Hybrid frame structure system with full-section diaphragm node
Through the connection nodes in the form of full-section partitions of columns, the problems of node stress concentration and construction complexity in the existing technology are solved, the effective connection between steel beams and reinforced concrete columns and the smooth pouring of concrete are realized, and the shear resistance is improved and Convenience of construction simplifies construction process.
Patent Information
- Application Number
- CN202010979974.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-09-17
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2040-09-17
AI Technical Summary
The nodes of the existing reinforced concrete column-steel beam mixed frame structure have problems such as concentrated stress, insufficient shear resistance, high construction complexity, and limited casting space at the connection, resulting in high difficulty in design and construction and poor quality.
The connecting nodes in the form of a column full-section partition are adopted. Through the design of upper and lower node plates, longitudinal reinforcement and horizontal stirrup are set, combined with short beam joints and shear bonds, to achieve effective connection between steel beams and reinforced concrete columns and smooth casting of concrete. , simplify welding workload, improve the seismic performance and construction convenience of nodes.
It avoids stress concentration in the node area, enhances shear resistance, simplifies construction processes, improves the seismic performance and construction quality of nodes, and facilitates the prefabricated and assembled construction of nodes and columns.
Smart Images

Figure CN112031156B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of concrete structures and composite structure buildings, and in particular to a reinforced concrete column-steel beam hybrid frame structure system with nodes connected in the form of column full-section diaphragms. Background Art
[0002] The existing reinforced concrete column-steel beam hybrid frame structure nodes mainly include beam penetration type, column penetration type and end plate high-strength bolt connection type, each of which has the following problems:
[0003] 1. Existing beam through-type nodes ( Figure 4 ), due to the narrow flange of the steel beam, the lever reaction force causes stress concentration in the concrete at the column end, resulting in compressive failure. The energy absorption capacity and ductility of the node are poor, and complex structural measures are needed to avoid this during design. At the same time, since the flange and web of the steel beam pass through the node, the shear stirrups in the node area must be passed through the web, which makes it difficult to configure the stirrups. Moreover, regardless of vertical or horizontal pouring, there are dead corners in the concrete pouring space, making it difficult to ensure the pouring quality.
[0004] 2. Existing column through-type nodes ( Figure 5 ), the flange of the steel beam is not connected, stress concentration occurs at the end plate, the end plate is prone to out-of-plane warping deformation, and it is difficult to ensure the effective transfer of stress from one side to the other side of the beam end; the welds between the steel beam and the end plate have high requirements, and it is difficult for the welding affected area to develop plastic deformation; the node area is not equipped with shear stirrups, and relies on the web and column steel plates for shear resistance, forming a vertically connected and horizontally closed node space, which is only suitable for vertical concrete pouring. It is difficult to realize the integrated prefabrication of nodes and reinforced concrete columns that require horizontal pouring.
[0005] 3. The longitudinal and transverse reserved screw holes of the existing end plate high-strength bolt connection nodes weaken the shear resistance of the concrete in the node area to a certain extent, and the bolts may undergo stress relaxation over time, and their long-term reliability needs further study; the pouring characteristics of the node concrete are similar to those of the column penetration form.
[0006] 4. Regardless of the existing beam-through form or the existing column-through form, the steel arrangement in the node area is relatively complicated, the welding workload is large, the node production and assembly are complicated, the stirrups in the node area are difficult to configure, and the space for concrete pouring and vibration is small, which is neither convenient for factory prefabrication nor conducive to on-site pouring construction.
[0007] Therefore, it is necessary to study and design a hybrid frame structure system with more comprehensive performance. Summary of the invention
[0008] In response to the deficiencies in the art, the present invention provides a hybrid frame structure system that uses full-section column diaphragms to connect nodes, thereby avoiding pressure damage at the column ends, ensuring effective transmission of horizontal shear forces, and improving the seismic performance of the nodes; at the same time, it reduces the welding workload, lowers the difficulty of construction, facilitates the integrated prefabrication of nodes and columns and the assembly construction of the system, saves labor and effort, and improves construction speed and quality.
[0009] A reinforced concrete column-steel beam hybrid frame structure system using column full-section diaphragm form to connect nodes, wherein the reinforced concrete column and the steel beam are connected in the node area by upper and lower node plates in the form of column full-section diaphragms.
[0010] In order to avoid the pressure damage of the node column end caused by local stress concentration and ensure that the connection of the left and right steel beam flanges has sufficient strength and rigidity, the present invention adopts a horizontal node plate in the form of a full-section diaphragm of the column (for example, Figure 1-Figure 3 The structure shown). The horizontal node plate in the form of a full-section partition cuts off the entire section of the column horizontally, which is not conducive to the arrangement of the longitudinal reinforcement of the column and difficult to pour the node and column concrete. It is generally considered unfeasible. However, the present invention adopts reverse thinking, taking the integrated factory prefabrication of reinforced concrete columns and nodes, that is, the horizontal pouring of concrete as the starting point, and only one horizontal node plate is set in the node, one above and one below, excluding all other steel plates, which facilitates the configuration of the stirrups in the node and forms an unobstructed space for the horizontal pouring of concrete.
[0011] The upper and lower node plates are both partitions covering the entire section of the column, and are provided with avoidance holes for the longitudinal reinforcement of the column and holes for pouring concrete. The longitudinal reinforcement of the reinforced concrete column passes through the corresponding avoidance holes of the upper and lower node plates; in the core area of the node between the upper and lower node plates, horizontal stirrups are arranged around the longitudinal reinforcement of the column.
[0012] In order to ensure the continuous penetration of the longitudinal reinforcement in the reinforced concrete column in the node area, avoidance holes for the column longitudinal reinforcement are opened in the upper and lower node plates, and the column longitudinal reinforcement runs through the upper and lower node plates; in order to ensure the shear strength of the node core area, the method of setting horizontal stirrups around the column longitudinal reinforcement is adopted; in order to ensure the vertical casting of reinforced concrete columns and concrete in the node core area at the same time, larger casting holes are opened in the middle of the upper and lower node plates.
[0013] Since a horizontal node plate that penetrates the entire cross section of the column is used, in order to prevent the concrete in the avoidance hole for the longitudinal reinforcement of the column from being filled densely, resulting in a large relative slip between the reinforced concrete column-horizontal node plate-node core area concrete, vertical studs (for example, Figure 1 The structure shown) or a vertical annular protrusion (for example, Figure 2 structure shown) or gusset plate openings (e.g. Figure 3 The structure shown in the figure) constitutes a horizontal shear key, which forms a flexible or rigid shear key in the horizontal direction to improve it.
[0014] The upper and lower node plates extend outward to form flanges of the short beam joint, and a short beam web is fixedly arranged between the upper and lower flanges; the flange of the short beam joint and the short beam web are fixedly connected to the flange and web of the steel beam respectively.
[0015] Preferably, the flange of the short beam joint is a variable width section, and the short beam web is welded to the upper and lower flanges as a whole.
[0016] Preferably, the flange of the short beam joint and the web of the short beam are respectively connected to the flange and web of the steel beam by bolts or splicing plate welding.
[0017] In order to ensure the effective transmission of the bending moment at the beam end and facilitate the assembly connection between the node and the beam, the node plate is directly extended outward to form the flange of the short beam joint, which is connected to the flange of the steel beam; the web of the short beam between the upper and lower flanges and the flange are integrated and fixed (such as welding), and connected to the web of the steel beam to transmit the shear force at the beam end; in order to increase the bending resistance of the beam end and promote the transfer of the plastic hinge area of the steel beam to the mid-span, the flange of the short beam joint adopts a variable width section (such as the width gradually decreases from the inside to the outside). The short beam joint and the mid-span steel beam can be connected with high-strength bolts or spliced plate welding.
[0018] Through the above technical means, the continuity of the longitudinal reinforcement of the steel beam and reinforced concrete column and the concrete pouring in the core area of the node are guaranteed. The welding of the node steel parts, the setting of the steel cage, the pouring of concrete and other processes are simple and clear, which improves the applicability and feasibility of the node, while avoiding the stress concentration at the end of the concrete column and the end plate of the steel beam, and improving the force performance of the node. At the same time, the node plate extends outward to form a short beam joint, which facilitates the connection with the mid-span steel beam. With the full-section diaphragm node of the column as the core, the effective connection between the reinforced concrete column and the steel beam is realized, forming a new reinforced concrete column-steel beam hybrid frame structure system.
[0019] Compared with the prior art, the present invention has the following main advantages:
[0020] 1. The node adopts the form of column full-section diaphragm, which can avoid local stress concentration and prevent column end pressure damage, while ensuring that the connection of the left and right steel beam flanges has sufficient strength and rigidity. The node plate in the form of column full-section diaphragm is set in the horizontal direction, forming a smooth space for horizontal concrete pouring, which is conducive to the integrated factory prefabrication of reinforced concrete columns and nodes; at the same time, the middle part of the node plate is provided with a large pouring hole and column longitudinal reinforcement perforation, which can also meet the requirements of on-site concrete pouring.
[0021] 2. In the core area of the node, the longitudinal reinforcement and horizontal stirrups of the reinforced concrete column form a continuous steel skeleton. The shear mechanism of the core area of the node is simple and clear, and the shear strength is easy to ensure. The longitudinal reinforcement of the reinforced concrete column is set through the reserved avoidance hole, which is convenient for factory prefabrication, ensures the accuracy of reinforcement, and reduces construction errors.
[0022] 3. By setting shear keys in the form of studs or circular protrusions or node plate openings on the outside or inside and outside of the node plate, the shear slip between the reinforced concrete column-horizontal node plate-concrete in the core area of the node can be prevented or reduced, the secondary shear stress of the longitudinal reinforcement of the column can be reduced, the hysteresis characteristics of the node can be improved, and the lateral stiffness of the system can be increased.
[0023] 4. A short beam is reserved outside the node area to separate the connection between the node and the beam, which not only simplifies the node structure, but also facilitates the connection with the steel beam and avoids the mutual influence between the two. The flange width of the short beam adopts a variable cross-section, which can adjust and control the bending resistance of the beam end, and at the same time induce the plastic hinge area of the steel beam to properly transfer toward the mid-span direction, further ensuring the seismic performance of the node. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 It is a three-dimensional schematic diagram of the node structure of the first embodiment of the hybrid frame structure system in the form of column full-section diaphragm nodes;
[0025] Figure 2 It is a three-dimensional schematic diagram of the node structure of the second embodiment of the hybrid frame structure system in the form of column full-section diaphragm nodes;
[0026] Figure 3 It is a three-dimensional schematic diagram of the node structure of the third embodiment of the hybrid frame structure system in the form of column full-section diaphragm nodes;
[0027] Figure 4 It is a three-dimensional schematic diagram of the node structure of the existing beam penetration form;
[0028] Figure 5 It is a three-dimensional schematic diagram of the node structure of the existing column penetration form;
[0029] In the figure, a hybrid frame structure system 1; a reinforced concrete column 2; a steel beam 3; a hybrid frame node 4;
[0030] Column full section diaphragm node node plate 11; circular hole 12; concrete pouring hole 13; column longitudinal reinforcement 14; stirrups 15; short beam 16; short beam flange 17; short beam web 18; bolt hole 19; steel beam flange 20; steel beam web 21;
[0031] Stud 31; annular protrusion 32; node plate opening 33;
[0032] Surface bearing plate 41; strip steel plate hoop 42; stiffening rib 43;
[0033] Web plate 51 inside the node; end plate 52; diagonal plate 53; column steel plate 54. DETAILED DESCRIPTION
[0034] The present invention is further described below in conjunction with the accompanying drawings and specific examples. It should be understood that these examples are only used to illustrate the present invention and are not intended to limit the scope of the present invention. The operating methods in the following examples without specifying specific conditions are usually carried out under conventional conditions or under conditions recommended by the design, prefabricated component production or construction unit.
[0035] Example 1
[0036] like Figure 1 As shown, the hybrid frame structural system 1 of this embodiment is composed of reinforced concrete columns 2 and steel beams 3 connected by hybrid frame nodes 4 in the form of column full-section diaphragms.
[0037] In order to ensure that the connection of the flanges 20 of the left and right steel beams 3 has sufficient strength and rigidity, and to avoid local stress concentration and pressure damage at the end of the node column, a horizontal node plate 11 in the form of a full-section diaphragm of the column is used; the horizontal node plate 11 in the form of a full-section diaphragm cuts off the full section of the column 2 horizontally, which is not conducive to the arrangement of the longitudinal reinforcement 14 of the column, and it is difficult to pour the concrete of the node 4 and column 2, which is generally considered to be unfeasible. The present invention adopts reverse thinking, and only one horizontal node plate 11 is set in the node, excluding all other steel plates, which facilitates the configuration of the stirrups 15 in the node and forms an unobstructed horizontal concrete pouring space.
[0038] In order to ensure the continuous penetration of the longitudinal steel bars 14 in the reinforced concrete column 2 at the node 4, circular holes 12 for penetrating the column longitudinal steel bars are opened on the upper and lower node plates, and the column longitudinal steel bars 14 are arranged through the upper and lower node plates 11; in order to ensure the shear strength of the core area of the node, a method of arranging horizontal stirrups 15 around the column longitudinal steel bars 14 is adopted; in order to realize the vertical pouring of concrete in the reinforced concrete column 2 and the core area of the node 4, a larger concrete pouring hole 13 is opened in the middle of the upper and lower node plates 11;
[0039] Since the horizontal node plate 11 that penetrates the entire cross section of the column is used, in order to prevent the circular hole 12 through which the column longitudinal reinforcement 14 is inserted from being filled with concrete densely, resulting in a large relative slip between the reinforced concrete column 2-horizontal node plate 11-node core area concrete, vertical studs 31 are welded on the outer side of the concrete pouring holes 13 in the middle of the upper and lower node plates 11 to form horizontal shear keys for improvement;
[0040] In order to ensure the effective transmission of the bending moment at the beam end and facilitate the assembly connection between the node and the beam, the node plate is directly extended outward to form the flange 17 of the short beam 16 joint, which is connected to the flange 20 of the steel beam 3; a web 18 is set between the upper and lower flanges 17 and welded to the flange 17 as a whole, and connected to the web 21 of the steel beam to transmit the shear force at the beam end; in order to increase the bending resistance of the beam end and promote the transfer of the plastic hinge area of the steel beam to the mid-span, the flange 17 of the short beam 16 adopts a variable width section. The short beam 16 is connected to the mid-span steel beam 3 with high-strength bolts or splicing plate welding.
[0041] Example 2
[0042] like Figure 2 As shown, in order to prevent the concrete in the circular hole 12 for passing the column longitudinal reinforcement 14 from not being densely filled, thereby causing a large relative slip between the reinforced concrete column 2, the horizontal node plate 11, and the concrete in the node core area, a vertical circular steel pipe protrusion 32 is welded on the outer side of the concrete pouring hole 13 in the middle of the upper and lower node plates 11 to form a horizontal shear key; the rest of the structure is similar to that of Example 1.
[0043] Example 3
[0044] like Figure 3 As shown, in order to prevent the circular hole 12 for passing the longitudinal reinforcement 14 of the column from being not densely filled with concrete, which would lead to a large relative slip between the reinforced concrete column 2, the horizontal node plate 11 and the concrete in the node core area, a hole 33 is opened in the middle of the upper and lower node plates 11 to form a horizontal shear key, which also serves as a concrete pouring hole 13; the rest of the structure is similar to that of Example 1.
[0045] Through the above technical means, the continuity of the longitudinal reinforcement 14 of the steel beam 3 and the reinforced concrete column 2 and the concrete pouring in the core area of the node are guaranteed. The welding of the node steel parts, the setting of the steel cage, the pouring of concrete and other processes are simple and clear, which improves the applicability and operability of the node and improves the force performance of the node. At the same time, the node plate 11 extends outward to form a short beam 16 joint, which facilitates the connection with the mid-span steel beam 3. With the node 4 in the form of a full-section diaphragm of the column as the core, the effective connection between the reinforced concrete column 2 and the steel beam 3 is achieved, forming a new reinforced concrete column-steel beam hybrid frame structure system 1.
[0046] Comparative Example 1
[0047] Existing beam through-type nodes:
[0048] like Figure 4As shown, the hybrid frame structure system 1 of the existing beam-through type node is composed of reinforced concrete columns 2 and steel beams 3 connected by the existing beam-through type hybrid frame nodes 4; since the steel beam flange 20 is narrow, the lever reaction force causes the concrete at the column end to be compressed and damaged, and the node energy dissipation capacity and ductility are poor. Complex structural measures such as strip steel plate hoops 42 and stiffening ribs 43 are required to avoid this during design; at the same time, since the steel beam flange 20 and the web 21 pass through the node, the shear stirrups 15 in the node area must be passed through the steel beam web 21, which makes it difficult to configure the stirrups 15; and regardless of vertical or horizontal pouring, there are dead corners in the concrete pouring space, making it difficult to ensure the pouring quality.
[0049] Comparative Example 2
[0050] Existing column penetration nodes:
[0051] like Figure 5 As shown, the hybrid frame structure system 1 of the existing column-through type node is composed of reinforced concrete columns 2 and steel beams 3 connected by the existing column-through type hybrid frame nodes 4; the steel beam flange 20 is not through, and the end plate 52 is prone to out-of-plane warping deformation, making it difficult to ensure the effective transfer of beam end stress from one side to the other, so it is necessary to weld a diagonal plate 53 to improve it; the welds between the steel beam 3 and the end plate 52 have high requirements, and it is difficult to develop plastic deformation in the welding affected area; the node area is not equipped with shear stirrups, relying on the web 51 and the column steel plate 54 for shear resistance, forming a vertically transparent and horizontally closed node space, which is only suitable for vertical concrete pouring, and it is difficult to realize the integrated prefabrication of the node 4 that requires horizontal pouring and the reinforced concrete column 2.
[0052] In addition, it should be understood that after reading the above description of the present invention, those skilled in the art may make various changes or modifications to the present invention, and these equivalent forms also fall within the scope defined by the claims attached to this application.
Claims
1. A reinforced concrete column-steel beam hybrid frame structure system using column full-section diaphragm form to connect nodes, characterized in that: The reinforced concrete column and the steel beam are connected in the node area by the upper and lower node plates in the form of column full-section diaphragms; both the upper and lower node plates are provided with avoidance holes for passing the column longitudinal reinforcement; In the node core area between the upper and lower node plates, horizontal stirrups are arranged around the column longitudinal reinforcement; Vertical studs or vertical annular protrusions or node plate openings are arranged on the outside or inside and outside of the concrete pouring holes in the middle of the upper and lower node plates to form horizontal shear keys; The upper and lower node plates extend outward to form flanges of the short beam joints. The flanges of the short beam joints are variable width sections, and the width gradually decreases from the inside to the outside.
2. The reinforced concrete column-steel beam hybrid frame structure system with full-section column diaphragm connection nodes according to claim 1 is characterized in that: The upper and lower node plates are both partitions that cover the entire cross-section of the column and have concrete pouring holes on them.
3. The reinforced concrete column-steel beam hybrid frame structure system with full-section column diaphragm connection nodes according to claim 1 is characterized in that: The longitudinal reinforcement of the reinforced concrete column passes through the corresponding avoidance holes of the upper and lower node plates.
4. The reinforced concrete column-steel beam hybrid frame structure system with full-section column diaphragm connection nodes according to claim 1 is characterized in that: A short beam web is fixedly arranged between the upper and lower flanges; the flange of the short beam joint and the short beam web are fixedly connected with the flange and web of the steel beam respectively.
5. The reinforced concrete column-steel beam hybrid frame structure system using column full-section diaphragm form to connect nodes according to claim 4 is characterized in that: The short beam web is welded to the upper and lower flanges as a whole.
6. The reinforced concrete column-steel beam hybrid frame structure system with full-section column diaphragm connection nodes according to claim 4 is characterized in that: The flange of the short beam joint and the web of the short beam are respectively connected to the flange and web of the steel beam by bolt connection or splicing plate welding.