A water treatment pump station system training device

By designing a compact water treatment pumping station system training device, the problems of large device size and single function in the existing technology are solved, efficient water quality detection and pump pipe valve operation training are achieved, and students' practical ability and training efficiency are improved. .

CN113223361BActive Publication Date: 2024-10-18GUANGDONG POLYTECHNIC OF ENVIRONMENTAL PROTECTION ENG
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202110538847.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-05-18
Publication Date
2024-10-18
Estimated Expiration
2041-05-18

AI Technical Summary

Technical Problem

The existing water treatment training equipment is bulky, has single functions, lacks system planning and design, and cannot effectively improve students' practical abilities and training quality.

Method used

A compact water treatment pumping station system training device is designed, including a bench, a water tank, a pump system and a waterway system. It is set on the bench for easy operation. A centrifugal pump and sensor are used for water quality detection, and through manual and electric valves Conduct debugging to simulate the actual engineering environment.

Benefits of technology

It achieves the compactness and efficiency of the device, improves students' various practical abilities and training efficiency, enhances the authenticity and automation level of practical training, protects the water tank, and facilitates movement and maintenance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113223361B_ABST
    Figure CN113223361B_ABST
Patent Text Reader

Abstract

The present invention discloses a water treatment pump station system training device, comprising a stand, a water tank, a pump system, and a water system. A work surface is arranged on the top of the stand; the water tank is arranged on the stand, and the water tank is arranged below the work surface, and the water tank is provided with a water inlet trough, a first water outlet trough, and a second water outlet trough with notches all facing upward; the pump system comprises a water pump; the water system comprises a main water inlet pipe, a main water outlet pipe, and a water outlet branch pipe, and the main water inlet pipe is provided with a bypass water pipe. The water tank, the pump system, and the water system are all arranged on the stand, and the structure is compact, the volume is small, and it is easy to move.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of teaching training devices, and in particular to a water treatment pump station system training device. Background Art

[0002] Water resources are the basis of human survival. However, in recent years, with the rapid development of the national economy, the pollution of water resources has become increasingly serious, and the role of sewage treatment has become increasingly important. Compact, efficient, and well-controlled water treatment devices are one of the important infrastructures of schools and training institutions. How to reasonably and efficiently integrate various water treatment processes and environmental protection knowledge in a system for teaching and assessment, while meeting the needs of various skill training, is the direction of designing water treatment devices.

[0003] However, there are very few existing water treatment training devices for teaching, and they occupy a large area; there is a certain "generation gap" with the development of the industry, and there is a lack of real-time updates; there is a certain "misalignment" with professional construction, and there is a lack of systematic planning and design; there is a certain "gap" with the improvement of skill teaching quality, that is, the current water treatment training devices have problems such as bulky size and single function, which makes it inconvenient to train students' practical skills in actual engineering applications, making it impossible to effectively improve students' practical ability and the teaching results of trainers cannot be tested. Summary of the invention

[0004] The purpose of the present invention is to provide a water treatment pump station system training device to solve one or more technical problems existing in the prior art and at least provide a beneficial choice or create conditions.

[0005] The technical solutions adopted to solve the above technical problems are:

[0006] First, the present invention provides a water treatment pump station system training device, including a stand, a water tank, a pump system, and a water system. A work surface is arranged on the top of the stand, and three pipe through holes are evenly distributed on the work surface, and the three pipe through holes are divided into a first pipe through hole, a second pipe through hole, and a third pipe through hole; the water tank is arranged on the stand, and the water tank is arranged below the work surface, and the water tank is provided with a water inlet trough, a first water outlet trough, and a second water outlet trough with notches facing upward; the pump system includes a water pump, and the water pump has a water outlet and a water inlet, and the water pump is arranged on the work surface; the water system includes a main water inlet pipe, a main water outlet pipe, and a water outlet branch pipe, and the main water inlet pipe is provided with a bypass water pipe, and the outlet end of the main water inlet pipe is connected to the water inlet, and the inlet end of the main water inlet pipe is connected to the water inlet. After passing through the first pipe through hole, it extends into the water inlet trough, the water inlet end of the main water outlet pipe is connected with the water outlet, the water outlet end of the main water outlet pipe passes through the second pipe through hole and extends into the second water outlet trough, the water inlet end of the water outlet branch pipe is connected with a section of the main water outlet pipe near the water outlet, the water outlet end of the water outlet branch pipe passes through the third pipe through hole and extends into the second water outlet trough, the main water inlet pipe is provided with a main water inlet valve, the main water outlet pipe is provided with a main water outlet valve, the water outlet branch pipe is provided with a branch pipe valve, and the bypass water pipe is provided with a bypass valve, the main water inlet valve and the bypass valve are arranged in parallel, and the main water inlet valve, the main water outlet valve, the bypass valve and the branch pipe valve are all arranged above the work surface.

[0007] The beneficial effects of the present invention are:

[0008] The water tank, pump system, and water system are all installed on the bench, with a compact structure, small size, and easy to move. At the same time, it simulates the situation of water quality testing in real life. The water in the water inlet tank is equivalent to the water that needs to be tested, and the water system and pump system are equivalent to simulating the extraction of water that needs to be tested for water quality testing. Before simulating the water pump to pump water, students can also be trained to perform the installation process of the entire pump pipe valve, the cold start-up process of the pump, and other operations on the workbench, so as to exercise students' various practical abilities. In addition, all of the above operations can be completed on the workbench, which is convenient to operate and does not require walking around, thereby improving the efficiency of practical training.

[0009] As a further improvement of the above technical solution, the main water inlet valve and the main water outlet valve are manual valves, and the bypass valve and the branch valve are electric valves. By letting students adjust the manual valves, students' manual debugging ability can be exercised, and the electric valves can also be connected to the control system for automatic debugging, control and monitoring of system data parameters.

[0010] As a further improvement of the above technical solution, overflow pipes are arranged above the side walls of the water inlet trough, the first water outlet trough and the second water outlet trough, drain pipes are arranged below the water inlet trough, the first water outlet trough and the second water outlet trough, the overflow pipes are provided with overflow valves, and the drain pipes are provided with drain valves to facilitate the water inlet and outlet of the water tank. At the same time, when the water level is too high, the water will automatically be discharged from the overflow valve to prevent damage to the water tank due to improper operation by students, thereby protecting the water tank.

[0011] As a further improvement of the above technical solution, the water pump is a centrifugal pump.

[0012] Before starting the centrifugal pump, first fill the centrifugal pump and the water inlet pipe with water. After the centrifugal pump is running, under the centrifugal force generated by the high-speed rotation of the impeller, the water in the impeller flow channel is thrown around and pressed into the volute, forming a vacuum at the impeller inlet. The water in the pool is sucked along the suction pipe under the external atmospheric pressure to fill this space, and then the sucked water is thrown out by the impeller through the volute and enters the outlet pipe. Therefore, the use of a centrifugal pump can better test the installation process of the student pump pipe valve.

[0013] As a further improvement of the above technical solution, the water inlet trough, the first water outlet trough and the second water outlet trough are all provided with pH sensors, and the main water outlet pipe is provided with a turbine flowmeter and a pressure sensor, and the turbine flowmeter and the pressure sensor are both arranged between the water outlet end of the main water outlet pipe and the water inlet end of the water outlet branch pipe, and the turbine flowmeter and the pressure sensor are both arranged above the work surface to detect the water volume, pipeline pressure and pH value.

[0014] As a further improvement of the above technical solution, fixed brackets are provided between both ends of the bypass water pipe and the work surface to fix and support the bypass water pipe, reduce its shaking and instability, and make it less susceptible to damage.

[0015] As a further improvement of the above technical solution, the main water inlet pipe, the main water outlet pipe and the water outlet branch pipe are all DN25 pipes.

[0016] The pipe fittings are configured according to DN25, which is consistent with actual engineering applications, improves the authenticity of the training, and is conducive to improving the effect of the training.

[0017] As a further improvement of the above technical solution, the water tank is a transparent component for easy observation.

[0018] As a further improvement of the above technical solution, the water inlet trough, the first water outlet trough and the second water outlet trough are arranged in sequence from left to right.

[0019] As a further improvement of the above technical solution, a plurality of pulleys are arranged at the bottom of the stand, so that the stand can be conveniently moved after the training, so as to facilitate the cleaning of the site and the storage of the water treatment pump station system training device. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] The present invention will be further described below in conjunction with the accompanying drawings and embodiments;

[0021] Figure 1 It is a water treatment pump station system training device provided by the present invention, and a structural schematic diagram of one embodiment thereof, wherein six arrows respectively represent forward, backward, left, right, upward and downward directions;

[0022] Figure 2 yes Figure 1 The front view schematic diagram in which the four arrows represent upward, downward, left and right directions respectively;

[0023] Figure 3 yes Figure 1 The left schematic diagram in which the four arrows represent upward, downward, forward and backward directions respectively;

[0024] Figure 4 yes Figure 1 A top view diagram in which four arrows represent upward, downward, left and right directions respectively;

[0025] Figure 5 The present invention provides a water treatment pump station system training device, and a structural principle diagram of one embodiment thereof. DETAILED DESCRIPTION

[0026] This section will describe in detail the specific embodiments of the present invention. The preferred embodiments of the present invention are shown in the accompanying drawings. The purpose of the accompanying drawings is to supplement the description of the text part of the specification with graphics, so that people can intuitively and vividly understand each technical feature and the overall technical solution of the present invention, but it cannot be understood as a limitation on the scope of protection of the present invention.

[0027] In the description of the present invention, it should be understood that descriptions involving orientations, such as up, down, front, back, left, right, etc., and orientations or positional relationships indicated are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.

[0028] In the description of the present invention, if there are words such as "several", it means one or more, "more" means more than two, greater than, less than, exceed, etc. are understood as not including the number, and above, below, within, etc. are understood as including the number.

[0029] In the description of the present invention, unless otherwise clearly defined, terms such as setting, installing, connecting, etc. should be understood in a broad sense, and technicians in the relevant technical field can reasonably determine the specific meanings of the above terms in the present invention based on the specific content of the technical solution.

[0030] Reference Figures 1 to 5 The present invention provides a water treatment pump station system training device as follows:

[0031] In some embodiments, a water treatment pump station system training device includes a stand 100, a water tank 200, a pump system, and a water system. The stand 100 serves as the framework of the entire device, and is used to support the water tank 200, the pump system, and the water system, making the entire device more compact; the water tank 200 stores simulated water to be tested and extracted water respectively; the pump system is used to simulate the extraction of water to be tested.

[0032] A work surface 110 is arranged on the top of the stand 100. The work surface 110 is evenly distributed with three pipeline through holes that penetrate from top to bottom. The three pipeline through holes are divided into a first pipeline through hole, a second pipeline through hole and a third pipeline through hole. Most of the operations of the students can be completed on the work surface 110. Compared with the traditional device with large floor space and high cost, the operation is more convenient. At the same time, the work surface 110 also facilitates students to record various experimental data and meet various needs of students.

[0033] In order to make the entire water treatment pump station system training device easy to store and not take up space, a plurality of pulleys 1000 are arranged at the bottom of the stand 100. After the training, the stand 100 can be easily moved to one side. In addition, generally, a plurality of training devices are placed in the laboratory at the same time. When the laboratory area is small, they can be pushed together after use, making the laboratory easy to move and easy to clean. The pulley 1000 can also use an existing universal wheel.

[0034] The water tank 200 is arranged on the stand 100 to make the whole device more compact. The water tank 200 is arranged below the work surface 110. The water tank 200 is provided with a water inlet 210, a first water outlet 220 and a second water outlet 230 with notches facing upward. For the convenience of observation, the water tank 200 is a transparent component, and the water tank 200 can be made of organic glass. When in use, the amount of water in the water tank 200 can be visually seen, and students and teachers can determine whether the operation is correct by observing the amount of water in the water tank 200. In some other embodiments, an opaque or translucent water tank can also be used. At the same time, the water inlet 210, the first water outlet 220 and the second water outlet 230 are arranged in sequence from left to right, and the water tank 200 can be observed from both sides of the stand 100.

[0035] The pump system includes a water pump 300, which has a water outlet and a water inlet. The water pump 300 is arranged on the work surface 110. The water pump 300 extracts the water to be tested, and students can fill the water pump 300 with water to start the cold operation. The water pump 300 can specifically be a centrifugal pump. Before the centrifugal pump is started, the centrifugal pump and the water inlet pipe are first filled with water. After the centrifugal pump is running, under the action of the centrifugal force generated by the high-speed rotation of the impeller, the water in the impeller flow channel is thrown to the surroundings and pressed into the volute, and a vacuum is formed at the impeller inlet. The water in the pool is sucked in along the water suction pipe under the external atmospheric pressure to supplement this space, and then the sucked water is thrown out by the impeller through the volute and enters the water outlet pipe. Therefore, the use of a centrifugal pump can better test the installation process of the student pump pipe valve.

[0036] The water system includes a main water inlet pipe 410, a main water outlet pipe 420, and a water outlet branch pipe 430. The main water inlet pipe 410 is provided with a bypass water pipe 440. The water outlet end of the main water inlet pipe 410 is connected to the water inlet. The water inlet end of the main water inlet pipe 410 passes through the first pipe through hole and then extends into the water inlet tank 210. The water inlet end of the main water outlet pipe 420 is connected to the water outlet. The water outlet end of the main water outlet pipe 420 passes through the second pipe through hole and then extends into the second water outlet tank 230. The water inlet end of the water outlet branch pipe 430 is connected to a section of the main water outlet pipe 420 near the water outlet. The water outlet end of the water outlet branch pipe 430 passes through the third pipe through hole and extends into the second water outlet trough 230. The main water inlet pipe 410 is provided with a main water inlet valve 500, the main water outlet pipe 420 is provided with a main water outlet valve 600, the water outlet branch pipe 430 is provided with a branch pipe valve 710, and the bypass water pipe 440 is provided with a bypass valve 700. The main water inlet valve 500 is arranged on the main water outlet pipe 420 connected in parallel with the bypass water pipe 440. The main water inlet valve 500, the main water outlet valve 600, the bypass valve 700, and the branch pipe valve 710 are all arranged above the work surface 110.

[0037] The water in the water inlet tank 210 is equivalent to the water to be tested in real life, and the water system and the pump system are equivalent to the simulated extraction of the water to be tested for water quality testing. In addition, before simulating the water pump 300 to pump water, students can also be trained to perform the entire pump pipe valve installation process, the cold start process of the pump, and other operations on the workbench 110, so as to exercise students' various practical abilities.

[0038] In order to fix the bypass water pipe 440, a fixing bracket 441 is provided between both ends of the bypass water pipe 440 and the work surface 110 to fix and support the bypass water pipe 440, reduce its shaking and instability, and make it less prone to damage. The fixing bracket 441 of this embodiment is a rectangular frame, the lower end of the rectangular frame is fixed on the work surface 110, and the upper end is fixedly connected to the pipe section of the bypass water pipe 440. It should be noted that the fixing bracket has various forms, and those skilled in the art can make changes according to specific circumstances, which will not be described in detail here.

[0039] In order to achieve better practical effects, pipe fittings are configured according to DN25, which is consistent with actual engineering applications and improves the authenticity of the training.

[0040] Furthermore, the water inlet trough 210, the first water outlet trough 220 and the second water outlet trough 230 are all provided with pH sensors, and the main water outlet pipe 420 is provided with a turbine flowmeter 800 and a pressure sensor 900, and the turbine flowmeter 800 and the pressure sensor 900 are both arranged between the water outlet end of the main water outlet pipe 420 and the water inlet end of the water outlet branch pipe 430, and the turbine flowmeter 800 and the pressure sensor 900 are both arranged above the workbench 110, and the water volume, pipeline pressure and pH value can be detected and read directly on the workbench 110, which is convenient to operate and also convenient for maintenance.

[0041] Overflow pipes are arranged above the side walls of the water inlet trough 210, the first water outlet trough 220 and the second water outlet trough 230, and drain pipes are arranged below the water inlet trough 210, the first water outlet trough 220 and the second water outlet trough 230. The overflow pipes are provided with overflow valves 211, and the drain pipes are provided with drain valves 212 to facilitate the water inlet and outlet of the water tank 200. At the same time, when the water level is too high, the water will automatically be discharged from the overflow valve 211 to prevent students from damaging the water tank 200 due to improper operation, thereby protecting the water tank 200.

[0042] In addition, in order to better train students' hands-on operation ability, the main water inlet valve 500 and the main water outlet valve 600 are both manual valves. If the bypass valve 700 and the branch valve 710 are closed, students need to manually adjust and operate them. By letting students adjust the manual valves, students' manual adjustment ability is trained; the bypass valve 700 and the branch valve 710 are both electric valves. If the main water inlet valve 500 and the main water outlet valve 600 are closed, the electric valves can also be connected to the control system for automatic adjustment, control and monitoring of system data parameters. At the same time, the overflow valve 211 and the drain valve 212 are both electric valves, which automatically control the water inlet and outlet of the water tank 200, improving the automation of the training device.

[0043] It can also be connected to the control box for electrical installation and debugging training. According to different control requirements, circuit design, PLC programming, hardware installation, parameter setting and debugging can be carried out. It can test students' mastery and application of modern electrical components such as PLC, inverter, touch screen, sensor and three-phase AC asynchronous motor. At the same time, it integrates electrical control knowledge with environmental protection water treatment knowledge, which is conducive to the cultivation of environmental protection electromechanical talents, which is also a talent in short supply in society. At present, there is a lack of training equipment that integrates electrical control knowledge and environmental protection knowledge. This part can be simply set to a fixed program for students to wire and debug, or it can be set to a fixed requirement for students to design, install and debug.

[0044] The preferred embodiments of the present invention are specifically described above, but the invention is not limited to the embodiments. Those skilled in the art may make various equivalent modifications or substitutions without violating the spirit of the invention. These equivalent modifications or substitutions are all included in the scope defined by the claims of this application.

Claims

1. A water treatment pump station system training device, characterized in that: include: A stand (100) is provided with a work surface (110) on the top thereof, the work surface (110) being evenly distributed with three pipeline through holes extending vertically therethrough, the three pipeline through holes being divided into a first pipeline through hole, a second pipeline through hole and a third pipeline through hole; A water tank (200) disposed on the stand (100), the water tank (200) being disposed below the work surface (110), the water tank (200) being provided with a water inlet trough (210) with notches all facing upward, a first water outlet trough (220), and a second water outlet trough (230); A pump system, comprising a water pump (300), the water pump (300) having a water outlet and a water inlet, the water pump (300) being arranged on the work surface (110); A water system, comprising a main water inlet pipe (410), a main water outlet pipe (420), and a water outlet branch pipe (430); the main water inlet pipe (410) is provided with a bypass water pipe (440); the water outlet end of the main water inlet pipe (410) is connected to the water inlet; the water inlet end of the main water inlet pipe (410) passes through the first pipe through hole and then extends into the water inlet groove (210); the water inlet end of the main water outlet pipe (420) is connected to the water outlet; the water outlet end of the main water outlet pipe (420) passes through the second pipe through hole and then extends into the second water outlet groove (230); the water inlet end of the water outlet branch pipe (430) is connected to a section of the main water outlet pipe (420) near the water outlet; The water outlet end of the water outlet branch pipe (430) passes through the third pipe through hole and then extends into the second water outlet groove (230); the main water inlet pipe (410) is provided with a main water inlet valve (500); the main water outlet pipe (420) is provided with a main water outlet valve (600); the water outlet branch pipe (430) is provided with a branch pipe valve (710); the bypass water pipe (440) is provided with a bypass valve (700); the main water inlet valve (500) and the bypass valve (700) are arranged in parallel; the main water inlet valve (500), the main water outlet valve (600), the bypass valve (700) and the branch pipe valve (710) are all arranged above the work surface (110); Overflow pipes are arranged above the side walls of the water inlet trough (210), the first water outlet trough (220) and the second water outlet trough (230); drainage pipes are arranged below the water inlet trough (210), the first water outlet trough (220) and the second water outlet trough (230); the overflow pipes are provided with overflow valves (211); and the drainage pipes are provided with drainage valves (212); The water inlet trough (210), the first water outlet trough (220) and the second water outlet trough (230) are all provided with pH sensors, the main water outlet pipe (420) is provided with a turbine flowmeter (800) and a pressure sensor (900), the turbine flowmeter (800) and the pressure sensor (900) are both provided between the water outlet end of the main water outlet pipe (420) and the water inlet end of the water outlet branch pipe (430), and the turbine flowmeter (800) and the pressure sensor (900) are both provided above the work surface (110).

2. A water treatment pump station system training device according to claim 1, characterized in that: The main water inlet valve (500) and the main water outlet valve (600) are both manual valves, and the bypass valve (700) and the branch pipe valve (710) are both electric valves.

3. A water treatment pump station system training device according to claim 1, characterized in that: The water pump (300) is a centrifugal pump.

4. A water treatment pump station system training device according to claim 1, characterized in that: Fixed brackets (441) are provided between both ends of the bypass water pipe (440) and the work surface (110).

5. A water treatment pump station system training device according to claim 1, characterized in that: The main water inlet pipe (410), the main water outlet pipe (420) and the water outlet branch pipe (430) are all DN25 pipes.

6. A water treatment pump station system training device according to claim 1, characterized in that: The water tank (200) is a transparent component.

7. A water treatment pump station system training device according to claim 6, characterized in that: The water inlet trough (210), the first water outlet trough (220) and the second water outlet trough (230) are arranged in sequence from left to right.

8. A water treatment pump station system training device according to claim 1, characterized in that: A plurality of pulleys (1000) are arranged at the bottom of the stand (100).

Citation Information

Patent Citations

  • A training device for a water treatment pump station system

    CN215265164U