Movable lifting device for steel structure factory building construction and using method thereof
A mobile hoisting and steel structure technology, applied in cranes, traveling gear, transportation and packaging, etc., can solve the problems that the column cannot speed up the progress, cannot speed up the installation, and is laborious and labor-intensive, so as to shorten the construction time and shorten the construction project. time, and the effect of reducing construction costs
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Publication Date
- 2021-06-11
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention relates to the technical field of hoisting, in particular to a mobile hoisting device used for steel structure factory building construction and a usage method thereof. Background technique
[0002] Tower cranes are one of the main construction machines for modern industrial and civil buildings. The performance advantages of tower cranes in terms of lifting height and working range make them widely used in high-rise building construction, but especially in the construction of steel structure workshops. When the steel column is erected, the construction is generally carried out by renting a crane, which is laborious and difficult to speed up the installation. Especially in the construction of a new factory building, it is generally divided into many workshops, and each steel structure workshop needs to carry out steel structure. In construction, a large number of column installations cannot speed up the progress, and there is an urgent nee...
Examples
Embodiment
[0027] A mobile lifting device for the construction of a steel structure factory building, comprising a balance arm 1, a slewing mechanism 2 is installed at the front end of the balance arm 1, a counterweight 3 is installed on the balance arm 1, and the upper end of the slewing mechanism 2 is A tower top bracket 4 is installed, a boom 5 is installed at the front end of the slewing mechanism 2, a hoisting vehicle 6 is installed at the lower end of the boom 5, and an operating room 7 is installed on one side of the slewing mechanism 2, and it is characterized in that the A tower frame 8 is installed at the lower end of the slewing mechanism 2, and a moving device is installed at the lower end of the tower frame 8. The moving device includes a sleeve frame 9, and a driving roller portion 10 is installed at the lower end of the sleeve frame 9. The driving roller portion 10 Rotationally connected to the moving guide rail 11, the sleeve frame 9 includes a left bracket 12 and a right ...