A super-high construction joint structure and construction method

By using the water-stop steel plate embedded in the wall to weld the pleated steel plate and connected through the anchor bars in the ultra-high construction joint structure, the problems of slurry leakage and water-stop steel plate tilt in the traditional construction joint structure are solved, and higher quality is achieved construction effect.

CN112127510BActive Publication Date: 2025-02-18HANGZHOU JIANGGAN SCI&TECH ECONOMIC DEV CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202011175006.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-10-28
Publication Date
2025-02-18
Estimated Expiration
2040-10-28

AI Technical Summary

Technical Problem

Among the ultra-high construction joints, traditional construction joint structures are prone to slurry leakage and water-stop steel plate inclination, which affects the construction quality.

Method used

The structure includes a wall, pleated steel plate and water-stop steel plate is adopted. The water-stop steel plate is embedded in the wall and welded with the pleated steel plate, connected by anchor bars, and a concrete density test hole is set to check the concrete density.

Benefits of technology

It effectively avoids slurry leakage in the construction joints and inclination of the water-stop steel plates, ensures the waterproofing effect of the construction joints, and passes the concrete density test hole inspection to avoid the occurrence of concrete hollowing.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112127510B_ABST
    Figure CN112127510B_ABST
Patent Text Reader

Abstract

The present invention relates to a super-high construction joint structure, including a wall, a corrugated steel plate and a water-stop steel plate, wherein one half of the water-stop steel plate is embedded in the wall and the other half is exposed, and the front and rear ends of the water-stop steel plate are respectively connected to a corrugated steel plate by welding, and the corrugated steel plate is closely connected to the wall section; a plurality of structural ribs are evenly arranged at the front and rear ends of the wall, and the structural ribs penetrate the corrugated steel plate; the corrugated steel plate is welded by a plurality of corrugated surfaces, and the welding place of two adjacent corrugated surfaces is the convex part of the corrugated steel plate; each corrugated surface is in the shape of an obtuse opening, and a plurality of stripes are arranged on each corrugated surface. The beneficial effects of the present invention are as follows: the present invention adopts a sealing form in which the front and rear ends of the water-stop steel plate are respectively welded to a corrugated steel plate at the construction joint, and only a plurality of concrete density validation holes with a diameter of only about 1 cm are left, and the concrete density validation holes are blocked during the concrete pouring process, which can effectively avoid serious leakage of the construction joint structure during the construction process.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of building construction, and in particular relates to a super-high construction joint structure and a construction method. Background Art

[0002] In some special buildings such as theaters, auditoriums, and garbage transfer stations, there are sometimes super-high construction joints of more than 10 meters. The use of traditional construction joint structures will cause serious leakage during the construction process. At the same time, the water-stop steel plate is prone to tilt during the construction process, affecting the waterproof effect of the construction joint.

[0003] Therefore, it is necessary to continuously invent and improve structures and construction methods suitable for super-high construction joint construction to ensure the construction quality of super-high construction joints. A super-high construction joint structure and construction method are proposed for super-high construction joint construction based on this requirement. Summary of the invention

[0004] The purpose of the present invention is to overcome the deficiencies in the prior art and provide a super-high construction joint structure and a construction method.

[0005] This super-high construction joint structure includes a wall, a corrugated steel plate and a waterstop steel plate. Half of the waterstop steel plate is embedded in the wall and the other half is exposed. The front and back of the waterstop steel plate are connected to a corrugated steel plate by welding respectively, and the corrugated steel plate is tightly connected to the wall section.

[0006] Preferably, a plurality of structural ribs are evenly arranged at the front and rear ends of the wall, and the structural ribs penetrate the corrugated steel plate.

[0007] Preferably, the corrugated steel plate is welded from a number of corrugated surfaces, the welding point between two adjacent corrugated surfaces is a convex point of the corrugated steel plate; each corrugated surface is an obtuse-angled opening, a number of stripes are arranged on each corrugated surface, a group of anchor bars are welded on each corrugated surface, and a concrete density test hole with a diameter of about 1 cm is arranged at the lower end of each corrugated surface.

[0008] Preferably, the group of anchor bars consists of three threaded steel bars, two of which are welded to the waterstop steel plate.

[0009] Preferably, the templates at the front and back of the wall are connected by screws.

[0010] The construction method of the super-high construction joint structure comprises the following steps:

[0011] S1. Making corrugated steel plates: According to the height and thickness of the super-high construction joint, select the corrugated surface of appropriate size, and weld several corrugated surfaces into corrugated steel plates.

[0012] S2. Preparation before construction: transport the materials required for construction to the site and clean up the construction site.

[0013] S3. Formwork work: Arrange structural reinforcement according to the height and thickness of the super-high construction joint, set up formwork of corresponding size, connect the formwork through screws, fix waterstop steel plates at the construction joints, weld a piece of corrugated steel plates in front and behind the waterstop steel plates, block the concrete density test holes on all the corrugated surfaces, and weld a group of anchor bars on each corrugated surface. The two threaded steel bars on each group of anchor bars must also be welded to the waterstop steel plate.

[0014] S4. Wall pouring: While pouring the wall, the concrete is vibrated continuously. Every time a piece of the fold surface is poured, the concrete density is checked through the concrete density test holes on the fold surface until the pouring is completed.

[0015] S5. Subsequent construction: After the wall maintenance is completed, the subsequent construction is carried out. After the construction of the entire wall is completed, the protective layer of the corrugated steel plate at the construction joint is constructed.

[0016] The beneficial effects of the present invention are:

[0017] 1. The present invention adopts a sealing form in which a water-stop steel plate is welded to a corrugated steel plate in front and behind at the construction joint, leaving only a number of concrete density test holes with a diameter of only about 1 cm, and the concrete density test holes are blocked during the concrete pouring process, which can effectively avoid serious leakage of the construction joint structure during the construction process.

[0018] 2. The present invention is provided with a concrete density testing hole, which can check whether the concrete at different positions is dense at any time, and can effectively avoid the generation of concrete hollowing near the construction joint.

[0019] 3. In the present invention, the corrugated steel plate and the water-stop steel plate are connected by anchor bars, which effectively prevents the water-stop steel plate from tilting during the construction process.

[0020] 4. The present invention is provided with anchor bars and a folded surface with an obtuse opening, and a plurality of stripes are provided on the folded surface, which can enhance the lap joint strength of the walls on both sides of the construction joint. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 This is a schematic diagram of the wall construction;

[0022] Figure 2 This is a schematic diagram of the wall after completion;

[0023] Figure 3 This is the front view of the wall after completion;

[0024] Figure 4 Schematic diagram of corrugated steel plate.

[0025] Explanation of the reference numerals: 1-wall; 2-formwork; 3-screw; 4-corrugated steel plate; 5-structural reinforcement; 6-concrete density test hole; 7-anchor reinforcement; 8-waterstop steel plate; 9-convex part of the corrugated steel plate; 10-stripes; 11-corrugated surface. DETAILED DESCRIPTION

[0026] The present invention is further described below in conjunction with embodiments. The description of the following embodiments is only used to help understand the present invention. It should be noted that for those of ordinary skill in the art, without departing from the principles of the present invention, several improvements and modifications may be made to the present invention, and these improvements and modifications also fall within the scope of protection of the claims of the present invention.

[0027] This patent adopts a sealing form in which the front and rear water-stop steel plates are welded to a pleated steel plate respectively at the construction joint, leaving only a number of concrete density test holes with a diameter of only about 1 cm, and the concrete density test holes are blocked during the concrete pouring process, which can effectively prevent the construction joint structure from serious leakage during the construction process. At the same time, the concrete density test holes can be used to check whether the concrete at different positions is dense at any time; the pleated steel plate and the water-stop steel plate are connected by anchor bars, which effectively prevents the water-stop steel plate from tilting during the construction process. At the same time, the anchor bars and the stripes on the pleated surface can enhance the anchoring strength of the walls on both sides of the construction joint. The above measures can ensure the construction quality of the super-high construction joint.

[0028] Embodiment 1

[0029] like Figure 1-4 As shown, the super-high construction joint structure shown is used for super-high construction joint construction, including a wall 1, a corrugated steel plate 4 and a waterstop steel plate 8. One half of the waterstop steel plate 8 is embedded in the wall 1 and the other half is exposed. The front and rear of the waterstop steel plate 8 are respectively connected to a corrugated steel plate 4 by welding, and the corrugated steel plate 4 is tightly connected to the cross-section of the wall 1; a number of structural ribs 5 are evenly arranged at the front and rear ends of the wall 1, and the structural ribs 5 pass through the corrugated steel plate 4; a group of anchor bars 7 are welded on each corrugated surface 11, and a group of anchor bars 7 consists of 3 threaded steel bars, of which two threaded steel bars are welded to the waterstop steel plate 8. The corrugated steel plate 4 is welded by a number of corrugated surfaces 11, and the welding point of two adjacent corrugated surfaces 11 is a corrugated steel plate convex point 9, and each corrugated surface 11 is an obtuse opening, and each corrugated surface 11 is provided with a number of stripes 10, and each corrugated surface 11 is provided with a concrete density test hole 6 with a diameter of about 1 cm at the lower end (such as Figure 4 shown).

[0030] Embodiment 2

[0031] Specific implementation: At a garbage transfer station, there is a wall close to a soil pile, which is 12m high, 48cm thick and 40m long, and an extra-high construction joint needs to be set.

[0032] HRB335 grade steel bars with a diameter of 16 mm are used as structural bars 5; HRB335 grade steel bars with a diameter of 10 mm are used as anchor bars; a water-stop steel plate 8 with a thickness of 4 mm is used; a corrugated steel plate 4 is made of a corrugated surface 11 with a thickness of 5 mm, a length of 23.8 cm, a height of 30 cm, a concave angle of 120°, and a concrete density test hole with a diameter of 1 cm.

[0033] During the specific construction, follow the following construction steps:

[0034] S1. Making a corrugated steel plate 4: According to the height and thickness of the super-high construction joint, select a corrugated surface 11 with a thickness of 5 mm, a length of 23.8 cm, a height of 30 cm, a concave angle of 120°, and a concrete density test hole diameter of 1 cm, and weld 40 corrugated surfaces 11 of this size into a corrugated steel plate 4.

[0035] S2. Preparation before construction: transport the materials required for construction to the site and clean up the construction site.

[0036] S3. Formwork work: arrange HRB335 grade steel bars with a diameter of 16mm as structural bars 5 according to the height and thickness of the super-high construction joint, set up formwork 2 of corresponding size, and connect the formwork 2 through screws 3. Fix a 4mm thick waterstop steel plate 8 at the construction joint, and weld a corrugated steel plate 4 in front and behind the waterstop steel plate 8, respectively, to block the concrete density test holes 6 on all the corrugated surfaces 11, and weld a group of anchor bars 7 on each corrugated surface at the same time. The two HRB335 grade threaded steel bars with a diameter of 10mm on each group of anchor bars 7 should also be welded to the waterstop steel plate 8.

[0037] S4, wall pouring: while pouring the wall, the concrete is continuously vibrated, and each time a height of the fold surface 11 is poured, the concrete density is checked through the concrete density test hole 6 on the fold surface 11 to see if the concrete is dense, until the pouring is completed.

[0038] S5, subsequent construction: After the wall maintenance is completed, subsequent construction is carried out. After the construction of the entire wall is completed, the protective layer of the corrugated steel plate 4 at the construction joint is constructed.

Claims

1. A construction method for a super-high construction joint structure, characterized in that: The super-high construction joint structure comprises a wall (1), a corrugated steel plate (4) and a water-stop steel plate (8), wherein half of the water-stop steel plate (8) is embedded in the wall (1) and the other half is exposed, and the front and rear of the water-stop steel plate (8) are respectively connected to a corrugated steel plate (4) by welding, and the corrugated steel plate (4) is tightly connected to the cross section of the wall (1); S1, manufacturing a corrugated steel plate (4): selecting a corrugated surface (11) of appropriate size according to the height and thickness of the super-high construction joint, and welding a plurality of corrugated surfaces (11) into a corrugated steel plate (4); S2. Preparation before construction: transport the materials required for construction to the site and clean up the construction site; S3, formwork work: according to the height and thickness of the super-high construction joint, the structural reinforcement (5) is arranged, and the formwork (2) of the corresponding size is erected. The formwork (2) is connected by screws (3), and a water stop steel plate (8) is fixed at the construction joint. A pleated steel plate (4) is staggered and welded in front and behind the water stop steel plate (8), and the concrete density test holes (6) on all the pleated surfaces (11) are blocked. At the same time, a group of anchoring reinforcements (7) is welded on each pleated surface, and two threaded steel bars on each group of anchoring reinforcements (7) are welded to the water stop steel plate (8) at the same time; S4, wall pouring: while pouring the wall, the concrete is continuously vibrated, and each time a height of the fold surface (11) is poured, the concrete density is checked through the concrete density test hole (6) on the fold surface (11) to see if the concrete is dense, until the pouring is completed; S5. Subsequent construction: After the wall maintenance is completed, subsequent construction is carried out. After the construction of the entire wall is completed, the protective layer of the corrugated steel plate (4) at the construction joint is constructed.

2. The construction method of superelevation construction joint structure according to claim 1, wherein: A plurality of structural ribs (5) are evenly arranged at the front and rear ends of the wall (1), and the structural ribs (5) penetrate the corrugated steel plate (4).

3. The construction method of superelevation construction joint structure according to claim 1, wherein: The corrugated steel plate (4) is formed by welding a plurality of corrugated surfaces (11), wherein the welding point between two adjacent corrugated surfaces (11) is a convex point (9) of the corrugated steel plate; each corrugated surface (11) is in the shape of an obtuse-angled opening, each corrugated surface (11) is provided with a plurality of stripes (10), each corrugated surface (11) is welded with a group of anchor bars (7), and each corrugated surface (11) is provided with a concrete density test hole (6) at the lower end.

4. The construction method of the superelevation construction joint structure according to claim 3, wherein: The set of anchor bars (7) is composed of three threaded steel bars, two of which are welded to the water stop steel plate (8).

5. The construction method of superelevation construction joint structure according to claim 1, characterized in that: The front and rear templates (2) of the wall (1) are connected via screws (3).

Citation Information

Patent Citations

  • Post-cast strip plugging structure and construction method thereof

    CN111733893A

  • Ultrahigh construction joint structure

    CN213597265U

  • Concrete filling extent detecting method and detection correcting method for steel pipe concrete structure

    JP1993018108A