An underground interchange structure with intensive underground substation

By utilizing the space between the ramp group and the main line tunnel to arrange the underground substation in the underground overpass structure, the problem of large area and high cost of the substation in the underground overpass structure is solved, and resource saving and environmental friendliness are achieved.

CN113089399BActive Publication Date: 2024-10-08HUNAN PROVINCIAL COMM PLANNING SURVEY & DESIGN INST CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202110509361.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-05-11
Publication Date
2024-10-08
Estimated Expiration
2041-05-11

AI Technical Summary

Technical Problem

The substations of existing underground overpass structures are usually set up on the ground, which results in a large area, a large amount of backfill, high engineering costs, and can easily trigger social complaints and disputes from surrounding residents.

Method used

Design an intensive underground interchange structure. By setting up ramp groups and main line tunnels on the ground road layer and the underground layer, the triangular vertical space formed between the ramp group and the main line tunnel is used to arrange the underground substation room, and on the ground Set up entrances and exits and ventilation and exhaust outlets to reduce the amount of backfilling work.

Benefits of technology

It realizes the functional requirements of the underground substation, reduces the amount of backfill work between structures, meets the requirements of resource conservation and environmental friendliness, and reduces the project cost.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113089399B_ABST
    Figure CN113089399B_ABST
Patent Text Reader

Abstract

The present invention provides an underground interchange structure with an intensive underground substation, wherein the underground interchange structure includes a ground road layer, a first underground layer, and a second underground layer arranged in sequence from top to bottom, wherein the ground road layer includes an entrance and exit of an underground substation arranged on a municipal road, and a ventilation and exhaust port of the underground substation, the first underground layer is provided with a ramp group and an underground substation room arranged side by side with the ramp group, the ramp group includes a first ramp, a second ramp, a third ramp, a fourth ramp, and a fifth ramp, and the second underground layer includes a main line tunnel. A vertical space in a triangular shape is enclosed by rationally arranging the positions between the second ramp, the third ramp, and the fourth ramp, and an underground substation room is arranged in the vertical space. In addition, a personnel inspection and maintenance entrance and exit directly to the ground and a ventilation and exhaust port are provided to meet the functional requirements of the substation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of underground interchange engineering, and in particular to an underground interchange structure with an intensive underground substation. Background Art

[0002] With the advancement of urbanization, when the city develops to a certain extent, many business districts or core areas with dense traffic will be formed. In order to meet the growing traffic demand of business districts or core areas, many new transportation hubs or interchange structures need to be built. In the core areas with tight land use and high land value, the application prospects of land-saving underground interchange structures are broad. Due to the requirements of traffic functions, underground interchange structures often have high requirements for ventilation, lighting, fire protection, etc., so special substations need to be set up.

[0003] The existing substations with underground interchange structures generally belong to the field of civil buildings. Considering the convenience of maintenance and overhaul, most of them are set up on the ground. However, setting the substation on the ground has the disadvantages of large floor space, large backfill volume between underground interchange structures, high engineering costs, and substations are special facilities, which are easy to cause social complaints and disputes from surrounding residents.

[0004] In view of this, it is necessary to propose an underground interchange structure with an intensive underground substation to solve the above problems. Summary of the invention

[0005] The main purpose of the present invention is to provide an underground interchange structure with an intensive underground substation to solve the problem that most of the substations in the existing underground interchange structure are set on the ground, occupying a large area, a large amount of backfill between underground interchange structures, high engineering costs, and the substation is a special facility, which is easy to cause social complaints and disputes from surrounding residents.

[0006] To achieve the above-mentioned object, the present invention provides an underground interchange structure with an intensive underground substation, the underground interchange structure comprising a ground road layer, a first underground layer and a second underground layer arranged in sequence from top to bottom; wherein the ground road layer comprises an entrance and exit of the underground substation arranged on a municipal road, and a ventilation outlet of the underground substation;

[0007] The underground first floor is provided with a ramp group and an underground substation room arranged side by side with the ramp group, the ramp group includes a first ramp, a second ramp, a third ramp, a fourth ramp and a fifth ramp; the underground second floor includes a main line tunnel; wherein,

[0008] The first ramp for entering the main line tunnel is arranged at a first side of the main line tunnel, the upstream of the first ramp is arranged as a one-way double lane, the downstream of the first ramp is divided into a second ramp for entering the main line tunnel and a third ramp for turning away from the first side, and the upstream of the first ramp is connected to the municipal road of the ground road layer;

[0009] The fourth ramp for exiting the main line tunnel is arranged at a second side of the main line tunnel, the second side is arranged opposite to the first side, the upstream of the fourth ramp is arranged as a single lane ramp connected to the main line tunnel, the downstream of the fourth ramp merges with the downstream of the third ramp and is connected to the upstream of the fifth ramp, and the downstream of the fifth ramp is connected to the municipal road;

[0010] The second ramp, the third ramp and the fourth ramp together form a triangular vertical space, so that the underground substation room is arranged in the vertical space.

[0011] Preferably, the second ramp and the third ramp are both single-lane ramps.

[0012] Preferably, the plane alignment of the second ramp and the fourth ramp is consistent with that of the main line tunnel.

[0013] Preferably, the turning radius of the third ramp and the fourth ramp are both less than 100m.

[0014] Preferably, the underground laying height of the municipal pipeline arranged between the ground road layer and the ramp group is ≥1.5m, and the structural height of the ramp group is the sum of the road construction limit height, the equipment installation height, and the top plate and bottom plate heights required by the structural bearing capacity of the ramp group.

[0015] Preferably, the entrance and exit of the underground substation, the ventilation outlet of the underground substation and the stairwell between the municipal road and the underground first floor are arranged at the green belt of the municipal road.

[0016] Preferably, the underground substation room also includes a raft foundation arranged at the bottom of the underground substation room, a plurality of supporting columns are arranged between the raft foundation and the ground road layer, the bottom of the supporting columns are connected to the raft foundation through foundation beams, and the bottom plate structure of the ramp and the top plate structure of the main line tunnel are both connected to the raft foundation through foundation beams.

[0017] Preferably, a plurality of anti-floating piles arranged at intervals are also vertically arranged at the bottom of the raft foundation to meet the overall anti-floating requirements of the underground substation structure.

[0018] Compared with the prior art, the present invention has the following beneficial effects:

[0019] The present invention provides an underground interchange structure with an intensive underground substation, wherein the underground interchange structure includes a ground road layer, a first underground layer and a second underground layer arranged in sequence from top to bottom, wherein the ground road layer includes an entrance and exit of the underground substation arranged on the municipal road, and a ventilation exhaust port of the underground substation, the first underground layer is provided with a ramp group and an underground substation room arranged side by side with the ramp group, the ramp group includes a first ramp, a second ramp, a third ramp, a fourth ramp and a fifth ramp, and the second underground layer includes a main line tunnel.

[0020] The present invention selectively adjusts the plane position and vertical arrangement of the ramp group and the main line tunnel, and reasonably arranges the positions between the second ramp, the third ramp and the fourth ramp to enclose a triangular vertical space, and sets an underground substation room in the vertical space. In addition, personnel maintenance entrances and exits directly to the ground and ventilation exhaust ports are set to meet the functional requirements of the substation. In this way, the substation and other structures of the tunnel are set underground, which can not only meet the functional requirements of the tunnel, but also reduce the amount of backfill engineering between structures. It is an intensive structural treatment measure that meets the requirements of "resource conservation and environmental friendliness" and has broad application prospects. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the structures shown in these drawings without paying creative work.

[0022] Figure 1 is a schematic plan view of an underground interchange structure in one embodiment of the present invention;

[0023] Figure 2 It is a schematic elevation diagram of an underground interchange structure in one embodiment of the present invention.

[0024] The purpose, features and advantages of the present invention will be further described with reference to the accompanying drawings in conjunction with the embodiments.

[0025] Description of Figure Numbers:

[0026] Ground road layer 100; entrance and exit 110;

[0027] Underground floor 200; ramp group 210; first ramp 211; second ramp 212; third ramp 213; fourth ramp 214; fifth ramp 215; underground substation room 220; raft foundation 221; supporting column 222; anti-floating pile 223; staircase 230;

[0028] The second underground floor is 300 meters; the main line tunnel is 310 meters;

[0029] The triangular vertical space is 400. DETAILED DESCRIPTION

[0030] It should be understood that the specific embodiments described herein are only used to explain the present invention, and are not used to limit the present invention.

[0031] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0032] It should be noted that all directional indications (such as up, down, left, right, front, back, etc.) in the embodiments of the present invention are only used to explain the relative position relationship, movement status, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.

[0033] In addition, the descriptions of "first", "second", etc. in the present invention are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, the technical solutions between the various embodiments can be combined with each other, but they must be based on the ability of ordinary technicians in the field to implement them. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such a combination of technical solutions does not exist and is not within the scope of protection required by the present invention.

[0034] Please see attached Figure 1-2In one embodiment of the present invention, an underground interchange structure with an intensive underground substation is provided, and the underground interchange structure includes a ground road layer 100, a first underground layer 200 and a second underground layer 300 arranged in sequence from top to bottom; wherein the ground road layer 100 includes an entrance and exit 110 of the underground substation arranged on the municipal road, and a ventilation exhaust port (not shown) of the underground substation, the first underground layer 200 is provided with a ramp group 210 and an underground substation room 220 arranged side by side with the ramp group 210, the ramp group 210 includes a first ramp 211, a second ramp 212, a third ramp 213, a fourth ramp 214 and a fifth ramp 215, and the second underground layer 300 includes a main line tunnel 310.

[0035] Those skilled in the art should understand that the present invention makes full use of the space formed between the ramp group 210 and the main line tunnel 310 to arrange the underground substation room 220 by selectively adjusting the plane position and vertical arrangement of the ramp group 210 and the main line tunnel 310, and by changing the structural arrangement, a personnel maintenance entrance and exit 110 directly leading to the ground and ventilation exhaust ports can be set up to meet the functional requirements of the underground substation.

[0036] Specifically, the underground interchange structure is arranged into three layers, namely a ground road layer 100, a first underground layer 200 and a second underground layer 300; wherein the ground road layer 100 is used to arrange municipal roads, entrances and exits 110 of underground substations and exhaust vents, the first underground layer 200 is used to arrange ramp groups 210 and underground substation rooms 220, and the second underground layer 300 is used to arrange main line tunnels 310.

[0037] It should be noted that the first ramp 211 for entering the main line tunnel 310 is arranged on the first side of the main line tunnel 310, the upstream of the first ramp 211 is set as a one-way two-lane road, the downstream of the first ramp 211 is diverted into the second ramp 212 entering the main line tunnel 310, and the third ramp 213 for turning away from the first side, and the upstream of the first ramp 211 is connected to the municipal road of the ground road layer 100.

[0038] The fourth ramp 214 for exiting the main line tunnel 310 is arranged on the second side of the main line tunnel 310, and the second side is arranged opposite to the first side, that is, the first ramp 211 and the fourth ramp 214 are arranged on the left and right sides of the main line tunnel 310, and the upstream of the fourth ramp 214 is set as a single-lane ramp connected to the main line tunnel 310, and the downstream of the fourth ramp 214 merges with the downstream of the third ramp 213 and is connected to the upstream of the fifth ramp 215, and the downstream of the fifth ramp 215 is connected to the municipal road.

[0039] The second ramp 212, the third ramp 213 and the fourth ramp 214 enclose a triangular vertical space 400, so that the underground substation room 220 can be set in the vertical space. It is worth noting that the second ramp 212, the third ramp 213 and the fourth ramp 214 enclose a vertical space 400 with an irregular triangular shape in the middle, which can be used to set the underground substation room 220, and the underground fan room can be set in the vertical space. It should be noted that the size of the triangular vertical space 400 is affected by the width of the main line tunnel 310 and the turning radius of the ramp group 210. From the perspective of saving the scale of project investment, the height difference formed between the main line tunnel 310 and the ramp group 210 should be used as much as possible to determine it, so as to reduce the scale of structural engineering on both sides of the underground project.

[0040] Further, the second ramp 212 and the third ramp 213 are both single-lane ramps. It is understandable that the number of lanes of the second ramp 212 and the third ramp 213 can be set according to actual needs. Preferably, considering the engineering volume and cost, the second ramp 212 and the third ramp 213 in this embodiment are both single-lane ramps.

[0041] Please refer again Figure 1 As a preferred embodiment of the present invention, the plane line shape of the second ramp 212 and the fourth ramp 214 is consistent with the main line tunnel 310.

[0042] Furthermore, the turning radius of the third ramp 213 and the fourth ramp 214 are both less than 100m. In order to realize that the first ramp 211 turns into the municipal road, the downstream turn of the fourth ramp 214 merges with the third ramp 213 and enters the municipal road, so the turning radius of the third ramp 213 and the fourth ramp 214 are both small radius curve turns, and the turning radius can be set according to actual needs. In a preferred embodiment, the turning radius is set to be less than 100m.

[0043] As a preferred embodiment of the present invention, the underground laying height of the municipal pipeline arranged between the ground road layer 100 and the ramp group 210 is ≥1.5m, and the structural height of the ramp group 210 is the sum of the road construction limit height, the equipment installation height, and the top plate and bottom plate heights required by the structural bearing capacity of the ramp group 210.

[0044] Furthermore, the structural height of the main line tunnel 310 is the sum of the height of the road construction limit, the equipment installation height, and the top plate and bottom plate heights required by the structural bearing capacity of the main line tunnel 310. In addition, the ramp longitudinal slope limit needs to be determined based on the height difference and design length of the design elevation of the ground road layer 100 and the design elevation of the main line tunnel 310 layer, and cannot exceed the maximum longitudinal slope of the road design specification.

[0045] Furthermore, the entrance and exit 110 of the underground substation, the ventilation and exhaust outlet of the underground substation, and the stairwell 230 arranged between the municipal road and the underground first floor 200 are arranged at the green belt position of the municipal road. It should be noted that the structural layout of the underground substation room 220 should be determined according to its function. The underground substation room 220 has the requirements of fire prevention, maintenance, and ventilation, so it is necessary to set the entrance and exit 110 and the exhaust vent directly to the outside.

[0046] As a preferred embodiment of the present invention, the underground substation room 220 also includes a raft foundation 221 arranged at the bottom of the underground substation room 220, and a plurality of supporting columns 222 are arranged between the raft foundation 221 and the ground road layer 100, and the bottom of the supporting column 222 is connected to the raft foundation 221 through a foundation beam, and the bottom plate structure of the ramp and the top plate structure of the main line tunnel 310 are connected to the raft foundation 221 through a foundation beam.

[0047] It should be noted that in order to better resist uneven settlement of the foundation and give full play to the bearing capacity of the foundation, the present invention also arranges a raft foundation 221 at the bottom of the underground substation room 220. At the same time, since the periphery of the underground substation room 220 has an arc due to the existence of the ramp and the top has an area restriction due to the existence of the ground road, in order to realize the layout requirements of the ground entrance and exit 110 and the ventilation exhaust port of the underground substation room 220, it is necessary to adopt a flexible and lightweight structural layout method. The present invention adopts a beam-column structural layout method.

[0048] Furthermore, a plurality of anti-floating piles 223 arranged at intervals are vertically disposed at the bottom of the raft foundation 221 to meet the overall anti-floating requirements of the underground substation structure.

[0049] The present invention is also specifically described in conjunction with the underground interchange structure of the core section of Tiedong Road in Zhuzhou City: Tiedong Road is a supporting project of the Changsha-Zhuzhou-Xiangtan Intercity Railway, located in Shifeng District, Hetang District and Lusong District of Zhuzhou City, starting from Zhonghuan Xiangtian Road in the north and ending at Fengxi Avenue in the south, with a total length of about 15.0 km. The core section of Tiedong Road ranges from Xinhua Road to Shisong Avenue, with a total length of about 1.6 km.

[0050] Due to the location and size restrictions of the intercity railway drop-off platform, a left-turn ramp is required to solve the traffic turning problem from north to south on Tiedong Road. An underground substation structure is set up in combination with the vertical height difference and plane setting characteristics of the underground interchange structure.

[0051] Technical parameters: The inner turning radius of the third ramp 213 is 45m, the minimum turning radius of the fourth ramp 214 is 42m, and the area of ​​the underground substation room 220 is 1140m 2 , stairwell entrances and exhaust outlets are set up in the green belts of the ground roads.

[0052] The above are only preferred embodiments of the present invention, and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.

Claims

1. An underground interchange structure with an intensive underground substation, It is characterized in that The underground interchange structure includes a ground road layer, a first underground layer and a second underground layer arranged in sequence from top to bottom; wherein the ground road layer includes an entrance and exit of an underground substation arranged on a municipal road, and a ventilation outlet of the underground substation; The underground first floor is provided with a ramp group and an underground substation room arranged side by side with the ramp group, the ramp group includes a first ramp, a second ramp, a third ramp, a fourth ramp and a fifth ramp; the underground second floor includes a main line tunnel; wherein, The first ramp for entering the main line tunnel is arranged at a first side of the main line tunnel, the upstream of the first ramp is arranged as a one-way double lane, the downstream of the first ramp is divided into a second ramp for entering the main line tunnel and a third ramp for turning away from the first side, and the upstream of the first ramp is connected to the municipal road of the ground road layer; The fourth ramp for exiting the main line tunnel is arranged at a second side of the main line tunnel, the second side is arranged opposite to the first side, the upstream of the fourth ramp is arranged as a single lane ramp connected to the main line tunnel, the downstream of the fourth ramp merges with the downstream of the third ramp and is connected to the upstream of the fifth ramp, and the downstream of the fifth ramp is connected to the municipal road; The second ramp, the third ramp and the fourth ramp together form a triangular vertical space, so that the underground substation room is arranged in the vertical space; The second ramp and the third ramp are both single-lane ramps; The buried height of the municipal pipeline arranged between the ground road layer and the ramp group is ≥1.5m, and the structural height of the ramp group is the sum of the road construction limit height, the equipment installation height, and the top plate and bottom plate heights required by the structural bearing capacity of the ramp group.

2. The underground interchange structure according to claim 1, It is characterized in that The plane alignment of the second ramp and the fourth ramp is consistent with that of the main line tunnel.

3. The underground interchange structure according to claim 2, It is characterized in that The turning radius of the third ramp and the fourth ramp are both less than 100m.

4. The underground interchange structure according to claim 1, It is characterized in that The structural height of the main line tunnel is the sum of the road construction limit height, the equipment installation height, and the top plate and bottom plate heights required by the structural bearing capacity of the main line tunnel.

5. The underground interchange structure according to claim 1, It is characterized in that The entrance and exit of the underground substation, the ventilation outlet of the underground substation and the stairwell between the municipal road and the underground first floor are arranged at the green belt of the municipal road.

6. The underground interchange structure according to claim 1, It is characterized in that The underground substation room also includes a raft foundation arranged at the bottom of the underground substation room, a plurality of supporting columns are arranged between the raft foundation and the ground road layer, the bottom of the supporting columns are connected to the raft foundation through foundation beams, and the bottom plate structure of the ramp and the top plate structure of the main line tunnel are both connected to the raft foundation through foundation beams.

7. The underground interchange structure according to claim 6, It is characterized in that A plurality of anti-floating piles arranged at intervals are also vertically arranged at the bottom of the raft foundation to meet the overall anti-floating requirements of the underground substation structure.