Trial risk emergency disposal scheme generation method and system
An emergency response and risk technology, applied in the field of data processing, can solve the problems of omission consideration, reduce the timeliness of the plan, generate emergency response plan, etc., and achieve the effect of improving timeliness, reducing and eliminating risks and hazards
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Publication Date
- 2021-06-11
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention belongs to the field of data processing, and in particular relates to a method and system for generating a trial risk emergency response plan. Background technique
[0002] The statements in this section merely provide background information related to the present invention and do not necessarily constitute prior art.
[0003] It is extremely important for courts at all levels to deal with risks in the trial process legally, timely and properly through efficient risk emergency response plans, prevent emergencies, and control, mitigate and eliminate risk hazards. At present, most courts at all levels have achieved a high degree of informatization of trial business. However, in terms of emergency handling of trial risks, the existing business information system can only provide a step-by-step reporting function according to the pre-divided responsibility authority. Disposal options. However, the inventor found that with the increasing co...
Examples
Embodiment 1
[0038] Such as figure 1 As shown, this embodiment provides a method for generating a trial risk emergency response plan, which specifically includes the following steps:
[0039] S101: Obtain court personnel and resource information, and construct a trial risk disposal responsibility map; the trial risk disposal responsibility map includes personnel nodes and resource nodes.
[0040] Among them, the nodes of the trial risk disposal responsibility map are directed edges, which represent the responsibility relationship between personnel and between personnel and resources. The weights of the edges of the trial risk disposal responsibility map represent the cost required for personnel or resources to be transferred by their responsible persons.
[0041] Specifically, a trial risk handling responsibility map is constructed based on the power-responsibility relationship between risk handling personnel and resources formulated by the court. Let G={H,R,E} represent the responsibili...
Embodiment 2
[0073] This embodiment provides a system for generating a trial risk emergency response plan, which includes:
[0074] A trial risk disposal responsibility map building module, which is used to obtain court personnel and resource information, and construct a trial risk disposal responsibility map; the trial risk disposal responsibility map includes personnel nodes and resource nodes;
[0075] Risk state transition map building module, which is used to receive and analyze trial risk warning information, obtain trial risk characteristics and query all possible states of risks from the risk knowledge base, and construct a risk state transition map;
[0076] Risk state transition graph edge weight calculation module, which is used to update the judgment risk disposal responsibility map and calculate the optimal implementation strategy of all state transitions in the risk state transition graph under the current personnel and resource status based on the graph, so as to optimally real...
Embodiment 3
[0080] This embodiment provides a computer-readable storage medium, on which a computer program is stored, and when the program is executed by a processor, the steps in the above-mentioned method for generating a trial risk emergency response plan are implemented.