A shock-absorbing assembled suspended staircase structure

By using suspended boom suspension and prefabricated groove-shaped plates combined with dampers in the stairwell structure, the problems of complex stress and insufficient seismic performance of the stair structure during earthquakes are solved, and good energy-dissipation and shock absorption effects and building Functional guarantee.

CN112095941BActive Publication Date: 2024-11-08ANHUI XINHUA UNIV
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202010946612.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-09-10
Publication Date
2024-11-08
Estimated Expiration
2040-09-10

AI Technical Summary

Technical Problem

The existing stair structure is subjected to complex structure due to the overall connection during earthquakes and is easily damaged. In addition, the separation connection technology of ladder section plates in prefabricated buildings has a jump, which weakens seismic resistance. The suspension stair plan has been produced under strong earthquakes. Large horizontal displacement affects building functions.

Method used

The shock-absorbing prefabricated suspension stairwell structure is adopted, and the traditional ladder support is replaced by hanging boom suspension. Combined with prefabricated groove plates and dampers, energy-consuming plates and other shock absorbing units, the node connection structure releases freedom when the intensity changes, realizing the Vibration decoupling and energy dissipation and shock absorption.

Benefits of technology

Effectively suppress the oblique bracing and torsional effect of the stairwell on the main structure, significantly improve seismic resistance, avoid jumping of the ladder plates and excessive displacement, and ensure the safety of building functions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112095941B_ABST
    Figure CN112095941B_ABST
Patent Text Reader

Abstract

The present invention proposes a shock-absorbing assembled suspended staircase structure, including a frame assembly and a staircase assembly arranged between two adjacent frame assemblies; the frame assembly includes vertically arranged frame columns and horizontally arranged frame beams, and the ends of the frame beams are connected to the frame columns; the staircase assembly includes staggered platforms, floor platforms and prefabricated stair treads, and the staggered platforms are connected to the frame beams through multiple suspension assemblies, and one end of the prefabricated stair treads is connected to the staggered platforms and the other end is connected to the floor platforms. The present invention adopts a hanger to suspend the staircase, and uses an integrated prefabricated trough plate, and also adds shock-absorbing units such as seismic isolation bearings, dampers, and energy-absorbing plates. The node connection structure makes the staircase substructure in an elastic deformation state, and the constraints of the node degrees of freedom are released accordingly according to the intensity. Functions such as vibration decoupling, vibration suppression, overcoming rigidity with softness, and energy dissipation and shock absorption will be activated in a timely manner.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building engineering, and in particular to a shock-absorbing assembled suspended staircase structure. Background Art

[0002] Stairs in multi-story and high-rise buildings have the functions of vertical traffic passages, escape routes and emergency earthquake-proof "islands". However, the stairwells have suffered serious damage after earthquakes. The damage survey and analysis show that due to the integral pouring connection between the staircase components and the main structure, the stair slabs form a diagonal brace effect and participate in the structural lateral force resistance, resulting in complex forces in the stairwell. In earthquakes, the stairwells are often destroyed first because they absorb more energy, forming the first line of defense against earthquakes, and the aforementioned expected earthquake resistance and disaster relief functions are not achieved. Existing studies have shown that when the stairs are connected to the main structure as a whole, the structure will be locally torsion. If the stairwell is improperly arranged, it will also aggravate the torsion effect of the overall structure. In order to solve the seismic problem of stairwells in frame structures, the current seismic design specifications and related atlases propose a separate connection technology for staircase sections, that is, the use of a sliding connection structure to release the connection constraints between the stairs and the main structure can effectively reduce the diagonal brace effect. Since prefabricated buildings have the properties of prefabrication before connection, and the core purpose of this technology is to change resistance to release, the application of this technology can be given priority in frame stairwells in prefabricated buildings. However, studies have shown that the current stair slab separate connection technology is mainly to simply separate the stairs from the main structure. Under the action of an earthquake, the stair slab will jump out violently, seriously weakening the seismic performance of the prefabricated building.

[0003] Another study proposed a suspended staircase solution to solve the diagonal bracing and torsional effects of the stairwell on the frame structure, that is, the stairwell is used as a suspended substructure acting on the main structure. At this time, the vibration of the main structure can be suppressed to a certain extent, but the suspended substructure will produce significant horizontal displacement under strong earthquakes, seriously affecting the architectural function of the stairwell. If the horizontal degrees of freedom are not released enough, the stair components will produce large stresses and be damaged. Therefore, under the premise of meeting the building function, effective measures need to be taken to control the horizontal displacement of the suspended substructure within the allowable range, while also playing a role in energy dissipation and shock reduction during vibration. Summary of the invention

[0004] Based on the technical problems existing in the background technology, the present invention proposes a shock-absorbing assembled suspended stairwell structure.

[0005] A shock-absorbing assembled suspended staircase structure proposed in the present invention comprises a frame assembly and a staircase assembly arranged between two adjacent frame assemblies; the frame assembly comprises vertically arranged frame columns and horizontally arranged frame beams, and the ends of the frame beams are connected to the frame columns; the staircase assembly comprises staggered platforms, floor platforms and prefabricated stair treads, the staggered platforms are connected to the frame beams through a plurality of suspension assemblies, and one end of the prefabricated stair tread is connected to the staggered platform and the other end is connected to the floor platform.

[0006] Preferably, the suspension assembly includes a hanger, which includes two side steel plates and a web steel plate arranged vertically opposite to each other. The web steel plate is arranged between the two side steel plates and its two ends are respectively vertically connected to the two side steel plates. The top end of the hanger is connected to the frame beam through an upper hinge node and the bottom end is connected to the staggered platform through a lower hinge node.

[0007] Preferably, the upper hinge node includes two upper energy absorbing plates and two upper connecting steel plates; the two upper energy absorbing plates are L-shaped, and the bottom ends of the two upper energy absorbing plates are respectively connected to the top ends of the two side steel plates through a plurality of upper bolt pairs, and the top ends of the upper energy absorbing plates are connected to the frame beam through a plurality of upper sleeve bolt pairs; the upper connecting steel plates are L-shaped, and the two upper connecting steel plates are respectively arranged on both sides of the top end of the web steel plate, and the top end of the web steel plate is rotatably connected to an upper shear force transfer rod connected to the two upper connecting steel plates, and the top end of the upper connecting steel plate is connected to the frame beam through a plurality of upper sleeve bolt pairs with anchor plates.

[0008] Preferably, the lower hinge assembly includes two lower connecting steel plates; the lower connecting steel plates are L-shaped, and the two lower connecting steel plates are respectively arranged on both sides of the bottom end of the web steel plate, and the bottom end of the web steel plate is rotatably connected to a lower shear force transfer rod connected to the two lower connecting steel plates, and the bottom end of the lower connecting steel plate is connected to the staggered platform through a plurality of lower anchor plate sleeve bolt pairs.

[0009] Preferably, dampers are connected to both ends of the staggered platform, and the other end of the damper is connected to the frame beam.

[0010] Preferably, a first support plate is provided at one end of the staggered platform, a seismic isolation bearing is installed on the first support plate, the end of the prefabricated ladder plate is connected to the seismic isolation bearing, a gap is left between the end of the prefabricated ladder plate and the staggered platform to form a seismic isolation joint, the width of the seismic isolation joint is not less than the distance between the seismic isolation bearing and the seismic isolation joint, and the seismic isolation joint is filled with polystyrene or grid to form a seismic isolation component.

[0011] Preferably, the seismic isolation bearing adopts a plastic plate seismic isolation block or a laminated rubber bearing with a diameter not exceeding 100 mm.

[0012] Preferably, a second support plate is provided at one end of the floor platform, and a plurality of sleeves are pre-embedded on the second support plate, and the plurality of sleeves are all threadedly connected with fixing pins; a plurality of reserved holes are opened at the end of the prefabricated stair tread, and the plurality of reserved holes are respectively arranged one-to-one with the plurality of sleeves, and the fixing pins of the sleeves are inserted into the corresponding reserved holes, and mortar is filled in the reserved holes; a vertical seam is reserved between the side of the prefabricated stair tread and the floor platform, and a connecting piece is formed by filling polystyrene in the vertical seam, and a flat seam is reserved between the bottom end of the prefabricated stair tread and the second support plate, and a fixing piece is formed by filling mortar in the flat seam.

[0013] Preferably, the vertical seam width is 10-40 mm, and the flat seam thickness is 10-30 mm.

[0014] Preferably, a gap is left between the staggered platform and the frame column to form an earthquake-resistant joint, and an earthquake-resistant part is formed by filling the earthquake-resistant joint with a flexible material.

[0015] The present invention proposes a shock-absorbing assembled suspended staircase structure, which changes the staircase from a traditional stair column support to a hanger suspension, and combines assembly technology to change the stair beams and intermediate rest platforms that are mainly manufactured on site into integrated prefabricated trough plates. In addition, shock-absorbing units such as seismic isolation bearings, dampers, and energy-absorbing plates are added. After the above-mentioned creative changes, when encountering an earthquake of multiple intensity, the node connection structure makes the stair substructure in an elastic deformation state. When encountering an earthquake with an intensity above the design intensity, the constraints on the node degrees of freedom are released accordingly according to the intensity, and functions such as vibration decoupling, vibration suppression, overcoming rigidity with flexibility, and energy dissipation and shock reduction will be activated in a timely manner. The present invention can not only fundamentally solve the diagonal bracing effect and torsional influence of traditional stair solutions on the main structure, but also play a good energy dissipation and shock reduction role, and significantly improve the seismic performance of the structure. The present invention has the advantages of simple structure, clear mechanism, simple construction, controllable precision, etc. It is suitable for stairwell units of frame parts in frame structures and frame-shear structures. By changing the compression support of the stair column to the tension suspension mode of the hanger rod, an energy dissipation and shock absorption connection unit is added, and all parts of the stairwell substructure are fully prefabricated and fully assembled, the problems of stair plate bouncing and complex on-site construction when the existing separation technology is applied to prefabricated buildings are effectively solved. At the same time, the problem of damage to stair components caused by the excessive displacement of the existing suspended staircases being inconsistent with the building function is also solved. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 This is a schematic structural diagram of a shock-absorbing assembled suspended staircase structure proposed by the present invention;

[0017] Figure 2 for Figure 1 The enlarged structural diagram at A in the middle;

[0018] Figure 3 for Figure 1 The enlarged structural diagram at B in the middle;

[0019] Figure 4 for Figure 1 The enlarged structural diagram at C in the middle;

[0020] Figure 5 for Figure 1 The enlarged structural diagram at D in the middle;

[0021] Figure 6 A plan view of a shock-absorbing assembled suspended staircase structure proposed by the present invention;

[0022] Figure 7 This is a schematic diagram of the structure of a staggered platform in a shock-absorbing assembled suspended staircase structure proposed by the present invention;

[0023] Figure 8 A schematic diagram of the structure of a prefabricated stair tread in a shock-absorbing assembled suspended staircase structure proposed by the present invention;

[0024] Fig. 9 This is a structural schematic diagram of a suspension component in a shock-absorbing assembled suspended stairwell structure proposed by the present invention;

[0025] Fig.10 This is a schematic diagram of the structure of a suspension rod in a shock-absorbing assembled suspended staircase structure proposed by the present invention;

[0026] Fig.11 This is a schematic diagram of the structure of an upper energy dissipation plate in a shock-absorbing assembled suspended staircase structure proposed by the present invention;

[0027] Fig.12 This is a schematic diagram of the structure of an upper connecting steel plate in a shock-absorbing assembled suspended staircase structure proposed by the present invention;

[0028] Fig.13 This is a schematic structural diagram of a lower connecting steel plate in a shock-absorbing assembled suspended stairwell structure proposed by the present invention. DETAILED DESCRIPTION

[0029] Reference Figure 1-Figure 13 The present invention provides a shock-absorbing assembled suspended staircase structure, comprising a frame assembly and a staircase assembly arranged between two adjacent frame assemblies; wherein:

[0030] The frame assembly includes a vertically arranged frame column 1 and a horizontally arranged frame beam 2 , and the ends of the frame beam 2 are connected to the frame column 1 .

[0031] The staircase assembly includes a staggered platform 3, a floor platform 4 and a prefabricated stair tread 5. The staggered platform 3 is in the form of a prefabricated trough plate, and the staggered platform 3 is connected to the frame beam 2 through a plurality of suspension components. The suspension component includes a hanger 6, which can be a rigid hanger of a steel section, a steel bar or a steel pipe, or a flexible hanger of a steel cable, a steel strand or a fiber reinforced composite material. The hanger 6 includes two side steel plates 61 and a web steel plate 62 arranged vertically opposite to each other, the web steel plate 62 is arranged between the two side steel plates 61 and its two ends are respectively vertically connected to the two side steel plates 61, the top end of the hanger 6 is connected to the frame beam 2 through an upper hinge node, and the bottom end is connected to the staggered platform 3 through a lower hinge node. A gap is left between the staggered platform 3 and the frame column 1 to form an anti-seismic joint 10, and the anti-seismic joint 10 is filled with flexible material to form an anti-seismic member, and the filler can be flattened when encountering an earthquake.

[0032] One end of the prefabricated stair slab 5 is connected to the staggered platform 3 and the other end thereof is connected to the floor platform 4, and the floor platform 4 is in the form of a composite beam slab.

[0033] The present invention changes the stairwell from traditional stair column support to hanger suspension, and combines assembly technology to change the stair beams and intermediate rest platforms that are mainly manufactured on site into integrated prefabricated stair treads. After the above creative changes, when encountering an earthquake of multiple intensity, the node connection structure makes the stair substructure in an elastic deformation state. When encountering an earthquake with an intensity above the design intensity, the constraints on the node degrees of freedom are released accordingly according to the intensity, and functions such as vibration decoupling, vibration suppression, overcoming rigidity with flexibility, energy dissipation and shock reduction will be activated in time. It can not only fundamentally solve the diagonal bracing effect and torsional influence of traditional stair solutions on the main structure, but also play a good energy dissipation and shock reduction role, and significantly improve the seismic performance of the structure.

[0034] In a specific embodiment, the upper hinge node includes two upper energy dissipation plates 71 and two upper connecting steel plates 72. The two upper energy dissipation plates 71 are L-shaped, and the bottom ends of the two upper energy dissipation plates 71 are connected to the top ends of the two side steel plates 61 through a plurality of upper bolt pairs 73, and the top ends of the upper energy dissipation plates 71 are connected to the frame beam 2 through a plurality of upper sleeve bolt pairs 74. The upper connecting steel plate 72 is L-shaped, and the two upper connecting steel plates 72 are respectively arranged on both sides of the top end of the web steel plate 62, and the top end of the web steel plate 62 is rotatably connected with an upper shear force transmission rod 75 connected to the two upper connecting steel plates 72, and the top end of the upper connecting steel plate 72 is connected to the frame beam 2 through a plurality of upper anchor plate sleeve bolt pairs 76. The upper end of the web steel plate 62 is an outwardly convex arc structure, and the bottom end of the upper connecting steel plate 72 is an arc structure adapted to the top end of the web steel plate 62. With such a configuration, when encountering an earthquake, the purpose of rotating the hanger 6 around the upper shear force transmission rod 75 can be achieved.

[0035] In a specific embodiment, the lower hinge assembly includes two lower connecting steel plates 81; the lower connecting steel plates 81 are L-shaped, and the two lower connecting steel plates 81 are respectively arranged on both sides of the bottom end of the web steel plate 62, and the bottom end of the web steel plate 62 is rotatably connected with a lower shear force transmission rod 82 connected to the two lower connecting steel plates 81, and the bottom end of the lower connecting steel plate 81 is connected to the staggered platform 3 through a plurality of lower anchor plate sleeve bolt pairs 83. The lower end of the web steel plate 62 is an outwardly convex arc structure, and the top end of the lower connecting steel plate 81 is an arc structure adapted to the bottom end of the web steel plate 62. In this arrangement, when encountering an earthquake, the purpose of rotating the hanger 6 around the lower shear force transmission rod 82 can be achieved.

[0036] In a specific embodiment, both ends of the staggered platform 3 are connected with a damper 9, and the other end of the damper 9 is connected to the frame beam 2. By providing the damper 9, the damper 9 and the upper energy dissipation plate 71 can achieve a combined shock absorption effect.

[0037] In a specific embodiment, a first support plate 31 is provided at one end of the staggered platform 3, and a seismic isolation support 32 is installed on the first support plate 31. The end of the prefabricated ladder plate 5 is connected to the seismic isolation support 32. The seismic isolation support 32 adopts a plastic plate seismic isolation block or a laminated rubber support with a diameter not exceeding 100 mm. A gap is left between the end of the prefabricated ladder plate 5 and the staggered platform 3 to form a seismic isolation gap 33. The width of the seismic isolation gap 33 is not less than the distance between the seismic isolation support 32 and the seismic isolation gap 33. The seismic isolation gap 33 is filled with polystyrene or a grid to form a seismic isolation member. By setting the seismic isolation support 3, the effect of combined shock absorption of the seismic isolation support 3 and the upper energy dissipation plate 71 is achieved.

[0038] In a specific embodiment, a second support plate 41 is provided at one end of the floor platform 4, and a plurality of sleeves 42 are pre-embedded on the second support plate 41, and the plurality of sleeves 42 are all threadedly connected with fixing pins 43. A plurality of reserved holes 51 are provided at the end of the prefabricated stair tread 5, and the plurality of reserved holes 51 are respectively arranged one by one with the plurality of sleeves 42, and the fixing pins 43 of the sleeves 42 are inserted into the corresponding reserved holes 51, and the reserved holes 51 are filled with a hole-filling mortar 52, and the strength standard value of the hole-filling mortar 52 is less than the strength standard value of the prefabricated stair tread 5. A vertical seam 44 is reserved between the side of the prefabricated stair tread 5 and the floor platform 4, and the vertical seam 44 is filled with polystyrene to form a connecting piece, and the width of the vertical seam 44 is 10-40mm, and a flat seam 45 is reserved between the bottom end of the prefabricated stair tread 5 and the second support plate 41, and the flat seam 45 is filled with cement mortar slurry with the same strength as the concrete of the prefabricated stair tread 5 to form a fixing piece, and the thickness of the flat seam 45 is 10-30mm.

[0039] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A shock-absorbing assembled suspended staircase structure, comprising a frame assembly and a staircase assembly arranged between two adjacent frame assemblies; characterized in that: The frame assembly comprises a vertically arranged frame column (1) and a horizontally arranged frame beam (2), the end of the frame beam (2) being connected to the frame column (1); the staircase assembly comprises a staggered platform (3), a floor platform (4) and a prefabricated stair tread (5), the staggered platform (3) being connected to the frame beam (2) via a plurality of suspension assemblies, one end of the prefabricated stair tread (5) being connected to the staggered platform (3) and the other end thereof being connected to the floor platform (4); the suspension assembly comprises a suspension rod (6), the suspension rod (6) comprising two vertically oppositely arranged side steel plates (61) and a web steel plate (62), the web steel plate (62) being arranged between the two side steel plates (61) and the two ends thereof being vertically connected to the two side steel plates (61), the top end of the suspension rod (6) being connected to the frame beam (2) via an upper hinge node and the bottom end thereof being connected to the staggered platform (3) via a lower hinge node; The upper hinge node comprises two upper energy absorbing plates (71) and two upper connecting steel plates (72); the two upper energy absorbing plates (71) are L-shaped, the bottom ends of the two upper energy absorbing plates (71) are respectively connected to the top ends of the two side steel plates (61) through a plurality of upper bolt pairs (73), and the top ends of the upper energy absorbing plates (71) are connected to the frame beam (2) through a plurality of upper sleeve bolt pairs (74); the upper connecting steel plate (72) is L-shaped, the two upper connecting steel plates (72) are respectively arranged on both sides of the top end of the web steel plate (62), the top end of the web steel plate (62) is rotatably connected to an upper shear force transmission rod (75) connected to the two upper connecting steel plates (72), and the top end of the upper connecting steel plate (72) is connected to the frame beam (2) through a plurality of upper sleeve bolt pairs (76) with anchor plates; dampers (9) are connected to both ends of the staggered platform (3), and the other end of the damper (9) is connected to the frame beam (2); A first support plate (31) is provided at one end of the staggered platform (3), a seismic isolation support (32) is installed on the first support plate (31), an end of the prefabricated ladder plate (5) is connected to the seismic isolation support (32), a gap is left between the end of the prefabricated ladder plate (5) and the staggered platform (3) to form a seismic isolation joint (33), the width of the seismic isolation joint (33) is not less than the distance between the seismic isolation support (32) and the seismic isolation joint (33), and the seismic isolation joint (33) is filled with polystyrene or a grid to form a seismic isolation member.

2. The shock-absorbing assembled suspended staircase structure according to claim 1 is characterized in that: The lower hinge assembly comprises two lower connecting steel plates (81); the lower connecting steel plates (81) are L-shaped, and the two lower connecting steel plates (81) are respectively arranged on both sides of the bottom end of the web steel plate (62); the bottom end of the web steel plate (62) is rotatably connected to a lower shear force transmission rod (82) connected to the two lower connecting steel plates (81); the bottom end of the lower connecting steel plate (81) is connected to the staggered platform (3) through a plurality of lower anchor plate sleeve bolt pairs (83).

3. The shock-absorbing assembled suspended staircase structure according to claim 1 is characterized in that: The seismic isolation support (32) adopts a plastic plate seismic isolation block or a laminated rubber support with a diameter not exceeding 100 mm.

4. The shock-absorbing assembled suspended staircase structure according to any one of claims 1 to 3, characterized in that: A second support plate (41) is provided at one end of the floor platform (4), a plurality of sleeves (42) are pre-buried on the second support plate (41), and the plurality of sleeves (42) are all threadedly connected with fixing pins (43); a plurality of reserved holes (51) are opened at the end of the prefabricated ladder plate (5), the plurality of reserved holes (51) are respectively arranged in one-to-one correspondence with the plurality of sleeves (42), and the fixing pins (43) of the sleeves (42) are inserted into the corresponding reserved holes (51), and the reserved holes (51) are filled with mortar (52); a vertical seam (44) is reserved between the side of the prefabricated ladder plate (5) and the floor platform (4), and a connecting piece is formed by filling the vertical seam (44) with polystyrene, and a flat seam (45) is reserved between the bottom end of the prefabricated ladder plate (5) and the second support plate (41), and a fixing piece is formed by filling the flat seam (45) with mortar.

5. The shock-absorbing assembled suspended staircase structure according to claim 4 is characterized in that: The width of the vertical seam (44) is 10-40 mm, and the thickness of the flat seam (45) is 10-30 mm.

6. The shock-absorbing assembled suspended staircase structure according to any one of claims 1 to 3, characterized in that: A gap is left between the staggered platform (3) and the frame column (1) to form an earthquake-resistant joint (10), and a flexible material is filled in the earthquake-resistant joint (10) to form an earthquake-resistant part.

Citation Information

Patent Citations

  • Separation type damping stair

    CN102383552A

  • Connection and installation construction method for earthquake collision and damage preventing on support of prefabricated stair

    CN103821289A

  • Hanging type prefabricated staircase structure

    CN111663727A

  • Hanging-pulling type assembled staircase structure

    CN212271444U

  • Damping assembly type suspended staircase structure

    CN214090672U