Cage formwork assembly integral vertical main structure and construction method thereof
By assembling the cage mold, the integrated vertical body structure is used to fix the steel bar parts by using the clamping device and the tight top part, and combining the integrated production of the formwork, the problem of time occupied by traditional formwork and steel bar projects is solved, and the production of prefabricated parts with low production costs and high working efficiency is achieved.
Patent Information
- Application Number
- CN202110060227.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-01-15
- Publication Date
- 2025-04-08
- Estimated Expiration
- 2041-01-15
AI Technical Summary
Existing formwork and steel bar projects take up a lot of time in house construction, and traditional prefabricated components are inefficient in production, making it difficult to achieve industrial assembly line production.
The cage mold is used to assemble the integral vertical main structure. Through the first clamping device and the second clamping device, the steel bar parts are fixed by tight top members without binding. It is integrated with the template and the steel bar parts to form a self-balancing cage mold prefabricated part.
It reduces production costs and construction costs, improves work efficiency, reduces construction time, avoids displacement and deformation during traditional binding process, and realizes the industrial production of prefabricated parts.
Smart Images

Figure CN112776139B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building engineering, and in particular to a cage-form assembly integral vertical main structure and a construction method thereof. Background Art
[0002] Formwork and reinforcement engineering are two crucial sub-projects in the main building project. Relevant research has measured the construction time of relevant sub-projects in the standard layer of residential construction projects, and found that the time spent on formwork and reinforcement engineering accounts for the largest proportion, and the combined time of the two accounts for about 50-70% of the construction time of a standard layer. And the larger the amount of reinforcement engineering (high-density reinforcement), the more important this link is, but in actual engineering, the project schedule cannot allow any time to be wasted. These two time periods can be targeted for technical optimization. For example, the current main push for formed reinforcement technology in reinforcement engineering can better solve the problem of time-consuming on-site production of traditional reinforcement, but it is limited by factors such as equipment manufacturing, transportation and storage.
[0003] In recent years, many new prefabricated building technology systems have emerged in China, such as "core-cast prefabricated concrete shear wall structure technology", "form-free assembly integrated reinforced concrete structure system" and "SPCS fully prefabricated building system". The common technical features they have can be simply summarized as: cavity, connector and cast-in-place. Taking the above-mentioned "form-free assembly integrated reinforced concrete structure system (PI system)" as the narrative object, from the perspective of its component production process, a single prefabricated component generally requires flipping, pouring, equal strength, and demolding. The production efficiency is very low, which is not conducive to industrial assembly line production, and its component price is not lower than that of general prefabricated components. Similarly, the application of PI cage molds in engineering is also difficult to avoid the dilemma encountered by the current prefabricated building technology. Summary of the invention
[0004] The first object of the present invention is to provide a cage mold assembly integral vertical main structure with low production cost, low difficulty in prefabricated parts production and improved work efficiency.
[0005] The second object of the present invention is to provide a construction method for a cage-form assembled integral vertical main structure with low construction cost and high work efficiency.
[0006] To achieve the above-mentioned first purpose, the present invention provides a cage mold assembled integral vertical main structure, including a first clamping device, a second clamping device, a steel bar and a template, the first clamping device and the second clamping device are arranged at intervals, the first clamping device is provided with a plurality of first plug holes along the circumferential direction, the second clamping device is provided with a plurality of second plug holes corresponding to the first plug holes along the circumferential direction, and a plurality of the steel bars are inserted into the first plug holes and the second plug holes; the first clamping device is provided with a plurality of first tightening members, the first tightening members can tighten or loosen the steel bar located in the first plug hole, the second clamping device is provided with a plurality of second tightening members, the second tightening members can tighten or loosen the steel bar located in the second plug hole; the template is sleeved on the outside of each of the steel bars, and the template is connected between the first clamping device and the second clamping device.
[0007] Compared with the prior art, the cage mold assembly integral vertical main structure of the present invention combines the template and the steel bar into a whole, which can be integrated in the factory (nomadic production) to become a self-balancing cage mold prefabricated part, realizing the transformation of the harsh construction environment (construction work surface) of traditional column steel bar binding to the indoor environment, and the prefabricated parts are easy to produce, and the industrialized production of prefabricated parts can be realized, which reduces production costs, reduces on-site labor input, and reduces construction time; the present invention utilizes a first clamp device and a second clamp device, and adopts a first tight top member and a second tight top member to tightly fix on the steel bar, without binding, thereby improving work efficiency and avoiding the displacement, deformation, distortion, dislocation, and falling off problems that occur during the lifting process of the traditional binding steel bar skeleton.
[0008] Preferably, the first clamping device includes a first outer frame member and a first inner frame member, the first outer frame member has a plurality of first outer half holes, the first inner frame member has a plurality of first inner half holes, the first outer frame member and the first inner frame member are detachably connected, the first outer frame member is located on the outer side of the first inner frame member, the first outer half hole and the first inner half hole are spliced to form the first insertion hole, and the first tight-pressing member is movably inserted on the first outer frame member; the first tight-pressing member is moved to extend into or withdraw from the first insertion hole to tighten or loosen the steel bar member located in the first insertion hole.
[0009] Preferably, the first outer frame member includes a first outer module, and a plurality of the first outer modules are spliced together to form a first outer frame structure. The first inner frame member includes a first inner module, and a plurality of the first inner modules are spliced together to form a first inner frame structure. The first outer module is detachably connected to the first inner module.
[0010] Preferably, a first locking member is provided between the first outer module and the first inner module, and the first outer module and the first inner module are locked or released by the first locking member to fix or disassemble the first outer module and the first inner module.
[0011] Preferably, the first outer module is in a U-shaped structure, two of the first outer modules are spliced together to form the first outer frame structure, and the first inner module is in a block structure, four of the first inner modules are spliced together in sequence to form the first inner frame structure.
[0012] Preferably, the first outer frame member is provided with a first groove, and the template is inserted into the first groove.
[0013] Preferably, the second clamping device includes a second outer frame member and a second inner frame member, the second outer frame member has a plurality of second outer half holes, the second inner frame member has a plurality of second inner half holes, the second outer frame member and the second inner frame member are detachably connected, the second outer frame member is located on the outer side of the second inner frame member, the second outer half hole and the second inner half hole are spliced to form the second insertion hole, and the second tight top member is movably inserted on the second outer frame member; the second tight top member is moved to extend into or withdraw from the second insertion hole to tight or loosen the steel bar member located in the second insertion hole.
[0014] Preferably, the second outer frame member includes a second outer module, and a plurality of the second outer modules are spliced together to form a second outer frame structure. The second inner frame member includes a second inner module, and a plurality of the second inner modules are spliced together to form a second inner frame structure. The second outer module is detachably connected to the second inner module.
[0015] Preferably, a second locking member is provided between the second outer module and the second inner module, and the second outer module and the second inner module are locked or released by the second locking member to fix or disassemble the second outer module and the second inner module.
[0016] Preferably, the second outer module is in a U-shaped structure, two of the second outer modules are spliced together to form the second outer frame structure, and the second inner module is in a block structure, four of the second inner modules are spliced together in sequence to form the second inner frame structure.
[0017] Preferably, a second groove is provided on the second outer frame member, and the template is inserted into the second groove.
[0018] Preferably, the second clamp device is provided with a lifting lug.
[0019] Preferably, the template is a FRP plate.
[0020] Preferably, the cage mold assembly integral vertical main structure also includes a steel bar seat, and one end of the steel bar member abuts against the steel bar seat.
[0021] Preferably, a plurality of protrusions are convexly provided on the upper surface of the steel bar seat, and each of the steel bar members abuts against the protrusions or the upper surface of the steel bar seat in a staggered manner.
[0022] Preferably, the cage-form assembled integral vertical main structure further includes stirrups, a plurality of stirrups are tied to the outside of the steel bar along the length direction of the steel bar, and the formwork is arranged around the outside of the stirrups.
[0023] Preferably, a plurality of protective layer pads are provided on the reinforcement member.
[0024] To achieve the above-mentioned second purpose, the present invention provides a construction method for an integral vertical main structure assembled with a cage formwork, comprising the following steps: (1) providing a first clamp device, a second clamp device and a steel bar, wherein the first clamp device has a plurality of first insertion holes along the circumferential direction, and the second clamp device has a plurality of second insertion holes corresponding to the first insertion holes along the circumferential direction, and inserting a plurality of the steel bars into the first insertion holes and the second insertion holes; (2) arranging a plurality of first tight top pieces on the first clamp device, and arranging a plurality of second tight top pieces on the second clamp device, and tightly pressing the first tight top pieces against the steel bars in the first insertion holes; (3) removing the second clamp device from the steel bar, sleeve the template on the outside of the steel bar, and then tightening the second clamp device through the mold. The second plug is inserted onto the steel bar, the second clamp is pressed against the steel bar in the second plug, and the template is positioned between the first clamp device and the second clamp device, thereby forming a cage-form assembled integral vertical main structure; (4) the cage-form assembled integral vertical main structure is hoisted to the steel bar joint reserved on the construction work surface, and the cage-form assembled integral vertical main structure and the steel bar joint are connected by steel bar tying or straight threading in the longitudinal direction; (5) the first clamp is driven to loosen the steel bar, the first clamp device is removed, the template is dropped onto the construction work surface, the second clamp is driven to loosen the steel bar, and the second clamp device is removed; (6) the contact between the template and the construction work surface is sealed with mortar.
[0025] Compared with the prior art, the construction method of the cage-form assembled integral vertical main structure of the present invention combines the template and the steel bar into a whole, which can be integrated in the factory (nomadic production) to become a self-balancing cage-form prefabricated part, realizing the transformation of the harsh construction environment (construction work surface) of the traditional column steel bar binding to the indoor environment, and the prefabricated parts have low production difficulty, which can realize the industrialized production of prefabricated parts, reduce production costs and construction costs, reduce on-site labor input, and shorten construction time; the present invention utilizes a first clamp device and a second clamp device, and adopts a first tight top member and a second tight top member to tightly fix on the steel bar, without binding, thereby improving work efficiency and avoiding the problems of displacement, deformation, distortion, dislocation, and falling off in the lifting process of the traditional binding steel bar skeleton.
[0026] Preferably, in the step (1), a steel bar seat is provided, the upper surface of which is provided with a plurality of protrusions, and each of the steel bars is staggeredly pressed against the protrusions or the upper surface of the steel bar seat.
[0027] Preferably, in the step (2), stirrups are tied to the steel bar along the length direction of the steel bar.
[0028] Preferably, in the step (2), a protective layer pad is provided on the steel bar.
[0029] Preferably, in step (1), the first hoop device comprises a first outer frame member and a first inner frame member, the first outer frame member has a plurality of first outer half holes, the first inner frame member has a plurality of first inner half holes, the first outer frame member and the first inner frame member are detachably connected so that the first outer half hole and the first inner half hole are spliced to form the first plug hole, and the second hoop device comprises a second outer frame member and a second inner frame member, the second outer frame member has a plurality of second outer half holes, the second inner frame member has a plurality of second inner half holes, the second outer frame member and the second inner frame member are detachably connected The first outer half hole and the second inner half hole are connected so that the second outer half hole is spliced with each other to form the second insertion hole; in step (2), the first tight top piece is movably inserted on the first outer frame piece so that the first tight top piece can be extended into or withdrawn from the first insertion hole, and the second tight top piece is movably inserted on the second outer frame piece so that the second tight top piece can be extended into or withdrawn from the second insertion hole; in step (5), the first outer frame piece and the first inner frame piece are disassembled to remove the first clamping device, and the second outer frame piece and the second inner frame piece are disassembled to remove the second clamping device.
[0030] Preferably, in step (1), the first outer frame member includes a first outer module, and a plurality of the first outer modules are spliced together to form a first outer frame structure; the first inner frame member includes a first inner module, and a plurality of the first inner modules are spliced together to form a first inner frame structure; the first outer module and the first inner module are locked together by a first locking member; in step (5), the first outer module and the first inner module are unlocked by the first locking member, thereby removing the first outer frame member and the first inner frame member.
[0031] Preferably, in step (1), the second outer frame member includes a second outer module, and a plurality of the second outer modules are spliced together to form a second outer frame structure; the second inner frame member includes a second inner module, and a plurality of the second inner modules are spliced together to form a second inner frame structure; the second outer module and the second inner module are locked together by a second locking member; in step (5), the second outer module and the second inner module are unlocked by the second locking member, thereby removing the second outer frame member and the second inner frame member.
[0032] Preferably, in step (1), a first groove is provided on the first outer frame member, and a second groove is provided on the second outer frame member; in step (3), the two ends of the template are respectively inserted into the first groove and the second groove to nest and fix the template.
[0033] Preferably, in step (6), a support frame is provided at the bottom of the template.
[0034] Preferably, in step (6), column bases are provided around the template, a kit is sleeved on the template, and support rods are connected between the column base and the kit.
[0035] Preferably, the method further comprises step (7), repeating steps (4) to (6). BRIEF DESCRIPTION OF THE DRAWINGS
[0036] Figure 1 It is a three-dimensional structural schematic diagram of the cage mold assembly integral vertical main structure of the present invention.
[0037] Figure 2 It is a structural schematic diagram of the first clamp device of the present invention.
[0038] Figure 3 It is an exploded view of the first clamp device of the present invention.
[0039] Figure 4 It is a structural schematic diagram of the second clamp device of the present invention.
[0040] Figure 5yes Figure 4 The exploded view of the second clamp device after being turned upside down is shown.
[0041] Figure 6 It is a structural schematic diagram of the reinforcement member of the present invention.
[0042] Figure 7 It is a structural schematic diagram of a steel bar seat of the present invention.
[0043] Figure 8 It is a structural schematic diagram when the cage formwork assembly integral vertical main structure of the present invention is hoisted to a steel bar joint.
[0044] Fig. 9 It is a structural schematic diagram after the cage formwork assembly integral vertical main structure of the present invention is connected to the steel bar joint.
[0045] Fig.10 It is a schematic diagram of the structure after the contact between the formwork and the construction working surface is sealed and supported. DETAILED DESCRIPTION
[0046] In order to explain the technical content and structural features of the present invention in detail, further description will be given below in combination with the implementation modes and the accompanying drawings.
[0047] See also Figure 1 , Figure 2 and Figure 4 The cage-form assembly integral vertical main structure 100 of the present invention comprises a first clamp device 1, a second clamp device 2, a steel bar 3 and a template 4. The first clamp device 1 and the second clamp device 2 are arranged at intervals. The first clamp device 1 is provided with a plurality of first plug holes 14 along the circumferential direction, and the second clamp device 2 is provided with a plurality of second plug holes 24 corresponding to the first plug holes 14 along the circumferential direction. A plurality of steel bars 3 are inserted into the first plug holes 14 and the second plug holes 24; the first clamp device 1 is provided with a plurality of first tightening members 11, which can tighten or loosen the steel bar 3 in the first plug holes 14, and the second clamp device 2 is provided with a plurality of second tightening members 21, which can tighten or loosen the steel bar 3 in the second plug holes 24; the template 4 is sleeved on the outside of each steel bar 3, and the template 4 is connected between the first clamp device 1 and the second clamp device 2. In this embodiment, the template 4 is an FRP plate. The template 4 is made of FRP material (fiber reinforced composite material), so that the template 4 (rectangular or circular cross section) of the vertical structure has a strong self-balancing ability to bear force, and avoids the phenomenon of template 4 bursting due to the lateral pressure of the concrete pouring of the vertical component; and the template 4 itself is a hollow closed structure, and the plastic concrete will not leak out of the template 4. However, the material of the template 4 is not limited to this.
[0048] See also Figure 2 and Figure 3The first clamp device 1 includes a first outer frame member 12 and a first inner frame member 13. The first outer frame member 12 has a plurality of first outer half holes 141, and the first inner frame member 13 has a plurality of first inner half holes 142. The first outer frame member 12 is detachably connected to the first inner frame member 13. The first outer half hole 141 and the first inner half hole 142 are spliced to form a first plug hole 14. The first tight top member 11 is movably inserted into the first outer frame member 12; the first tight top member 11 is moved to extend into or withdraw from the first plug hole 14 to tighten or loosen the steel bar member 3 located in the first plug hole 14. Specifically, the first outer frame member 12 includes a first outer module 121, and a plurality of first outer modules 121 are spliced to form a first outer frame structure. The first inner frame member 13 includes a first inner module 131, and a plurality of first inner modules 131 are spliced to form a first inner frame structure. The first outer module 121 and the first inner module 131 are detachably connected. More specifically, a first locking member 15 is provided between the first outer module 121 and the first inner module 131, and the first outer module 121 and the first inner module 131 are locked or unlocked by the first locking member 15, so as to fix or disassemble the first outer module 121 and the first inner module 131. The first locking member 15 can adopt an existing bolt structure, but is not limited thereto.
[0049] Please continue reading Figure 2 and Figure 3 In this embodiment, the first outer module 121 is a U-shaped structure, two first outer modules 121 are spliced to form a first outer frame structure, and the first inner module 131 is a block structure, and four first inner modules 131 are spliced in sequence to form a first inner frame structure. However, the structure of the first outer module 121 and the first inner module 131 is not limited to this. Further, the first outer frame member 12 is provided with a first groove 122, and the template 4 is inserted into the first groove 122, so as to position the template 4. Specifically, the first groove 122 is provided on the first outer module 121, but it is not limited to this.
[0050] See also Figure 4 and Figure 5The second clamping device 2 includes a second outer frame member 22 and a second inner frame member 23. The second outer frame member 22 has a plurality of second outer half holes 241, and the second inner frame member 23 has a plurality of second inner half holes 242. The second outer frame member 22 is detachably connected to the second inner frame member 23. The second outer half hole 241 and the second inner half hole 242 are spliced to form a second plug hole 24. The second tight top member 21 is movably inserted into the second outer frame member 22; the second tight top member 21 is moved to extend into or withdraw from the second plug hole 24 to tighten or loosen the steel bar member 3 located in the second plug hole 24. Specifically, the second outer frame member 22 includes a second outer module 221, and a plurality of second outer modules 221 are spliced to form a second outer frame structure. The second inner frame member 23 includes a second inner module 231, and a plurality of second inner modules 231 are spliced to form a second inner frame structure. The second outer module 221 and the second inner module 231 are detachably connected. More specifically, a second locking member 25 is provided between the second outer module 221 and the second inner module 231, and the second outer module 221 and the second inner module 231 are locked or unlocked by the second locking member 25, so as to fix or disassemble the second outer module 221 and the second inner module 231. The second locking member 25 can adopt an existing bolt structure, but is not limited thereto.
[0051] Please continue reading Figure 4 and Figure 5 In this embodiment, the second outer module 221 is a U-shaped structure, two second outer modules 221 are spliced to form a second outer frame structure, and the second inner module 231 is a block structure, and four second inner modules 231 are spliced in sequence to form a second inner frame structure. Further, the second outer frame member 22 is provided with a second groove 222, and the template 4 is inserted into the second groove 222, so as to position the template 4. Specifically, the second groove 222 is provided on the second outer module 221, but it is not limited thereto.
[0052] See also Figure 4 The second clamp device 2 is provided with a lifting lug 26. The cage mold assembly integral vertical main structure 100 of the present invention can be conveniently lifted up by the lifting lug 26. Specifically, the lifting lug 26 is provided on the second outer module 221, and the number of the lifting lug 26 is four, but not limited thereto.
[0053] See also Figure 1 and Figure 7The cage mold assembly integral vertical main body structure 100 of the present invention further includes a steel bar seat 5, and one end of the steel bar member 3 abuts against the steel bar seat 5. Specifically, the upper surface 52 of the steel bar seat 5 is provided with a plurality of protrusions 51, and each steel bar member 3 abuts against the protrusion 51 or the upper surface 52 of the steel bar seat 5 in a staggered manner. By providing the steel bar seat 5, the adjacent longitudinal steel bars 3 are staggered to meet the requirements of the area percentage of the adjacent vertical steel bar joints 201.
[0054] See also Figure 6 The cage-form assembly integral vertical main structure 100 of the present invention further includes stirrups 6, a plurality of stirrups 6 are tied to the outside of the reinforcement member 3 along the length direction of the reinforcement member 3, and the template 4 is arranged around the outside of the stirrups 6. A plurality of protective layer pads 7 are also arranged on the reinforcement member 3. By arranging the stirrups 6 and the protective layer pads 7 on the reinforcement member 3, a shaped reinforcement skeleton is formed, and the thickness of the protective layer of the cage-form assembly integral vertical main structure 100 can be controlled.
[0055] See also Figures 1 to 10 In one embodiment, the construction method of the cage mold assembly integral vertical main structure 100 of the present invention includes the following steps:
[0056] S11, providing a first clamp device 1, a second clamp device 2 and a reinforcement member 3, wherein the first clamp device 1 has a plurality of first insertion holes 14 along the circumferential direction, and the second clamp device 2 has a plurality of second insertion holes 24 corresponding to the first insertion holes 14 along the circumferential direction, and inserting a plurality of reinforcement members 3 into the first insertion holes 14 and the second insertion holes 24;
[0057] S12, a plurality of first pressing members 11 are arranged on the first clamp device 1, and a plurality of second pressing members 21 are arranged on the second clamp device 2, and the first pressing members 11 are pressed tightly against the reinforcing bar 3 located in the first insertion hole 14;
[0058] S13, pull the second clamp device 2 off the steel bar 3, sleeve the template 4 on the outside of the steel bar 3, and then sleeve the second clamp device 2 on the steel bar 3 through the second insertion hole 24, press the second tight-pressing member 21 against the steel bar 3 in the second insertion hole 24, and position the template 4 between the first clamp device 1 and the second clamp device 2, so as to form a cage-form assembly integral vertical main structure 100;
[0059] S14, hoisting the cage-form assembled integral vertical main structure 100 to the steel bar joint 201 reserved on the construction work surface, and tying or straight-threading the steel bars of the cage-form assembled integral vertical main structure 100 and the steel bar joint 201 in the longitudinal direction;
[0060] S15, driving the first top tightening member 11 to loosen the steel bar 3, removing the first clamping device 1, placing the template 4 on the construction work surface, driving the second top tightening member 21 to loosen the steel bar 3, and removing the second clamping device 2;
[0061] S16, performing mortar sealing treatment at the contact point between the template 4 and the construction working surface.
[0062] Among them, in the above S13, the template 4 adopts FRP plate, but it is not limited to this.
[0063] See also Figures 1 to 10 In another embodiment, the construction method of the cage mold assembly integral vertical main structure 100 of the present invention comprises the following steps:
[0064] S21, providing a first clamp device 1, a second clamp device 2 and a steel bar 3, wherein the first clamp device 1 has a plurality of first insertion holes 14 along the circumferential direction, and the second clamp device 2 has a plurality of second insertion holes 24 corresponding to the first insertion holes 14 along the circumferential direction, and inserting a plurality of steel bars 3 into the first insertion holes 14 and the second insertion holes 24; providing a steel bar seat 5, wherein a plurality of protrusions 51 are protruding from an upper surface 52 of the steel bar seat 5, and each steel bar 3 is staggeredly pressed against the protrusions 51 or the upper surface 52 of the steel bar seat 5 to meet a certain joint rate;
[0065] S22, a plurality of first pressing members 11 are arranged on the first clamp device 1, and a plurality of second pressing members 21 are arranged on the second clamp device 2, and the first pressing members 11 are pressed tightly against the steel bar 3 located in the first insertion hole 14; stirrups 6 are tied to the steel bar 3 along the length direction of the steel bar 3, and protective layer pads 7 are arranged on the steel bar 3, so as to form a formed steel bar skeleton;
[0066] S23, pull the second clamp device 2 off the steel bar 3, sleeve the template 4 on the outside of the steel bar 3, and then sleeve the second clamp device 2 on the steel bar 3 through the second insertion hole 24, press the second tight-pressing member 21 against the steel bar 3 in the second insertion hole 24, and position the template 4 between the first clamp device 1 and the second clamp device 2, so as to form a cage-form assembly integral vertical main structure 100;
[0067] S24, hoisting the cage-form assembled integral vertical main structure 100 to the steel bar joint 201 reserved on the construction work surface, and tying or straight-threading the steel bars of the cage-form assembled integral vertical main structure 100 and the steel bar joint 201 in the longitudinal direction;
[0068] S25, driving the first top tightening member 11 to loosen the steel bar 3, removing the first clamping device 1, placing the template 4 on the construction work surface, driving the second top tightening member 21 to loosen the steel bar 3, and removing the second clamping device 2;
[0069] S26, performing mortar sealing treatment at the contact point between the template 4 and the construction working surface.
[0070] Among them, in the above S23, the template 4 adopts FRP plate, but it is not limited to this.
[0071] See also Figures 1 to 10 In another embodiment, the construction method of the cage formwork assembly integral vertical main structure 100 of the present invention comprises the following steps:
[0072] S31, providing a first clamp device 1, a second clamp device 2 and a steel bar 3, the first clamp device 1 comprising a first outer frame member 12 and a first inner frame member 13, the first outer frame member 12 having a plurality of first outer half holes 141, the first inner frame member 13 having a plurality of first inner half holes 142, the first outer frame member 12 and the first inner frame member 13 being detachably connected so that the first outer half holes 141 and the first inner half holes 142 are spliced to form a first plug hole 14, and a first groove 122 is provided on the first outer frame member 12; the second clamp device 2 comprising a second outer frame member 22 and a second inner frame member 23, the second outer frame member 22 The second outer frame member 22 has a plurality of second inner half holes 241, and the second inner frame member 23 has a plurality of second inner half holes 242. The second outer frame member 22 is detachably connected with the second inner frame member 23, so that the second outer half hole 241 and the second inner half hole 242 are spliced to form a second insertion hole 24, and a second groove 222 is provided on the second outer frame member 22; a plurality of steel bars 3 are inserted into the first insertion hole 14 and the second insertion hole 24; a steel bar seat 5 is provided, and a plurality of protrusions 51 are convexly provided on the upper surface 52 of the steel bar seat 5, and each steel bar 3 is staggeredly pressed against the protrusion 51 or the upper surface 52 of the steel bar seat 5 to meet a certain joint rate;
[0073] S32, insert the first top member 11 movably on the first outer frame member 12 so that the first top member 11 can be inserted into or withdrawn from the first insertion hole 14, insert the second top member 21 movably on the second outer frame member 22 so that the second top member 21 can be inserted into or withdrawn from the second insertion hole 24, and the first top member 11 is pressed tightly against the steel bar 3 located in the first insertion hole 14; tie the stirrups 6 to the steel bar 3 along the length direction of the steel bar 3, and set the protective layer pad 7 on the steel bar 3, so as to form a formed steel bar skeleton;
[0074] S33, pull the second clamp device 2 off the steel bar 3, sleeve the template 4 on the outside of the steel bar 3, and then sleeve the second clamp device 2 on the steel bar 3 through the second insertion hole 24, insert the two ends of the template 4 into the first groove 122 and the second groove 222 respectively, so as to nest and fix the template 4; press the second tight-pressing member 21 against the steel bar 3 in the second insertion hole 24, so as to form a cage-form assembly integral vertical main structure 100;
[0075] S34, hoisting the cage-form assembled integral vertical main structure 100 to the steel bar joint 201 reserved on the construction work surface, and tying or straight-threading the steel bars of the cage-form assembled integral vertical main structure 100 and the steel bar joint 201 in the longitudinal direction;
[0076] S35, driving the first top tight member 11 to loosen the steel bar member 3, dismantling the first outer frame member 12 and the first inner frame member 13, so as to remove the first clamp device 1; placing the template 4 on the construction work surface; driving the second top tight member 21 to loosen the steel bar member 3, dismantling the second outer frame member 22 and the second inner frame member 23, so as to remove the second clamp device 2;
[0077] S36, performing mortar sealing treatment at the contact point between the template 4 and the construction work surface, setting a support frame 202 at the bottom of the template 4, setting a column base 203 around the template 4, setting a set 204 on the template 4, and connecting a support rod 205 between the column base 203 and the set 204;
[0078] S37, repeat S34 to S36.
[0079] Specifically, in S31, the first outer frame member 12 includes a first outer module 121, and a plurality of first outer modules 121 are spliced together to form a first outer frame structure. The first inner frame member 13 includes a first inner module 131, and a plurality of first inner modules 131 are spliced together to form a first inner frame structure. The first outer module 121 and the first inner module 131 are locked together by a first locking member 15. The second outer frame member 22 includes a second outer module 221, and a plurality of second outer modules 221 are spliced together to form a second outer frame structure. The second inner frame member 23 includes a second inner module 231, and a plurality of second inner modules 231 are spliced together to form a second inner frame structure. The second outer module 221 and the second inner module 231 are locked together by a second locking member 25. In the above S33, the template 4 adopts an FRP plate, but is not limited thereto. In S35, the first outer module 121 and the first inner module 131 are unlocked by the first locking member 15, so that the first outer frame member 12 and the first inner frame member 13 are disassembled; the second outer module 221 and the second inner module 231 are unlocked by the second locking member 25, so that the second outer frame member 22 and the second inner frame member 23 are disassembled.
[0080] In summary, first, the cage mold assembly integral vertical main structure 100 of the present invention combines the template 4 and the steel bar 3 into a whole, which can be integrated in the factory (nomadic production) to become a self-balancing column cage mold prefabricated part, realizing the transformation of the traditional column steel bar binding harsh construction environment (construction work surface) to the indoor environment, and the prefabricated parts are easy to produce, which can realize the industrialized production of prefabricated parts, reduce production costs, reduce on-site labor input, and reduce construction time. Second, the present invention utilizes the first clamp device 1 and the second clamp device 2, and adopts the first tight top member 11 and the second tight top member 21 to tightly fix on the steel bar 3, without binding, which improves work efficiency and avoids the displacement, deformation, distortion, dislocation, and falling off problems that occur during the lifting process of the traditional binding steel bar skeleton. Third, the formed cage mold prefabricated part can improve the quality of the project, and the clamps and plastic pads provided make the steel bar spacing of the cage mold prefabricated part and the thickness of the protective layer between the steel bar and the template 4 achieve unified specifications. Fourth, the formed cage form prefabricated parts are transported to the construction site and hoisted. The weight of the components is only about 1 / 8 of the current solid components of precast concrete columns. They have high strength and can be installed quickly. Fifth, the concrete is poured at one time. The integrated cage form prefabricated parts form a self-balancing and stable system to bear the construction load, which greatly simplifies the support construction. The integrity and connection safety are completely consistent with the traditional cast-in-place structure, which is equivalent to the cast-in-place structure. It has the characteristics of no building formwork 4 and no construction waste. At the same time, it has good compatibility with concrete and will not affect the structure. Sixth, the formwork 4 uses FRP plates that can greatly improve the strength of reinforced concrete components. After the construction is completed, they are not removed and become one with the main structure. The exterior facades of the FRP column cage formwork system are all smooth glass fiber reinforced plastic walls (can be treated with paraffin or gel coat), and the surface flatness effect is good (the paint adhesion is poor, but thin stickers or veneer cavity wrapping can solve the exterior decoration problem). Seventh, the combination of FRP and steel-concrete structure can greatly improve the bearing capacity of the structure. Therefore, the design cross-section of its components will be greatly reduced and the cost of traditional formwork 4 will be reduced. In general, the total cost is easy to be accepted by the construction party. Eighth, the FRP cage formwork system solves the important problem of the difficulty in obtaining the evaluation score of vertical components in the evaluation standards for prefabricated buildings, and meets the requirements of the evaluation guidelines for prefabricated buildings. Ninth, the FRP column cage formwork system is bold, especially for construction, which solves the two major problems of concrete structure steel bars and on-site formwork 4 production, greatly reducing the occupation of this sub-project on the construction work surface and shortening the critical time period.
[0081] The above disclosure is only a preferred embodiment of the present invention, which cannot be used to limit the scope of the present invention. Therefore, equivalent changes made according to the claims of the present invention are all within the scope of the present invention.
Claims
1. A cage mold assembly integral vertical main structure, characterized in that: The present invention comprises a first clamping device, a second clamping device, a steel bar and a template, wherein the first clamping device and the second clamping device are arranged at intervals, the first clamping device is provided with a plurality of first insertion holes along a circumferential direction, the second clamping device is provided with a plurality of second insertion holes corresponding to the first insertion holes along a circumferential direction, and a plurality of the steel bars are inserted into the first insertion holes and the second insertion holes; the first clamping device is provided with a plurality of first tightening members, the first tightening members can tighten or loosen the steel bar in the first insertion hole, the second clamping device is provided with a plurality of second tightening members, the second tightening members can tighten or loosen the steel bar in the second insertion hole; the template is sleeved on the outside of each of the steel bars, and the template is connected between the first clamping device and the second clamping device; the first clamping device comprises a first outer frame member and a first inner frame member, the first outer frame member has a plurality of first outer half holes, the first inner frame member has a plurality of first inner half holes, the first outer frame member The first inner frame member is detachably connected to the first inner frame member, the first outer frame member is located on the outer side of the first inner frame member, the first outer half hole is spliced with the first inner half hole to form the first insertion hole, and the first tight top member is movably inserted into the first outer frame member; the first tight top member is moved into or withdrawn from the first insertion hole to tightly press or loosen the steel bar member located in the first insertion hole; the second hoop device includes a second outer frame member and a second inner frame member, the second outer frame member has a plurality of second outer half holes, the second inner frame member has a plurality of second inner half holes, the second outer frame member is detachably connected to the second inner frame member, the second outer frame member is located on the outer side of the second inner frame member, the second outer half hole is spliced with the second inner half hole to form the second insertion hole, and the second tight top member is movably inserted into the second outer frame member; the second tight top member is moved into or withdrawn from the second insertion hole to tightly press or loosen the steel bar member located in the second insertion hole.
2. The cage mold assembly integral vertical main structure according to claim 1 is characterized in that: The first outer frame member includes a first outer module, and a plurality of the first outer modules are spliced together to form a first outer frame structure. The first inner frame member includes a first inner module, and a plurality of the first inner modules are spliced together to form a first inner frame structure. The first outer module is detachably connected to the first inner module.
3. The cage mold assembly integral vertical main structure according to claim 2 is characterized in that: A first locking member is provided between the first outer module and the first inner module, and the first outer module and the first inner module are locked or released by the first locking member to fix or disassemble the first outer module and the first inner module.
4. The cage mold assembly integral vertical main structure according to claim 2, characterized in that: The first outer module is in a U-shaped structure, two of the first outer modules are spliced together to form the first outer frame structure, and the first inner module is in a block structure, four of the first inner modules are spliced together in sequence to form the first inner frame structure.
5. The cage mold assembly integral vertical main structure according to claim 1, characterized in that: The first outer frame member is provided with a first groove, and the template is inserted into the first groove.
6. The cage mold assembly integral vertical main structure according to claim 1, characterized in that: The second outer frame member includes a second outer module, and a plurality of the second outer modules are spliced together to form a second outer frame structure. The second inner frame member includes a second inner module, and a plurality of the second inner modules are spliced together to form a second inner frame structure. The second outer module is detachably connected to the second inner module.
7. The cage mold assembly integral vertical main structure according to claim 6, characterized in that: A second locking member is provided between the second outer module and the second inner module, and the second outer module and the second inner module are locked or released by the second locking member to fix or disassemble the second outer module and the second inner module.
8. The cage mold assembly integral vertical main structure according to claim 6, characterized in that: The second outer module is in a U-shaped structure, two of the second outer modules are spliced together to form the second outer frame structure, and the second inner module is in a block structure, four of the second inner modules are spliced together in sequence to form the second inner frame structure.
9. The cage mold assembly integral vertical main structure according to claim 1, characterized in that: The second outer frame member is provided with a second groove, and the template is inserted into the second groove.
10. The cage mold assembly integral vertical main structure according to claim 1, characterized in that: The second clamp device is provided with a lifting lug.
11. The cage mold assembly integral vertical main structure according to claim 1, characterized in that: The template is a FRP plate.
12. The cage mold assembly integral vertical main structure according to claim 1, characterized in that: It also includes a steel bar seat, and one end of the steel bar member abuts against the steel bar seat.
13. The cage mold assembly integral vertical main structure according to claim 12, characterized in that: The upper surface of the steel bar seat is provided with a plurality of protrusions, and each of the steel bar pieces is staggeredly pressed against the protrusions or the upper surface of the steel bar seat.
14. The cage mold assembly integral vertical main structure according to claim 1, characterized in that: It also includes stirrups, a plurality of which are tied to the outside of the reinforcement member along the length direction of the reinforcement member, and the template is arranged around the outside of the stirrups.
15. The cage mold assembly integral vertical main structure according to claim 1, characterized in that: A plurality of protective layer pads are arranged on the steel bar member.
16. A construction method for a cage-form assembly integral vertical main structure, characterized in that: The following steps are involved: (1) providing a first clamping device, a second clamping device and a steel bar, wherein the first clamping device has a plurality of first insertion holes along a circumferential direction, and the second clamping device has a plurality of second insertion holes corresponding to the first insertion holes along a circumferential direction, and inserting a plurality of the steel bars into the first insertion holes and the second insertion holes; the first clamping device comprises a first outer frame member and a first inner frame member, the first outer frame member has a plurality of first outer half holes, the first inner frame member has a plurality of first inner half holes, the first outer frame member is detachably connected to the first inner frame member, so that the first outer half hole is spliced with the first inner half hole to form the first insertion hole, and the second clamping device comprises a second outer frame member and a second inner frame member, the second outer frame member has a plurality of second outer half holes, the second inner frame member has a plurality of second inner half holes, the second outer frame member is detachably connected to the second inner frame member, so that the second outer half hole is spliced with the second inner half hole to form the second insertion hole; (2) a plurality of first pressing members are provided on the first clamping hoop device, and a plurality of second pressing members are provided on the second clamping hoop device, and the first pressing members are pressed tightly against the steel bar member located in the first insertion hole; the first pressing member is movably inserted into the first outer frame member so that the first pressing member can be extended into or withdrawn from the first insertion hole, and the second pressing member is movably inserted into the second outer frame member so that the second pressing member can be extended into or withdrawn from the second insertion hole; (3) The second clamping device is pulled off from the steel bar, the template is sleeved on the outside of the steel bar, and then the second clamping device is sleeved on the steel bar through the second insertion hole, the second pressing member is pressed tightly against the steel bar located in the second insertion hole, and the template is positioned between the first clamping device and the second clamping device, thereby forming a cage-form assembly integral vertical main structure; (4) hoisting the cage-form assembled integral vertical main structure to a steel bar joint reserved on the construction work surface, and tying or straight-threading the steel bars between the cage-form assembled integral vertical main structure and the steel bar joint in the longitudinal direction; (5) driving the first top tight member to loosen the steel bar, removing the first clamping device, lowering the template onto the construction work surface, driving the second top tight member to loosen the steel bar, and removing the second clamping device; removing the first outer frame member and the first inner frame member to remove the first clamping device, and removing the second outer frame member and the second inner frame member to remove the second clamping device; (6) Perform grout sealing treatment at the contact point between the template and the construction work surface.
17. The construction method of the cage-form assembly integral vertical main structure according to claim 16, characterized in that: In the step (1), a steel bar seat is provided, and a plurality of protrusions are provided on the upper surface of the steel bar seat, and each of the steel bars is staggeredly pressed against the protrusions or the upper surface of the steel bar seat.
18. The construction method of the cage-form assembly integral vertical main structure according to claim 16, characterized in that: In the step (2), stirrups are tied to the steel bar along the length direction of the steel bar.
19. The construction method of the cage-form assembly integral vertical main structure according to claim 16, characterized in that: In the step (2), a protective layer pad is provided on the reinforcement member.
20. The construction method of the cage-form assembly integral vertical main structure according to claim 16, characterized in that: In the step (1), the first outer frame member includes a first outer module, and a plurality of the first outer modules are spliced together to form a first outer frame structure; the first inner frame member includes a first inner module, and a plurality of the first inner modules are spliced together to form a first inner frame structure; the first outer module and the first inner module are locked together by a first locking member; in the step (5), the first outer module and the first inner module are released by the first locking member, thereby removing the first outer frame member and the first inner frame member.
21. The construction method of the cage mold assembly integral vertical main structure according to claim 16, characterized in that: In the step (1), the second outer frame member includes a second outer module, and a plurality of the second outer modules are spliced together to form a second outer frame structure; the second inner frame member includes a second inner module, and a plurality of the second inner modules are spliced together to form a second inner frame structure; the second outer module and the second inner module are locked together by a second locking member; in the step (5), the second outer module and the second inner module are unlocked by the second locking member, thereby removing the second outer frame member and the second inner frame member.
22. The construction method of the cage mold assembly integral vertical main structure according to claim 16, characterized in that: In step (1), a first groove is provided on the first outer frame member, and a second groove is provided on the second outer frame member; in step (3), the two ends of the template are respectively inserted into the first groove and the second groove to nest and fix the template.
23. The construction method of the cage mold assembly integral vertical main structure according to claim 16, characterized in that: In the step (6), a support frame is provided at the bottom of the template.
24. The construction method of the cage mold assembly integral vertical main structure according to claim 16, characterized in that: In the step (6), a column base is arranged around the template, a set is placed on the template, and a support rod is connected between the column base and the set.
25. The construction method of the cage-form assembly integral vertical main structure according to claim 16, characterized in that: The method further comprises step (7), repeating steps (4) to (6).
Citation Information
Patent Citations
Cage mold assembly integral type vertical main body structure
CN214925366U