A liftable side elevation module and a suspended biological filler device
By designing the lifting side elevation module and suspended biofiller device, the movement of the module and the improvement of the filler is achieved by using guide rails and traction parts, which solves the problem of inconvenient installation and maintenance of suspended biofillers in the sewage treatment tank, reduces the risk of filler leakage, and improves treatment efficiency.
Patent Information
- Application Number
- CN202010961032.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-09-14
- Publication Date
- 2025-03-21
- Estimated Expiration
- 2040-09-14
AI Technical Summary
The existing suspended biological fillers are inconvenient to install and maintain in the sewage treatment tank, especially the iron mesh that prevents the fillers from leaking and installing on the pool wall.
A lifting side elevation module and suspended biofiller device are designed to realize the movement of side elevation module and lifting of suspended biofiller through guide rails and traction members, blocking the water holes and reducing the possibility of filler leakage.
It realizes the convenient installation and maintenance of the side elevation module in the sewage treatment tank, reduces the risk of suspended biological filler leakage, saves time and manpower, and improves treatment efficiency.
Smart Images

Figure CN112174295B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of filler auxiliary equipment, and in particular to a liftable side elevation module and a suspended biological filler device. Background Art
[0002] At present, with the continuous acceleration of economic development in large, medium and small cities and towns, the amount of water required to be treated by various sewage treatment plants and stations in my country is constantly increasing. Coupled with the continuous improvement of requirements for effluent water quality, most of the early sewage treatment plants and stations are faced with the task of upgrading and transformation.
[0003] Existing suspended biological fillers can generally be directly placed inside the sewage treatment pool. They have the characteristics of a suspended full three-dimensional structure, a large specific surface area, no need for fixation, easy biofilm formation, and no clogging. If suspended biological fillers are needed in conventional renovation projects, it is necessary to add iron meshes and other devices to the water holes between the pool walls in advance to prevent the fillers from leaking. The inventor believes that the iron mesh currently used to prevent the fillers from leaking is inconvenient to install on the pool wall of the sewage treatment pool. Summary of the invention
[0004] In order to facilitate the installation of the side facade module, to facilitate the maintenance or replacement of the side facade module, and to save time and manpower, the present application provides a liftable side facade module and a suspended biological filler device.
[0005] The present application provides a liftable side facade module adopting the following technical solution:
[0006] A liftable side facade module, guide rails for supporting the side facade module are arranged on both sides of the side facade module, the side facade module is a mesh structure, and a traction member capable of driving the side facade module to move is connected to the guide rails.
[0007] By adopting the above technical solution, when it is necessary to renovate a sewage treatment tank with suspended biological fillers placed inside, the guide rails can be placed together into the sewage treatment tank through the traction parts, so that the side facade module can block the water holes on the sewage treatment tank, thereby reducing the possibility of leakage of suspended biological fillers inside the sewage treatment tank, and people do not need to work for a long time inside the sewage treatment tank, thereby facilitating the installation of the side facade module and saving time and manpower.
[0008] Preferably, the side facade module includes a first side panel and a third side panel which can be detachably connected to the two guide rails, one or more second side panels are detachably installed between the first side panel and the third side panel, and the second side panels can be detachably connected to each other.
[0009] By adopting the above technical solution, the side facade module is spliced by the first side panel, the second side panel and the third side panel. The number of second side panels used will change depending on the width of the sewage treatment tank, thereby achieving the effect of expanding the application scope of the side facade module.
[0010] Preferably, first connecting tenons are provided on the sides of the first side panel and the third side panel away from the second side panel, and first connecting grooves matched with the first connecting tenons are provided on the guide rail.
[0011] By adopting the above technical solution, when the first side panel or the third side panel needs to be installed on the guide rail, the first connecting tenon on the first side panel or the third side panel can be matched with the first connecting groove on the guide rail.
[0012] Preferably, a second connecting tenon is provided on one side surface of the second side panel, and a second connecting groove that is compatible with the second connecting tenon and runs through the two end surfaces of the second side panel is provided on the other side surface, a second connecting tenon is provided on the side of the first side panel close to the second side panel, and a second connecting groove is provided on the side of the third side panel close to the second side panel.
[0013] By adopting the above technical solution, the second connecting tenons and the third connecting grooves on both sides of the second side panels can connect multiple second side panels to each other, and can also install the second side panels on the first side panel or the third side panel.
[0014] The present application provides a suspended biological filler device that adopts the following technical solution:
[0015] A suspended biological filler device includes the above-mentioned side facade modules, wherein two groups of side facade modules are sequentially arranged along the length direction of the sewage treatment tank and are spliced with two opposite side walls in the sewage treatment tank to form a rectangular area, and a mesh lower panel fixedly connected to a guide rail is arranged below the two groups of side facade modules.
[0016] By adopting the above technical solution, when it is necessary to add suspended biological fillers inside the sewage treatment tank, people can add them to the rectangular area formed by the two sets of side facade modules and the side walls of the sewage treatment tank. This not only reduces the possibility of leakage of the suspended biological fillers, but also forms a local area inside the sewage treatment tank where suspended biological fillers can be added. By pulling the side facade modules and the lower panel to the outside of the sewage treatment tank, the suspended biological fillers therein can be lifted to the outside of the sewage treatment tank together, which makes it convenient for people to observe the biofilm condition on the suspended biological fillers.
[0017] Preferably, there are four guide rails in total, which are respectively located at the four top corners of the lower panel, and quick connectors are provided between the lower panel and the guide rails.
[0018] By adopting the above technical solution, the lower panel is fixedly connected to the guide rails through the quick connector, and there are four guide rails in total, so that the lower panel can be fixed on the guide rails more stably.
[0019] Preferably, the quick connector includes two connecting rods respectively arranged on two adjacent side surfaces of the lower panel, the two connecting rods are respectively provided with rotating rods, the rotating rods and the connecting rods are hinged around a vertical axis, and a fastening bolt for connecting the two rotating rods is provided between the two rotating rods.
[0020] By adopting the above technical solution, when the lower panel needs to be fixed to the guide rail, the rotating rod is rotated on the connecting rod so that the guide rail can be moved to the inside of the embedded groove on the lower panel; then the rotating rod is rotated on the connecting rod again until the rotating rod is rotated to a position where the guide rail is away from the lower panel, and then the two rotating rods are connected together using fastening bolts, thereby completing the process of fixing the lower panel to the guide rail.
[0021] Preferably, the traction member comprises a traction rope, one end of which is located at one side of the sewage treatment tank, and the other end of which extends downward to below the lower panel and then extends upward to the other side of the sewage treatment tank.
[0022] By adopting the above technical solution, when the suspended biological filler device needs to be pulled out from the sewage treatment tank by a traction device, the two ends of the traction rope are pulled away from the sewage treatment tank, and the length of the traction rope inside the sewage treatment tank will become smaller, so that the suspended biological filler device can be lifted to the outside of the sewage treatment tank.
[0023] Preferably, first fixed pulleys for reversing the traction rope are arranged on two opposite inner walls of the sewage treatment tank, and the two first fixed pulleys are arranged close to the upper end surface of the sewage treatment tank. A second fixed pulley for reversing the traction rope is arranged below each first fixed pulley, and the second fixed pulley is located below the lower panel and is rotatably connected to the guide rail.
[0024] By adopting the above technical solution, the first fixed pulley and the second fixed pulley inside the sewage treatment tank can realize the reversal of the traction rope inside the sewage treatment tank, and can reduce the resistance when people pull the traction rope, reduce the wear on the surface of the traction rope, and extend the service life of the traction rope.
[0025] Preferably, two groups of side modules are provided along the width direction of the sewage treatment tank and are joined together with the side facade modules to form a sealed area, and an upper panel having the same structure as the lower panel is provided above the side modules and the side facade modules.
[0026] By adopting the above technical solution, after installing the side facade modules, side modules, guide rails and lower panels inside the sewage treatment tank, an enclosed area will be formed between the two groups of side facade modules, the two groups of side module lower panels and the upper panels, and the suspended biological filler device will be placed in this area. In this way, the process of locally adding suspended biological fillers inside the sewage treatment tank can be realized, and the possibility of further leakage of suspended biological fillers can be reduced. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 This is a diagram of the use state of the suspended biological filler device in the embodiment of the present application when it is installed inside a sewage treatment tank;
[0028] Figure 2 This is a structural diagram of the suspended biological filler device in the embodiment of the present application after the upper panel is hidden;
[0029] Figure 3 It is a partial structural diagram highlighting the routing mode of the traction rope in the suspended biological filler device in the embodiment of the present application;
[0030] Figure 4 yes Figure 2 A partial enlarged view of the middle part;
[0031] Figure 5 yes Figure 2 A partial enlarged view of point B in the middle.
[0032] In the figure, 1. suspended biological filler device; 11. mounting plate; 12. guide rail; 13. lower panel; 131. embedding groove; 14. quick connector; 141. connecting rod; 142. rotating rod; 143. fastening bolt; 15. side facade module; 151. first side panel; 152. second side panel; 153. first connecting tenon; 154. second connecting tenon; 155. third side panel; 156. first connecting groove; 157. second connecting groove; 16. traction member; 161. traction rope; 162. first fixed pulley; 163. second fixed pulley; 17. fixing bolt; 18. side module; 2. sewage treatment tank; 3. suspended biological filler; 4. counterweight head; 5. upper panel. DETAILED DESCRIPTION
[0033] The present application is further described in detail below in conjunction with the accompanying drawings.
[0034] Reference Figure 1 and Figure 2The present application provides a suspended biological filler device, which is arranged inside a sewage treatment tank 2 and can limit the suspended biological filler 3 inside the sewage treatment tank 2; when the suspended biological filler 3 is in use, it will be located inside the suspended biological filler device 1, thereby achieving the purpose of locally adding the suspended biological filler 3 inside the sewage treatment tank 2, and can reduce the possibility of leakage of the suspended biological filler 3; when the suspended biological filler 3 needs to be cleaned, the suspended biological filler device 1 is lifted to the outside of the sewage treatment tank 2, and the suspended biological filler device 1 can lift the suspended biological filler 3 inside the sewage treatment tank 2 to the outside of the sewage treatment tank 2 together, so that people do not need to empty the sewage inside the sewage treatment tank 2 first, thereby achieving the effect of facilitating the cleaning of the suspended biological filler 3.
[0035] Reference Figure 1 and Figure 2 The suspended biological filler device 1 includes a mounting plate 11, a guide rail 12, a lower panel 13, a quick connector 14, a side elevation module 15 and a traction member 16. The lower panel 13 is a mesh structure. The lower panel 13 is horizontally arranged inside the sewage treatment tank 2. The four top corners of the lower panel 13 are provided with embedding grooves 131. There are four guide rails 12, and the four guide rails 12 are respectively vertically arranged inside the four embedding grooves 131 of the lower panel 13. The mounting plate 11 is horizontally arranged on one side of the guide rail 12 close to the side wall of the sewage treatment tank 2 and is aligned with the upper end surface of the sewage treatment tank 2. The mounting plate 11 is detachably mounted on the side wall of the sewage treatment tank 2 by means of fixing bolts 17; the quick connector 14 is arranged between the guide rail 12 and the lower panel 13 and keeps the positions of the two relatively fixed; two groups of side facade modules 15 are arranged in total, and the two groups of side facade modules 15 are arranged in sequence along the length direction of the sewage treatment tank 2; the side facade modules 15 are arranged between the two guide rails 12 and are detachably connected to the two guide rails 12; the traction member 16 is arranged on the sewage treatment tank 2 and can drive the guide rail 12 to move upward or downward inside the sewage treatment tank 2.
[0036] Before adding the suspended biological filler 3 into the sewage treatment tank 2, the four guide rails 12 are first moved to the four embedding grooves 131 of the lower panel 13, and the two are fixed together using the quick connector 14; then, the guide rails 12 and the lower panel 13 are lowered into the sewage treatment tank 2 by the traction member 16, and then two sets of side facade modules 15 are installed in sequence along the length direction of the sewage treatment tank 2. The side facade module 15 will be installed between the two guide rails 12, so that the installation of the suspended biological filler device 1 is completed without emptying the sewage treatment tank 2, which is convenient for installation. The effect of installing the suspended biological filler device 1; then the suspended biological filler 3 is added to the inside of the sewage treatment tank 2, and the suspended biological filler 3 will be suspended in the area composed of the two sets of side facade modules 15 and the lower panel 13; when the suspended biological filler 3 needs to be cleaned after being used for a period of time, the fixing bolts 17 are loosened, and the guide rails 12 are driven to move upward through the traction member 16 until the lower panel 13 and the side facade module 15 move to the outside of the sewage treatment tank 2. At this time, the lower panel 13 and the side facade module 15 can lift a large amount of suspended biological fillers 3 to the outside of the sewage treatment tank 2.
[0037] Furthermore, the suspended biological filler 3 is formed by splicing the lower panel 13, the guide rail 12 and the side facade module 15 together. When the suspended biological filler device 1 needs to be transported, people can separate the lower panel 13, the guide rail 12 and the side facade module 15 from each other, thereby reducing the footprint of the suspended biological filler device 1 and achieving the effect of facilitating the transportation of the suspended biological filler device 1.
[0038] Reference Figure 3 After the suspended biological filler device 1 is installed inside the sewage treatment tank 2, in order to make it more stably installed inside the sewage treatment tank 2, and to facilitate the installation of the suspended biological filler device 1 inside the sewage treatment tank 2, a counterweight head 4 with the tip facing downward is fixed on the lower end of the guide rail 12.
[0039] Reference Figure 4The quick connector 14 includes a connecting rod 141, a rotating rod 142 and a fastening bolt 143. Two connecting rods 141 and two rotating rods 142 are provided. The two connecting rods 141 are respectively fixed on the two side surfaces of the lower panel 13. The two rotating rods 142 correspond to the two connecting rods 141 one by one. The rotating rod 142 is located above the connecting rod 141 and is hinged with the connecting rod 141 around a vertical axis. After the guide rail 12 is moved into the embedded groove 131 of the lower panel 13, the rotating rod 142 can be rotated on the connecting rod 141 until the two rotating rods 142 are rotated to the side of the guide rail 12 away from the lower panel 13. At this time, fixing holes are opened on the ends of the two rotating rods 142 that are close to each other. The fastening bolt 143 is threadedly installed in the fixing hole and connects the two rotating rods 142 together, thereby realizing the process of fixing the fixed plate to the guide rail 12.
[0040] Reference Figure 2 and Figure 5 The side elevation module 15 includes a first side panel 151, a first connecting tenon 153, a second side panel 152, a second connecting tenon 154 and a third side panel 155. The first side panel 151, the second side panel 152 and the third side panel 155 are all vertically arranged and their lower end surfaces are all abutted against the upper end surface of the lower panel 13. The first side panel 151, the second side panel 152 and the third side panel 155 are all mesh structures. The first side panel 151 and the third side panel 155 are located on both sides of one or more second side panels 152; the first connecting tenon 153 is arranged on the first side panel On the side of the first side panel 151 and the third side panel 155 away from the second side panel 152, a first connecting groove 156 matched with the first connecting tenon 153 is opened on the guide rail 12 along the vertical direction, and the first connecting groove 156 passes through the upper end surface of the guide rail 12; when it is necessary to install the side facade module 15 between the two guide rails 12, the first connecting tenon 153 is aligned with the first connecting groove 156 on the guide rail 12, and then the first side panel 151 or the third side panel 155 is moved from top to bottom, so that the connection between the first side panel 151 or the third side panel 155 and the guide rail 12 can be completed.
[0041] In this embodiment, two second side panels 152 are provided, and the second connection tenons 154 are provided on one side of the second side panel 152 and on the side of the first side panel 151 close to the second side panel 152. The cross-sectional shape of the second connection tenons 154 is T-shaped, and the side of the second side panel 152 away from the second connection tenons 154 and the side of the third side panel 155 close to the second side panel 152 are provided with second connection grooves 157 adapted to the second connection tenons 154. After the first side panel 151 and the second side panel 152 are installed on the guide rail 12, people can determine the number of second side panels 152 to be used according to the width of the sewage treatment tank 2, and splice them, and finally splice the plurality of second side panels 152 after splicing with the first side panel 151 and the third side panel 155, so as to complete the installation process of the side facade module 15.
[0042] Reference Figure 2 Two groups of side modules 18 are arranged along the width direction of the sewage treatment tank 2, and the side modules 18 are also arranged between the two guide rails 12. The only difference between the side modules 18 and the side facade modules 15 is that the number of second side panels 152 in the side modules 18 is the same. In other examples, the second side panels 152 in the side modules 18 can be changed according to people's needs.
[0043] Reference Figure 1 In this embodiment, people can set an upper panel 5 with the same structure as the lower panel 13 above the side facade module 15 or set a clamp (not shown in the figure) above the guide rail 12 as needed. After the upper panel 5 is installed above the side facade module 15, the amount of suspended biological filler 3 that can be fished out when the upper panel 5 moves upward can be further increased; after the clamp is installed on the guide rail 12, the lower end surface of the clamp can abut against the upper end surface of the side facade module 15 inside the suspended filler device 1. The clamp can not only make the side facade module 15 installed on the guide rail 12 more stable, but also increase the strength of the guide rail 12 itself.
[0044] Reference Figure 2 and Figure 3The traction member 16 includes a traction rope 161, a first fixed pulley 162 and a second fixed pulley 163. The traction rope 161 extends along the width direction of the sewage treatment tank 2. One end of the traction rope 161 is located outside the sewage treatment tank 2, and the other end extends to the top of the sewage treatment tank 2 and then extends downward from one side of the lower panel 13 to the bottom of the lower panel 13. Then, after extending in the horizontal direction inside the sewage treatment tank 2, it extends upward from the other side of the lower panel 13 to the other side of the sewage treatment tank 2; there are two first fixed pulleys 162, and the two first fixed pulleys 162 are arranged along the traction rope. The extension direction of 161 is sequentially arranged on the two opposite inner walls of the sewage treatment tank 2, the first fixed pulley 162 is rotatably connected to the inner wall of the sewage treatment tank 2 and is arranged close to the upper port of the sewage treatment tank 2; there are two second fixed pulleys 163 in total, and the two second fixed pulleys 163 are sequentially arranged along the direction of the traction rope 161, the second fixed pulley 163 is located below the lower panel 13 and is rotatably connected to the two guide rails 12 respectively, and when one end of the traction rope 161 passes through the inside of the sewage treatment tank 2, it will complete the reversal under the action of the first fixed pulley 162 and the second fixed pulley 163.
[0045] When it is necessary to take the suspended biological filler 3 out of the sewage treatment tank 2 through the traction member 16, the traction rope 161 can be pulled at both ends of the traction rope 161 in a direction away from the sewage treatment tank 2, which will reduce the length of the traction rope 161 inside the sewage treatment tank 2. The traction rope 161 passes under the lower panel 13, so in the process of pulling the traction rope 161, the traction rope 161 can drive the suspended biological filler device 1 to move upward together, so that the suspended biological filler device 1 can lift the suspended biological filler 3 inside the sewage treatment tank 2 to the outside of the sewage treatment tank 2; the first fixed pulley 162 on the inner wall of the sewage treatment tank 2 and the second fixed pulley 163 on the guide rail 12 can facilitate the traction rope 161 to achieve reversal inside the sewage treatment tank 2, and can reduce the wear on the surface of the traction rope 161, thereby extending the service life of the traction rope 161.
[0046] This specific embodiment is merely an explanation of the present application and is not a limitation of the present application. After reading this specification, those skilled in the art may make modifications to the present embodiment without any creative contribution as needed, but such modifications are protected by the patent law as long as they are within the scope of the claims of the present application.
Claims
1. A suspended biological filler device, characterized in that: It comprises a side facade module (15), guide rails (12) for supporting the side facade module (15) are arranged on both sides of the side facade module (15), the side facade module (15) is a mesh structure, and a traction member (16) capable of driving the side facade module (15) to move is connected to the guide rail (12); The side facade module (15) comprises a first side panel (151) and a third side panel (155) which can be detachably connected to the two guide rails (12); one or more second side panels (152) are detachably installed between the first side panel (151) and the third side panel (155); and the second side panels (152) can be detachably connected to each other; Two groups of side facade modules (15) are sequentially arranged along the length direction of the sewage treatment tank (2) and are spliced with two opposite side walls of the sewage treatment tank (2) to form a rectangular area. A mesh-shaped lower panel (13) fixedly connected to the guide rail (12) is arranged below the two groups of side facade modules (15); There are four guide rails (12) in total, and the four guide rails (12) are respectively located at the four top corners of the lower panel (13), and a quick connector (14) is provided between the lower panel (13) and the guide rails (12); The quick connector (14) comprises two connecting rods (141) respectively arranged on two adjacent side surfaces of the lower panel (13); the two connecting rods (141) are respectively provided with a rotating rod (142); the rotating rod (142) and the connecting rod (141) are hinged around a vertical axis; a fastening bolt (143) for connecting the two rotating rods (142) is provided between the two rotating rods (142); The traction member (16) comprises a traction rope (161), one end of which is located at one side of the sewage treatment tank (2), and the other end of which extends downward to below the lower panel (13) and then extends upward to the other side of the sewage treatment tank (2); First fixed pulleys (162) for changing the direction of the traction rope (161) are arranged on two opposite inner walls of the sewage treatment tank (2); the two first fixed pulleys (162) are arranged close to the upper end surface of the sewage treatment tank (2); a second fixed pulley (163) for changing the direction of the traction rope (161) is arranged below each first fixed pulley (162); the second fixed pulley (163) is located below the lower panel (13) and is rotatably connected to the guide rail (12).
2. A suspended biological filler device according to claim 1, characterized in that: A first connecting tenon (153) is provided on the side of the first side panel (151) and the third side panel (155) away from the second side panel (152), and a first connecting groove (156) matched with the first connecting tenon (153) is provided on the guide rail (12).
3. A suspended biological filler device according to claim 2, characterized in that: A second connecting tenon (154) is provided on one side surface of the second side panel (152), and a second connecting groove (157) adapted to the second connecting tenon (154) and penetrating through both end surfaces of the second side panel (152) is provided on the other side surface; a second connecting tenon (154) is provided on the side surface of the first side panel (151) close to the second side panel (152), and a second connecting groove (157) is provided on the side surface of the third side panel (155) close to the second side panel (152).
4. A suspended biological filler device according to claim 1, characterized in that: Two groups of side modules (18) are also arranged along the width direction of the sewage treatment tank (2) and are joined together with the side facade modules (15) to form a sealed area. An upper panel (5) having the same structure as the lower panel (13) is arranged above the side modules (18) and the side facade modules (15).
Citation Information
Patent Citations
Liftable side facade module and suspended biological filler device
CN214270353U