Composite curtain pile construction drilling tool and construction method thereof

Through the design of composite curtain pile construction drill tool, combined with mixing and spraying mechanism, a lateral and circular consolidation structure is formed, which solves the problem of cement soil mixing piles being unable to overlap and waste of high-pressure rotary spray piles, and achieves efficient Material utilization and water cutoff effect.

CN112160333BActive Publication Date: 2024-12-06SHANDONG CONSTR & PROSPECTING GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202011135864.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-10-21
Publication Date
2024-12-06
Estimated Expiration
2040-10-21

AI Technical Summary

Technical Problem

The existing cement soil mixing piles cannot overlap with the support piles, high-pressure rotary spray piles cause waste of materials, and the high-pressure fixed spray and swing spray curtain walls are spliced ​​by fan-shaped causes poor water cut-off effect.

Method used

Provide a composite curtain pile construction drill tool, combining a stirring mechanism and a fixed spraying mechanism, and drives the blade assembly to rotate through a stirring rod and cooperate with the fixed spraying mechanism. The nozzle is designed as a plurality of slurry outlets to form a lateral consolidation body and a circle. A combined structure of a solidified body is used to overlap with support piles to reduce waste slurry production.

Benefits of technology

The overlap between cement soil mixing piles and support piles is achieved, material saving, water cut-off effect is improved, waste slurry is produced, high construction efficiency is high, and construction period is saved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112160333B_ABST
    Figure CN112160333B_ABST
Patent Text Reader

Abstract

The invention provides a composite curtain pile construction drill tool and a construction method thereof, and relates to the technical field of building foundation construction, including a stirring mechanism and a fixed spraying mechanism; the stirring mechanism includes a stirring rod and a blade assembly connected to the bottom end thereof; the stirring rod is rotatably connected to the center of the fixed spraying mechanism, the fixed spraying mechanism includes a conveying pipeline and a nozzle, the height of which is greater than the height of the blade assembly, a slurry outlet is arranged on the nozzle, the distance between the nozzle and the center of the stirring rod is less than the rotation radius of the blade assembly, the stirring rod drives the blade assembly to rotate, and high-pressure consolidation material is sprayed out from the slurry outlet to cut the soil to form a lateral consolidation body structure exceeding the rotation radius of the blade assembly and overlapped with the supporting pile, part of the consolidation material is stirred by the blade assembly to form a circular consolidation body, the two consolidation bodies overlap each other, and the problem that the cement soil mixing pile cannot be overlapped with the supporting pile is solved while the problem that the center of the fixed spraying consolidation body is weak is solved, material is saved, work efficiency is high, and construction is convenient.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building foundation construction, and in particular to a composite curtain pile construction drill tool and a construction method thereof. Background Art

[0002] Water cut-off curtain is an important structural measure in the field of foundation pit groundwater control. At present, the most commonly used forms of water cut-off curtain are cement soil mixing piles, high-pressure rotary jet piles and high-pressure fixed and swing jet curtains.

[0003] Cement soil mixing piles are made by injecting pre-configured cement slurry into the hole, and forcibly mixing the cement slurry with the surrounding soft soil by rotating the mixing blades to form a cement reinforcement body. Its advantages are simple construction, low cost, and reliable pile quality. However, for foundation pits supported by pile anchors, the curtain piles cannot be overlapped with the supporting piles due to the conflict between the mixing blades and the concrete supporting piles. Only a circle of cement soil mixing pile curtains can be constructed outside the supporting piles, resulting in a waste of materials and construction time.

[0004] High-pressure jet grouting piles use high-pressure rotating nozzles to spray cement slurry into the soil layer, use high-pressure jets to cut the soil, mix the cement slurry with the soil, and form a continuous overlapping cement reinforcement body. Its advantages are small construction area, small vibration, low noise, and good stratum adaptability. When used for the inter-pile curtain of foundation pit pile anchor support, its high-pressure jet will wash the surface of the pile body when passing through the hard concrete support pile, so that the cement soil pile and the support pile form an effective overlap, and the applicability is excellent. However, due to the huge amount of slurry discharged by the high-pressure jet, there is serious waste, high cost, and it is easy to pollute the environment.

[0005] High-pressure fixed spraying and swing spraying curtains only form a fan-shaped consolidation body with interconnected vertices when the drill bit does not rotate or swings within a certain angle range during the drilling process. This curtain form improves the disadvantage of slurry waste in rotary spraying curtain piles to a certain extent due to its small wall thickness. However, whether it is high-pressure fixed spraying or swing spraying curtains, since the wall is made of fan-shaped splicing, the thickness of the fan-shaped vertex position is extremely small, which greatly reduces the water interception effect of the curtain. Summary of the invention

[0006] The purpose of the present invention is to provide a composite curtain pile construction drill tool and a construction method thereof, so as to alleviate the technical problems that the existing cement soil mixing pile construction is limited, the high-pressure rotary jet pile causes material waste, and the high-pressure fixed jet and swing jet curtain wall is formed by fan-shaped splicing, and the thickness at the fan-shaped vertex position is extremely small, which greatly reduces the water interception effect of the curtain.

[0007] The composite curtain pile construction drilling tool provided by the present invention comprises a stirring mechanism and a fixed spraying mechanism; the stirring mechanism comprises a stirring rod and a blade assembly connected to the bottom end of the stirring rod;

[0008] The stirring rod is rotatably connected to the center of the fixed spray mechanism, and the stirring rod can move up and down together with the fixed spray mechanism;

[0009] The fixed spray mechanism includes a conveying pipe and a nozzle, wherein the nozzle is connected to the bottom of the conveying pipe, the height of the nozzle is greater than the height of the blade assembly, the nozzle is provided with a slurry outlet with a spraying direction away from the stirring rod, and the distance between the nozzle and the center of the stirring rod is less than the rotation radius of the blade assembly.

[0010] Furthermore, the number of the nozzles is two.

[0011] Furthermore, along the circumference of the stirring rod, the angle between the two nozzles is adjustable.

[0012] Furthermore, there are multiple slurry outlets on each of the nozzles, and the multiple slurry outlets are arranged at intervals along the length direction of the nozzle.

[0013] Furthermore, there are two slurry outlets on each nozzle, the projections of the extension directions of the two slurry outlets in a plane perpendicular to the length direction of the stirring rod do not overlap, and the injection paths of the two slurry outlets intersect outside the rotation radius of the blade assembly.

[0014] Furthermore, a first rotating assembly is provided at the junction of the stirring rod and the fixed spray mechanism;

[0015] The first rotating assembly includes a fixed bearing, the stirring rod is connected to the inner ring of the fixed bearing, and the fixed spray mechanism is connected to the outer ring of the fixed bearing.

[0016] Furthermore, it also includes a sleeve, the inner wall of the sleeve is connected to the outer ring of the fixed bearing, and the fixed spray mechanism is connected to the outer wall of the sleeve.

[0017] Furthermore, the fixed spray mechanism further comprises a connecting rod and a high spray pipe; one end of the connecting rod is connected to the outer ring of the fixed bearing, the other end of the connecting rod is connected to the high spray pipe, the spray head is connected to the bottom end of the high spray pipe, and the delivery pipeline is arranged in the high spray pipe;

[0018] The extension direction of the high nozzle is the same as the extension direction of the stirring rod.

[0019] Furthermore, the stirring mechanism also includes a driving mechanism, which is connected to an end of the stirring rod away from the blade assembly and is used to drive the stirring rod and the blade assembly to rotate.

[0020] The construction method of the composite curtain pile construction drill tool provided by the present invention comprises:

[0021] Measure and lay out between two adjacent support piles to determine the position of the composite curtain piles and install the composite curtain pile construction drilling tools;

[0022] The stirring rod of the stirring mechanism drives the blade assembly to rotate, and water or consolidation material is introduced into the delivery pipe of the fixed spraying mechanism, and the composite curtain pile construction drill moves from top to bottom to a preset depth;

[0023] The consolidation material is introduced into the delivery pipeline of the fixed spraying mechanism to lift the composite curtain pile construction drilling tool from a preset depth to a preset elevation.

[0024] The composite curtain pile construction drilling tool provided by the present invention comprises a stirring mechanism and a fixed spraying mechanism; the stirring mechanism comprises a stirring rod and a blade assembly connected to the bottom end of the stirring rod, the stirring rod is rotatably connected to the center of the fixed spraying mechanism, and the stirring rod can move up and down with the fixed spraying mechanism; the fixed spraying mechanism comprises a conveying pipe and a nozzle, the nozzle is connected to the bottom of the conveying pipe, the height of the nozzle is greater than the height of the blade assembly, the nozzle is provided with a slurry outlet with a spraying direction away from the stirring rod, and the distance between the nozzle and the center of the stirring rod is less than the rotation radius of the blade assembly.

[0025] When in use, the position of the composite curtain pile is determined by measuring and laying out between two adjacent supporting piles, and the composite curtain pile construction drill is installed. The mixing mechanism and the fixed spraying mechanism move from top to bottom at the same time, and the mixing rod drives the blade assembly to rotate together. At the same time, consolidation material, such as cement slurry, is introduced into the conveying pipeline of the fixed spraying mechanism, and the consolidation material is sprayed out from the slurry outlet of the nozzle. When the introduced consolidation material is in a high-pressure state, it can cut the soil to form a lateral consolidation body structure that exceeds the rotation radius of the blade assembly. The consolidation body structure is used to overlap with the supporting piles. At the same time, part of the consolidation material is stirred by the blade assembly of the mixing mechanism to form a circular consolidation body. The two consolidation bodies can overlap with each other to form a composite curtain pile, which not only solves the problem that the existing cement-soil mixing piles cannot be overlapped with the supporting piles, but also solves the problem that the center of the fixed spraying consolidation body is weak. Almost no waste slurry is generated, materials are saved, work efficiency is high, construction is convenient, and construction period is saved.

[0026] The construction method of the composite curtain pile construction drill tool provided by the present invention comprises: measuring and laying out between two adjacent support piles to determine the position of the composite curtain pile and installing the composite curtain pile construction drill tool; a stirring rod of a stirring mechanism drives a blade assembly to rotate, and water or consolidation material is introduced into a delivery pipeline of a fixed spraying mechanism, and the composite curtain pile construction drill tool moves from top to bottom to a preset depth; consolidation material is introduced into the delivery pipeline of the fixed spraying mechanism, and the composite curtain pile construction drill tool is lifted from a preset depth to a preset elevation.

[0027] The construction method of the composite curtain pile construction drill tool provided by the present invention comprises the following steps: when the composite curtain pile construction drill tool moves from top to bottom to a preset depth, a stirring rod of a stirring mechanism drives a blade assembly to rotate, and low-pressure or high-pressure water and low-pressure or high-pressure consolidation materials are introduced into a delivery pipeline of a fixed spraying mechanism. Then, when the composite curtain pile construction drill tool is lifted from a preset depth to a preset elevation, consolidation materials are introduced into the delivery pipeline, thereby forming a circular consolidation body or a combination of multiple lateral consolidation bodies and circular consolidation bodies, so as to adapt to various complex working conditions, have high working efficiency, facilitate construction, and save construction period. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0029] Figure 1 The first structural form of the composite curtain pile construction drilling tool provided in the embodiment of the present invention;

[0030] Figure 2 A schematic diagram of the injection of the slurry outlet of the composite curtain pile construction drilling tool provided in an embodiment of the present invention;

[0031] Figure 3 for Figure 2 A magnified view of part A in FIG.

[0032] Figure 4 for Figure 2 A top view of the

[0033] Figure 5 The second structural form of the composite curtain pile construction drilling tool provided in the embodiment of the present invention;

[0034] Figure 6 A structural diagram of a bidirectional fixed-jet mixing pile of a composite curtain pile construction drill provided in an embodiment of the present invention;

[0035] Figure 7 A top view of a bidirectional fixed-jet mixing pile of a composite curtain pile construction drill provided in an embodiment of the present invention;

[0036] Figure 8 A structural diagram of a one-way fixed-jet mixing pile of a composite curtain pile construction drill provided by an embodiment of the present invention;

[0037] Fig. 9 A structural diagram of a conventional mixing pile of a composite curtain pile construction drill provided by an embodiment of the present invention;

[0038] Fig.10 A schematic diagram of a first connection form between a bidirectional fixed-jet mixing pile and a support pile of a composite curtain pile construction drill provided in an embodiment of the present invention;

[0039] Fig.11 A schematic diagram of a second connection form between a bidirectional fixed-jet mixing pile and a supporting pile of a composite curtain pile construction drill provided in an embodiment of the present invention;

[0040] Fig.12 The present invention is a flowchart of a construction method of a composite curtain pile construction drilling tool provided in an embodiment of the present invention.

[0041] Icons: 10-circular consolidation body; 20-lateral consolidation body; 30-support pile; 111-stirring rod; 112-blade assembly; 120-fixed spray mechanism; 121-high spray pipe; 122-connecting rod; 123-spray head; 124-slurry outlet; 130-fixed bearing; 131-casing. DETAILED DESCRIPTION

[0042] The technical solution of the present invention will be clearly and completely described below in conjunction with the embodiments. Obviously, the described embodiments are part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0043] like Figures 1 to 11 As shown, the composite curtain pile construction drill provided in this embodiment includes a stirring mechanism and a fixed spray mechanism 120; the stirring mechanism includes a stirring rod 111 and a blade assembly 112 connected to the bottom end of the stirring rod 111; the stirring rod 111 is rotatably connected to the center of the fixed spray mechanism 120, and the stirring rod 111 can move up and down with the fixed spray mechanism 120; the fixed spray mechanism 120 includes a conveying pipe and a nozzle 123, the nozzle 123 is connected to the bottom of the conveying pipe, the height of the nozzle 123 is greater than the height of the blade assembly 112, and the nozzle 123 is provided with a slurry outlet 124 with a spraying direction away from the stirring rod 111, and the distance between the nozzle 123 and the center of the stirring rod 111 is less than the rotation radius of the blade assembly 112.

[0044] It should be noted that, in the present embodiment, the slurry outlet 124 may be oriented away from the stirring rod 111 , or may be oriented in other directions, but it needs to avoid the direction toward the stirring rod 111 .

[0045] When in use, the position of the composite curtain pile is determined by measuring and laying out between two adjacent supporting piles 30, and the composite curtain pile construction drill is installed. The mixing mechanism and the fixed spraying mechanism 120 move from top to bottom at the same time, and the mixing rod 111 drives the blade assembly 112 to rotate together. At the same time, a consolidation material, such as cement slurry, is introduced into the conveying pipe of the fixed spraying mechanism 120, and the consolidation material is sprayed out from the slurry outlet 124 of the nozzle 123. When the introduced consolidation material is in a high-pressure state, it can cut the soil to form a lateral consolidation body 20 structure that exceeds the rotation radius of the blade assembly 112. The consolidation body structure is used to overlap with the supporting pile 30. At the same time, part of the consolidation material is stirred by the blade assembly 112 of the mixing mechanism to form a circular consolidation body 10. The two consolidation bodies can overlap with each other to form a composite curtain pile, which not only solves the problem that the existing cement-soil mixing pile cannot overlap with the supporting pile 30, but also solves the problem that the center of the fixed spraying consolidation body is weak, and almost no waste slurry is generated, saving materials, high work efficiency, convenient construction, and saving construction period.

[0046] It should be noted that, in the present embodiment, the consolidation material is cement slurry. Of course, other consolidation materials that can be used for underground anti-seepage walls can be used instead.

[0047] Furthermore, the number of the nozzles 123 is two, and the two nozzles 123 are spaced apart in the circumferential direction around the stirring rod 111 .

[0048] Specifically, during actual use, the stirring rod 111 drives the blade assembly 112 at its bottom to rotate, while the position of the fixed spray mechanism 120 remains unchanged, and the end of the delivery pipeline away from the nozzle 123 is connected to the high-pressure cement pump. When high-pressure cement slurry is released into the delivery pipeline, the high-pressure cement slurry is sprayed out from the slurry outlet 124 of the nozzle 123, cutting the soil to form a fan-shaped cement consolidation body that exceeds the rotation radius of the blade assembly 112, and part of the cement slurry is stirred by the blade assembly 112 of the stirring mechanism to form a circular cement consolidation body with the soil. The two cement consolidation bodies overlap with each other to form a composite curtain pile. The composite curtain pile is a two-way fixed spray stirring pile, in which one end of the fan-shaped cement consolidation body away from the circular cement consolidation body is used to overlap with a supporting pile 30, and the other end of the fan-shaped cement consolidation body away from the circular cement consolidation body is used to overlap with another supporting pile 30.

[0049] It should be noted that high-pressure cement slurry can be introduced into one nozzle 123, and low-pressure or no cement slurry can be introduced into the other nozzle 123. At this time, only a circular cement consolidation body and a fan-shaped cement consolidation body overlapping it are formed, and the fan-shaped cement consolidation body is located on one side of the circular cement consolidation body, thus forming a one-way fixed-jet mixing pile.

[0050] Of course, low-pressure cement slurry can also be introduced into both nozzles 123. In this case, only a circular cement consolidation body is formed, that is, a conventional mixing pile is formed.

[0051] In actual use, the above three types of mixing piles formed by the composite curtain pile construction drill can be used in any combination to suit different complex working conditions.

[0052] Furthermore, there are multiple slurry outlets 124 on each of the nozzles 123 , and the multiple slurry outlets 124 are arranged at intervals along the length direction of the nozzle 123 .

[0053] Specifically, in the present embodiment, each nozzle 123 is provided with two slurry outlets 124 , and the two slurry outlets 124 are arranged along the length direction of the nozzle 123 , that is, in the vertical direction.

[0054] In this embodiment, one end of the nozzle 123 facing the blade assembly 112 is tapered, and the smaller portion of the tapered shape faces the blade assembly 112, so as to reduce the resistance to movement when the composite curtain pile construction drill moves from top to bottom.

[0055] Furthermore, there are two slurry outlets 124 on each of the nozzles 123, the projections of the extension directions of the two slurry outlets 124 in a plane perpendicular to the length direction of the stirring rod 111 do not overlap, and the injection paths of the two slurry outlets 124 intersect outside the rotation radius of the blade assembly 112.

[0056] Specifically, the two slurry outlets 124 on the nozzle 123 can be arranged at intervals in the vertical direction, but the extension directions of the two slurry outlets 124 are different, that is, they are arranged at a certain angle. The cement slurry sprayed from the two slurry outlets 124 intersects outside the rotation radius of the blade assembly 112, and there is no gap, thereby ensuring the sealing performance. At the same time, it can be arranged so that the height of the cement slurry sprayed from the two slurry outlets 124 at the end away from the slurry outlet 124 is the same.

[0057] It should be noted that due to the different heights of the two slurry outlets 124, there must be gaps in the cement slurry sprayed near the slurry outlet 124. Since the distance between the nozzle 123 and the center of the stirring rod 111 is smaller than the rotation radius of the blade assembly 112, this gap is compensated by the circular cement solid body formed by the stirring of the blade assembly 112, thereby forming a sealed composite curtain pile structure.

[0058] Furthermore, a first rotating component is provided at the junction of the stirring rod 111 and the fixed spray mechanism 120; the first rotating component includes a fixed bearing 130, the stirring rod 111 is connected to the inner ring of the fixed bearing 130, and the fixed spray mechanism 120 is connected to the outer ring of the fixed bearing 130.

[0059] It should be noted that if Figure 5 As shown, as another implementation form, the first rotating assembly further includes a sleeve 131 , an inner wall of the sleeve 131 is connected to the outer ring of the fixed bearing 130 , and the fixed spray mechanism 120 is connected to the outer wall of the sleeve 131 .

[0060] Preferably, in this embodiment, the fixed spray mechanism 120 also includes a connecting rod 122 and a high nozzle 121; one end of the connecting rod 122 is connected to the outer ring of the fixed bearing 130, and the other end of the connecting rod 122 is connected to the high nozzle 121, the nozzle 123 is connected to the bottom end of the high nozzle 121, and the conveying pipeline is arranged in the high nozzle 121; the extension direction of the high nozzle 121 is the same as the extension direction of the stirring rod 111.

[0061] Specifically, the fixed spray mechanism 120 includes two high spray pipes 121, the extension direction of the high spray pipes 121 is the same as the extension direction of the stirring rod 111, and each high spray pipe 121 is connected to the outer ring of the fixed bearing 130 through a connecting rod 122, the conveying pipeline is installed in the high spray pipe 121, and the nozzle 123 is connected to the bottom end of the high spray pipe 121.

[0062] Furthermore, one of the connecting rods 122 is connected to one side of the fixed bearing 130 , and the other connecting rod 122 is connected to the other side opposite to the fixed bearing 130 .

[0063] Specifically, the two connecting rods 122 are respectively connected to the two sides of the fixed bearing 130, so that a high nozzle 121 connected thereto and a nozzle 123 connected to the bottom of the high nozzle 121 are arranged opposite to another high nozzle 121 and a nozzle 123 connected to the bottom thereof, so that the directions of the cement slurry sprayed out from the slurry outlets 124 on the two nozzles 123 are opposite. At this time, the composite curtain pile can be arranged between the two supporting piles 30, so that the fan-shaped cement consolidation body formed by the cement slurry sprayed out from the slurry outlets 124 of the two nozzles 123 can overlap with the two supporting piles 30 respectively.

[0064] Furthermore, along the circumference of the stirring rod 111 , the angle between the two nozzles 123 is adjustable.

[0065] Preferably, along the circumference of the fixed bearing 130, the angle between the two connecting rods 122 is adjustable. The advantage of such a setting is that the angle between the extension directions of the cement slurry sprayed out from the slurry outlets 124 of the two nozzles 123 can be made variable, and the composite curtain pile can be set on one side of the line between the two supporting piles 30, making the setting position of the composite curtain pile more flexible.

[0066] It should be noted that in order to adjust the angle between the two connecting rods 122, a plurality of connecting parts can be set on the outer ring of the fixed bearing 130, and the end of the connecting rod 122 away from the high nozzle 121 can be foldably connected to the connecting part. By disassembling and connecting one of the connecting rods 122 to a different connecting part, the angle between the two connecting rods 122 can be adjusted.

[0067] The outer ring of the fixed bearing 130 can also be set as two parts that can rotate relative to each other about the center of the fixed bearing 130, wherein a connecting rod 122 is connected to one of the parts, and the other connecting rod 122 is connected to the other part, and the angle between the two connecting rods 122 can be adjusted by rotating between the two parts.

[0068] Furthermore, the stirring mechanism further includes a driving mechanism, which is connected to one end of the stirring rod 111 away from the blade assembly 112 and is used for driving the stirring rod 111 and the blade assembly 112 to rotate.

[0069] The composite curtain pile construction drilling tool provided in this embodiment has the following advantages:

[0070] 1. Combining high-pressure fixed spraying with mixing piles, fixed spraying solves the problem that the cement-soil mixing pile cannot overlap with the supporting pile 30, and mixing piles solve the problem that the center of the fixed spraying consolidation body is weak;

[0071] 2. The cement slurry returned by fixed spraying is directly used for stirring to form a circular cement consolidation body, which produces almost no waste slurry and saves materials.

[0072] 3. The stirring rod 111 and the blade assembly 112 are the same as the drill bit but different from the nozzle 123. They can move up and down synchronously and rotate independently of each other. The stirring rate can be adjusted as needed during fixed spraying.

[0073] 4. By changing the position of the high nozzle 121, the number and direction of the slurry outlets 124, the size of the blade assembly 112, and the slurry outlet form of the high nozzle 121, a variety of combinations of fan-shaped cement consolidation bodies and circular cement consolidation bodies can be formed to adapt to various complex working conditions.

[0074] 5. High-pressure fixed spraying and mixing are carried out simultaneously, which has high work efficiency, convenient construction and saves construction time.

[0075] like Fig.12As shown, the construction method of the composite curtain pile construction drill tool provided in this embodiment relies on the above-mentioned composite curtain pile construction drill tool, and specifically includes: measuring and laying out between two adjacent support piles 30 to determine the position of the composite curtain pile and installing the composite curtain pile construction drill tool; the stirring rod 111 of the stirring mechanism drives the blade assembly 112 to rotate, and water or consolidation material is introduced into the conveying pipe of the fixed spraying mechanism 120, and the composite curtain pile construction drill tool moves from top to bottom to a preset depth; the consolidation material is introduced into the conveying pipe of the fixed spraying mechanism 120, and the composite curtain pile construction drill tool is lifted from the preset depth to the preset elevation.

[0076] Specifically, the construction method of the composite curtain pile construction drill tool provided by the present invention is that when the composite curtain pile construction drill tool moves from top to bottom to a preset depth, the stirring rod 111 of the stirring mechanism drives the blade assembly 112 to rotate while low-pressure or high-pressure water and low-pressure or high-pressure consolidation materials are introduced into the conveying pipeline of the fixed spraying mechanism 120. Then, when the composite curtain pile construction drill tool is lifted from the preset depth to the preset elevation, the consolidation material is introduced into the conveying pipeline. Low-pressure or high-pressure consolidation material is introduced, thereby forming a circular consolidation body 10 or a combination of multiple lateral consolidation bodies 20 and a circular consolidation body 10 to adapt to various complex working conditions, with high work efficiency, convenient construction, and saved construction period.

[0077] Specifically, the construction method of the composite curtain pile construction drill provided in this embodiment can form three single pile sections, namely, bidirectional fixed jetting mixing piles, unidirectional fixed jetting mixing piles and conventional mixing piles.

[0078] The construction method of the bidirectional fixed spray mixing pile is as follows: first, the position of the composite curtain pile is determined by measuring and laying out between two adjacent support piles 30, and the composite curtain pile construction drill is installed; secondly, the stirring rod 111 drives the blade assembly 112 to rotate and sink, and at the same time, two high spray rods can be used to spray low-pressure or high-pressure water, low-pressure or high-pressure cement slurry in two directions; finally, after sinking to the designed depth, high-pressure cement slurry is sprayed in two directions through two high spray rods, and the stirring rod 111 is rotated to lift the drill tool to the designed elevation, and re-mixing is performed when necessary.

[0079] The construction method of the one-way fixed-jet mixing pile is as follows: first, the position of the composite curtain pile is determined by measuring and laying out between two adjacent support piles 30, and the composite curtain pile construction drill is installed; secondly, the stirring rod 111 drives the blade assembly 112 to rotate and sink, and at the same time, low-pressure water or low-pressure cement slurry can be sprayed in both directions through two high spray rods; finally, after sinking to the designed depth, high-pressure cement slurry is sprayed in one direction through a pre-set high spray rod on one side, and the stirring rod 111 is rotated to lift the drill to the designed elevation, and re-mixing is performed when necessary.

[0080] The construction method of conventional mixing piles is as follows: first, the position of the composite curtain piles is determined by measuring and laying out between two adjacent support piles 30, and the composite curtain pile construction drill is installed; secondly, the mixing rod 111 drives the blade assembly 112 to rotate and sink, and at the same time, two high spray bars can be used to spray low-pressure water or low-pressure cement slurry in both directions; finally, after sinking to the designed depth, two high spray bars are used to spray low-pressure cement slurry in both directions, and the mixing rod 111 is rotated to lift the drill to the designed elevation, and re-mixing is performed if necessary.

[0081] In summary, the composite curtain pile construction drill provided by the present invention is used to measure and lay out between two adjacent support piles 30 to determine the position of the composite curtain pile and install the composite curtain pile construction drill. The stirring mechanism and the fixed spray mechanism 120 move from top to bottom at the same time, and the stirring rod 111 drives the blade assembly 112 to rotate together. At the same time, a consolidation material, such as cement slurry, is introduced into the delivery pipe of the fixed spray mechanism 120. The consolidation material is sprayed out from the slurry outlet 124 of the nozzle 123. When the introduced consolidation material is in a high-pressure state, it can cut the soil. , forming a lateral consolidation body 20 structure that exceeds the rotation radius of the blade assembly 112, and the consolidation body structure is used to overlap with the supporting pile 30. At the same time, part of the consolidation material is stirred by the blade assembly 112 of the stirring mechanism to form a circular consolidation body 10. The two consolidation bodies can overlap with each other to form a composite curtain pile, which not only solves the problem that the existing cement-soil mixing piles cannot overlap with the supporting piles 30, but also solves the problem that the center of the fixed-spray consolidation body is weak, almost no waste slurry is generated, material is saved, work efficiency is high, construction is convenient, and construction period is saved.

[0082] The construction method of the composite curtain pile construction drill tool provided by the present invention is as follows: when the composite curtain pile construction drill tool moves from top to bottom to a preset depth, the stirring rod 111 of the stirring mechanism drives the blade assembly 112 to rotate, and at the same time, low-pressure or high-pressure water and low-pressure or high-pressure consolidation materials are introduced into the conveying pipeline of the fixed spraying mechanism 120; then, when the composite curtain pile construction drill tool is lifted from the preset depth to the preset elevation, the consolidation material is introduced into the conveying pipeline, thereby forming a circular consolidation body 10 or a combination of multiple lateral consolidation bodies 20 and the circular consolidation body 10 to adapt to various complex working conditions, with high work efficiency, convenient construction, and saved construction period.

[0083] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.

Claims

1. A composite curtain pile construction drilling tool, characterized in that: It includes a stirring mechanism and a fixed spray mechanism; the stirring mechanism includes a stirring rod and a blade assembly connected to the bottom end of the stirring rod; The stirring rod is rotatably connected to the center of the fixed spray mechanism, and the stirring rod can move up and down together with the fixed spray mechanism; The fixed spray mechanism comprises a delivery pipe and a spray head, wherein the spray head is connected to the bottom of the delivery pipe, the height of the spray head is greater than the height of the blade assembly, the spray head is provided with a slurry outlet with a spraying direction away from the stirring rod, and the distance between the spray head and the center of the stirring rod is less than the rotation radius of the blade assembly; A first rotating assembly is provided at the junction of the stirring rod and the fixed spray mechanism; The first rotating assembly includes a fixed bearing, the stirring rod is connected to the inner ring of the fixed bearing, and the fixed spray mechanism is connected to the outer ring of the fixed bearing.

2. The composite curtain pile construction drilling tool according to claim 1, characterized in that: The number of the nozzles is two.

3. The composite curtain pile construction drilling tool according to claim 2, characterized in that: Along the circumference of the stirring rod, the angle between the two nozzles is adjustable.

4. The composite curtain pile construction drilling tool according to claim 2, characterized in that: There are multiple slurry outlets on each nozzle, and the multiple slurry outlets are arranged at intervals along the length direction of the nozzle.

5. The composite curtain pile construction drilling tool according to claim 4, characterized in that: There are two slurry outlets on each nozzle, the projections of the extension directions of the two slurry outlets in a plane perpendicular to the length direction of the stirring rod do not overlap, and the injection paths of the two slurry outlets intersect outside the rotation radius of the blade assembly.

6. The composite curtain pile construction drilling tool according to claim 1, characterized in that: It also includes a sleeve, the inner side wall of the sleeve is connected to the outer ring of the fixed bearing, and the fixed spray mechanism is connected to the outer side wall of the sleeve.

7. The composite curtain pile construction drilling tool according to claim 1, characterized in that: The fixed spray mechanism further includes a connecting rod and a high spray pipe; one end of the connecting rod is connected to the outer ring of the fixed bearing, the other end of the connecting rod is connected to the high spray pipe, the spray head is connected to the bottom end of the high spray pipe, and the delivery pipeline is arranged in the high spray pipe; The extension direction of the high nozzle is the same as the extension direction of the stirring rod.

8. The composite curtain pile construction drilling tool according to claim 1, characterized in that: The stirring mechanism further comprises a driving mechanism, which is connected to one end of the stirring rod away from the blade assembly and is used for driving the stirring rod and the blade assembly to rotate.

9. A construction method for composite curtain pile construction drilling tools, characterized in that: The composite curtain pile construction drilling tool according to any one of claims 1 to 8 comprises: Measure and lay out between two adjacent support piles to determine the position of the composite curtain piles and install the composite curtain pile construction drilling tools; The stirring rod of the stirring mechanism drives the blade assembly to rotate, and water or consolidation material is introduced into the delivery pipe of the fixed spraying mechanism, and the composite curtain pile construction drill moves from top to bottom to a preset depth; The consolidation material is introduced into the delivery pipeline of the fixed spraying mechanism to lift the composite curtain pile construction drilling tool from a preset depth to a preset elevation.