Lotus seed pre-treatment integrated production line

By designing an integrated lotus seed pretreatment production line, the series of lotus seed soaking, undressing, lotus clothes separation, edge opening and lotus core separation processes have been solved, the problem of frequent material transfer in traditional processes has been improved, production efficiency and land occupation and labor saving strength.

CN112056537BActive Publication Date: 2024-12-27GUANGZHOU RESTAURANT GRP LIKOUFU (XIANGTAN) FOOD CO LTD +1
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202011025042.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-09-25
Publication Date
2024-12-27
Estimated Expiration
2040-09-25

AI Technical Summary

Technical Problem

In the traditional lotus seed pretreatment process, the soaking, undressing, cleaning and other processes are carried out independently, resulting in frequent material transfers, affecting production efficiency and floor area, and having a high labor intensity.

Method used

The integrated lotus seed pretreatment production line is designed, including hot water supply device, primary soaking device, undressing device, primary separation device, secondary soaking device, edge opening device and secondary separation device. The lotus seed soaking and undressing device are realized through series design, The continuous operation of lotus garment separation, edge opening and lotus core separation processes reduce material transfer and improve production efficiency.

Benefits of technology

The continuous operation of the lotus seed pretreatment process is realized, the material transfer process is reduced, the production efficiency is improved, the floor area and labor intensity are saved, and the stable and continuous processing process is ensured through the design of multiple soaking barrels.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112056537B_ABST
    Figure CN112056537B_ABST
Patent Text Reader

Abstract

The present application discloses an integrated production line for lotus seed pre-treatment, including: a hot water supply device, a primary soaking device, a stripping device, a primary separation device, a secondary soaking device, an edge-cutting device and a secondary separation device; the primary soaking device includes a plurality of soaking barrels; by sequentially connecting the hot water supply device, the primary soaking device, the stripping device, the primary separation device, the secondary soaking device, the edge-cutting device and the secondary separation device in series, continuous operation between the lotus seed soaking, stripping, lotus skin separation, edge-cutting and lotus core separation processes is achieved. The integrated operation of the lotus seed pre-treatment process is achieved, the material transfer process is reduced, the production efficiency is improved, the floor space is saved, and the labor intensity is reduced. Moreover, the primary soaking device adopts a multi-soaking barrel design, which can realize multi-barrel soaking, ensure the continuous supply of lotus seeds after soaking, and make the overall processing process stable and continuous.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of food processing technology, and in particular to an integrated production line for lotus seed pre-treatment. Background Art

[0002] Lotus seeds are the seeds of the aquatic herbaceous plant lotus in the Nymphaeaceae family, also known as white lotus, lotus seeds, lotus rice, and lotus meat. It has high nutritional value and is widely used in daily cooking and making mooncake fillings. Whether it is used for daily cooking or making fillings, lotus seeds need to undergo a series of corresponding pre-treatments. As far as filling making is concerned, the lotus seed pre-treatment process is one of the important factors affecting the taste and nutrition of the filling. The lotus seed pre-treatment process in traditional filling making mainly includes lotus seed soaking, stripping, washing and cutting. However, at present, the processes of lotus seed soaking, stripping, washing and cutting are carried out independently in the factory, and there are many material transfer processes in the production, which greatly affects the production efficiency. Summary of the invention

[0003] In view of this, the purpose of this application is to provide an integrated lotus seed pretreatment production line that can realize an integrated lotus seed pretreatment process and improve production efficiency.

[0004] In order to achieve the above technical purpose, the present application provides an integrated lotus seed pre-treatment production line, including: a hot water supply device, a primary soaking device, a stripping device, a primary separation device, a secondary soaking device, an edge opening device and a secondary separation device;

[0005] The one-time soaking device includes a plurality of soaking barrels;

[0006] The feed inlets of the soaking barrels are connected to the feeding devices respectively;

[0007] The hot water supply device is connected to the hot water inlet of each soaking bucket respectively;

[0008] The feed inlet of the stripping device is connected to the discharge outlet of each soaking bucket respectively;

[0009] The feed inlet of the primary separation device is connected to the discharge outlet of the undressing device;

[0010] The discharge port of the primary separation device is connected to the feed port of the edge opening device;

[0011] The discharge port of the edge opening device is connected to the feed port of the secondary separation device.

[0012] Furthermore, the one-time soaking device also includes a fixed frame;

[0013] A plurality of installation grids are provided in the fixed frame;

[0014] The soaking barrels are installed in the installation grid in a one-to-one correspondence.

[0015] Furthermore, a plurality of the soaking barrels are installed directly above the undressing device.

[0016] Further, the hot water supply device includes a container, a steam pipe, a temperature sensor, a temperature controller, a hot water pipe and a cold water pipe;

[0017] One end of the steam pipe is connected to the steam supply system, and the other end extends into the bottom of the container;

[0018] The steam pipe is provided with a steam electric valve;

[0019] The temperature sensor is installed in the container and is used to detect the water temperature in the container;

[0020] The temperature controller is electrically connected to the temperature sensor and the steam electric valve respectively;

[0021] The hot water pipe is installed at the water outlet of the container;

[0022] The cold water pipe is installed at the water filling port of the container;

[0023] The container is also provided with an emptying port.

[0024] Further, a muffler is included;

[0025] The muffler is installed at the other end of the steam pipe.

[0026] Furthermore, the secondary soaking device comprises a tank body, a conveying mechanism, a heating mechanism and a bubbling mechanism;

[0027] The conveying mechanism is provided with a first conveying section and a second conveying section;

[0028] The first conveying section is horizontally erected in the tank body along the length direction of the tank body;

[0029] The input end of the second conveying section is connected to the output end of the first conveying section, and the output end of the second conveying section extends upwardly from the trough body along the material running direction of the first conveying section;

[0030] The heating mechanism is installed in the tank body and is used to heat the water in the tank body;

[0031] The bubbling mechanism is used to generate bubbles inside the tank.

[0032] Furthermore, the conveying mechanism includes a conveying chain plate and a conveying motor;

[0033] A plurality of partitions are arranged on the chain plates of the conveying chain plates at intervals;

[0034] A material transport cavity is formed between the adjacent partition plates and the chain plates;

[0035] The conveying chain plate includes a horizontal chain plate segment and an inclined chain plate segment;

[0036] The horizontal chain plate segment forms the first conveying segment;

[0037] The inclined chain plate segment forms the second conveying segment;

[0038] The conveying motor is installed on one side of the inclined chain plate section extending out of the end of the trough body.

[0039] Furthermore, the primary separation device and the secondary separation device are both linear vibrating screen machines.

[0040] Further, it also includes a picking conveyor;

[0041] The feeding end of the picking conveyor is connected to the discharging end of the secondary separation device.

[0042] Furthermore, it also includes a material receiving bucket;

[0043] The material receiving bucket is arranged at one side of the material discharging end of the picking conveyor and is communicated with the material discharging end of the picking conveyor.

[0044] As can be seen from the above technical solutions, the present application realizes continuous operation between lotus seed soaking, stripping, lotus skin separation, edge cutting and lotus core separation processes by sequentially connecting a hot water supply device, a primary soaking device, a stripping device, a primary separation device, a secondary soaking device, a side cutting device and a secondary separation device in series. The integrated operation of the lotus seed pre-treatment process is realized, the material transfer process is reduced, the production efficiency is improved, the floor space is saved, and the labor intensity is reduced. Moreover, the primary soaking device adopts a multi-soaking barrel design, which can realize multi-barrel soaking, ensure the continuous supply of lotus seeds after soaking, and make the overall processing process stable and continuous. BRIEF DESCRIPTION OF THE DRAWINGS

[0045] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0046] Figure 1 This is a front view of the lotus seed pre-treatment integrated production line provided in this application;

[0047] Figure 2A top view of the integrated lotus seed pre-treatment production line provided in this application;

[0048] Figure 3 A top view of a one-time soaking device of a lotus seed pre-treatment integrated production line provided in this application;

[0049] Figure 4 This is a schematic diagram of the structure of the soaking barrel of the lotus seed pre-treatment integrated production line provided in this application;

[0050] Figure 5 A top view of a one-time soaking device with pipelines for the integrated lotus seed pre-treatment production line provided in this application;

[0051] Figure 6 This is a schematic diagram of the structure of the stripping device of the lotus seed pre-treatment integrated production line provided in this application;

[0052] Figure 7 This is a schematic diagram of the structure of the secondary soaking device of the lotus seed pre-treatment integrated production line provided in this application;

[0053] Figure 8 A partial top view of the secondary soaking device of the lotus seed pre-treatment integrated production line provided in this application;

[0054] Fig. 9 This is a structural schematic diagram of a hot water supply device for a lotus seed pre-treatment integrated production line provided in this application;

[0055] Fig.10 This is a schematic diagram of the structure of the container of the hot water supply device of the lotus seed pre-treatment integrated production line provided in this application;

[0056] Fig.11 A partial schematic diagram of a container with a condensation hood of a hot water supply device of a lotus seed pre-treatment integrated production line provided in this application;

[0057] In the figure: 1. primary soaking device; 11. soaking barrel; 111. barrel body; 112. connecting lug; 113. stirring motor; 114. rotating shaft; 115. stirring blade; 12. fixed frame; 121. fixed beam; 13. elevated platform; 14. flow meter; 2. stripping device; 21. spiral auger; 3. primary separation device; 4. secondary soaking device; 41. tank body; 411. tank cover; 42. conveying chain plate; 43. conveying motor; 441. bubbling fan; 442. air blowing pipe; 451. circulating water pump; 452. filter box; 46. adding Heat pipe; 47, discharge hopper; 48, first spray pipe; 49, control box; 5, edge opening device; 6, secondary separation device; 7, picking conveyor; 8, receiving bucket; 9, hot water supply device; 91, container; 911, drain port; 912, condensation hood; 92, steam pipe; 921, steam electric valve; 922, first manual valve; 923, second manual valve; 924, third manual valve; 925, check valve; 93, hot water pipe; 94, cold water pipe; 941, float valve; 95, temperature sensor; 96, temperature controller; 97, muffler. DETAILED DESCRIPTION

[0058] The technical solutions of the embodiments of the present application will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the present application, not all of them. All other embodiments obtained by ordinary technicians in this field without creative work based on the embodiments in the embodiments of the present application are within the scope of protection of the embodiments of the present application.

[0059] In the description of the embodiments of the present application, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, which are only for the convenience of describing the embodiments of the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the embodiments of the present application. In addition, the terms "first", "second", and "third" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance.

[0060] In the description of the embodiments of the present application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a replaceable connection, or an integral connection, it can be a mechanical connection, it can be an electrical connection, it can be a direct connection, it can be indirectly connected through an intermediate medium, and it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the embodiments of the present application can be understood according to specific circumstances.

[0061] The embodiment of the present application discloses an integrated production line for lotus seed pre-treatment.

[0062] See also Figure 1 to Figure 2 An embodiment of the lotus seed pre-treatment integrated production line provided in the embodiments of the present application includes:

[0063] A hot water supply device 9, a primary immersion device 1, a undressing device 2, a primary separation device 3, a secondary immersion device 4, an edge opening device 5 and a secondary separation device 6; the primary immersion device 1 comprises a plurality of immersion barrels 11; the feed port of each immersion barrel 11 is respectively connected and communicated with the feed device; the hot water supply device 9 is respectively connected and communicated with the hot water inlet of each immersion barrel 11; the feed port of the undressing device 2 is respectively connected and communicated with the discharge port of each immersion barrel 11; the feed port of the primary separation device 3 is connected and communicated with the discharge port of the undressing device 2; the discharge port of the primary separation device 3 is connected and communicated with the feed port of the edge opening device 5; the discharge port of the edge opening device 5 is connected and communicated with the feed port of the secondary separation device 6.

[0064] Specifically, the feeding device can adopt a bucket elevator to transport and supply the lotus seeds to be soaked to the soaking barrel 11. Of course, the feeding can also be realized by pumping, and there is no specific limitation. In this embodiment, a multi-soaking barrel 11 design is adopted, so that one or more barrels can be soaked pending, and another part of the soaking barrels 11 can be continuously supplied. For example, at the beginning, the feeding device can add raw materials to all soaking barrels 11 at the same time, and the hot water supply device 9 also adds the required soaking hot water to all soaking barrels 11 to start soaking. When the soaking time is up, open one or more of the soaking barrels 11 discharge ports, and the soaked materials are connected to the water and transported into the undressing device 2 to complete the undressing, and the soaking barrel 11 that has transported the materials can be replenished with materials and hot water to continue the soaking operation. The soaking materials in the other part of the soaking barrels 11 can continue to be used pending, because the time required for undressing is often shorter than that for soaking, therefore, when the undressing is completed, the discharge ports of the other part of the soaking barrels 11 can be opened to continue feeding the soaked materials to the undressing device 2. Thereby, continuous feeding operation is achieved and efficiency is improved. Moreover, the design of multiple soaking barrels 11 can also avoid the situation where a single soaking barrel 11 is damaged and has to be shut down for maintenance, reduce accident risks, and make production and processing more stable. The feed port, discharge port and hot water inlet of each soaking barrel 11 can be independently connected to an electronic control valve to achieve selective feeding and transportation of materials, thereby improving the convenience of control. The feed ports of multiple soaking barrels 11 can be connected to the same feed pipe to receive materials. Taking a bucket elevator as an example, the conveyed materials can be conveyed from a low position to a high position. For example, the materials are lifted from a low position and then conveyed to each soaking barrel 11. Compared with the traditional method of conveying by a suction pump, it is more energy-saving and consumption-reducing.

[0065] As can be seen from the above technical scheme, the present application realizes continuous operation between lotus seed soaking, undressing, lotus skin separation, edge opening and lotus core separation processes by connecting hot water supply device 9, primary soaking device 1, undressing device 2, primary separation device 3, secondary soaking device 4, edge opening device 5 and secondary separation device 6 in series. The integrated operation of lotus seed pre-treatment process is realized, the material transfer process is reduced, the production efficiency is improved, the floor space is saved, and the labor intensity is reduced. Moreover, the primary soaking device 1 adopts a multi-immersion barrel 11 design, which can realize multi-barrel soaking, ensure the continuous supply of lotus seeds after soaking, and make the overall processing process stable and continuous. The present application scheme is not only limited to the processing and use of lotus seeds, but also can be used for materials that need to be processed by the same or substantially similar processing means as lotus seeds, without specific restrictions.

[0066] The above is the first embodiment of the integrated production line for pre-treatment of lotus seeds provided in the embodiment of the present application. The following is the second embodiment of the integrated production line for pre-treatment of lotus seeds provided in the embodiment of the present application. For details, please refer to Figures 1 to 11 .

[0067] The integrated lotus seed pre-treatment production line comprises: a hot water supply device 9, a primary soaking device 1, a undressing device 2, a primary separation device 3, a secondary soaking device 4, an edge opening device 5 and a secondary separation device 6; the primary soaking device 1 comprises a plurality of soaking barrels 11; the feed port of each soaking barrel 11 is respectively connected to the feed device; the hot water supply device 9 is respectively connected to the hot water inlet of each soaking barrel 11; the feed port of the undressing device 2 is respectively connected to the discharge port of each soaking barrel 11; the feed port of the primary separation device 3 is connected to the discharge port of the undressing device 2; the discharge port of the primary separation device 3 is connected to the feed port of the edge opening device 5; the discharge port of the edge opening device 5 is connected to the feed port of the secondary separation device 6.

[0068] Furthermore, as for the one-time soaking device 1, the one-time soaking device 1 may further include a fixed frame 12; a plurality of mounting grids are arranged in the fixed frame 12; and each soaking bucket 11 is mounted in the mounting grid one by one. Thus, the plurality of soaking buckets 11 can be mounted in one piece, and the structure is more compact.

[0069] Furthermore, a plurality of fixed beams 121 are arranged in the fixed frame 12; the plurality of fixed beams 121 are staggered to divide the fixed frame 12 into a plurality of installation grids. The fixed beams 121 can be welded and fixed in the fixed frame 12, staggered to form a grid structure, and then divide the fixed frame into a plurality of installation grids. When in use, not all installation grids are necessarily used, and can be determined according to the number of soaking barrels 11 actually needed, and there is no specific limitation.

[0070] Further, in terms of the installation and fixation of the soaking bucket 11, a plurality of connecting lugs 112 are welded on the outer peripheral wall of the soaking bucket 11; the plurality of connecting lugs 112 are respectively connected to the fixing beams 121. The specific structure of the connecting lugs 112 is not limited, and they can be connected and fixed to the fixing beams 121 by fasteners such as bolts.

[0071] Furthermore, if Figure 3 As shown, the number of soaking barrels 11 can be four, and the four soaking barrels 11 are distributed in a square array. Those skilled in the art can adjust the number of soaking barrels 11 according to actual needs, and there is no specific limitation.

[0072] Furthermore, if Figure 4 As shown, the one-time soaking device 1 may further include an elevated platform 13; a mounting hole for mounting the fixed frame 12 is provided on the top of the elevated platform 13. The one-time soaking device 1 may be elevated to a certain height by providing the elevated platform 13, so as to facilitate the upper and lower distribution with the undressing device 2, and save a certain amount of installation space. The structure of the elevated platform 13 may include a support plate and a plurality of pillars mounted on the bottom of the support plate, and is not specifically limited.

[0073] Furthermore, the soaking barrel 11 may include a barrel body 111 and a stirrer, and the stirrer is installed on the barrel body 111. The stirrer can accelerate the soaking, improve the soaking efficiency, and make the material contact with the hot water more fully.

[0074] Furthermore, the barrel body 111 includes a cylindrical barrel portion and an inverted conical barrel portion; the bottom of the cylindrical barrel portion is fixedly connected to the top of the inverted conical barrel portion. The cylindrical barrel portion and the inverted conical barrel portion can be connected as one piece, and there is no specific limitation. The inverted conical barrel portion can better realize centralized discharge. The feed port of the barrel body 111 can be set at the top position of itself, and the discharge port can be set at the bottom position of itself.

[0075] Furthermore, if Figure 5 As shown, the barrel body 111 is also provided with a spray port and an alkaline water inlet. The spray port can be connected to a spray water pipeline for cleaning the inside of the barrel body 111. The alkaline water inlet can be connected to an alkaline water pipeline for replenishing alkaline water required for soaking. The hot water inlet can be connected to a hot water supply device 9 through a hot water pipeline. Flow meters 14 can be respectively provided on the hot water pipeline and the alkaline water pipeline to accurately control the amount of water added, and there is no specific limitation.

[0076] Furthermore, the stirrer structure may include a stirring motor 113, a rotating shaft 114, and stirring blades 115; the stirring motor 113 is vertically installed on the top of the barrel body 111; the rotating shaft 114 extends into the barrel body 111 and is synchronously rotated and connected with the output shaft of the stirring motor 113; the stirring blades 115 are installed on the rotating shaft 114. The stirring motor 113 can be inverted on the top of the soaking barrel 11 through the motor frame, and the stirring blades 115 can also be multiple, distributed at upper and lower intervals to improve the stirring effect.

[0077] Furthermore, if Figures 9 to 11 As shown, with regard to the hot water supply device 9, the hot water supply device 9 may include a container 91, a steam pipe 92, a temperature sensor 95, a temperature controller 96, a hot water pipe 93 and a cold water pipe 94; one end of the steam pipe 92 is connected to the steam supply system, and the other end extends into the bottom of the container 91; a steam electric valve 921 is provided on the steam pipe 92; the temperature sensor 95 is installed on the container 91, and is used to detect the water temperature in the container 91; the temperature controller 96 is electrically connected to the temperature sensor 95 and the steam electric valve 921 respectively; the hot water pipe 93 is installed at the water outlet of the container 91; the cold water pipe 94 is installed at the water replenishment port of the container 91; and an emptying port 911 is also provided on the container 91.

[0078] Specifically, steam is transported into the container 91 through the steam pipe 92, so that the steam contacts and exchanges heat with the water in the container 91, thereby achieving heating. This heating method, due to the impact force generated when the steam is released, will have a certain stirring effect on the water, so that the contact between water and steam is more sufficient, and the heating efficiency is better than the heating method with the same number of electric heating rods. At the same time, the steam source of steam heating can be obtained from the production workshop, which can also save energy consumption and reduce costs to a certain extent. In addition, by setting a steam electric valve 921, a temperature controller 96 and a temperature sensor 95, it is possible to monitor the water temperature in the container 91, thereby intelligently adjusting the amount of steam released by the steam pipe 92, achieving more accurate control of the water temperature, and ensuring a stable supply of hot water. In general, the hot water supply device 9 has the beneficial effects of efficient heating and accurate temperature control. In this embodiment, the steam supply system can be a steam preparation device, which is not specifically limited.

[0079] Further, with respect to the structure of the container 91, Fig.10 As shown, the container 91 can be a square box structure, such as a conventional insulated water tank, or a round barrel structure, etc., without limitation.

[0080] Furthermore, a check valve 925 can be installed on the steam pipe 92 to prevent steam from flowing back and affecting the heating efficiency. The check valve 925 can be arranged on the pipe section between the steam electric valve 921 and the installation opening of the steam pipe 92 installed in the container 91, and there is no specific limitation.

[0081] Furthermore, in order to cope with unexpected situations of the steam electric valve 921, that is, the situation where the electric steam valve cannot be adjusted, a first manual valve 922 can be installed in series on both sides of the steam electric valve 921 in the steam pipe 92. The first manual valve 922 can be used for adjustment and control, and this situation can be reflected by the temperature controller 96. For example, when the temperature controller 96 detects that the water temperature in the container 91 is not within the normal set temperature range, such as not within the range of 80℃±5℃ for a certain period of time, it can control the buzzer and other alarms to send out an alarm to remind the staff to check or manually control.

[0082] Furthermore, in order to deal with the abnormal situation of blockage of the steam electric valve 921, a branch pipe can be connected in parallel to the pipe section of the steam pipe 92 where the steam electric valve 921 is installed, and a second manual valve 923 is installed on the branch pipe. When the steam electric valve 921 or the first manual valve 922 is blocked, the second manual valve 923 of the branch can be started to ensure the normal supply of steam.

[0083] Furthermore, in order to improve the diversity and security of control, a third manual valve 924 may be installed near one end of the steam pipe 92 .

[0084] Furthermore, a muffler 97 is included; the muffler 97 is installed at the other end of the steam pipe 92. The purpose of setting the muffler 97 is to reduce the noise when the steam is released and reduce noise pollution. The muffler 97 can be a conventional steam muffler 97, and there is no specific limitation.

[0085] Furthermore, the muffler 97 is 40 mm to 80 mm away from the inner bottom surface of the container 91. The muffler 97 needs to maintain a certain distance from the inner bottom surface of the container 91 to prevent the muffler 97 from vibrating and colliding with the bottom surface of the container 91 and being damaged. Too small a distance will still cause the muffler 97 to have a risk of contact and collision with the bottom surface of the container 91, while too large a distance will affect the heating efficiency. For example, in this embodiment, it is preferably 40 mm to 80 mm away from the inner bottom surface of the container 91. Those skilled in the art can make appropriate changes based on this, and there is no specific limitation.

[0086] Furthermore, the cold water pipe 94 is connected to a float valve 941. The opening and closing of the cooling pipe can be controlled by the float valve 941. When the internal liquid level gradually decreases, the height of the float valve 941 is also continuously decreasing, so that the cold water pipe 94 is opened by the movement of the crank to replenish water. When replenishing water, the internal page will also rise accordingly, and at this time the float valve 941 is also rising, and then the crank is gradually reset to close the cold water pipe 94. Of course, the present application can also be to set an electronic liquid level gauge inside, and set an electric valve on the cold water pipe 94, monitor the information of the electronic liquid level gauge through a controller, and then control the electric valve on the cold water pipe 94 to achieve automatic water replenishment. Those skilled in the art can make appropriate changes based on this, and there is no specific limitation.

[0087] Furthermore, the steam pipe 92 is inclined at the pipe section extending into the container 91. In this way, the released steam can have a force to impact the water in the horizontal direction, thereby better stirring the water and making the contact between the water and the steam more sufficient. Specifically, the inclination angle can be preferably 45°, without limitation. Of course, in the present application, an agitator such as the soaking barrel 11 can also be added to accelerate the stirring of the water inside the container 91 to improve the heating efficiency.

[0088] Furthermore, for the convenience of installation, the temperature sensor 95 can be specifically a temperature sensing probe; the temperature sensing probe is inserted into the container 91, and the temperature sensing end extends into the interior of the container 91, and there is no specific limitation.

[0089] Furthermore, if Fig.11 , the drain port 911 is opened at the top of the container 91, and a metal condensation hood 912 is provided in the area directly above; the side of the condensation hood 912 is tilted downward. In the case of excess steam, the excess steam will still be discharged from the drain port 911. At this time, by providing the condensation hood 912 with tilted side, it can come into contact with the discharged steam, so that the cooled condensation is refluxed into the container 91 along the tilted side, so as to reduce the steam loss. Of course, the drain port 911 can also be connected to a steam recovery pipe for recovering excess steam.

[0090] In the present application, in order to further improve the heating efficiency, electric heating can be combined, for example, an electric heating tube 46 is provided in the container 91 to assist heating and further improve the heating efficiency.

[0091] Further, with respect to the undressing device 2, its structure may be as follows: Figure 6As shown, it includes a main body, two spiral agitators 21 and a rotating motor (not shown in the figure). A stripping chamber can be set in the main body, and the two spiral agitators 21 are arranged side by side in the stripping chamber. While the spiral agitators 21 are used to realize transportation, stripping is also realized by friction between lotus seeds and lotus seeds, lotus seeds and the stripping chamber wall, and lotus seeds and spiral agitators 21. A plurality of drainage holes can be provided at the bottom of the chamber wall, so that when the soaking barrel 11 is fed, the lotus seeds can be directly fed with water, thereby improving the continuity of the overall pre-treatment process. Of course, a single spiral dragon structure design can also be adopted, and those skilled in the art can make appropriate changes on this basis, without specific limitation.

[0092] Furthermore, if Figure 7 as well as Figure 8 As shown, the secondary immersion device 4 includes a trough body 41, a conveying mechanism, a heating mechanism and a bubbling mechanism; the conveying mechanism is provided with a first conveying section and a second conveying section; the first conveying section is horizontally erected in the trough body 41 along the length direction of the trough body 41; the input end of the second conveying section is connected to the output end of the first conveying end, and the output end of the second conveying section extends upwardly out of the trough body 41 along the material feeding direction of the first conveying section; the heating mechanism is installed in the trough body 41, and is used to heat the water in the trough body 41; the bubbling mechanism is used to generate bubbles inside the trough body 41.

[0093] Specifically, the tank body 41 can be a long trough structure to ensure a certain conveying distance, improve the secondary immersion effect, and also improve the cleaning effect. The secondary immersion can make the lotus seeds further soaked, which is conducive to the subsequent edge opening and coring process, and the cleaning can wash the lotus seeds in the first immersion with residual alkaline water and the residual lotus seed skin after the first separation. The conveying mechanism adopts a segmented design, which can meet the requirements that the material can be transported upward and tilted out of the tank body 41 after being transported in the tank body 41. In order to cooperate with the inclined setting of the second conveying section, the tank body 41 can also be provided with an inclined platform at this location, so that a certain installation space can be reserved between this position and the external ground to facilitate the installation of related components, and there is no specific restriction. By setting a heating mechanism, the inside of the tank body 41 can be heated to control it at a certain temperature, so as to better perform secondary immersion and cleaning. And setting a bubbling mechanism can bubble the tank body 41 to achieve bubbling cleaning, further improving the cleaning effect.

[0094] Furthermore, with regard to the conveying mechanism, the conveying mechanism may include a conveying chain plate 42 and a conveying motor 43; a plurality of partitions are arranged at intervals on the chain plate of the conveying chain plate 42, which are not shown in the figure; a material transport cavity is formed between adjacent partitions and chain plates; the conveying chain plate 42 includes a horizontal chain plate segment and an inclined chain plate segment; the horizontal chain plate segment forms a first conveying segment; the inclined chain plate segment forms a second conveying segment; the conveying motor 43 is installed on one side of the inclined chain plate segment extending out of the end of the trough body 41.

[0095] Specifically, installing the conveying motor 43 at the end of the inclined chain plate segment can avoid contact with the water in the trough body 41, ensuring safe operation. The partition plate arranged on the chain plate can form a material transport cavity to better transport materials such as lotus seeds, and can smoothly transport materials even in an inclined device. The conveying chain plate 42 in this embodiment can be a conventional chain plate conveyor, including a frame, a chain plate, a driving shaft, a driven shaft, etc. The frame can be composed of two parts, a horizontal frame and an inclined frame, and then after the chain plate is installed, a horizontal chain plate segment and an inclined chain plate segment can be formed.

[0096] Further, as for the heating mechanism, the heating mechanism may include a plurality of heating tubes 46; the plurality of heating tubes 46 are laid in parallel and at intervals at the bottom of the tank body 41. Laying in parallel and at intervals can increase the contact area with water, making the heating more sufficient and further improving the heating efficiency.

[0097] Furthermore, the heating tube 46 can be specifically a steam heating tube; multiple heating tubes 46 are respectively connected to the steam supply system. This heating method, because the impact force generated when the steam is released will have a certain stirring effect on the water, so that the contact between water and steam is more complete, and the heating efficiency is better than the heating method with the same number of electric heating rods. At the same time, the steam source of steam heating can be obtained from the production workshop, which can also save energy and reduce costs to a certain extent. Of course, in this application, the heating tube 46 can also be a conventional electric heating tube 46, without specific limitation.

[0098] Furthermore, a circulating filtration mechanism may be included to circulate and filter the water in the tank body 41. By setting up the circulating filtration mechanism, the water can be circulated and filtered to a certain extent to ensure the cleanliness of the water, reduce the frequency of shutdown for water change, save water resources, and improve the stability and efficiency of the production site.

[0099] Furthermore, with regard to the circulating filtering mechanism, the circulating filtering mechanism may include a circulating water pump 451 and a filter box 452; the circulating water pump 451 is installed on the outer wall of the tank body 41, and the water pumping end is connected to the interior of the tank body 41, and the water outlet end is connected to the water inlet of the filter box 452; a filtering component is provided in the filter box 452, and the water outlet of the filter box 452 is connected to the interior of the tank body 41.

[0100] Specifically, the filter components in the filter box 452 may include activated carbon filter layers, magnetized elements, filter cotton and other water filter components. Those skilled in the art can make appropriate choices according to actual needs, and there is no specific limitation. Among them, multiple filter boxes 452 can be set for backup, connected to the outlet of the circulating water pump 451 through a branch pipe. When a filter box 452 needs to replace the internal filter components after being used for a certain period of time, it can be switched to the backup filter box 452 for use without stopping the circulating water pump 451 for too long, ensuring the continuity of circulating filtration.

[0101] Furthermore, the bubbling mechanism includes a bubbling fan 441 and a plurality of air blowing pipes 442; the bubbling fan 441 is installed outside the tank body 41; the plurality of air blowing pipes 442 are laid in parallel and at intervals in the tank body 41, and are connected to the bubbling fan 441 through a main pipe.

[0102] Specifically, the bubbling fan 441 blows air and delivers the gas into the air blast pipe 442, and the gas is ejected through the air outlet nozzle on the air blast pipe 442 to form bubbles. Similar to the distribution of the above-mentioned heating pipes 46, the parallel and spaced distribution can well generate uniform and sufficient bubbles, thereby better cleaning the materials on the conveying chain plate 42. After the bubbles burst, impact water flow will be generated, which can impact the surface of the material for cleaning. In this embodiment, the air blast pipes 442 and the heating pipes 46 can be staggered and can be arranged below the horizontal chain plate section, without specific limitation.

[0103] Furthermore, it also includes a discharge hopper 47, which is tilted downward and connected to the discharge end of the conveying mechanism. It can collect and discharge the washed lotus seeds and other materials. The discharge hopper 47 can be V-shaped, that is, the size of the discharge end of the discharge hopper 47 is smaller than the connection end, and there is no specific limitation.

[0104] Furthermore, it also includes a plurality of first spray pipes 48; the plurality of first spray pipes 48 are horizontally erected at the discharge end of the conveying mechanism, and a plurality of spray nozzles are arranged along the length direction thereof toward the discharge end of the conveying mechanism. The first spray pipes 48 can be arranged to re-rinse the lotus seed material that has been cleaned and conveyed to the discharge hopper 47, thereby forming a flowing water flow to accelerate the material to flow into the next device.

[0105] In the present application, a plurality of first spray pipes 48 may also be provided on the inclined chain plate section to further rinse the lotus seed material and also to impact the lotus seed material to prevent a large amount of the lotus seed material from adhering to the chain plate.

[0106] Furthermore, a slot cover 411 is included; the slot cover 411 is arranged on the top of the slot body 41, and a feed port is formed between one end of the slot body 41 and one end of the slot body 41, and a bypass port for avoiding the second conveying section is formed between the other end of the slot body 41 and the other end of the slot body 41. The arrangement of the slot cover 411 can improve the heat preservation effect, reduce the loss of temperature inside the slot body 41, and save energy consumption.

[0107] In the present application, a main control box 49 may also be provided, which is electrically connected to each mechanism respectively, for centrally controlling each mechanism and improving the convenience of control.

[0108] Furthermore, if Figure 1 as well as Figure 2 As shown, in order to achieve a more three-dimensional overall installation and further save floor space, in this embodiment, multiple soaking barrels 11 can be installed directly above the undressing device 2 through an elevated platform 13, so that the gravity of the lotus seeds can be used to feed, thereby saving the use of feeding devices such as pumps; correspondingly, the hot water supply device 9 can also be installed on one side of the soaking barrel 11, and is at the same installation height as the soaking barrel 11; the primary separation device 3 and the undressing device 2 are arranged in sequence along the first straight line direction; the secondary soaking device 4, the edge opening device 5 and the secondary separation device 6 are arranged in sequence along the second straight line direction perpendicular to the first straight line direction. The first production line formed by the primary separation device 3 and the undressing device 2 and the second production line formed by the secondary soaking device 4, the edge opening device 5 and the secondary separation device 6 are arranged in an L shape. The overall installation is made more three-dimensional and the floor space is further saved. Those skilled in the art can make appropriate changes based on this, without specific restrictions. As for the overall production line, an intelligent control system can be used for control to realize an automated assembly line.

[0109] Furthermore, the primary separation device 3 and the secondary separation device 6 are both linear vibrating screen machines.

[0110] Specifically, the primary separation device 3 and the secondary separation device 6 can be conventional linear vibration screen machines. The separation of lotus skin and lotus core is realized by using the vibration screening principle. In order to improve the separation efficiency, multiple second spray pipes (not shown) can be horizontally set up in the first separation device and the second separation device in the direction of material feeding in turn; the bottom of the second spray pipe is evenly provided with a vertical downward first nozzle along its own length direction. The lotus skin and lotus core are impacted by the second spray pipe, and the lotus core and lotus skin are accelerated to be flushed to the lower layer of the sieve plate to improve the separation efficiency. In addition, in this application, in order to reduce the sieve holes of the sieve plate on the primary separation device 3 / secondary separation device 6 due to long-term screening work and avoid shutdown cleaning, a booster pump can be added to pressurize the second spray pipe and the second spray pipe, and the pressure spray is regularly applied to better impact the surface of the sieve plate and reduce the clogging of the sieve holes on the sieve plate. Those skilled in the art can make appropriate changes on this basis, and there is no specific limitation.

[0111] In the present application, the edge-cutting device 5 can be a conventional edge-cutting machine used for cutting the edges of lotus seeds, and there is no specific limitation.

[0112] Furthermore, it also includes a picking conveyor 7; the feeding end of the picking conveyor 7 is connected to the discharging end of the secondary separation device 6. Figure 1 as well as Figure 2 As shown, the picking conveyor 7 can be a conventional conveyor belt. The lotus seeds after secondary separation can be conveyed to the picking conveyor 7, and the conveying speed of the picking conveyor 7 can be adjusted to a desired speed. A small amount of inferior lotus seeds can be picked by the picking conveyor 7 to avoid affecting the taste of the fillings made later.

[0113] Furthermore, a receiving bucket 8 is included; the receiving bucket 8 is arranged on one side of the discharge end of the picking conveyor 7 and is connected to the discharge end of the picking conveyor 7. The lotus seeds finally picked can be collected by the receiving bucket 8, and there is no specific limitation.

[0114] The above is a detailed introduction to the lotus seed pre-treatment integrated production line provided in the present application. For a person skilled in the art, according to the idea of ​​the embodiments of the present application, there may be changes in the specific implementation method and application scope. In summary, the content of this specification should not be understood as a limitation on the present application.

Claims

1. Lotus seed pre-treatment integrated production line, characterized in that: include: Hot water supply device, primary immersion device, undressing device, primary separation device, secondary immersion device, edge opening device and secondary separation device; The one-time soaking device includes a plurality of soaking barrels; The feed inlets of the soaking barrels are connected to the feeding devices respectively; The hot water supply device is connected to the hot water inlet of each soaking bucket respectively; The feed inlet of the stripping device is connected to the discharge outlet of each soaking bucket respectively; The feed inlet of the primary separation device is connected to the discharge outlet of the undressing device; The discharge port of the primary separation device is connected to the feed port of the edge opening device; The discharge port of the edge opening device is connected to the feed port of the secondary separation device; The secondary soaking device comprises a tank body and a conveying mechanism; The conveying mechanism is provided with a first conveying section and a second conveying section; The first conveying section is horizontally erected in the tank body along the length direction of the tank body; The input end of the second conveying section is connected to the output end of the first conveying section, and the output end of the second conveying section extends upwardly from the trough body along the material running direction of the first conveying section; Also includes a plurality of first spray pipes; A plurality of the first spray pipes are transversely mounted at the discharge end of the conveying mechanism, and a plurality of spray nozzles are arranged along the length direction thereof and are arranged toward the discharge end of the conveying mechanism; A plurality of second spray pipes are sequentially and horizontally arranged on the primary separation device and the secondary separation device along the material feeding direction; The bottom of the second spray pipe is evenly provided with first nozzles pointing vertically downward along its length direction; Also includes a pressure pump for timed pressurization of the second spray pipe; The conveying mechanism includes a conveying chain plate and a conveying motor; The conveying chain plate includes a horizontal chain plate segment and an inclined chain plate segment; The horizontal chain plate segment forms the first conveying segment; The inclined chain plate segment forms the second conveying segment; A plurality of the first spray pipes are also arranged on the inclined chain plate segment; The hot water supply device comprises a container, a steam pipe, a temperature sensor, a temperature controller, a hot water pipe and a cold water pipe; One end of the steam pipe is connected to the steam supply system, and the other end extends into the bottom of the container; The steam pipe is provided with a steam electric valve; The temperature sensor is installed in the container and is used to detect the water temperature in the container; The temperature controller is electrically connected to the temperature sensor and the steam electric valve respectively; The hot water pipe is installed at the water outlet of the container; The cold water pipe is installed at the water filling port of the container; The steam pipe is arranged obliquely at the pipe section extending into the container; The container is also provided with an exhaust port, and a metal condensation cover is provided in the area directly above; The side periphery of the condensation hood is arranged to be inclined downward.

2. The lotus seed pre-treatment integrated production line according to claim 1, characterized in that: The one-time soaking device also includes a fixed frame; A plurality of installation grids are provided in the fixed frame; The soaking barrels are installed in the installation grid in a one-to-one correspondence.

3. The lotus seed pre-treatment integrated production line according to claim 1, characterized in that: A plurality of soaking barrels are installed directly above the undressing device.

4. The lotus seed pre-treatment integrated production line according to claim 1, characterized in that: Also includes a muffler; The muffler is installed at the other end of the steam pipe.

5. The lotus seed pre-treatment integrated production line according to claim 1, characterized in that: The secondary soaking device also includes a heating mechanism and a bubbling mechanism; The heating mechanism is installed in the tank body and is used to heat the water in the tank body; The bubbling mechanism is used to generate bubbles inside the tank.

6. The lotus seed pre-treatment integrated production line according to claim 5, characterized in that: A plurality of partitions are arranged on the chain plates of the conveying chain plates at intervals; A material transport cavity is formed between the adjacent partition plates and the chain plates; The conveying motor is installed on one side of the inclined chain plate section extending out of the end of the trough body.

7. The lotus seed pre-treatment integrated production line according to claim 1, characterized in that: The primary separation device and the secondary separation device are specifically linear vibrating screen machines.

8. The lotus seed pre-treatment integrated production line according to claim 1, characterized in that: Also included are picking conveyors; The feeding end of the picking conveyor is connected to the discharging end of the secondary separation device.

9. The lotus seed pre-treatment integrated production line according to claim 8, characterized in that: Also includes a receiving bucket; The material receiving bucket is arranged at one side of the material discharging end of the picking conveyor and is communicated with the material discharging end of the picking conveyor.

Citation Information

Patent Citations

  • Lotus seed paste fillings and preparation method thereof

    CN103519188A

  • High-efficiency continuous-type pure physical walnut kernel peeling device

    CN110584151A

  • Automatic temperature control system used for drying equipment

    CN203454684U

  • Agricultural and sideline product huller

    CN206150400U

  • Lotus seeds are peeled and are opened limit coring production line

    CN207767485U