Bridge structure connection nodes and construction methods

By adopting a combined design of movable support seat, peripheral connecting parts and fixed connectors in the bridge structure, the problem of insufficient stress on the structure of traditional steel cover beams and column connection methods is solved, and the risk of bending and cracking is reduced and stability is improved. and the effect of resource utilization efficiency.

CN111979902BActive Publication Date: 2024-12-06TONGJI UNIV ARCHITECTURAL DESIGN INST GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010888302.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-08-28
Publication Date
2024-12-06
Estimated Expiration
2040-08-28

AI Technical Summary

Technical Problem

The structure of traditional steel cover beams and column connections have poor stress, which leads to severe impact loads and bending moments applied to the columns during construction, which can easily lead to column bending and cracks, especially in areas with high earthquake intensity.

Method used

A bridge structure is used to connect nodes, including a movable support seat, an peripheral connecting component and a fixed connector. Temporary support is provided through the movable support seat, and the bending moment of the cover beam and the constant carrier is released in stages. The horizontal position is locked with the peripheral connecting component, and finally the fixed position is filled. The connecting body forms an integral combined structure to enhance support and stiffness.

Benefits of technology

Effectively reduce the risk of bending and cracks to the load-bearing structure during construction, ensure the stability of the overall horizontal position, reduce the usage of the cover beam structure, save engineering cost, reduce construction equipment requirements, improve the rationality of resource allocation, and reduce Construction costs and construction periods.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111979902B_ABST
    Figure CN111979902B_ABST
Patent Text Reader

Abstract

The present invention relates to a bridge structure connection node and construction method, including: a movable support seat, arranged between a bearing structure and a cap beam structure, for movably supporting the cap beam body; a peripheral connection component, arranged around the bearing structure and the cap beam structure, for circumferentially connecting the bearing structure and the cap beam structure; a fixed connection body, arranged around the movable support seat and filled between the bearing structure and the cap beam body, for fixedly connecting the bearing structure and the cap beam body. The connection method of this embodiment has good structural stress resistance, and the impact load and bending moment applied to the bearing structure will not cause damage to the column; the peripheral connection component can prevent the bearing structure and the cap beam structure from horizontal relative sliding in unexpected situations, and avoid safety accidents caused by position displacement.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of building construction, and in particular to a bridge structure connection node and a construction method. Background Art

[0002] For elevated bridge projects in urban areas with busy ground traffic, the traditional on-site cast concrete construction method directly carries out on-site construction at the bridge site, which will block traffic for a long time and generate significant construction pollution, and cannot meet the current requirements for ecological construction and environmental protection. In addition, the repeated configuration of construction equipment and auxiliary facilities results in large consumption of resources and energy, and waste of financial and material resources.

[0003] Different from the traditional cast-in-place construction method, the "prefabricated bridge construction method" that adopts factory prefabrication and on-site assembly completes most of the work in the factory. With the increase of the assembly rate, on-site construction work becomes very small, which can not only avoid the impact on traffic to a large extent, but also effectively reduce the impact on the surrounding environment during the construction process, and improve the rationality of resource allocation. It is a concrete manifestation of "green building" and "building industrialization" in bridge engineering.

[0004] There are many structural forms and many years of practical experience in the prefabrication of superstructures in municipal bridges. Prefabricated columns have also been used in recent years. However, the weight of concrete bridge cap beams with six lanes or more in both directions is generally more than 250t. On the one hand, prefabrication is difficult and requires customized specially processed formwork and tire frames. On the other hand, transportation and lifting are difficult, and construction costs increase significantly. In addition, the connection quality between the heavy cap beam and the bottom column cannot be guaranteed. All these limit the application of large prefabricated cap beams, especially in areas with high earthquake intensity.

[0005] In order to solve this problem, the use of steel cap beams can be considered, which can reduce the weight of the upper prefabricated structure to a certain extent. However, during the construction process, the steel cap beam and the column are directly and simply combined and connected, and the structure has poor stress resistance. In particular, when the constant load is constructed on the cap beam, it will continuously apply severe impact loads to the column, and it is easy to increase the bending moment borne by the column. Once the bending moment reaches a certain value, it is easy to cause the column to bend and crack. Summary of the invention

[0006] Based on this, it is necessary to provide a bridge structure connection node and construction method to address the problems that the traditional connection method between the steel cap beam and the column has poor structural stress and the impact load and bending moment applied to the column can easily cause damage to the column.

[0007] A bridge structure connection node, comprising:

[0008] A movable support seat is provided between the bearing structure and the cap beam structure, and is used for movably supporting the cap beam body;

[0009] A peripheral connection component is arranged around the bearing structure and the cap beam structure, and is used to circumferentially connect the bearing structure and the cap beam structure;

[0010] A fixed connecting body is arranged around the movable supporting seat and filled between the bearing structure and the cap beam body, and is used for fixedly connecting the bearing structure and the cap beam body.

[0011] The above-mentioned bridge structure connection node has at least the following beneficial technical effects:

[0012] During the construction process, the cap beam structure and the bearing structure are not directly rigidly connected as a whole. Instead, the cap beam structure is divided into a cap beam body and a constant carrier. A movable support seat is first set up to provide temporary support, and then the cap beam body is hoisted in turn and the constant carrier is laid on the cap beam body. Before the construction of the constant carrier stage, a temporary hinged movable support seat is set up to release the bending moment of the cap beam body and the constant carrier on the top of the bearing structure in stages, thereby avoiding continuous application of severe impact loads and bending moments to the bearing structure during construction. The release of the bending moment effectively reduces the risk of bending and cracking of the bearing structure.

[0013] In this embodiment, during the construction process, since the cap beam structure and the bearing structure are not directly and integrally rigidly connected, they are prone to horizontal relative movement in the event of a disaster such as an earthquake. Therefore, the bearing structure and the cap beam structure are circumferentially connected using peripheral connecting components, which can lock the horizontal relative position between the cap beam structure and the bearing structure, avoid horizontal relative slippage between the bearing structure and the cap beam structure in unexpected circumstances, ensure the stability of the overall horizontal position, and avoid safety accidents caused by position offset.

[0014] The subsequently filled fixed connector and the cap beam body together form an integral combined structure, which enhances the support and structural rigidity, and is conducive to further reducing the design thickness of the top and bottom plates of the cap beam body. When the thickness of the top and bottom plates is reduced, the pressure and bending moment on the bearing structure will also be reduced.

[0015] In this embodiment, the fixed connector is filled last, and the bearing structure has sufficient time to shrink and settle to finalize. After finalization, the fixed connector is filled to form a post-casting strip, so that the settlement of the bearing structure will not cause deformation cracks at the connection, ensuring the safety of the force at the connection. The design of this embodiment is conducive to reducing the amount of cap beam structure, thereby saving engineering costs.

[0016] This embodiment can be applied to the connection and installation of the steel cap beam and the concrete bearing structure. Since it is conducive to reducing the structural weight of the prefabricated cap beam, the requirements for construction equipment are reduced, which is conducive to the full prefabrication of the bridge structure. The cap beam structure can generally be pre-prepared in a processing plant with high processing precision and strict quality inspection, which can largely avoid the impact on traffic, improve the rationality of resource allocation, and avoid waste of resources and financial consumption. The subsequent on-site foundation engineering and bridge structure can be constructed and completed simultaneously, and the quality of on-site connection and welding is more controllable. The weight of the cap beam structure is reduced, and transportation and installation are convenient, which reduces construction costs and shortens construction period.

[0017] In one embodiment, the peripheral connection component includes:

[0018] A flange is arranged around the circumference of the cap beam structure, and a connection hole is provided on the surface of the flange;

[0019] A connecting rib, comprising an anchor end and a connecting end, wherein the anchor end is anchored to the bearing structure, and the connecting end extends toward the cap beam structure and passes through the bottom plate of the cap beam structure and the connecting hole in sequence;

[0020] A fastener is installed at the connection end, and the fastener can abut against the surface of the flange to fasten the bearing structure and the cap beam structure.

[0021] In one of the embodiments, reinforcing ribs are distributed on the surface of the flange, and the reinforcing ribs are perpendicular to the surface of the flange.

[0022] In one of the embodiments, there are a plurality of connection holes, which are sequentially arranged along the circumferential direction of the flange; and there are a plurality of connection ribs, which pass through each of the connection holes respectively.

[0023] In one of the embodiments, the connection holes are symmetrically distributed on the surface of the flange.

[0024] In one of the embodiments, the connecting ribs are embedded in the bearing structure, and thus prefabricated integrally with the bearing structure.

[0025] In one embodiment, the fastener comprises a fastening nut, and the connecting rib comprises a steel rib.

[0026] In one embodiment, the fixed connection body comprises UHPC.

[0027] In one embodiment, the movable support seat includes a pad stone and a plate support arranged on the pad stone.

[0028] A construction method for a bridge structure connection node, comprising:

[0029] The movable support seat is arranged on the surface of the bearing structure formed by construction, and the cap beam body is suspended on the movable support seat, and the movable support seat is used to provide temporary movable support for the cap beam body;

[0030] Disposing a peripheral connection component around the load-bearing structure and the cap beam structure, thereby circumferentially connecting the load-bearing structure and the cap beam structure;

[0031] After the permanent carrier is constructed and arranged on the surface of the cap beam body, a fixed connecting body is filled between the bearing structure and the cap beam body around the movable support seat to form a bridge structure connection node. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] Figure 1 A schematic diagram of a bridge structure connection node provided by an embodiment of the present invention;

[0033] Figure 2 for Figure 1 A top view of

[0034] Figure 3 for Figure 2 BB section view;

[0035] Figure 4 for Figure 2 CC section view;

[0036] Figure 5 A schematic diagram of hanging the cap beam body on the movable support seat;

[0037] Figure 6 A schematic diagram of arranging a constant carrier on the surface of the cap beam body;

[0038] Figure 7 A schematic diagram of a bridge structure connection node formed by filling a fixed connection body between the bearing structure and the cap beam body around the movable support seat;

[0039] In the figure, 100, bridge structure connection node; 110, movable support seat; 111, pad stone; 112, plate support; 120, fixed connection body; 130, peripheral connection component; 131, flange; 131a, connection hole; 131b, reinforcing rib plate; 132, connection rib; 133, fastener;

[0040] 200, load-bearing structure;

[0041] 300. Cap beam structure; 310. Cap beam body; 320. Constant carrier; 301. Base plate. DETAILED DESCRIPTION

[0042] The present invention will be further described below in conjunction with the accompanying drawings.

[0043] To facilitate understanding of the present invention, various embodiments defined by the claims of the present invention will be described more fully below with reference to the relevant drawings. Preferred embodiments of the present invention are given in the drawings, which contain various specific details to assist in this understanding, but these details should be regarded as exemplary only. However, the present invention can be implemented in many different forms and is not limited to the embodiments described herein. Accordingly, those of ordinary skill in the art will recognize that changes and improvements may be made to the various embodiments described herein without departing from the scope of the present invention defined by the appended claims. In addition, for the sake of clarity and brevity, descriptions of well-known functions and configurations may be omitted.

[0044] It will be apparent to those skilled in the art that the following description of various embodiments of the present invention is provided for illustrative purposes only and not for the purpose of limiting the invention as defined by the appended claims.

[0045] Throughout the specification and claims of this application document, the words "include" and "comprise" and variations of the words, such as "include" and "include" mean "including but not limited to", and are not intended to (and will not) exclude other components, integers or steps. Features, integers or characteristics described in conjunction with a particular aspect, embodiment or example of the present invention will be understood to be applicable to any other aspect, embodiment or example described herein, unless incompatible therewith.

[0046] It should be understood that the singular forms "a", "an", and "the" include plural references unless the context clearly dictates otherwise. The expressions "including" and / or "may include" used in the present invention are intended to indicate the presence of corresponding functions, operations, or elements, and are not intended to limit the presence of one or more functions, operations, and / or elements. In addition, in the present invention, the terms "including" and / or "having" are intended to indicate the presence of characteristics, quantities, operations, elements, and components, or combinations thereof, disclosed in the application documents. Therefore, the terms "including" and / or "having" should be understood as additional possibilities of one or more other characteristics, quantities, operations, elements, and components, or combinations thereof.

[0047] In the present invention, the expression "or" includes any or all combinations of the words listed together. For example, "A or B" may include A or B, or may include both A and B.

[0048] It should be understood that when an element is referred to as being "fixed to" another element, it can be directly on the other element or there can also be an intervening element; when an element is considered to be "connected" or "coupled" to another element, it can be directly or coupled to the other element or there can also be an intervening element.

[0049] The terms “upper”, “lower”, “left”, “right”, etc. mentioned in the text are only used to indicate relative position relationships. When the absolute position of the object being described changes, the relative position relationship may also change accordingly.

[0050] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by those skilled in the art to which the present invention belongs. It should also be understood that terms, such as those defined in commonly used dictionaries, should be interpreted as having a meaning consistent with the context of the relevant field and this specification, and should not be interpreted in an idealized or overly formal sense unless explicitly defined as such herein. The term "and / or" as used herein includes any and all combinations of one or more of the relevant listed items.

[0051] like Figure 1 As shown, in one embodiment of the present invention, a bridge structure connection node is provided, comprising:

[0052] The movable support seat 110 is disposed between the bearing structure 200 and the cap beam structure 300 and is used to movably support the cap beam body 310;

[0053] A peripheral connection component 130 is disposed around the bearing structure 200 and the cap beam structure 300 and is used to circumferentially connect the bearing structure 200 and the cap beam structure 300;

[0054] The fixed connection body 120 is arranged around the movable support seat 110 and filled between the bearing structure 200 and the cap beam body 310 , and is used for fixedly connecting the bearing structure 200 and the cap beam body 310 .

[0055] For specific applications, refer to Figure 5 After the load-bearing structure 200 (column) is formed, the movable support seat 110 is set on the surface of the load-bearing structure 200, and then the cap beam body 310 is suspended on the movable support seat 110, and the movable support seat 110 is used to provide temporary movable support for the cap beam body 310, and a peripheral connecting component 130 is set around the load-bearing structure 200 and the cap beam structure 300, so as to circumferentially connect the load-bearing structure 200 and the cap beam structure 300; refer to Figure 6 , the constant carrier 320 structure is constructed and arranged on the surface of the cap beam body 310; finally, Figure 7 , a fixed connection body 120 is filled between the bearing structure 200 and the cap beam body 310 around the movable support seat 110 to form a bridge structure connection node. It is worth noting that the above-mentioned permanent carrier 220 may include a cap beam upper structure and a top pad stone.

[0056] During the construction process, the cap beam structure 300 and the bearing structure 200 are not directly rigidly connected as a whole, but the cap beam structure 300 is divided into a cap beam body 310 and a permanent carrier 320. A movable support seat 110 is first set to provide temporary support, and then the cap beam body 310 is hoisted in turn and the permanent carrier 320 is laid on the cap beam body 310. Before the construction of the permanent carrier 320, the movable support seat 110 is temporarily hinged to release the bending moment of the cap beam body 310 and the permanent carrier 320 on the top of the bearing structure 200 in stages, thereby avoiding continuous application of severe impact loads and bending moments to the bearing structure 200 during construction. The release of the bending moment effectively reduces the risk of bending and cracking of the bearing structure 200.

[0057] In this embodiment, during the construction process, since the cap beam structure 300 and the bearing structure 200 are not directly and integrally rigidly connected, they are prone to horizontal relative movement in the event of a disaster such as an earthquake. Therefore, the peripheral connecting components 130 are used to circumferentially connect the bearing structure 200 and the cap beam structure 300, so as to lock the horizontal relative position between the cap beam structure 300 and the bearing structure 200, thereby preventing the bearing structure 200 and the cap beam structure 300 from horizontal relative slipping in unexpected circumstances, thereby ensuring the stability of the overall horizontal position and preventing safety accidents caused by position offset.

[0058] The subsequently filled fixed connector 120 and the cap beam body 310 with prestress applied on the upper edge together form an integral combined structure, which optimizes the stress of the cap beam structure 300 and enhances the structural rigidity, which is conducive to further reducing the design thickness of the top and bottom plates of the cap beam body 310. When the thickness of the top and bottom plates is reduced, the pressure and bending moment on the bearing structure 200 will also be reduced.

[0059] In this embodiment, the fixed connector 120 is filled last, and the bearing structure 200 has sufficient time to shrink and settle to finalize. After finalization, the fixed connector 120 is filled to form a post-casting strip, so that the settlement of the bearing structure 200 will not cause deformation cracks at the connection, ensuring the safety of the force at the connection. The design of this embodiment is conducive to reducing the amount of the cap beam structure 300, thereby saving engineering costs.

[0060] This embodiment can be applied to the connection and installation of the steel cap beam and the concrete bearing structure 200. Since it is conducive to reducing the structural weight of the prefabricated cap beam, the requirements for construction equipment are reduced, which is conducive to the full prefabrication of the bridge structure. The cap beam structure 300 can generally be pre-prepared in a processing plant with high processing precision and strict quality inspection, which can largely avoid the impact on traffic, improve the rationality of resource allocation, and avoid waste of resources and financial consumption; subsequent on-site foundation engineering and bridge structure can be constructed and completed simultaneously, and the quality of on-site connection and welding is more controllable; the cap beam structure 300 is lightened, and transportation and installation are convenient, which reduces construction costs and shortens construction period.

[0061] refer to Figure 1-Figure 4 In some embodiments, the peripheral connection component 130 includes:

[0062] A flange 131 is arranged around the circumference of the cap beam structure 300, and a connection hole 131a is provided on the surface of the flange 131;

[0063] The connecting rib 132 includes an anchoring end and a connecting end, wherein the anchoring end is anchored to the bearing structure 200, and the connecting end extends toward the cap beam structure 300 and passes through the bottom plate 301 of the cap beam structure 300 and the connecting hole 131a in sequence;

[0064] The fastener 133 is installed at the connection end, and the fastener 133 can abut against the surface of the flange 131 to fasten the support structure 200 and the cap beam structure 300 .

[0065] Specifically, after the construction and installation of the bearing structure 200, the movable support seat 110 is set on the surface of the bearing structure 200, and then the cap beam body 310 is suspended on the movable support seat 110, and the movable support seat 110 is used to provide temporary support for the cap beam body 310; a flange 131 is set around the circumference of the cap beam structure 300, and the connecting ends of the connecting ribs 132 such as steel ribs are passed through the bottom plate 301 of the cap beam structure 300 and the connecting holes 131a in turn, and fasteners 133 such as fastening nuts are temporarily installed on the connecting ends, thereby temporarily connecting the bearing structure 200 and the cap beam structure 300 around the circumference; a constant carrier 320 is arranged on the surface of the cap beam body 310, and then the fasteners 133 are operated to make the fasteners 133 firmly abut against the surface of the flange 131, thereby fastening and connecting the bearing structure 200 and the cap beam structure 300; finally, a fixed connector 120 is filled between the movable support seat 110, the bearing structure 200 and the cap beam body 310.

[0066] In this embodiment, the connecting ribs 132 arranged around the circumference can temporarily connect the cap beam structure 300 and the bearing structure 200, and can limit the relative position between the cap beam structure 300 and the bearing structure 200 in the horizontal direction during the installation process, thereby avoiding relative horizontal slippage between the bearing structure 200 and the cap beam structure 300 in unexpected situations, ensuring the stability of the overall horizontal position, and avoiding safety accidents caused by position deviation.

[0067] Finally, the fastener 133 is firmly abutted against the surface of the flange 131, and the fastener 133 can limit the cap beam structure 300 from moving upward away from the bearing structure 200 in case of an accident; the flange 131 has the ability to bear and resist pressure, and can absorb the load when the cap beam structure 300 is bearing, avoiding excessive pressure on the bearing structure 200 below. Therefore, the peripheral connection component 130 of this embodiment can effectively limit the upper and lower positions of the cap beam structure 300, avoiding it from detaching from the bearing structure 200 below or applying excessive pressure on the bearing structure 200, thereby improving the safety of use.

[0068] refer to Figure 2 In some embodiments, the surface of the flange 131 is provided with reinforcing ribs 131b, and the reinforcing ribs 131b are perpendicular to the surface of the flange 131. The flange 131 of this embodiment can fully absorb the load when the cap beam structure 300 is loaded by its load-bearing and compressive resistance, avoiding excessive pressure on the load-bearing structure 200 below. The reinforcing ribs 131b can enhance the overall strength and rigidity of the flange 131, so that the load can be stably absorbed and deformation can be avoided during use.

[0069] refer to Figure 2 and Figure 3 In some embodiments, there are a plurality of connection holes 131a, which are sequentially arranged along the surrounding direction of the flange 131; and there are a plurality of connection ribs 132, which pass through each of the connection holes 131a. After the connection ribs 132 pass through each of the connection holes 131a, they can surround the cap beam structure 300 and the bearing structure 200 in the entire circumference, and can limit the relative position between the cap beam structure 300 and the bearing structure 200 from any direction on the horizontal plane during the installation process, so as to prevent the bearing structure 200 and the cap beam structure 300 from sliding horizontally in any direction in an unexpected situation, thereby ensuring the stability of the overall horizontal position of the cap beam structure 300 and the bearing structure 200, and more effectively preventing safety accidents caused by position offset.

[0070] refer to Figure 2 In some embodiments, the connection holes 131a are symmetrically distributed on the surface of the flange 131. After the connection holes 131a are symmetrically arranged, the connection ribs 132 passing through the connection holes 131a are symmetrically arranged around the cap beam structure 300 and the bearing structure 200, which can evenly limit the relative position between the cap beam structure 300 and the bearing structure 200 from all directions in the horizontal plane, ensure the balance of the relative position restriction of the cap beam structure 300 and the bearing structure 200 from all directions, improve the balance stability of the horizontal relative position of the bearing structure 200 and the cap beam structure 300, and more effectively ensure the safety of use.

[0071] In some embodiments, the connecting ribs 132 are pre-buried in the bearing structure 200, that is, the connecting ribs 132 and the bearing structure 200 are directly prefabricated as one piece. The one-piece prefabrication method can avoid damage to the bearing structure 200 when the connecting ribs 132 are anchored inside the bearing structure 200 after the bearing structure 200 is formed, and can ensure the stability of the connection between the connecting ribs 132 and the bearing structure 200.

[0072] Of course, in some other embodiments, the connecting ribs 132 may be drilled directly into the interior of the bearing structure 200 after the bearing structure 200 is constructed and installed, which is not limited here.

[0073] In some embodiments, the fixed connector 120 includes UHPC. Specifically, UHPC (Ultra-High Performance Concrete) has ultra-high durability and ultra-high mechanical properties, and its compressive strength is greater than 120 MPa. The design theory of ultra-high performance concrete is the maximum packing density theory (densified particle packing), and its constituent materials have different particle sizes that form the most dense packing in the best proportion, that is, the gaps between the millimeter-level particles (aggregates) are filled with micron-level particles (cement, fly ash, mineral powder), and the gaps between the micron-level particles are filled with submicron-level particles (silica ash).

[0074] Using UHPC as the fixed connector 120 can enhance the compressive performance of the load-bearing structure 200. The filled UHPC and the cap beam body 310 with prestress applied on the upper edge together form an integral combined structure, which optimizes the force on the cap beam structure 300 and enhances the structural rigidity, which is conducive to further reducing the design thickness of the top and bottom plates of the cap beam body 310. When the thickness of the top and bottom plates is reduced, the pressure and bending moment on the load-bearing structure 200 will also be reduced.

[0075] refer to Figure 3 In some embodiments, the movable support seat 110 includes a pad stone 111 and a plate support 112 arranged on the pad stone 111 .

[0076] Specifically, during construction, after the bearing structure 200 is formed, the pad stones 111 and plate supports 112 of appropriate sizes are sequentially arranged on the surface of the bearing structure 200, and the cap beam body 310 and the constant carrier 320 are sequentially suspended on the plate supports 112, and the pad stones 111 and the plate supports 112 are used to provide temporary support for the cap beam body 310.

[0077] The pad stone 111 and the plate support 112 in this embodiment have a large contact surface, which can provide stable temporary support for the cap beam body 310, and can release the bending moment of the cap beam body 310 and the constant carrier 320 on the top of the bearing structure 200 in stages in sequence. The release of the bending moment effectively reduces the risk of bending and cracking of the bearing structure 200. In addition, the pad stone 111 of appropriate thickness can be selected as needed to adjust the overall thickness of the movable support seat 110, so that the surface of the cap beam body 310 is maintained at the required height, thereby enhancing the flexibility of use of this embodiment.

[0078] In another embodiment of the present invention, a construction method for a bridge structure connection node is provided, comprising:

[0079] The movable support seat is arranged on the surface of the bearing structure formed by construction, and the cap beam body is suspended on the movable support seat, and the movable support seat is used to provide temporary movable support for the cap beam body;

[0080] Disposing a peripheral connection component around the load-bearing structure and the cap beam structure, thereby circumferentially connecting the load-bearing structure and the cap beam structure;

[0081] After the permanent carrier is constructed and arranged on the surface of the cap beam body, a fixed connecting body is filled between the bearing structure and the cap beam body around the movable support seat to form a bridge structure connection node.

[0082] This embodiment has the following advantages: during the construction process, the cap beam structure 300 and the bearing structure 200 are not directly rigidly connected as a whole, but the cap beam structure 300 is divided into a cap beam body 310 and a constant carrier 320. A movable support seat 110 is first set to provide temporary support, and then the cap beam body 310 is hoisted in turn and the constant carrier 320 is laid on the cap beam body 310. Before the construction stage of the constant carrier 320, the movable support seat 110 is temporarily hinged to release the bending moment of the cap beam body 310 and the constant carrier 320 on the top of the bearing structure 200 in stages, thereby avoiding continuous application of severe impact loads and bending moments to the bearing structure 200 during construction. The release of the bending moment effectively reduces the risk of bending and cracking of the bearing structure 200.

[0083] In this embodiment, during the construction process, since the cap beam structure 300 and the bearing structure 200 are not directly and integrally rigidly connected, they are prone to horizontal relative movement in the event of a disaster such as an earthquake. Therefore, the peripheral connecting components 130 are used to circumferentially connect the bearing structure 200 and the cap beam structure 300, so as to lock the horizontal relative position between the cap beam structure 300 and the bearing structure 200, thereby preventing the bearing structure 200 and the cap beam structure 300 from horizontal relative slipping in unexpected circumstances, thereby ensuring the stability of the overall horizontal position and preventing safety accidents caused by position offset.

[0084] The subsequently filled fixed connector 120 and the cap beam body 310 with prestress applied on the upper edge together form an integral combined structure, which optimizes the stress of the cap beam structure 300 and enhances the structural rigidity, which is conducive to further reducing the design thickness of the top and bottom plates of the cap beam body 310. When the thickness of the top and bottom plates is reduced, the pressure and bending moment on the bearing structure 200 will also be reduced.

[0085] In the above description, although expressions such as "first" and "second" may be used to describe various elements of the present invention, they are not intended to limit the corresponding elements. For example, the above expressions are not intended to limit the order or importance of the corresponding elements. The above expressions are used to distinguish one component from another component.

[0086] The terms used in the specification of the present invention herein are only for the purpose of describing specific embodiments and are not intended to limit the present invention. A singular expression includes a plural expression unless there is a significant difference in context or scheme therebetween.

[0087] The above description is merely an exemplary embodiment of the present invention and is not intended to limit the protection scope of the present invention. The protection scope of the present invention is determined by the appended claims.

[0088] Those skilled in the art will understand that the various technical features of the above-described embodiments may be omitted, added or combined in any manner accordingly. To make the description concise, not all possible combinations of the various technical features in the above-described embodiments are described. However, as long as there is no contradiction in the combination of these technical features, and the simple transformation methods that can be thought of by those skilled in the art and the solutions for making adaptive and functional structural transformations to the prior art should be considered to be within the scope of this specification.

[0089] The above-mentioned embodiments only express several implementation methods of the present invention, and the description thereof is relatively specific and detailed, but it cannot be understood as limiting the scope of the invention patent. It should be pointed out that although the present invention has been shown and described with reference to various embodiments, for ordinary technicians in the field, various deformations and improvements in several forms and details can be made without departing from the concept of the present invention, and without departing from the scope of the present invention defined by the attached claims, all of which belong to the protection scope of the present invention. Therefore, the protection scope of the patent of the present invention shall be based on the attached claims.

Claims

1. A construction method for a bridge structure connection node, characterized in that: The bridge structure connection node includes a movable support seat, a peripheral connection component and a fixed connection body; The movable support seat is arranged between the bearing structure and the cap beam structure, the cap beam structure comprises a cap beam body and a constant carrier, and the movable support seat is used for movably supporting the cap beam body; The peripheral connection component is arranged around the bearing structure and the cap beam structure, and is used to circumferentially connect the bearing structure and the cap beam structure; The fixed connection body is arranged around the movable support seat and filled between the bearing structure and the cap beam body, and is used for fixedly connecting the bearing structure and the cap beam body; The peripheral connection components include: A flange is arranged around the circumference of the cap beam structure, and a connection hole is provided on the surface of the flange; A connecting rib, comprising an anchor end and a connecting end, wherein the anchor end is anchored to the bearing structure, and the connecting end extends toward the cap beam structure and passes through the bottom plate of the cap beam structure and the connecting hole in sequence; A fastener is installed at the connection end, and the fastener can abut against the surface of the flange to fasten the bearing structure and the cap beam structure; a reinforcing rib plate is distributed on the surface of the flange, and the reinforcing rib plate is perpendicular to the surface of the flange; The construction method comprises the following steps: arranging the movable support seat on the surface of the bearing structure formed by construction, and hanging the cap beam body on the movable support seat, and using the movable support seat to provide temporary movable support for the cap beam body; Disposing a peripheral connection component around the load-bearing structure and the cap beam structure, thereby circumferentially connecting the load-bearing structure and the cap beam structure; After the permanent carrier is constructed and arranged on the surface of the cap beam body, a fixed connecting body is filled between the bearing structure and the cap beam body around the movable support seat to form a bridge structure connection node.

2. The construction method of the bridge structure connection node according to claim 1, characterized in that: There are a plurality of connection holes, which are sequentially arranged along the surrounding direction of the flange; and there are a plurality of connection ribs, which pass through each of the connection holes respectively.

3. The construction method of the bridge structure connection node according to claim 1, characterized in that: The connecting holes are symmetrically distributed on the surface of the flange.

4. The construction method of the bridge structure connection node according to claim 1, characterized in that: The connecting ribs are embedded in the bearing structure, and thus prefabricated integrally with the bearing structure.

5. The construction method of the bridge structure connection node according to claim 1, characterized in that: The fastener comprises a fastening nut, and the connecting rib comprises a steel rib.

6. The construction method of the bridge structure connection node according to claim 1, characterized in that: The fixed connection body includes UHPC.

7. The construction method of the bridge structure connection node according to claim 1, characterized in that: The movable support seat comprises a cushion stone and a plate-type support seat arranged on the cushion stone.