mounted on the first platform; it is provided with a first servo motor and a first rotating part thereon is driven by the first servo motor to perform horizontal circular motion; A second shaft driving part (522) is fixedly mounted on the first rotating part, and its power source is a second servo motor. The second servo motor drives a second rotating part (523) clamped on the second servo motor housing to rotate on the Z-direction surface. The second rotating part (523) drives a third rotating part (524) to rotate on the Z-direction surface through the transmission of a pulley and a gear. The third shaft driving part (525) has a third servo motor, and the third servo motor housing is clamped on both sides by the outer ends of the third rotating part (524). The third rotating part (524) drives the third servo motor to rotate in the Z direction through the transmission of the belt, and the driving end of the third servo motor drives the turntable assembly at its end to rotate in a circle; A first end shaft (526), one end of which is connected to the turntable assembly and the other end of which is mounted with the clamping mechanism (53); Coaxial driving gears are installed on the shaft holes on both sides of the second servo motor housing, and the two coaxial driving gears are respectively connected to the coaxial first passive gears through the first synchronous belt; A first transmission shaft is fixedly arranged between the two coaxial first passive gears, a first transmission gear is sleeved on the first transmission shaft, a second transmission shaft is installed in one end of the outer shell of the third rotating part (524), and a second transmission gear meshing with the first transmission gear is sleeved on the second transmission shaft, and coaxial second passive gears are connected at both ends of the second transmission shaft; The two second driven gears are connected to a coaxial third driven gear via a second synchronous belt, and the two third driven gears are respectively fixed to two sides of the third servo motor housing via shafts; The second manipulator device (6) comprises: A fifth frame (61) has a packaging cavity and a second platform (62) on the top, wherein a second electrical control system is arranged in the packaging cavity to control the operation of a second multi-axis manipulator; A second multi-axis manipulator is mounted on the second platform (62), and a second clamping mechanism (610) is mounted on the outer end of the second end axis (69); The second multi-axis manipulator is a four-axis manipulator, and the four-axis manipulator comprises: The first shaft power source (64) is fixedly mounted on the second platform (62) through a box structure; it is provided with a 1# servo motor and the 1# servo motor drives the first rotating shaft (65) thereon to perform horizontal circular motion; A second shaft power source (66) is axially connected to the upper side of the outer end of the first rotating shaft (65), and the power source in the housing of the second shaft power source is a 2# servo motor, and the 2# servo motor reversely drives the shaft rod to make horizontal circular motion; A third shaft power source (67) is installed in the vertical hole at the outer end of the housing of the second shaft power source, and its power source is a 3# servo motor, which drives a lifting rod (68) to perform lifting motion; One end of the second distal shaft (69) is connected to the lower end of the lifting rod (68), and the other end of the second clamping mechanism (610) is installed.
2. The automatic loading and unloading equipment for a boiler for a steam ironing machine according to claim 1, characterized in that: The first clamping mechanism (53) drives the clamping jaws to loosen and clamp via a cylinder.
3. The automatic loading and unloading equipment for a boiler for a steam ironing machine according to claim 1, characterized in that: The feeding and glue dispensing station equipment (21) comprises: A second frame (211); A first X-axis mechanism (212) provided on the second frame (211) and having a first X-direction moving portion; At least one set of first loading jigs (213) installed on the first X-axis moving part and driven by the first X-axis mechanism (212) to move in the X-axis, the first loading jigs (213) being used to load the boiler; a first gantry (214) mounted on the second frame (211); A first YZ axis mechanism (215) installed at the crossbeam on the first gantry (214) and having a first Z-direction moving part; A first glue dispensing device is installed on the first Z-axis moving part and is driven by the first YZ-axis mechanism (215) to move in the YZ direction, wherein the first glue dispensing device dispenses glue to the boiler on the first material loading fixture (213).
4. The automatic loading and unloading equipment for a boiler for a steam ironing machine according to claim 1, characterized in that: The first screw driving station equipment (11) comprises: A third frame (111); Two sets of second X-axis mechanisms (112) are arranged on the third frame (111), and the two sets of second X-axis mechanisms (112) each have a second X-direction moving part; at least one set of second loading jigs (113) installed on the second X-axis moving part and driven by the second X-axis mechanism (112) to move in the X-axis, the second loading jigs (113) being used to load the boiler; A second gantry (114) mounted on the third frame (111); A second YZ axis mechanism (115) installed at the crossbeam on the second gantry (114) and having a second Z-direction moving portion; A screw driving device (116) is installed on the second Z-axis moving part and is driven by the second YZ-axis mechanism (115) to move in the YZ direction. The screw driving device (116) drives screws on the boiler on the second loading fixture (113).
5. The automatic loading and unloading equipment for a boiler for a steam ironing machine according to claim 1, characterized in that: The second clamping mechanism (610) drives the clamping jaws to loosen and clamp via a cylinder.