A stable unloading device for pipe punching machine

By designing the conveying mechanism, unloading mechanism and buffer device on the pipe punching machine, the problem of pipes being scattered and damaged during the unloading process is solved, stable transportation and protection are achieved, and the punching quality is improved.

CN112475008BActive Publication Date: 2024-10-18HEFEI SHENGYUAN AUTO PARTS CO LTD +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202011169529.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-10-28
Publication Date
2024-10-18
Estimated Expiration
2040-10-28

AI Technical Summary

Technical Problem

During the unloading process of existing pipe punching machines, pipes are easily scattered and the outer surface is easily damaged, resulting in poor punching quality.

Method used

A stable unloading device including a conveying mechanism, unloading mechanism and blanking device is designed. Through the clamping mechanism, transmission screw, jacking component, straightening component, sponge pad and buffering mechanism, it ensures that the pipe is discharged during the unloading process. Stable transportation and buffering to reduce bruises.

Benefits of technology

It improves the transportation stability and protection effect of the pipe, reduces the damage to the outer surface of the pipe, and ensures the punching quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112475008B_ABST
    Figure CN112475008B_ABST
Patent Text Reader

Abstract

The present invention discloses a stable unloading device for a pipe punching machine, comprising a conveying mechanism, a unloading mechanism is arranged on the right side of the conveying mechanism, a blanking device is arranged at the bottom of the discharge end of the unloading mechanism, the conveying mechanism comprises a support frame, a fixed block, a transmission screw, and a transmission device, the fixed blocks are fixed at the two ends of the top of the support frame, the transmission screw is rotatably connected between the opposite sides of the two fixed blocks, the transmission device is fixed on one side of the support frame and is transmission-connected with the transmission screw, and a clamping mechanism for conveying and clamping the processed pipe fittings is also arranged on the transmission screw. The stable unloading device for a pipe punching machine improves the stability of pipe transportation through the coordinated use of the conveying mechanism, the unloading mechanism and the blanking device, reduces the damage to the outer surface of the pipe when entering the blanking device, greatly protects the pipe, and thus ensures the processing quality of the pipe.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of mechanical processing, in particular to a stable unloading device for a pipe punching machine. Background Art

[0002] With the development of economy, mechanization is a kind of social progress. It is a measure or means to directly use electricity or other power to drive or operate mechanical equipment in the production process to replace manual labor. The use of mechanical equipment but still driven by human or animal power is called "semi-mechanization". Mechanization is an important way to improve labor productivity and reduce physical labor.

[0003] With the continuous development of industry, more and more mechanical equipment are used. Many mechanical equipment need to use metal tubular workpieces with holes to realize connection, control and other functions. Therefore, the role and use of punching machines are becoming more and more extensive. When punching holes in pipes, the workpiece needs to be taken out after the punching is completed. In the prior art, the pipes processed by the pipe punching machine fall directly to the ground. On the one hand, the processed pipes will fall to the ground in a scattered manner after falling, which will be inconvenient for the staff to pick up and use due to the messy placement of the pipes. On the other hand, the newly processed pipes are usually manually unloaded directly from the pipe punching machine and put into the collection box. There is no buffering link in this unloading method. When the pipe is directly put from the punching machine into the collection box, it is easy to cause the outer surface of the pipe to be easily scratched, damaging the pipe and causing poor punching quality. To this end, we propose a stable unloading device for a pipe punching machine. Summary of the invention

[0004] The object of the present invention is to provide a stable unloading device for a pipe punching machine to solve the problems raised in the above background technology.

[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a stable unloading device for a tube punching machine, comprising a conveying mechanism, a unloading mechanism is arranged on the right side of the conveying mechanism, a dropping device is arranged at the bottom of the discharge end of the unloading mechanism, the conveying mechanism comprises a support frame, a fixed block, a transmission screw, and a transmission device, the fixed blocks are fixed at the top two ends of the support frame, the transmission screw is rotatably connected between the opposite sides of the two fixed blocks, the transmission device is fixed on one side of the support frame and is transmission-connected to the transmission screw, and the transmission screw is also provided with a clamping mechanism for conveying and clamping the processed pipe fittings.

[0006] Preferably, the clamping mechanism includes a sliding table and a mounting frame, the sliding table is threadedly connected to the transmission screw, the mounting frame is fixed to the top of the sliding table by screws, two groups of mounting frames are provided, and the two groups of mounting frames are symmetrically distributed about the central axis plane of the sliding table, and the two groups of mounting frames are fixedly installed with clamping cylinders on the sides away from each other, the output ends of the clamping cylinders pass through the middle of the mounting frame and are fixedly connected with arc-shaped clamping blocks, and slide rails are symmetrically fixed on both sides of the top of the fixed block, and the two ends of the sliding table are slidably connected in the slide rails, and a lifting component for lifting and tilting the processed pipe fittings is fixed on the leftmost side of the support frame.

[0007] Preferably, the transmission device includes a mounting plate, a motor frame and a driving motor, the mounting plate is fixed to an inner wall of one side of the support frame, the motor frame is fixed to the top of the mounting plate by screws, a driving motor is fixedly mounted on one side of the motor frame, a coupling is fixed to the outer side of the output end of the driving motor, and a transmission shaft is fixed through the coupling, an end of the transmission shaft away from the coupling passes through the side wall of the support frame and extends outward, and is fixed with a driving pulley, a transmission belt is transmission-connected to the driving pulley, and a driven pulley is transmission-connected to the driven pulley through the transmission belt, one end of the transmission screw is fixedly sleeved on the driven pulley, and bearings are clamped on opposite sides of two fixed blocks, and two ends of the transmission screw are respectively rotatably connected to the inner ring of the bearing.

[0008] Preferably, the lifting assembly includes a lifting cylinder and a connecting rod, the lifting cylinder is fixed at the leftmost position of the support frame, and the connecting rod is fixedly connected to the output end of the lifting cylinder, an arc-shaped bracket is fixed to the top of the connecting rod, and the initial position of the arc-shaped bracket is flush with the horizontal position of the arc-shaped clamping block.

[0009] Preferably, the unloading mechanism includes a base, a support rod, a blanking plate and a side baffle, the support rod is fixed at the four corners of the top of the base, the blanking plate is fixedly connected to the base through four support rods, the blanking plate is inclined at forty-five degrees to the horizontal plane, the side baffles are symmetrically fixed on both sides of the top of the blanking plate, and blanking traction rollers are rotatably connected between the two sides near the top of the two side baffles, an infrared sensor is fixedly installed on the inner side wall of one of the side baffles, a bottom plate is fixed at the bottom of the side baffles, a gap is left between the two bottom plates, and an arc-shaped transition plate is fixedly connected to the lower end of the gap, and the two side baffles are fixed with a correction component near the bottom plate for correcting the position of the processed pipe fittings that are about to pass through the gap.

[0010] Preferably, the straightening assembly includes a straightening cylinder, a push plate and a rotating hinge. The straightening cylinder is fixed to an outer wall of one side of the side baffle by screws, and the output end of the straightening cylinder slides through the side wall of the side baffle and is fixedly connected to the push plate. One side of the push plate is connected to the internal rotation of the side baffle by a rotating hinge.

[0011] Preferably, the bottom of the push plate and the top of the clamping mechanism are parallel to each other, and the distance between the bottom of the push plate and the top of the clamping mechanism is five centimeters.

[0012] Preferably, the blanking device includes a blanking storage box, a material storage rack and a sponge pad, one side of the top of the blanking storage box is abutted against the bottom of the arc-shaped transition plate, the material storage rack is movably arranged in the blanking storage box, the sponge pad is fixed on the top of the material storage rack, and a plurality of buffer mechanisms for buffering and preventing collision of the processed pipe fittings are symmetrically arranged on the bottom of the material storage rack.

[0013] Preferably, the buffer mechanism includes a rotating shaft and a first gear. The rotating shaft is rotatably connected between the inner walls of the blanking storage box. The first gear is fixed at both ends of the rotating shaft. The two sides of the first gear are respectively meshed with a double-headed gear rod and a single-headed gear rod. The side of the double-headed gear rod away from the first gear is meshed with a second gear. The top of the double-headed gear rod is fixedly connected to the material storage rack.

[0014] Preferably, the bottom of the double-headed gear rod is fixedly connected with a first telescopic column, a first buffer spring is arranged around the outside of the first telescopic column, and two ends of the first buffer spring are respectively fixed to the double-headed gear rod and the blanking storage box, the bottom of the first telescopic column is fixed to the blanking storage box, the bottom of the single-headed gear rod is fixedly connected with a second telescopic column, a second buffer spring is arranged around the outside of the second telescopic column, and two ends of the second buffer spring are respectively fixed to the single-headed gear rod and the blanking storage box, and the bottom of the second telescopic column is fixed to the blanking storage box.

[0015] Compared with the prior art, the present invention has the following beneficial effects:

[0016] The present invention provides a conveying mechanism, and the clamping mechanism on the conveying mechanism can clamp and fix the processed pipe, and the transmission screw and the transmission device cooperate to realize the transportation of the pipe. When conveying to the front end of the unloading mechanism, the lifting component is used to lift and tilt the processed pipe fittings, so that they are in the same inclined state as the unloading mechanism. Before the pipe passes through the unloading mechanism and slides into the blanking device, the position of the processed pipe fittings that are about to enter the blanking device is adjusted by the straightening component, so as to further improve the stability of pipe transportation. After entering the blanking device, the sponge pad is first used to play a preliminary buffering role, and then the buffer mechanism is used to buffer and prevent collision of the processed pipe fittings again, thereby further passing through two buffering links, reducing the damage to the outer surface of the pipe when entering the blanking device, greatly protecting the pipe, and thus ensuring the processing quality of the pipe. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a schematic diagram of the overall structure of the present invention;

[0018] Figure 2 It is a schematic diagram of the structure of the conveying mechanism of the present invention;

[0019] Figure 3 It is a schematic diagram of the structure of the unloading mechanism of the present invention;

[0020] Figure 4 It is a schematic diagram of the structure of the blanking device of the present invention;

[0021] Figure 5 for Figure 2 A magnified image of area A;

[0022] Figure 6 for Figure 2 Enlarged view of area B

[0023] Figure 7 for Figure 3 Enlarged view of area C in the middle;

[0024] Figure 8 for Figure 4 Enlarged view of area D in the middle.

[0025] In the figure: 1-conveying mechanism; 2-unloading mechanism; 3-feeding device; 4-support frame; 5-fixed block; 6-driving screw; 7-driving device; 8-mounting plate; 9-motor frame; 10-driving motor; 11-coupling; 12-transmission shaft; 13-driving pulley; 14-transmission belt; 15-driven pulley; 16-bearing; 17-sliding table; 18-mounting frame; 19-clamping cylinder; 20-arc clamping block; 21-slide rail; 22-lifting assembly; 23-lifting cylinder; 24-connecting rod; 25-arc bracket; 26-clamping mechanism; 27-bottom Seat; 28-support rod; 29-blank material plate; 30-side baffle; 31-blank material traction roller; 32-infrared sensor; 33-alignment assembly; 34-arc transition plate; 35-bottom plate; 36-alignment cylinder; 37-push plate; 38-rotating hinge; 39-blank material storage box; 40-storage rack; 41-sponge pad; 42-buffer mechanism; 43-rotating shaft; 44-first gear; 45-double-headed gear rod; 46-first telescopic column; 47-first buffer spring; 48-single-headed gear rod; 49-second gear; 50-second telescopic column; 51-second buffer spring. DETAILED DESCRIPTION

[0026] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0027] See also Figure 1-8 The present invention provides a technical solution: a stable unloading device for a pipe punching machine, comprising a conveying mechanism 1, a unloading mechanism 2 is arranged on the right side of the conveying mechanism 1, a drop device 3 is arranged at the bottom of the discharge end of the unloading mechanism 2, the conveying mechanism 1 comprises a support frame 4, a fixed block 5, a transmission screw 6, and a transmission device 7, the fixed block 5 is fixed at both ends of the top of the support frame 4, the transmission screw 6 is rotatably connected between the opposite sides of the two fixed blocks 5, the transmission device 7 is fixed on one side of the support frame 4 and is connected to the fixed block 5. The transmission screw 6 is connected for transmission. The transmission screw 6 is also provided with a clamping mechanism 26 for conveying and clamping the processed pipe fittings. The clamping mechanism 26 on the conveying mechanism 1 can clamp and fix the processed pipe, and the transmission screw 6 and the transmission device 7 cooperate to realize the transportation of the pipe. The pipe slides into the blanking device 3 through the unloading mechanism 2, and passes through two buffer links on the blanking device 3, which reduces the damage to the outer surface of the pipe when entering the blanking device 3, greatly protects the pipe, and thus ensures the processing quality of the pipe.

[0028] The clamping mechanism 26 includes a sliding table 17 and a mounting frame 18. The sliding table 17 is threadedly connected to the transmission screw 6. The mounting frame 18 is fixed to the top of the sliding table 17 by screws. The mounting frame 18 is provided with two groups, and the two groups of mounting frames 18 are symmetrically distributed about the central axis plane of the sliding table 17. A clamping cylinder 19 is fixedly installed on the side away from each other of the two groups of mounting frames 18. The output end of the clamping cylinder 19 passes through the middle of the mounting frame 18 and is fixedly connected with an arc-shaped clamping block 20. Slide rails 21 are symmetrically fixed on both sides of the top of the fixed block 5. The two ends of the sliding table 17 are slidably connected in the slide rails 21. A lifting component 22 for lifting and tilting the processed pipe fittings is fixed on the leftmost side of the support frame 4. The two groups of arc-shaped clamping blocks 20 are driven to approach each other by the clamping cylinder 19, thereby realizing the clamping and fixing of one end of the pipe, facilitating the transportation of the pipe, preventing shaking, and having good stability.

[0029] The transmission device 7 includes a mounting plate 8, a motor frame 9 and a drive motor 10, wherein the mounting plate 8 is fixed to an inner wall of one side of the support frame 4, the motor frame 9 is fixed to the top of the mounting plate 8 by screws, and a drive motor 10 is fixedly installed on one side of the motor frame 9, a coupling 11 is fixed to the outer side of the output end of the drive motor 10, and a transmission shaft 12 is fixed through the coupling 11, and the end of the transmission shaft 12 away from the coupling 11 passes through the side wall of the support frame 4 and extends outward, and is fixed with a driving pulley 13, and a transmission belt 14 is connected to the driving pulley 13 through the transmission belt 14. Pulley 15, one end of the transmission screw 6 is fixedly sleeved on the driven pulley 15, and the opposite sides of the two fixed blocks 5 are clamped with bearings 16, and the two ends of the transmission screw 6 are respectively rotatably connected in the inner ring of the bearing 16, and the transmission shaft 12 is driven by the driving motor 10 to rotate, and the transmission shaft 12 drives the active pulley 13 to rotate, and the active pulley 13 transmits power to the driven pulley 15 through the transmission belt 14, and the driven pulley 15 rotates, and the driven pulley 15 drives the transmission screw 6 to rotate, so that the rotation of the transmission screw 6 drives the sliding table 17 to slide on the slide rail 21, and drives the clamped pipe to be transported from left to right.

[0030] The lifting assembly 22 includes a lifting cylinder 23 and a connecting rod 24. The lifting cylinder 23 is fixed at the leftmost position of the support frame 4, and the connecting rod 24 is fixedly connected to the output end of the lifting cylinder 23. An arc bracket 25 is fixed to the top of the connecting rod 24. The initial position of the arc bracket 25 is flush with the horizontal position of the arc clamping block 20. When the pipe is transported to the front end of the unloading mechanism 2 under the cooperation of the above-mentioned transmission screw 6 and the transmission device 7, the transportation is stopped and the clamping constraint is released. The arc bracket 25 is driven to move upward by the lifting cylinder 23, so that the processed pipe is lifted and tilted by the arc bracket 25, so that it is in the same tilted state as the unloading mechanism 2.

[0031] The unloading mechanism 2 includes a base 27, a support rod 28, a blanking plate 29 and a side baffle 30. The support rod 28 is fixed at the four corners of the top of the base 27. The blanking plate 29 is fixedly connected to the base 27 through four support rods 28. The blanking plate 29 is inclined at 45 degrees to the horizontal plane. The side baffles 30 are symmetrically fixed on both sides of the top of the blanking plate 29, and blanking traction rollers 31 are rotatably connected between the two sides of the two side baffles 30 near the top. An infrared sensor 32 is fixedly installed on the inner side wall of one of the side baffles 30, and a bottom plate 35 is fixed at the bottom of each of the side baffles 30. A gap is left between the two bottom plates 35, and an arc-shaped transition plate 34 is fixedly connected to the lower end of the gap. The two side baffles 30 are fixed with a straightening component 33 for straightening the position of the processed pipe fittings that are about to pass through the gap at positions close to the bottom plates 35. The pipes slide downward through the blanking traction rollers 31 and the blanking plates 29 in turn. When they slide down and pass through the infrared sensor 32, the infrared sensor 32 detects whether there are pipes passing through. If there are pipes passing through, the straightening component 33 can be controlled by the control system to straighten the position of the processed pipe fittings that are about to enter the blanking device 3, thereby further improving the stability of pipe transportation.

[0032] The straightening assembly 33 includes a straightening cylinder 36, a push plate 37 and a rotating hinge 38. The straightening cylinder 36 is fixed to the outer wall of one side of the side baffle 30 by screws, and the output end of the straightening cylinder 36 slides through the side wall of the side baffle 30 and is fixedly connected to the push plate 37. One side of the push plate 37 is connected to the internal rotation of the side baffle 30 through the rotating hinge 38. The start and stop of the straightening cylinder 36 are electrically controlled by the infrared sensor 32. When the straightening cylinder 36 is started, it will drive the push plates 37 on both sides to rotate on the blanking plate 29, so that the push plates 37 are close to the surface of the pipe, thereby pushing the position of the pipe for straightening and adjustment.

[0033] The bottom of the push plate 37 and the top of the clamping mechanism 26 are parallel to each other, and the distance between the bottom of the push plate 37 and the top of the clamping mechanism 26 is five centimeters, so that the push plate 37 can rotate stably.

[0034] The blanking device 3 includes a blanking storage box 39, a storage rack 40 and a sponge pad 41. One side of the top of the blanking storage box 39 is in contact with the bottom of the arc-shaped transition plate 34. The storage rack 40 is movably arranged in the blanking storage box 39. The sponge pad 41 is fixed on the top of the storage rack 40, and a plurality of buffer mechanisms 42 for buffering and preventing collision of processed pipe fittings are symmetrically arranged at the bottom of the storage rack 40. After entering the blanking device 3, the pipe first passes through the sponge pad 41 to play a preliminary buffering role, and then the buffer mechanism 42 is used to buffer and prevent collision of the processed pipe fittings again.

[0035] The buffer mechanism 42 includes a rotating shaft 43 and a first gear 44. The rotating shaft 43 is rotatably connected between the inner walls of the blanking storage box 39. The first gear 44 is fixed to both ends of the rotating shaft 43. The two sides of the first gear 44 are respectively meshed with a double-headed gear rod 45 and a single-headed gear rod 48. The side of the double-headed gear rod 45 away from the first gear 44 is meshed with a second gear 49. The top of the double-headed gear rod 45 is fixedly connected to the storage rack 40. The bottom of the double-headed gear rod 45 is fixedly connected to a first telescopic column 46. A first buffer spring 47 is arranged around the outside of a telescopic column 46, and the two ends of the first buffer spring 47 are respectively fixed to the double-headed gear rod 45 and the blanking storage box 39, the bottom of the first telescopic column 46 is fixed to the blanking storage box 39, the bottom of the single-headed gear rod 48 is fixedly connected to the second telescopic column 50, the second telescopic column 50 is arranged around the outside of the second buffer spring 51, and the two ends of the second buffer spring 51 are respectively fixed to the single-headed gear rod 48 and the blanking storage box 39, the bottom of the second telescopic column 50 is fixed to the blanking storage box 39, and the second telescopic column 50 is fixed to the blanking storage box 39. When the pipe contacts the material storage box 39, the collision force generated will drive the material storage rack 40 to move downward, so that the double-headed gear rod 45 moves downward, squeezes the first telescopic column 46 and the first buffer spring 47 to shorten, and makes the first gear 44 on one side of the double-headed gear rod 45 mesh and rotate, driving the single-headed gear rod 48 meshing with the first gear 44 to move upward, further driving the extension of the second telescopic column 50 and the second buffer spring 51, and then the first buffer spring 47 and the second buffer spring 51 will have a reset effect, so that The single-headed toothed rod 48 moves downward under the action of the elastic recovery tension of the second buffer spring 51. At this time, the first gear 44 rotates in the opposite direction, so that the elastic recovery thrust of the first buffer spring 47 and the meshing action of the first gear 44 drive the double-headed toothed rod 45 to move upward, so that the storage rack 40 moves upward with the pipe. This is repeated to further reduce the collision mechanical energy of the pipe contacting the storage rack 40, reduce the outer surface of the pipe being damaged when entering the blanking device 3, greatly protect the pipe, and thus ensure the processing quality of the pipe.

[0036] In this solution, the driving motor 10 is preferably of model Y80M1-2, the power supply interface of the motor is connected to the power supply system through a switch, the motor operation circuit is a conventional motor forward and reverse control program, and the circuit operation is an existing conventional circuit. The circuits and controls involved in this solution are all existing technologies and will not be elaborated on here.

[0037] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0038] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A stable unloading device for a pipe punching machine, comprising a conveying mechanism (1), characterized in that: A discharge mechanism (2) is arranged on the right side of the conveying mechanism (1), and a blanking device (3) is arranged at the bottom of the discharge end of the discharge mechanism (2). The conveying mechanism (1) comprises a support frame (4), a fixed block (5), a transmission screw (6), and a transmission device (7). The fixed block (5) is fixed to the two ends of the top of the support frame (4), and the transmission screw (6) is rotatably connected between the opposite sides of the two fixed blocks (5). The transmission device (7) is fixed to one side of the support frame (4) and is transmission-connected to the transmission screw (6). A clamping mechanism (26) for conveying and clamping the processed pipe fittings is also arranged on the transmission screw (6). The blanking device (3) comprises a blanking storage box (39), a storage rack (40), and a sponge pad ( 41), one side of the top of the blanking storage box (39) is in contact with the bottom of the arc-shaped transition plate (34), the storage rack (40) is movably arranged in the blanking storage box (39), the sponge pad (41) is fixed on the top of the storage rack (40), and the bottom of the storage rack (40) is symmetrically provided with a plurality of buffer mechanisms (42) for buffering and preventing collision of the processed pipe fittings, the buffer mechanism (42) comprising a rotating shaft (43) and a first gear (44), the rotating shaft (43) is rotatably connected between the inner walls of the blanking storage box (39), the first gear (44) is fixed at both ends of the rotating shaft (43), and the two sides of the first gear (44) are respectively meshed and connected with a double-headed gear rod (45) and a single-headed gear rod (48), the double-headed gear rod The side of the double-headed gear rod (45) away from the first gear (44) is meshedly connected with a second gear (49), the top of the double-headed gear rod (45) is fixedly connected to the material storage rack (40), the bottom of the double-headed gear rod (45) is fixedly connected to a first telescopic column (46), the first telescopic column (46) is surrounded by a first buffer spring (47), and the two ends of the first buffer spring (47) are respectively fixed to the double-headed gear rod (45) and the blanking storage box (39), the bottom of the first telescopic column (46) is fixed on the blanking storage box (39), the bottom of the single-headed gear rod (48) is fixedly connected to a second telescopic column (50), the second telescopic column (50) is surrounded by a second buffer spring (51), and the second buffer spring (51) The two ends are respectively fixed to the single-head gear rod (48) and the blanking storage box (39), the bottom of the second telescopic column (50) is fixed on the blanking storage box (39), the clamping mechanism (26) comprises a sliding table (17) and a mounting frame (18), the sliding table (17) is threadedly connected to the transmission screw (6), the mounting frame (18) is fixed to the top of the sliding table (17) by screws, the mounting frame (18) is provided with two groups, and the two groups of mounting frames (18) are symmetrically distributed about the central axis plane of the sliding table (17), and the two groups of mounting frames (18) are fixedly installed with a clamping cylinder (19) on the side away from each other, the output end of the clamping cylinder (19) passes through the middle part of the mounting frame (18) and is fixedly connected with an arc-shaped clamping block (20),Slide rails (21) are symmetrically fixed on both sides of the top of the fixed block (5); the two ends of the sliding table (17) are slidably connected in the slide rails (21); a lifting assembly (22) for lifting and tilting the processed pipe fitting is fixed on the leftmost side of the support frame (4); the transmission device (7) comprises a mounting plate (8), a motor frame (9) and a drive motor (10); the mounting plate (8) is fixed to an inner wall of one side of the support frame (4); the motor frame (9) is fixed to the top of the mounting plate (8) by screws; the drive motor (10) is fixedly installed on one side of the motor frame (9); a coupling (11) is fixed to the outer side of the output end of the drive motor (10); and a transmission shaft (12) is fixed through the coupling (11); the transmission One end of the shaft (12) away from the coupling (11) passes through the side wall of the support frame (4) and extends outward, and is fixed with a driving pulley (13). The driving pulley (13) is connected to a transmission belt (14) and is connected to a driven pulley (15) through the transmission belt (14). One end of the transmission screw (6) is fixedly sleeved on the driven pulley (15), and the two fixed blocks (5) are clamped with bearings (16) on opposite sides. The two ends of the transmission screw (6) are respectively rotatably connected to the inner ring of the bearing (16). The lifting assembly (22) includes a lifting cylinder (23) and a connecting rod (24). The lifting cylinder (23) is fixed at the leftmost position of the support frame (4), and the connecting rod (24) is connected to the lifting cylinder (23). The output end of the connecting rod (24) is fixedly connected, an arc bracket (25) is fixed on the top of the connecting rod (24), the initial position of the arc bracket (25) is flush with the horizontal position of the arc clamping block (20), the unloading mechanism (2) comprises a base (27), a support rod (28), a blanking plate (29) and a side baffle (30), the support rod (28) is fixed at the four corners of the top of the base (27), the blanking plate (29) is fixedly connected to the base (27) through the four support rods (28), the blanking plate (29) is inclined at 45 degrees to the horizontal plane, the side baffles (30) are symmetrically fixed on both sides of the top of the blanking plate (29), and a blanking traction roller (31) is rotatably connected between the two sides of the two side baffles (30) close to the top. ), an infrared sensor (32) is fixedly mounted on the inner wall of one of the side baffles (30), a bottom plate (35) is fixedly mounted on the bottom of each of the side baffles (30), a gap is left between the two bottom plates (35), and an arc-shaped transition plate (34) is fixedly connected to the lower end of the gap, and a squaring assembly (33) for squaring the position of a processed pipe fitting that is about to pass through the gap is fixedly mounted at a position close to the bottom plate (35) of the two side baffles (30), the squaring assembly (33) comprising a squaring cylinder (36), a push plate (37) and a rotating hinge (38), the squaring cylinder (36) is fixedly mounted on the outer wall of one side of the side baffle (30) by screws, and the output end of the squaring cylinder (36) slides through the side wall of the side baffle (30),The push plate (37) is fixedly connected to the push plate (37), and one side of the push plate (37) is rotatably connected to the inside of the side baffle (30) via a swivel hinge (38).

2. A stable unloading device for a pipe punching machine according to claim 1, characterized in that: The bottom of the push plate (37) and the top of the clamping mechanism (26) are parallel to each other, and the distance between the bottom of the push plate (37) and the top of the clamping mechanism (26) is five centimeters.

Citation Information

Patent Citations

  • Water-cycle full-automatic dining utensil washing machine

    CN110786807A

  • Steel pipe discharge apparatus that punches

    CN206981530U