A quantitative evaluation method for the effectiveness of risk management of long-distance pipelines based on index method

Through the long-term transportation pipeline risk control efficiency evaluation method based on the index method, a risk control model of lines, stations, operations and management was constructed, and the resource allocation problems in the existing technology were solved, and the quantitative evaluation of the risk control efficiency of long-term transportation pipeline companies was realized. optimization.

CN112348307BActive Publication Date: 2024-12-13SINOPEC CHONGQING NATURAL GAS PIPELINE CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010938653.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-09-09
Publication Date
2024-12-13
Estimated Expiration
2040-09-09

AI Technical Summary

Technical Problem

The existing technology is difficult to allocate resources reasonably in the risk control of long-term transportation pipelines, resulting in low risk control efficiency and lack of comprehensive analysis of the comprehensive risk control effect of various parts.

Method used

The quantitative evaluation method of risk control efficiency of long-distance pipelines based on the index method is used. By constructing a line, station, operation and management risk control efficiency model, the risk control efficiency value of each part is calculated, and the weight and power index are combined to obtain The risk control efficiency value of the entire long-distance pipeline company.

Benefits of technology

The quantitative assessment of the risk control efficiency of long-distance pipeline companies has been achieved, the calculation accuracy and evaluation efficiency of risk control efficiency have been improved, and the position and role of each individual risk in the overall system has been analyzed in depth, thereby optimizing the risk control system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112348307B_ABST
    Figure CN112348307B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for quantitatively evaluating the effectiveness of risk control of long-distance pipelines based on an index method, including constructing a long-distance pipeline risk control effectiveness model; the calculation result of the long-distance pipeline risk control effectiveness model is a long-distance pipeline risk control effectiveness value; the evaluation index of the long-distance pipeline risk control effectiveness model includes a line risk control effectiveness value, a station risk control effectiveness value, an operation risk control effectiveness value, and a management risk control effectiveness value; the effectiveness value of risk control is calculated according to the long-distance pipeline risk control effectiveness model constructed above. The present invention realizes a quantitative evaluation of the effectiveness of risk control of a long-distance pipeline company, and has the advantages of small modeling amount and high evaluation efficiency; at the same time, it can also deeply analyze the status and role of each single risk in the entire risk control system of the long-distance pipeline company, thereby optimizing the risk control system of the long-distance pipeline company.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of long-distance pipeline risk assessment, and in particular to a method for quantitatively assessing the risk management and control efficiency of long-distance pipelines based on an index method. Background Art

[0002] The risk management efficiency of long-distance pipelines refers to the ability of long-distance pipeline companies to meet the requirements of risk management content, which is expressed as the ratio of the risk reduction value to the cost of handling the risk. It is an important indicator for evaluating the effectiveness of risk management. In the early days of long-distance pipeline risk management, a single indicator was often used to express the quality of risk management. Although it can well reflect the management efficiency of a single risk, for the entire long-distance pipeline company, it is necessary not only to consider the risk management effect of a single indicator, but also to know the comprehensive management effect of each part of the risk, so as to analyze risks and allocate resources from the overall perspective; provide a reliable basis for risk measures decision-making, create conditions for improving the management efficiency of risks, and have important significance for comprehensively improving the level of intelligent risk management.

[0003] At present, the risks of long-distance pipelines mainly include lines, stations, operations, management and other aspects. Past studies have focused on the control of single risks, and rarely considered the efficiency of each part in the comprehensive control of various risks. As a result, it is difficult to reasonably allocate resources in the risk control process and the risk control efficiency is low. Summary of the invention

[0004] The present invention mainly overcomes the deficiencies in the prior art and proposes a quantitative evaluation method for the risk management and control effectiveness of long-distance pipelines based on the index method with small modeling amount and high evaluation efficiency.

[0005] The technical solution provided by the present invention to solve the above technical problems is: a quantitative evaluation method for the risk management and control efficiency of long-distance pipelines based on an index method, comprising the following steps:

[0006] S11. Construct a risk management and control effectiveness model for long-distance pipelines;

[0007] The calculation result of the long-distance pipeline risk management efficiency model is the long-distance pipeline risk management efficiency value E s ;

[0008] The evaluation indicators of the long-distance pipeline risk management and control efficiency model include the line risk management efficiency value E ps , Station risk control efficiency value E ss , Operational risk control efficiency value E os , Management risk control efficiency value E ms ;

[0009] S12. Calculate the risk control efficiency value E based on the long-distance pipeline risk control efficiency model constructed above s, which is calculated as follows:

[0010]

[0011] Where: E s is the risk control efficiency value of long-distance pipelines; k is the adjustment coefficient; ψ p E is the weight of line risk control efficiency in risk control; ps is the line risk control efficiency value; ψ s E is the weight of the station risk control efficiency in risk control; ss is the station risk control efficiency value; ψ o E is the weight of operational risk control effectiveness in risk control; os is the operational risk control efficiency value; m The weight of risk management effectiveness in risk management; E ms is the management risk control efficiency value; α and β are power exponents.

[0012] A further technical solution is that the line risk control efficiency value E ps Obtained through the following steps:

[0013] S21. Construct line risk management and control effectiveness model;

[0014] The calculation result of the line risk management efficiency model is the line risk management efficiency value E ps ;

[0015] The evaluation indicators of the line risk control effectiveness model include the third-party damage control effectiveness value E p1 , Corrosion control efficiency value E p2 , Error operation control efficiency value E p3 , Design control efficiency value E p4 ;

[0016] S22. Calculate the line risk control efficiency value E according to the line risk control efficiency model constructed above ps , which is calculated as follows:

[0017] E ps =ψ p1 E p1 +ψ p2 E p2 +ψ p3 E p3 +ψ p4 E p4

[0018] Where: E ps is the line risk control efficiency value; ψ p1The weight of third-party damage in line risk management; E p1 Destroy the control efficiency value for the third party; p2 is the weight of corrosion in line risk management; E p2 is the corrosion control efficiency value; p3 is the weight of misoperation in line risk management; E p3 is the error operation control efficiency value; p4 is the weight of design in line risk management; E p4 is the designed control effectiveness value.

[0019] A further technical solution is that the station risk control efficiency value E ss Obtained through the following steps:

[0020] S31. Construct a station risk management and control effectiveness model;

[0021] The calculation result of the station risk control efficiency model is the station risk control efficiency value E ss ;

[0022] The evaluation indicators of the station risk control efficiency model include the equipment control efficiency value E s1 , pipeline control efficiency value E s2 , Instrument control efficiency value E s3 , Environmental control efficiency value E s4 ;

[0023] S32. Calculate the station risk control efficiency value E according to the station risk control efficiency model constructed above ss , which is calculated as follows:

[0024] E ss =ψ s1 E s1 +ψ s2 E s2 +ψ s3 E s3 +ψ s4 E s4

[0025] Where: E ss is the station risk control efficiency value; ψ s1 is the weight of the equipment in the risk control of the station; E s1 is the equipment control efficiency value; s2 is the weight of pipeline in station risk management; E s2 is the pipeline control efficiency value; ψ s3 E is the weight of the instrument in the risk control of the station; s3 is the instrument control efficiency value; ψ s4is the weight of the environment in the risk management of the station; E s4 It is the environmental control efficiency value.

[0026] A further technical solution is that the operation risk control efficiency value E os Obtained through the following steps:

[0027] S41. Constructing an operational risk management and control effectiveness model;

[0028] The calculation result of the operational risk management efficiency model is the operational risk management efficiency value E os ;

[0029] The evaluation indexes of the operation risk control efficiency model include the fire operation control efficiency value E o1 , Earthwork control efficiency value E o2 , Lifting operation control efficiency value E o3 , Efficiency value of high-altitude operation control o4 , Temporary power operation control efficiency value E o5 , Blind plate extraction and plugging operation control efficiency value E o6 , Efficiency value of control over entering confined space operations o7 , Pipeline pigging and internal inspection operation control efficiency value E o8 ;

[0030] S42. Calculate the operational risk management efficiency value E according to the operational risk management efficiency model constructed above. os , which is calculated as follows:

[0031] E os =ψ o1 E o1 +ψ o2 E o2 +ψ o3 E o3 +ψ o4 E o4 +ψ o5 E o5 +ψ o6 E o6 +ψ o7 E o7 +ψ o8 E o8

[0032] Where: E os is the operational risk control efficiency value; o1 is the weight of fire operation in operation risk control; E o1 is the fire operation control efficiency value; o2 E is the weight of earth-breaking operation in operation risk control; o2 is the earthwork control efficiency value;o3 is the weight of the lifting operation in the operation risk control; is the control efficiency value of the lifting operation; o4 is the weight of working at height in the risk control of working; E o4 is the control efficiency value of high-altitude operations; ψ o5 is the weight of temporary power operation in operation risk control; E o5 is the control efficiency value of temporary power operation; o6 E is the weight of blind plate plugging operation in operation risk control; o6 is the control efficiency value of blind plate plugging operation; ψ o7 E is the weight of entering confined space operations in the operation risk management; o7 is the control efficiency value for entering confined space operations; ψ o8 is the weight of pipeline pigging and internal inspection operations in operational risk control; E o8 It is the control efficiency value of pipeline pigging and internal inspection operations.

[0033] A further technical solution is that the management risk control efficiency value E ms Obtained through the following steps:

[0034] S51. Construct a management risk control effectiveness model;

[0035] The calculation result of the management risk control efficiency model is the management risk control efficiency value E ms ;

[0036] The evaluation indicators of its management risk control effectiveness model include information asymmetry control effectiveness value E m1 , Poor management control effectiveness value E m2 , Error control efficiency value E m3 ;

[0037] S52. Calculate the management risk control efficiency value E according to the management risk control efficiency model constructed above. ms , which is calculated as follows:

[0038] E ms =ψ m1 E m1 ·ψ m2 E m2 ·ψ m3 E m3

[0039] Where: E ms is the management risk control efficiency value; m1 is the weight of information asymmetry in risk management; E m1 is the information asymmetry control efficiency value; m2is the weight of poor management in management risk control; E m2 The efficiency value for poor management control; m3 is the weight of misjudgment in management risk control; E m3 To judge the effectiveness of mismanagement management.

[0040] The present invention has the following beneficial effects: the present invention establishes a risk management efficiency calculation model for a long-distance pipeline company through an index method and "and", "or" and "multiplication" logical structures; based on the index method, the specific management efficiency value of each single risk is calculated, and then it is aggregated through the three structural elements of "and", "or" and "multiplication", so that the risk management efficiency value of the entire long-distance pipeline company can be obtained, and a quantitative evaluation of the risk management efficiency of the long-distance pipeline company can be achieved, and it has the advantages of small modeling amount and high evaluation efficiency; at the same time, the status and role of each single risk in the risk management system of the entire long-distance pipeline company can also be deeply analyzed, so as to optimize the risk management system of the long-distance pipeline company. BRIEF DESCRIPTION OF THE DRAWINGS

[0041] Figure 1 This is a risk management efficiency structure diagram of the long-distance pipeline management company of the present invention;

[0042] Figure 2 This is a diagram of the line risk management structure in the present invention;

[0043] Figure 3 This is the station risk management structure diagram;

[0044] Figure 4 This is the operation risk management structure diagram;

[0045] Figure 5 To manage the risk control structure diagram. DETAILED DESCRIPTION

[0046] The present invention will be further described below in conjunction with the embodiments and drawings.

[0047] The ultimate goal of risk management is to control, eliminate and prevent risks. According to the purpose of risk elimination, use the available information and data to identify, analyze, evaluate and propose management and control measures for risks, and provide the required parameters for risk management in real time. The risk management system of long-distance pipeline companies generally has four aspects: line risk, station risk, operation risk and management risk. The main contents are shown in Table 1:

[0048] Table 1 Main contents of risk management

[0049]

[0050]

[0051] Therefore, Figure 1 As shown, a method for quantitatively evaluating the risk management and control efficiency of a long-distance pipeline based on an index method of the present invention comprises the following steps:

[0052] S11. Construct a risk management and control effectiveness model for long-distance pipelines;

[0053] The calculation result of the long-distance pipeline risk management efficiency model is the long-distance pipeline risk management efficiency value E s ;

[0054] The evaluation index of the long-distance pipeline risk management and control efficiency model includes the line risk management and control efficiency value E ps , Station risk control efficiency value E ss , Operational risk control efficiency value E os , Management risk control efficiency value E ms ;

[0055] S12. Calculate the risk control efficiency value E based on the long-distance pipeline risk control efficiency model constructed above s , which is calculated as follows:

[0056]

[0057] Where: E s is the risk control efficiency value of long-distance pipelines; k is the adjustment coefficient; ψ p E is the weight of line risk control efficiency in risk control; ps is the line risk control efficiency value; ψ s E is the weight of the station risk control efficiency in risk control; ss is the station risk control efficiency value; ψ o E is the weight of operational risk control effectiveness in risk control; os is the operational risk control efficiency value; m The weight of risk management effectiveness in risk management; E ms is the management risk control efficiency value; α and β are power exponents.

[0058] The present invention adopts the index method for analysis. The index analysis method is an analysis method that uses the index system to analyze the direction and degree of influence of changes in various influencing factors on the total index, as well as the amount of influence of each factor on the total index. Since each individual performance indicator, such as line risk, station risk, operation risk, management risk, etc., has different attributes, dimensions, and value ranges, it is necessary to use dimensionless and normalized methods to convert them into dimensionless relative values ​​in order to comprehensively analyze and evaluate the management and control effectiveness.

[0059] In the present invention, Figure 2 As shown, the line risk control efficiency value Eps Obtained through the following steps:

[0060] S21. Construct line risk management and control effectiveness model;

[0061] The calculation result of the line risk management efficiency model is the line risk management efficiency value E ps ;

[0062] The evaluation index of the line risk control effectiveness model includes the third-party damage control effectiveness value E p1 , Corrosion control efficiency value E p2 , Error operation control efficiency value E p3 , Design control efficiency value E p4 ;

[0063] S22. Calculate the line risk control efficiency value E according to the line risk control efficiency model constructed above ps , which is calculated as follows:

[0064] E ps =ψ p1 E p1 +ψ p2 E p2 +ψ p3 E p3 +ψ p4 E p4

[0065] Where: E ps is the line risk control efficiency value; ψ p1 The weight of third-party damage in line risk management; E p1 Destroy the control efficiency value for the third party; p2 is the weight of corrosion in line risk management; E p2 is the corrosion control efficiency value; p3 is the weight of misoperation in line risk management; E p3 is the error operation control efficiency value; p4 is the weight of design in line risk management; E p4 is the designed control effectiveness value.

[0066] In the present invention, Figure 3 As shown, the station risk control efficiency value E ss Obtained through the following steps:

[0067] S31. Construct a station risk management and control effectiveness model;

[0068] The calculation result of the station risk control efficiency model is the station risk control efficiency value E ss ;

[0069] The evaluation index of the station risk control efficiency model includes the equipment control efficiency value E s1 , pipeline control efficiency value E s2 , Instrument control efficiency value E s3 , Environmental control efficiency value E s4 ;

[0070] S32. Calculate the station risk control efficiency value E according to the station risk control efficiency model constructed above ss , which is calculated as follows:

[0071] E ss =ψ s1 E s1 +ψ s2 E s2 +ψ s3 E s3 +ψ s4 E s4

[0072] Where: E ss is the station risk control efficiency value; ψ s1 is the weight of the equipment in the risk control of the station; E s1 is the equipment control efficiency value; s2 is the weight of pipeline in station risk management; E s2 is the pipeline control efficiency value; ψ s3 is the weight of the instrument in the risk control of the station; E s3 is the instrument control efficiency value; ψ s4 is the weight of the environment in the risk management of the station; E s4 It is the environmental control efficiency value.

[0073] In the present invention, Figure 4 As shown, the operational risk management efficiency value E os Obtained through the following steps:

[0074] S41. Constructing an operational risk management and control effectiveness model;

[0075] The calculation result of the operational risk management efficiency model is the operational risk management efficiency value E os ;

[0076] The evaluation indexes of the operation risk control efficiency model include the fire operation control efficiency value E o1 , Earthwork control efficiency value E o2 , Lifting operation control efficiency value E o3 , Efficiency value of high-altitude operation control o4 , Temporary power operation control efficiency value E o5 , Blind plate extraction and plugging operation control efficiency value E o6, Efficiency value of control over entering confined space operations o7 , Pipeline pigging and internal inspection operation control efficiency value E o8 ;

[0077] S42. Calculate the operational risk management efficiency value E according to the operational risk management efficiency model constructed above. os , which is calculated as follows:

[0078] E os =ψ o1 E o1 +ψ o2 E o2 +ψ o3 E o3 +ψ o4 E o4 +ψ o5 E o5 +ψ o6 E o6 +ψ o7 E o7 +ψ o8 E o8

[0079] Where: E os is the operational risk control efficiency value; o1 is the weight of fire operation in operation risk control; E o1 is the fire operation control efficiency value; o2 E is the weight of earth-breaking operation in operation risk control; o2 is the earthwork control efficiency value; o3 is the weight of the lifting operation in the operation risk control; is the control efficiency value of the lifting operation; o4 is the weight of working at height in the risk control of working; E o4 is the control efficiency value of high-altitude operations; ψ o5 is the weight of temporary power operation in operation risk control; E o5 is the control efficiency value of temporary power operation; o6 E is the weight of blind plate plugging operation in operation risk control; o6 is the control efficiency value of blind plate plugging operation; ψ o7 E is the weight of entering confined space operations in the operation risk management; o7 is the control efficiency value for entering confined space operations; ψ o8 is the weight of pipeline pigging and internal inspection operations in operational risk control; E o8 It is the control efficiency value of pipeline pigging and internal inspection operations.

[0080] In the present invention, Figure 5As shown, the management risk control efficiency value E ms Obtained through the following steps:

[0081] S51. Construct a management risk control effectiveness model;

[0082] The calculation result of the management risk control efficiency model is the management risk control efficiency value E ms ;

[0083] The evaluation indicators of its management risk control effectiveness model include information asymmetry control effectiveness value E m1 , Poor management control effectiveness value E m2 , Error control efficiency value E m3 ;

[0084] S52. Calculate the management risk control efficiency value E according to the management risk control efficiency model constructed above. ms , which is calculated as follows:

[0085] E ms =ψ m1 E m1 ·ψ m2 E m2 ·ψ m3 E m3

[0086] Where: E ms is the management risk control efficiency value; m1 is the weight of information asymmetry in risk management; E m1 is the information asymmetry control efficiency value; m2 is the weight of poor management in management risk control; E m2 The efficiency value for poor management control; m3 is the weight of misjudgment in management risk control; E m3 To judge the effectiveness of mismanagement management.

[0087] The present invention adopts the index method to conduct a comprehensive analysis of the risk control indicators of four aspects, namely, line risk, station risk, operation risk and management risk, introduces the logical relationships of "and", "or" and "multiplication", establishes a risk control efficiency model for long-distance pipeline companies, aggregates the efficiency item by item, and obtains the overall control efficiency value of the long-distance pipeline companies.

[0088] Example

[0089] Taking a natural gas long-distance pipeline in the southwest region as an example, the risk control efficiency value analysis is carried out: the line between the JS valve chamber and the LY valve chamber is 12 km long, the design pressure is 10.0 MPa, and the design gas transmission volume is 60×10 8 m 3In the 2019 risk assessment results based on the Kent method, the third-party damage risk assessment score was 90 points, the corrosion risk assessment score was 77 points, the design risk score was 77 points, and the misoperation score was 81 points. This pipe section is not a high-risk section.

[0090] When calculating the line risk control efficiency value, it is necessary to first calculate the risk efficiency of each sub-item, taking the third-party damage efficiency value E of the line between the JS valve chamber and the LY valve chamber as p1 Taking calculation as an example, the calculation formula is as follows:

[0091] E p1 =aω1+bω2+…zω n

[0092] Among them, a, b, z are the risk reduction values ​​of each sub-item; ω i is the power index, generally required

[0093] Since the control efficiency value represents the ratio of the risk reduction value to the risk control cost, the risk reduction value is called the benefit-type indicator, and the risk control cost is called the cost-type indicator. p1 The calculation formula is:

[0094]

[0095] According to the third-party damage indicator system, benefit indicators include: ground activity level (a), minimum coverage depth (b), geomorphic characteristics (c), public education (d), pipeline right-of-way conditions (e), and line inspection frequency (f).

[0096] Cost indicators include the sum of the cost of risk measures to deal with third-party damage to each indicator system, the cost of continuity, and the implicit cost of avoiding accidents. Among them, the total cost of managing ground activity is a1, the total cost of managing the minimum coverage depth is b1, the total cost of managing landform features is c1, the total cost of managing public education is d1, the total cost of managing pipeline right of way conditions is e1, and the total cost of managing line inspection frequency is f1.

[0097] Therefore, the calculation model of the third-party damage risk management efficiency is obtained as follows:

[0098]

[0099] The values ​​of each indicator are as follows:

[0100] Table 2 Line risk management and control benefit indicators

[0101]

[0102] Table 3 Line risk management cost indicators

[0103]

[0104] Referring to the weight distribution of third-party damage indicators in the Kent method, the weight coefficients are: ω1 = 0.25, ω2 = 0.2, ω3 = 0.1, ω4 = 0.2, ω5 = 0.1, ω6 = 0.15. Therefore, the third-party damage risk control efficiency value E is calculated according to the formula p1 =3.9. Similarly, the corrosion control efficiency value E is calculated p2 =3.3, error operation control efficiency value E p3 =5.1, design control efficiency value E p4 =6.2.

[0105] Based on the improved hierarchical analysis method and historical risk statistics, the weights are divided and the weight of third-party damage in line risk management and control is calculated. p1 =0.35, the weight of corrosion in line risk management ψ p2 =0.35, the weight of misoperation in line risk control ψ p3 =0.13, the weight of design in line risk control ψ p4 =0.17. The line risk management efficiency value E is finally calculated according to the formula in step S22 above. ps =4.23.

[0106] Finally, the risk control efficiency values ​​of lines, stations, operations, and management are aggregated item by item through the exponential method and the "AND", "OR", and "multiplication" of logic gates to obtain the overall risk control efficiency value of the long-distance pipeline company. This can quantitatively describe the risk control efficiency of the long-distance pipeline company, thereby providing a scientific reference for the risk control of the long-distance pipeline company.

[0107] The above description is not intended to impose any form of limitation on the present invention. Although the present invention has been disclosed through the above embodiments, it is not intended to limit the present invention. Any technician familiar with the profession can make some changes or modifications to equivalent embodiments of equivalent changes using the technical contents disclosed above without departing from the scope of the technical solution of the present invention. However, any simple modification, equivalent change and modification made to the above embodiments based on the technical essence of the present invention without departing from the content of the technical solution of the present invention still falls within the scope of the technical solution of the present invention.

Claims

1. A quantitative evaluation method for the risk management and control effectiveness of long-distance pipelines based on an index method, characterized in that: The following steps are involved: S11. Construct a risk management and control effectiveness model for long-distance pipelines; The calculation result of the long-distance pipeline risk management efficiency model is the long-distance pipeline risk management efficiency value E s ; The evaluation indicators of the long-distance pipeline risk management and control efficiency model include the line risk management efficiency value E ps , Station risk control efficiency value E ss , Operational risk control efficiency value E os , Management risk control efficiency value E ms ; S12. Calculate the risk control efficiency value E based on the long-distance pipeline risk control efficiency model constructed above s , which is calculated as follows: Where: E s is the risk control efficiency value of long-distance pipelines; k is the adjustment coefficient; ψ p E is the weight of line risk control efficiency in risk control; ps is the line risk control efficiency value; ψ s E is the weight of the station risk control efficiency in risk control; ss is the station risk control efficiency value; ψ o E is the weight of operational risk control effectiveness in risk control; os is the operational risk control efficiency value; m To manage the weight of risk control effectiveness in risk control; E ms To manage the risk control effectiveness value; α and β are power exponents; The line risk control efficiency value E ps Obtained through the following steps: S21. Construct line risk management and control effectiveness model; The calculation result of the line risk management efficiency model is the line risk management efficiency value E ps ; The evaluation indicators of the line risk control effectiveness model include the third-party damage control effectiveness value E p1 , Corrosion control efficiency value E p2 , Error operation control efficiency value E p3 , Design control efficiency value E p4 ; S22. Calculate the line risk control efficiency value E according to the line risk control efficiency model constructed above ps , which is calculated as follows: E ps =ψ p1 E p1 +ψ p2 E p2 +ψ p3 E p3 +ψ p4 E p4 Where: E ps is the line risk control efficiency value; ψ p1 The weight of third-party damage in line risk management; E p1 Destroy the control efficiency value for the third party; p2 is the weight of corrosion in line risk management; E p2 is the corrosion control efficiency value; p3 is the weight of misoperation in line risk management; E p3 is the error operation control efficiency value; p4 is the weight of design in line risk management; E p4 is the designed control effectiveness value; The station risk control efficiency value E ss Obtained through the following steps: S31. Construct a station risk management and control effectiveness model; The calculation result of the station risk control efficiency model is the station risk control efficiency value E ss ; The evaluation indicators of the station risk control efficiency model include the equipment control efficiency value E s1 , pipeline control efficiency value E s2 , Instrument control efficiency value E s3 , Environmental control efficiency value E s4 ; S32. Calculate the station risk control efficiency value E according to the station risk control efficiency model constructed above ss , which is calculated as follows: E ss =ψ s1 E s1 +ψ s2 E s2 +ψ s3 E s3 +ψ s4 E s4 Where: E ss is the station risk control efficiency value; ψ s1 is the weight of the equipment in the risk control of the station; E s1 is the equipment control efficiency value; s2 is the weight of pipeline in station risk management; E s2 is the pipeline control efficiency value; s3 E is the weight of the instrument in the risk control of the station; s3 is the instrument control efficiency value; ψ s4 is the weight of the environment in the risk management of the station; E s4 is the environmental control efficiency value; The operational risk control efficiency value E os Obtained through the following steps: S41. Constructing an operational risk management and control effectiveness model; The calculation result of the operational risk management efficiency model is the operational risk management efficiency value E os ; The evaluation indexes of the operation risk control efficiency model include the fire operation control efficiency value E o1 , Earthwork control efficiency value E o2 , Lifting operation control efficiency value E o3 , Efficiency value of high-altitude operation control o4 , Temporary power operation control efficiency value E o5 , Blind plate extraction and plugging operation control efficiency value E o6 , Efficiency value of control over entering confined space operations o7 , Pipeline pigging and internal inspection operation control efficiency value E o8 ; S42. Calculate the operational risk management efficiency value E according to the operational risk management efficiency model constructed above. os , which is calculated as follows: E os =ψ o1 E o1 +ψ o2 E o2 +ψ o3 E o3 +ψ o4 E o4 +ψ o5 E o5 +ψ o6 E o6 +ψ o7 E o7 +ψ o8 E o8 Where: E os is the operational risk control efficiency value; o1 is the weight of fire operation in operation risk control; E o1 is the fire operation control efficiency value; o2 E is the weight of earth-breaking operation in operation risk control; o2 is the earthwork control efficiency value; o3 is the weight of the lifting operation in the operation risk control; is the control efficiency value of the lifting operation; o4 is the weight of working at height in the risk control of working; E o4 is the control efficiency value of high-altitude operations; ψ o5 is the weight of temporary power operation in operation risk control; E o5 It is the control efficiency value of temporary power operation; ψ o6 E is the weight of blind plate plugging operation in operation risk control; o6 It is the control efficiency value of blind plate plugging operation; ψ o7 E is the weight of entering confined space operations in the operation risk management; o7 is the control efficiency value for entering confined space operations; ψ o8 is the weight of pipeline pigging and internal inspection operations in operational risk control; E o8 It is the control efficiency value of pipeline pigging and internal inspection operations; The management risk control efficiency value E ms Obtained through the following steps: S51. Construct a management risk control effectiveness model; The calculation result of the management risk control efficiency model is the management risk control efficiency value E ms ; The evaluation indicators of its management risk control effectiveness model include information asymmetry control effectiveness value E m1 , Poor management control effectiveness value E m2 , Error control efficiency value E m3 ; S52. Calculate the management risk control efficiency value E according to the management risk control efficiency model constructed above. ms , which is calculated as follows: AND ms =ψ m1 AND m1 ·ψ m2 AND m2 ·ψ m3 AND m3 Where: E ms is the management risk control efficiency value; m1 is the weight of information asymmetry in risk management; E m1 is the information asymmetry control efficiency value; m2 is the weight of poor management in management risk control; E m2 The efficiency value for poor management control; m3 is the weight of misjudgment in management risk control; E m3 To determine the error control efficiency value.