Support frame and method of using the same

By designing the support frame, using hydraulic pumps and lifters, combined with stiffening ribs and lifting corbels, the overall lowering and segmental dismantling of the large steel frame was achieved, which solved the problems of difficult demolition construction and high safety risks, reduced the difficulty of construction and improved security.

CN112376947BActive Publication Date: 2024-10-29SHANGHAI CONSTR NO 5 GRP CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202011351971.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-11-27
Publication Date
2024-10-29
Estimated Expiration
2040-11-27

AI Technical Summary

Technical Problem

When dismantling a large indoor stage steel frame, the construction is difficult and the safety risks are high, which cannot be effectively reduced by existing technology.

Method used

Design a support frame that is connected to the bottom side of the variable-section lattice column, using hydraulic pumps and lifters, combined with stiffening ribs and lifting corbels, to realize the overall lowering and segmental dismantling of large steel frames, and convert the gravity support points. Ensure structural stability and safety.

Benefits of technology

The use of support frames reduces the difficulty of demolition construction, avoids high-altitude operations, improves construction safety, and eliminates the need to introduce large-scale lifting equipment, overcoming the problems of small building space and limited ground bearing capacity.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112376947B_ABST
    Figure CN112376947B_ABST
Patent Text Reader

Abstract

The present invention discloses a support frame that can be raised and lowered and a method for using the support frame, which relate to the technical field of steel structure engineering. The existing large-scale indoor steel frame demolition construction process has the problems of great construction difficulty and high safety risks. The support frame includes a support frame body, a lifting power device and a connecting piece connected to the support frame body, and the lifting power device is detachably connected to the variable-section lattice column through the connecting piece. The support frame body includes a pair of parallel and spaced columns, and a lifting beam laterally connected to the top of the column. The hydraulic lifting device includes a hydraulic pump and a lifter installed on the top of the lifting beam and connected to each other. The bottom end of the steel strand of the lifter passes through the lifting beam and the connecting piece in sequence and is anchored to the original foundation of the building. Method of use: cut off the connection between the large steel frame and the original structure and foundation of the building, use the support frame to alternately support and remove the variable-section lattice column section by section, until the plane truss structure drops to the horizontal support surface and then implement the dismantling construction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of steel structure engineering, and in particular to a support frame and a use method thereof. Background Art

[0002] At present, when dismantling the steel frame of the indoor stage in a large venue, various types of cranes are often used, and manual dismantling and mechanical transportation are adopted. The steel frame of the indoor stage is usually composed of a plane truss structure and multiple lattice columns vertically fixed to it. The plane truss structure is supported on the ground by multiple lattice columns. During the dismantling construction process of the indoor stage steel frame, the stability mechanism of the original structure is destroyed, which increases the difficulty of the dismantling construction and the safety risk. Summary of the invention

[0003] In view of the problems of great construction difficulty and high safety risk in the existing demolition construction process of large indoor steel frames, an object of the present invention is to provide a support frame and a method for using the same.

[0004] The technical solution adopted by the present invention to solve its technical problems is: a support frame, which is connected to the bottom side of the variable-section lattice column, and it includes a support frame body, a lifting power device and a connecting piece connected to the support frame body, the lifting power device is detachably connected to the variable-section lattice column through the connecting piece, and the lifting power device is connected to the control system signal; the support frame body includes a pair of parallel and spaced columns, and a lifting beam laterally connected to the top of the pair of columns, and the bottom of the column is anchored to the original foundation of the building through a post-embedded part, the lifting power device includes a hydraulic pump and a lifter installed on the top of the lifting beam and connected to each other, and the bottom end of the steel strand of the lifter passes through the lifting beam and the connecting piece in sequence and is anchored to the bottom of the connecting piece.

[0005] The support frame of the present invention comprises a support frame body, a lifting power device and a connecting piece connected to the support frame body, and the lifting power device is detachably connected to the variable-section lattice column through the connecting piece. Since the variable-section lattice column and the main truss beam therebetween are the heaviest components in the large-scale steel frame, the center of gravity of the large-scale steel frame is offset to one side of the variable-section lattice column. The variable-section lattice column is connected to the support frame through the connecting piece, and the support frame can be used to bear the weight of the two variable-section lattice columns and the main truss beam. The hydraulic lifting device installed on the top of the tower and the lifting power device of the support frame are used as a power device for synchronously lifting or lowering the large-scale steel frame step by step. During the segmented dismantling construction process of the large-scale steel frame, the support point of the gravity of the large-scale steel frame is transferred from the bottom of the variable-section lattice column to the support frame. The reasonable force conversion system of the support frame effectively ensures the overall stability and safety of the structure during the dismantling construction process of the large-scale steel frame, and avoids the large-scale steel frame from tilting during the lifting or lowering process.

[0006] Furthermore, the connecting member includes a stiffening rib which is sleeved and fixedly connected to the main limb of the variable-section lattice column, a lifting bracket connected to the stiffening rib, and a bottom anchor of the steel strand located at the bottom of the lifting bracket and sleeved on the lifter.

[0007] Furthermore, the stiffening ribs include two parallel and spaced-apart annular ribs, the two annular ribs are provided with holes corresponding in position and adapted to the outer diameter of the main limb, and slots corresponding in position and adapted to the reinforcing rod, the two annular ribs are respectively sleeved on the main limb and the reinforcing rod and are welded and fixed to the two.

[0008] Furthermore, the lifting corbel includes a corbel body, the width of which is adapted to the width of the gap between the two upright posts of the support frame, the corbel body being made of a steel material having a rectangular cross-section, and the top plate and the bottom plate of the corbel body being provided with through holes corresponding in position, the corbel body being embedded in the gap between the two upright posts, and the steel strand of the lifter passing through the through hole of the corbel body is fastened and fixed by a bottom anchor.

[0009] Furthermore, the lifting corbel also includes a plurality of limit baffles symmetrically arranged on both sides of the corbel body, and the plurality of limit baffles are buckled on the outer sides of the two columns.

[0010] Furthermore, the inner cavity of the lifting corbel is also vertically connected with a rib plate, and the rib plate is adjacent to the through hole.

[0011] Furthermore, the support frame also includes two diagonal braces connected to the sides of the columns, the top ends of the two diagonal braces are respectively fixed to the two columns, the bottom ends of the two diagonal braces are anchored to the original foundation of the building through post-embedded parts, and the adjacent two diagonal braces are connected and reinforced by transversely arranged connecting rods.

[0012] Furthermore, the support frame also includes two temporary connecting rods, one end of the two temporary connecting rods is connected to the bottom end of the main limb of the variable-section lattice column, and the other end of the two temporary connecting rods is respectively connected to the bottom end of the two columns.

[0013] In addition, the present invention also provides a method for using the support frame, the steps are as follows:

[0014] S1: at least one pair of towers is set up in the middle below the platform truss structure of the large steel frame, the hydraulic lifting device at the top of the tower passes through the plane truss structure, and the hydraulic lifting device is detachably connected to the plane truss structure, at least one pair of wall guide rails are installed on the side of the concrete structure column, one end of the plane truss structure is snapped on the wall guide rail and slides along the wall guide rail, a support frame is connected to each side of the main limb of a plurality of variable-section lattice columns, and the top of the first segment of the variable-section lattice column is connected to the support frame through a connecting piece;

[0015] S2: Cutting off the connection between the plane truss structure and the concrete structural column, cutting off the connection between the variable-section lattice column and the original foundation of the building, loading the hydraulic lifting device and the lifting power device step by step until the large steel frame is separated from the concrete structural column, the cutting position of the variable-section lattice column is separated, and the first segment of the variable-section lattice column is cut;

[0016] S3: Lower the large steel frame as a whole. When the bottom end of the variable-section lattice column is stably supported on the ground, unload the load of the variable-section lattice column suspension point in stages until the pressure of the lifting power device is zero. Remove the connecting piece and install it on the top of the second segment of the variable-section lattice column, so that the variable-section lattice column is connected to the temporary support through the connecting piece. Load the hydraulic lifting device and the lifting power device step by step again until the variable-section lattice column is separated from the original foundation of the building. Cut the second segment of the variable-section lattice column, lower the large steel frame as a whole again. When the bottom end of the variable-section lattice column is stably supported on the original foundation of the building, stop lowering. Unload the load of two variable-section lattice columns in stages. Remove the connecting piece and install it on the top of the third segment of the variable-section lattice column, so that the third segment of the variable-section lattice column is connected to the temporary support through the connecting piece. Repeat this process. Alternately support and remove the variable-section lattice column section by section through the support frame until the plane truss structure descends to the horizontal support surface, and then remove the plane truss structure.

[0017] The method for using the support frame of the present invention comprises the following steps: first, installing the tower frame and the wall-attached guide rail at the designed position, connecting a support frame to the sides of the main limbs of the two variable-section lattice columns, connecting the top of the first segment of the variable-section lattice column to the support frame through a connecting piece, synchronously lifting the large steel frame by using the hydraulic lifting device of the tower frame and the lifting power device of the support frame, allowing the tower frame and the support frame to bear the weight of the large steel frame, cutting off the connection between the large steel frame and the concrete structural column and the original foundation of the building, cutting the first segment of the variable-section lattice column, lowering the large steel frame as a whole so that it is stably supported on the ground, removing the connecting piece and installing it on the top of the second segment of the variable-section lattice column, connecting the variable-section lattice column to the support frame through the connecting piece, and controlling the hydraulic lifting device and the lifting power device to synchronously load step by step again. Until the variable-section lattice column is separated from the original foundation of the building, the second section of the variable-section lattice column is removed, and this process is repeated, and the variable-section lattice column is alternately supported and removed section by section by section through the support frame, until the plane truss structure descends to the horizontal support surface, and then the plane truss structure is removed. The method of the present invention using the support frame to remove the large steel frame adopts the construction method of "overall lowering and segmented removal", and the large steel frame is alternately supported by the support frame, and the segmented removal construction of the variable-section lattice column is realized by using the original site, and the elevation of the plane truss structure is lowered before it is dismantled on the ground, without the need to introduce large-scale lifting equipment, thereby reducing the difficulty of the removal construction and overcoming the problems of the small space of the original building and the limited bearing capacity of the ground. Moreover, since high-altitude operations are avoided, the safety of the removal construction process is effectively guaranteed.

[0018] Furthermore, in steps S2 and S3, before the large steel frame is lowered as a whole so that it is stably supported on the ground and the current segment of the variable-section lattice column is removed, the stiffening ribs are sleeved on the main limbs and the reinforcing rods of the variable-section lattice column and fixedly connected to the two, the lifting corbel is embedded between the two columns of the support frame, the steel strands of the lifter are passed through the through holes of the lifting corbel and then locked and fixed by the bottom anchors, the stiffening ribs are fixedly connected to the lifting corbel, and the large steel frame is lifted as a whole until the variable-section lattice column is separated from the original foundation of the building; after cutting the current segment of the variable-section lattice column, the large steel frame is lowered as a whole again so that it is stably supported on the ground, the connection between the stiffening ribs and the variable-section lattice column is cut off, the stiffening ribs are fixedly connected to the next segment of the variable-section lattice column to be cut, and the stiffening ribs are fixedly connected to the lifting corbel again. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a schematic plan view of a large indoor steel frame in one embodiment of the present invention;

[0020] Figure 2 A schematic diagram of the structure of a tower according to an embodiment of the present invention;

[0021] Figure 3 This is a schematic structural diagram of a wall-mounted guide rail according to an embodiment of the present invention;

[0022] Figure 4 A three-dimensional diagram of a support frame according to an embodiment of the present invention;

[0023] Figure 5 and Figure 6 A side view of a support frame according to an embodiment of the present invention;

[0024] Figure 7 A schematic diagram of a connection node between a support frame and a variable-section lattice column according to an embodiment of the present invention;

[0025] Figure 8 for Figure 7 AA section view;

[0026] Figures 9 to 14 It is a schematic diagram of each step of the method for using the support frame of the present invention.

[0027] The numbers in the figure are as follows:

[0028] Concrete structural column 1; original foundation of the building 2; foundation pit of the lifting stage 3; steel truss roof support system 4; tower 10; lattice column 11; lifting beam 12; hydraulic lifting device 14; connecting rod 15; wall guide rail 20; wall connecting member 21; cross bar 22; slide rail 24; pulley 1 205; pulley 2 206; support frame 30; column 31; lifting beam 32; lifting power device 33; connecting piece 35; annular rib 351; corbel body 352; through hole 353; limit baffle 354; rib 355; bottom anchor 356; diagonal brace 36; steel strand 37; large steel frame 200; plane truss structure 202; variable-section lattice column 201; main limb 207; reinforcement rod 208; temporary connecting rod 209. DETAILED DESCRIPTION

[0029] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments. It should be noted that the drawings are all in very simplified form and use non-precise proportions, which are only used to conveniently and clearly assist in explaining the purpose of the embodiments of the present invention. For the convenience of description, the "upper" and "lower" described below are consistent with the upper and lower directions of the drawings, but this cannot be a limitation of the technical solution of the present invention.

[0030] This embodiment takes the demolition construction of a large stage steel frame (hereinafter referred to as the large steel frame) in a large sports stadium as an example. The large steel frame 200 includes a plane truss structure 202 and two variable-section lattice columns 201. The plane truss structure 202 is composed of 13 longitudinal plane tube trusses and 9 transverse plane tube trusses. The maximum span of the plane truss structure 202 is about 35.453m and the height is about 3.0m. One side of the plane truss structure 202 is connected to the embedded part set in the concrete structure column 1 through a connecting support, and two support brackets are set on the other side of the plane truss structure 202. The variable-section lattice column 201 on the ground is wide at the top and narrow at the bottom, thus forming a stable structural system. The variable-section lattice column 201 (single column 12.7T) and the main truss beam therebetween (single beam 11.9T, two beams in total) are the heaviest components of the large steel frame 200. A 7.5m-high platform is provided at the stage location, and a lifting stage foundation pit 3 is provided in the center of the stage. The top of the concrete structural column 1 is connected to the steel truss roof support system 4. Since the purpose of the stage location has changed, the large steel frame 200 at the stage location needs to be dismantled.

[0031] like Figure 1 and Fig. 9 As shown, the following devices are installed at the location of the large steel frame 200 to implement the demolition construction:

[0032] At least one pair of wall guide rails 20 are vertically spaced and fixed to the concrete structure column 1 respectively, and the pulley assembly arranged at the end of the plane truss structure 202 of the large steel frame 200 is buckled on the wall guide rails 20 and slides vertically along the wall guide rails 20;

[0033] At least one pair of towers 10 are vertically spaced and arranged in the middle of the plane truss structure 202. The bottom end of the tower 10 is supported on the bottom surface of the lifting stage pit 3. The top of the tower 10 passes through the plane truss structure 202. It includes a tower body and a hydraulic lifting device 14 connected to the top thereof. The hydraulic lifting device 14 is connected to the upper chord and / or lower chord of the plane truss structure 202 through a sling.

[0034] Two support frames 30 are respectively connected to the bottom side of two variable-section lattice columns 201, and include a support frame body, a lifting power device 33 and a connecting member 35 connected to the support frame body, and the lifting power device 33 is connected to the variable-section lattice column 201 through the connecting member 35;

[0035] The hydraulic lifting device 14 and the lifting power device 33 are both connected to a control system (not shown) by signals.

[0036] The at least one pair of towers 10 arranged in the middle of the plane truss structure 202, the at least one pair of wall guide rails 20 connected to the concrete structure column 1, and the two support frames 30 connected to the bottom of the variable-section lattice column 201 are used as temporary supports for the large steel frame 200 after being disconnected from the original building structure, and are used to bear the weight of the large steel frame 200, and with the help of the hydraulic lifting device 14 installed on the top of the tower 10 and the lifting power device 33 connected to the support frame 30 as synchronous step-by-step lifting or lowering The large steel frame 200 is powered by a wall guide rail 20 fixed to the concrete structural column 1 as a guide device for lowering the large steel frame 200, thereby ensuring the overall stability of the large steel frame 200 during the lifting or lowering process; the large steel frame 200 is dismantled by adopting the construction process of "overall descent and segmented dismantling", the top of the first segment of the variable-section lattice column 201 is connected to the support frame 30 through a connector 35, the connection between the large steel frame 200 and the original building structure and foundation is disconnected, and the entire steel frame 200 is dismantled. The large steel frame 200 is lifted up by the body to separate it from the original foundation 2 of the building, the first section of the variable-section lattice column 201 is cut, the large steel frame 200 is lowered as a whole to be stably supported on the original foundation 2 of the building, the connecting piece 35 is removed and connected to the second section of the variable-section lattice column 201, so that the second section of the variable-section lattice column 201 is connected to the support frame 30 through the connecting piece 35, and the hydraulic lifting device 14 and the lifting power device 33 are reloaded step by step until the variable-section lattice column 201 is separated from the ground, and the second section of the variable-section lattice column 201 is cut, and this is repeated, and the variable-section lattice column 201 is alternately supported by the support frame 30, and is lowered and removed in sections until the plane truss structure 202 is supported on the horizontal plane and then the demolition construction is carried out; since the original site is used to realize the alternating support and demolition construction of the large steel frame 200, the construction difficulty is reduced, and there is no need to introduce large-scale lifting equipment, which overcomes the problem of small original building space and limited ground bearing capacity. Moreover, since high-altitude operations are avoided, the safety of the demolition construction is guaranteed.

[0037] like Figure 1 As shown, the at least one pair of wall guide rails 20, at least one pair of towers 10 and two support frames 30 are symmetrically arranged along the axis ax of the large steel frame 200, so that the large steel frame 200 is subjected to more balanced force during the lifting or lowering process.

[0038] like Figure 2As shown, the tower body includes two lattice columns 11 arranged in parallel and at intervals, and a lifting beam 12 transversely connected to the top of the two lattice columns 11, that is, the two lattice columns 11 and the lifting beam 12 together constitute a gate-shaped tower body, thereby improving the overall stability of the tower 10 structure. The hydraulic lifting device 14 includes a hydraulic pump and a lifter 1 installed on the top of the lifting beam 12 and connected to each other. The steel strand of the lifter 1 passes through the lifting beam 12 and is detachably connected to the upper chord rod or / and the lower chord rod of the plane truss structure 202 through a hanger, which is convenient for disassembly and assembly.

[0039] Furthermore, the tower 10 also includes a displacement sensor (not shown in the figure) installed on the lifter 1, which is used to monitor the vertical displacement of the large steel frame 200, so as to control the lifter 1 to increase the load step by step during the process of lifting the large steel frame 200, which is conducive to the precise control of the entire demolition construction cycle.

[0040] like Fig. 9 As shown, in order to further improve the stability of the tower 10, the tower 10 also includes at least two horizontally arranged connecting rods 15, one end of the connecting rod 15 is connected to the lifting beam 12 of the tower 10, and the other end of the connecting rod 15 is anchored and connected to the embedded parts in the concrete structural column 1, so that the connection between the tower 10 and the original concrete structural column 1 of the building is achieved by setting the connecting rod 15.

[0041] like Figure 3 As shown, the wall-attached guide rail 20 includes a plurality of pairs of wall connecting members 21, a plurality of cross bars 22 laterally connected between adjacent wall connecting members 21, and at least three vertically arranged slide rails 24. The plurality of pairs of wall connecting members 21 are arranged in parallel and at intervals in the vertical direction. One end of the wall connecting member 21 is connected to the rear embedded member of the concrete structure column 1, and the inner side of the other end of the wall connecting member 21 is respectively fixedly connected to a pair of vertically arranged slide rails 24. One side of the plurality of cross bars 22 close to the plane truss structure 202 is vertically fixedly connected to a slide rail 24. The end of the plane truss structure 202 is connected to a pulley assembly, and the pulley assembly is buckled in a groove formed by the wall connecting member 21 and the cross bar 22 and can slide vertically along the groove. The pulley assembly includes a vertically arranged main rod and a support rod, and the main rod is fixedly connected to the plane truss. The end of the upper chord or the lower chord of the structure 202, and the axis of the main rod coincides with the axis of the upper chord or the lower chord, the end of the main rod is connected to a pulley 205, the two support rods are symmetrically arranged and fixed to the two sides of the main rod, the ends of the two support rods are respectively connected to a pulley 206, and the pulley 1 205 and the pulley 2 206 are relatively arranged along the axis of the support rod. After the pulley assembly is snapped into the groove, the pulley 1 205 contacts the slide rail 24 fixed to the cross bar 22, and the two pulleys 206 contact a pair of slide rails 24 fixed to the end of the wall connecting member 21. Therefore, the plane truss structure 202 can slide vertically along the wall guide rail 20 without deviation, thereby playing a role of horizontal limitation during the lifting and lowering process of the large steel frame 200.

[0042] Combine the following Figures 4 to 8 The support frame 30 of the present invention is described in detail. It is connected to the bottom side of the variable-section lattice column 201, and includes a support frame body, a lifting power device 33 and a connecting piece 35 connected to the support frame body. The lifting power device 33 is detachably connected to the variable-section lattice column 201 through the connecting piece 35, and the lifting power device 33 is connected to the control system signal; the support frame body includes a pair of parallel and spaced columns 31, and a lifting beam 32 transversely connected to the top of the pair of columns 31, and the bottom of the column 31 is anchored to the original foundation 2 of the building through a post-embedded part, that is, the pair of columns 31 and the lifting beam 32 together constitute a door-shaped bracket, which improves the overall stability of the support frame 30; the lifting power device 33 includes a hydraulic pump and a lifter installed on the top of the lifting beam 32 and connected to each other, and the bottom end of the steel strand 37 of the lifter passes through the lifting beam 32 and the connecting piece 35 in sequence and is anchored to the bottom of the connecting piece 35.

[0043] The support frame 30 of the present invention includes a support frame body, a lifting power device 33 and a connecting member 35 connected to the support frame body, and the lifting power device 33 is detachably connected to the variable-section lattice column 201 through the connecting member 35. Since the variable-section lattice column 201 and the main truss beam therebetween are the heaviest components in the large steel frame 200, the center of gravity of the large steel frame 200 is offset to one side of the variable-section lattice column 201. The variable-section lattice column 201 is connected to the support frame 30 through the connecting member 35, and the support frame 30 can be used to carry two variable-section lattice columns 201 and the main truss beam. The weight of the beam is controlled by the hydraulic lifting device 14 installed on the top of the tower 10 and the lifting power device 33 of the support frame 30 as the power device for synchronously lifting or lowering the large steel frame 200 step by step; during the segmented dismantling construction of the large steel frame 200, the support point of the gravity of the large steel frame 200 is transferred from the bottom of the variable-section lattice column 201 to the support frame 30. The reasonable force conversion system of the support frame 30 effectively ensures the overall stability and safety of the structure during the dismantling construction of the large steel frame 200, and avoids the large steel frame 200 from tilting during the lifting or lowering process.

[0044] like Figure 4 As shown, in order to further improve the overall stability of the support frame 30, the support frame body also includes two diagonal braces 36 connected to the sides of the columns 31, the top ends of the two diagonal braces 36 are respectively fixed to the two columns 31, the bottom ends of the two diagonal braces 36 are anchored to the original foundation 2 of the building through post-embedded parts, and the adjacent two diagonal braces 36 are connected and reinforced by a transversely arranged connecting rod.

[0045] Please continue to refer to Figure 4The support frame also includes two temporary connecting rods 209, one end of the two temporary connecting rods 209 is connected to the bottom end of the main limb 207 of the variable-section lattice column 201, and the other ends of the two temporary connecting rods 209 are respectively connected to the bottom ends of the two columns 31, so as to stably connect the bottom end of the variable-section lattice column 201 to the support frame 30.

[0046] like Figure 4 and Figure 7 As shown, before the variable-section lattice column 201 is dismantled in sections, in order to enhance the rigidity and strength of the main limb 207 of the variable-section lattice column 201, a reinforcing rod 208 with a T-shaped cross-section is fixedly connected to the side of the main limb 207 along its length direction, and the above-mentioned connecting member 35 includes a stiffening rib which is sleeved and fixed to the main limb 207 of the variable-section lattice column 201, a lifting bracket connected to the stiffening rib, and a bottom anchor 356 of the steel strand 37 located at the bottom of the lifting bracket and sleeved on the lifter; the setting of the stiffening rib plays a role in strengthening the connection strength of the lifting part of the variable-section lattice column 201, and the setting of the connecting member 35 realizes a detachable connection between the variable-section lattice column 201 and the support frame 30, which is convenient for the subsequent segmented dismantling construction of the variable-section lattice column 201.

[0047] like Figure 8 As shown, the stiffening ribs include two parallel and spaced-apart annular ribs 351, the two annular ribs 351 are provided with holes corresponding in position and adapted to the outer diameter of the main limb 207, and slots corresponding in position and adapted to the reinforcing rod 208, the two annular ribs 351 are respectively sleeved on the main limb 207 and the reinforcing rod 208 and are welded and fixed to the two.

[0048] Please continue to refer to Figure 7 and Figure 8 The lifting corbel includes a corbel body 352, the width of the corbel body 352 is adapted to the width of the gap between the two upright columns 31 of the support frame, the corbel body 352 is made of a steel material with a rectangular cross-section, and the top plate and the bottom plate of the corbel body 352 are provided with through holes 353 at corresponding positions, the corbel body 352 is embedded in the gap between the two upright columns 31, the steel strand 37 of the lifter passes through the through hole 353 of the corbel body 352 and is locked and fixed by the bottom anchor 356, the construction personnel can control the steel strand 37 of the lifter to tighten the lifting corbel and indirectly drive the variable-section lattice column 201 to automatically lift or lower, thereby improving the automation and safety of the demolition construction of the large steel frame 200.

[0049] like Figure 8As shown, the lifting bracket also includes a plurality of limit baffles 354 symmetrically arranged on both sides of the bracket body 352. The plurality of limit baffles 354 are buckled on the outside of the two columns 31 to play a role of horizontal limit, ensuring the stability of the large steel frame 200 during the lifting or lowering process, and preventing it from "swaying" away from the support frame or colliding with the support frame. In addition, the lifting bracket inner cavity is also vertically connected with a rib plate 355, and the rib plate 355 is adjacent to the through hole 353. The setting of the rib plate 355 enhances the structural strength of the position where the lifting through hole 353 is located.

[0050] Combination Figures 9 to 14 The method of using the support frame of the present invention is described, and the specific steps are as follows:

[0051] S1: According to the field measured data, such as Fig. 9 As shown, two groups of lattice towers 10 are set up in the lifting stage foundation pit 3 where the stage is located, the hydraulic lifting device 14 at the top of the tower 10 passes through the plane truss structure 202 of the large steel frame 200, and the hydraulic lifting device 14 is connected to the plane truss structure 202 through a hanger, and a pair of wall guide rails 20 are installed on the side of the concrete structure column 1, one end of the plane truss structure 202 is buckled on the wall guide rail 20 and slides along the wall guide rail 20, and a support frame 30 is connected to the side of the main limb 207 of the two variable-section lattice columns 201, and the top of the first segment of the variable-section lattice column 201 (the segment close to the ground is the first segment and so on) is connected to the support frame 30 through a connecting piece 35, and the hydraulic lifting device 14 and the lifting power device 33 are debugged and test-loaded;

[0052] S2: Fig.10 As shown, the hydraulic lifting device 14 and the lifting power device 33 are loaded to 30% of the design load and then paused, a scaffold is set up on the side of the concrete structure column 1, the connecting beam and the connecting support between the plane truss structure 202 and the concrete structure column 1 are cut, and the first section of the variable-section lattice column 201 is cut at a distance of about 400mm from the original foundation 2 of the building, and the hydraulic lifting device 14 and the lifting power device 33 are loaded step by step to 100% of the design load until the large steel frame 200 is separated from the concrete structure column 1 and the original foundation 2 of the building, and the large steel frame 200 is raised by 30mm as a whole, and the loading is stopped and left to stand for 6 to 12 hours, and the temporary measures and the large steel frame 200 itself are checked for abnormal conditions. After confirming that it is normal, the connecting support is removed and the first section of the variable-section lattice column 201 is cut;

[0053] S3: Figures 11 to 14As shown, the large steel frame 200 is lowered as a whole. When the bottom end of the variable-section lattice column 201 is stably supported on the original foundation 2 of the building, the lowering is suspended, and the loads of the hanging points of the two variable-section lattice columns 201 are unloaded in stages until the pressure of the lifting power device 33 is zero. The connecting piece 35 is removed and installed on the top of the second segment of the variable-section lattice column 201, so that the variable-section lattice column 201 is connected to the support frame 30 through the connecting piece 35, and the hydraulic lifting device 14 and the lifting power device 33 are loaded step by step again until the variable-section lattice column 201 is separated from the original foundation 2 of the building, and the variable section lattice column 201 is cut. The second section of the variable section lattice column 201 is lowered as a whole again. When the bottom end of the variable section lattice column 201 is stably supported on the original foundation 2 of the building, the lowering is suspended, and the loads of the two variable section lattice columns 201 are unloaded in stages. The connecting piece 35 is removed and installed on the top of the third section of the variable section lattice column 201, so that the third section of the variable section lattice column 201 is connected to the support frame 30 through the connecting piece 35. This is repeated, and the variable section lattice column 201 is alternately supported and removed section by section through the support frame 30 until the plane truss structure 202 drops to the horizontal support surface, as shown in FIG. Fig.14 As shown, the planar truss structure 202 is removed.

[0054] The method for using the support frame of the present invention comprises the following steps: first, installing the tower frame 10 and the wall guide rail 20 at the designed position, connecting a support frame 30 to the sides of the main limbs 207 of the two variable-section lattice columns 201, connecting the top of the first segment of the variable-section lattice column 201 to the support frame 30 through a connecting piece 35, and synchronously lifting the large steel frame 200 by using the hydraulic lifting device 14 of the tower frame 10 and the lifting power device 33 of the support frame 30, so that the weight of the large steel frame 200 is borne by the tower frame 10 and the support frame 30, cutting off the connection between the large steel frame 200 and the concrete structural column 1 and the original foundation 2 of the building, cutting the first segment of the variable-section lattice column 201, lowering the large steel frame 200 as a whole so that it is stably supported on the ground, removing the connecting piece 35 and installing it on the top of the second segment of the variable-section lattice column 201, so that the variable-section lattice column 201 is connected to the support frame 30 through the connecting piece 35, and controlling the hydraulic lifting device again. 14 and the lifting power device 33 are loaded synchronously step by step until the variable-section lattice column 201 is separated from the original foundation 2 of the building, and the second section of the variable-section lattice column 201 is removed, and this process is repeated. The variable-section lattice column 201 is alternately supported and removed section by section by section by the support frame 30 until the plane truss structure 202 drops to the horizontal support surface, and then the plane truss structure 202 is removed. The method of removing a large steel frame using a support frame of the present invention adopts a construction method of "overall lowering and segmented removal". The large steel frame 200 is alternately supported by the support frame 30, and the segmented removal construction of the variable-section lattice column 201 is realized by using the original site. The elevation of the plane truss structure 202 is lowered and then the dismantling is carried out on the ground. There is no need to introduce large-scale lifting equipment, thereby reducing the difficulty of the removal construction and overcoming the problems of the small space of the original building and the limited bearing capacity of the ground. Moreover, since high-altitude operations are avoided, the safety of the removal construction process is effectively guaranteed.

[0055] In the above steps S2 and S3, if Figure 7 and Figure 8As shown, the connecting member 35 includes a stiffening rib sleeved and fixedly connected to the main limb 207 of the variable-section lattice column 201, a lifting bracket fixedly connected to the stiffening rib, and a bottom anchor 356 located at the bottom of the lifting bracket and sleeved on the steel strand 37 of the lifter; before the large-scale steel frame 200 is lowered as a whole to be stably supported on the ground and the current segment of the variable-section lattice column 201 is removed, the stiffening rib is sleeved on the main limb 207 and the reinforcing rod 208 of the variable-section lattice column 201 and the two are welded and fixed, the bracket body 352 of the lifting bracket is embedded between the two columns 31 of the support frame, and the steel strand 37 of the lifter passes through the through hole 353 of the bracket body 352 and is then connected to the bottom anchor 356 located at the bottom thereof. The anchor 356 is locked and fixed, the stiffening ribs are welded to the lifting bracket as a whole, and the large steel frame 200 is lifted as a whole until the variable-section lattice column 201 is separated from the original foundation 2 of the building; after cutting the current segment of the variable-section lattice column 201, the large steel frame 200 is lowered as a whole again to make it stably supported on the ground, the stiffening ribs are cut and fixed to the next segment to be cut of the variable-section lattice column 201, and the stiffening ribs are welded to the lifting bracket as a whole again; since the detachable connection between the variable-section lattice column 201 and the support frame 30 is realized by the connecting piece 35, the installation and disassembly are convenient and quick, which is convenient for the subsequent segmented dismantling construction of the variable-section lattice column 201.

[0056] In the above step S3, the tower 10 also includes a displacement sensor installed on the lifter 1. After the previous segment of the variable-section lattice column 201 is dismantled, the hydraulic lifting device 14 and the lifting power device 33 are controlled to synchronously lower the large steel frame 200 as a whole. During the lifting or lowering process of the large steel frame 200, the displacement sensor monitors the displacement data of the large steel frame 200. The control system receives the displacement data and controls the descending speed and distance of the large steel frame 200 by adjusting the lifter 1 and the hydraulic flow of the lifter, thereby improving the safety of the lifting construction by gradually increasing the load.

[0057] The above description is only a description of the preferred embodiments of the present invention, and is not intended to limit the scope of the present invention. Any changes or modifications made by a person skilled in the art in the field of the present invention based on the above disclosure shall fall within the scope of the claims.

Claims

1. A support frame, characterized in that: It is connected to the bottom side of the variable-section lattice column, and it includes a support frame, a lifting power device and a connecting piece connected to the support frame, the lifting power device is detachably connected to the variable-section lattice column through the connecting piece, and the lifting power device is connected to the control system signal; the support frame includes a pair of parallel and spaced columns, and a lifting beam transversely connected to the top of a pair of columns, and the bottom of the column is anchored to the original foundation of the building through a post-embedded part, the lifting power device includes a hydraulic pump and a lifter installed on the top of the lifting beam and connected to each other, the bottom end of the steel strand of the lifter passes through the lifting beam and the connecting piece in turn and is anchored to the bottom of the connecting piece; the connecting piece includes a stiffening rib mounted on and fixed to the main limb of the variable-section lattice column, a lifting corbel connected to the stiffening rib, and a bottom anchor of the steel strand located at the bottom of the lifting corbel and mounted on the lifter; the stiffening rib includes two parallel and spaced Annular ribs are arranged at intervals, and two of the annular ribs are provided with holes corresponding in position and adapted to the outer diameter of the main limb, and slots corresponding in position and adapted to the reinforcing rod. The two annular ribs are respectively sleeved on the main limb and the reinforcing rod and welded and fixed to the two. The lifting corbel includes a corbel body, the width of the corbel body is adapted to the width of the gap between the two columns of the support frame, the corbel body is made of a steel material with a rectangular cross-section, and the top plate and the bottom plate of the corbel body are provided with through holes corresponding in position, the corbel body is embedded in the gap between the two columns, and the steel strand of the lifter passes through the through holes of the corbel body and is locked and fixed by the bottom anchor; the lifting corbel also includes a plurality of limit baffles symmetrically arranged on both sides of the corbel body, and the plurality of limit baffles are buckled on the outside of the two columns; the inner cavity of the lifting corbel is also vertically connected with ribs, and the ribs are adjacent to the through holes.

2. The support frame according to claim 1, characterized in that: The support frame also includes two diagonal braces connected to the sides of the columns, the top ends of the two diagonal braces are respectively fixed to the two columns, the bottom ends of the two diagonal braces are anchored to the original foundation of the building through post-embedded parts, and the adjacent two diagonal braces are connected and reinforced by a transversely arranged connecting rod.

3. The support frame according to claim 1, characterized in that: The support frame also includes two temporary connecting rods, one end of the two temporary connecting rods is connected to the bottom end of the main limb of the variable-section lattice column, and the other ends of the two temporary connecting rods are respectively connected to the bottom ends of the two columns.

4. A construction method for dismantling a large steel frame using the support frame according to any one of claims 1 to 3, characterized in that: Here are the steps: S1: at least one pair of towers is set up in the middle below the platform truss structure of the large steel frame, the hydraulic lifting device at the top of the tower passes through the plane truss structure, and the hydraulic lifting device is detachably connected to the plane truss structure, at least one pair of wall guide rails are installed on the side of the concrete structure column, one end of the plane truss structure is snapped on the wall guide rail and slides along the wall guide rail, a support frame as claimed in claim 1 is connected to each side of the main limb of a plurality of variable-section lattice columns, and the top of the first segment of the variable-section lattice column is connected to the support frame through a connecting piece; S2: Cutting off the connection between the plane truss structure and the concrete structural column, cutting off the connection between the variable-section lattice column and the original foundation of the building, loading the hydraulic lifting device and the lifting power device step by step until the large steel frame is separated from the concrete structural column, the cutting position of the variable-section lattice column is separated, and the first segment of the variable-section lattice column is cut; S3: Lower the large steel frame as a whole. When the bottom end of the variable-section lattice column is stably supported on the ground, unload the load of the variable-section lattice column suspension point in stages until the pressure of the lifting power device is zero. Remove the connecting piece and install it on the top of the second segment of the variable-section lattice column, so that the variable-section lattice column is connected to the temporary support through the connecting piece. Load the hydraulic lifting device and the lifting power device step by step again until the variable-section lattice column is separated from the original foundation of the building. Cut the second segment of the variable-section lattice column, lower the large steel frame as a whole again. When the bottom end of the variable-section lattice column is stably supported on the original foundation of the building, stop lowering. Unload the load of two variable-section lattice columns in stages. Remove the connecting piece and install it on the top of the third segment of the variable-section lattice column, so that the third segment of the variable-section lattice column is connected to the temporary support through the connecting piece. Repeat this process. Alternately support and remove the variable-section lattice column section by section through the support frame until the plane truss structure descends to the horizontal support surface, and then remove the plane truss structure.

5. The construction method for dismantling a large steel frame according to claim 4, characterized in that: In the steps S2 and S3, before the large-scale steel frame is lowered as a whole so that it is stably supported on the ground and the current segment of the variable-section lattice column is removed, the stiffening ribs are sleeved on the main limbs and the reinforcing rods of the variable-section lattice column and fixedly connected to the two, the lifting corbel is embedded between the two columns of the support frame, the steel strands of the lifter pass through the through holes of the lifting corbel and are locked and fixed by the bottom anchors, the stiffening ribs are fixedly connected to the lifting corbel, and the large-scale steel frame is lifted as a whole until the variable-section lattice column is separated from the original foundation of the building; after cutting the current segment of the variable-section lattice column, the large-scale steel frame is lowered as a whole again so that it is stably supported on the ground, the connection between the stiffening ribs and the variable-section lattice column is cut off, the stiffening ribs are fixedly connected to the next segment of the variable-section lattice column to be cut, and the stiffening ribs are fixedly connected to the lifting corbel again.

Citation Information

Patent Citations

  • Supporting frame capable of being adjusted in lifting mode

    CN214885842U