A water treatment method, system, device and storage medium
By deploying the collection subsystem on the water treatment equipment and automatically matching and precipitation production processes, the problem of manual experience dependence in the water treatment production process is solved, intelligence and standardization are achieved, and quality and efficiency are improved.
Patent Information
- Application Number
- CN202110049722.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-01-14
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2041-01-14
AI Technical Summary
The water treatment production process relies on manual experience and has low intelligence, resulting in unstable production quality.
Deploy the collection subsystem on the water treatment equipment, collect water treatment data and precipitate the production process based on the data, automatically match the order information to determine the appropriate production process, and realize automatic operation of the water treatment equipment.
The intelligentization and standardization of the water treatment production process has been achieved, labor costs have been reduced, production quality has been improved, manual intervention has been reduced, and the reproducibility of process parameters has been improved.
Smart Images

Figure CN113296480B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of water treatment technology, and in particular to a water treatment method, system, equipment and storage medium. Background Art
[0002] In the denim production process, washing is a very critical production process. Through washing, denim can be made to have a variety of appearance effects such as clean, nostalgic, rough, etc., and it can also make denim softer, fitter and more suitable for wearing.
[0003] At present, the management of the water washing process mainly relies on manual experience, with a low degree of intelligence. Moreover, due to the uneven manual experience, the production quality is unstable. Summary of the invention
[0004] Various aspects of the present application provide a water treatment method, system, device and storage medium for realizing intelligent water treatment production process.
[0005] The present application provides a water treatment method, comprising:
[0006] Receive pending order information;
[0007] Determine a production process that matches the order information;
[0008] The production process is sent to water treatment equipment, and the water treatment equipment performs water treatment operations based on the production process.
[0009] The present application also provides a water treatment method, comprising:
[0010] Get pending order information;
[0011] Determine a production process that matches the order information from production processes that have been processed by the water treatment equipment;
[0012] Water treatment is performed on the production object of the order based on the matched production process.
[0013] The embodiment of the present application also provides a control device, including a memory, a processor, and a communication component;
[0014] The memory is used to store one or more computer instructions;
[0015] The processor is coupled to the memory and the communication component and is configured to execute the one or more computer instructions for:
[0016] receiving order information to be processed through the communication component;
[0017] Determine a production process that matches the order information;
[0018] The production process is sent to the water treatment equipment through the communication component, and the water treatment equipment performs water treatment operations based on the production process.
[0019] The embodiment of the present application also provides a water treatment device, including a memory, a processor and a communication component;
[0020] The memory is used to store one or more computer instructions;
[0021] The processor is coupled to the memory and the communication component and is configured to execute the one or more computer instructions for:
[0022] Get pending order information;
[0023] Determine a production process that matches the order information from the production processes that the company has processed;
[0024] Water treatment is performed on the production object of the order based on the matched production process.
[0025] The embodiment of the present application also provides a water treatment system, including a control device and a collection subsystem deployed on the water treatment device, wherein the control device is communicatively connected with the collection subsystem;
[0026] The acquisition subsystem is used to collect water treatment data generated by the water treatment device in which it is located during the water treatment process, and provide the water treatment data to the control device;
[0027] The control device is used to generate production status information in at least one dimension based on the water treatment data provided by the acquisition subsystem.
[0028] The present application also provides a water treatment method, comprising:
[0029] Receive production monitoring requests;
[0030] According to the production monitoring request, during the water treatment process, using a collection subsystem deployed on the water treatment equipment, water treatment data generated on the water treatment equipment is collected;
[0031] Production status information in at least one dimension is generated according to the water treatment data provided by the acquisition subsystem.
[0032] The embodiment of the present application also provides a control device, including a memory, a processor, and a communication component;
[0033] The memory is used to store one or more computer instructions;
[0034] The processor is coupled to the memory and the communication component and is configured to execute the one or more computer instructions for:
[0035] receiving a production monitoring request via the communication component;
[0036] According to the production monitoring request, during the water treatment process, using a collection subsystem deployed on the water treatment equipment, water treatment data generated on the water treatment equipment is collected;
[0037] Production status information in at least one dimension is generated according to the water treatment data provided by the acquisition subsystem.
[0038] An embodiment of the present application also provides a computer-readable storage medium storing computer instructions. When the computer instructions are executed by one or more processors, the one or more processors are caused to execute the aforementioned water treatment method.
[0039] In an embodiment of the present application, a collection subsystem is deployed on the water treatment equipment. During the water treatment process, the collection subsystem can be used to collect water treatment data generated on the water treatment equipment, and the production process can be precipitated based on the water treatment data. Based on this, when the order information is received, the production process that matches the order information can be conveniently and quickly determined, and the matched production process can be sent to the water treatment equipment, so that the water treatment equipment performs water treatment operations based on the production process. Accordingly, in an embodiment of the present application, the production process can be continuously precipitated during the water treatment process, and the adapted production process can be determined for the order information to be processed, so that the water treatment equipment can automatically perform water treatment operations based on the matched production process, basically without the need for manual intervention, realizing the intelligence and standardization of the water treatment production process, greatly reducing labor costs, and improving production quality. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] The drawings described herein are used to provide a further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:
[0041] Figure 1 A schematic diagram of the structure of a water treatment system provided by an exemplary embodiment of the present application;
[0042] Figure 2 A schematic diagram of the architecture of a water treatment system provided by an exemplary embodiment of the present application;
[0043] Figure 3 A schematic diagram of the deployment relationship between a collection subsystem and water treatment equipment provided by an exemplary embodiment of the present application;
[0044] Figure 4 A schematic flow chart of a water treatment method provided for another exemplary embodiment of the present application;
[0045] Figure 5 A structural schematic diagram of a control device provided for another exemplary embodiment of the present application;
[0046] Figure 6 A schematic flow chart of another water treatment method provided as another exemplary embodiment of the present application;
[0047] Figure 7 A schematic flow chart of another water treatment method provided as another exemplary embodiment of the present application;
[0048] Figure 8 A structural schematic diagram of a control device is provided for another exemplary embodiment of the present application;
[0049] Fig. 9 A schematic structural diagram of a water treatment device provided as yet another exemplary embodiment of the present application. DETAILED DESCRIPTION
[0050] In order to make the purpose, technical solution and advantages of the present application clearer, the technical solution of the present application will be clearly and completely described below in combination with the specific embodiments of the present application and the corresponding drawings. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present application.
[0051] At present, the water treatment production process mainly relies on manual experience to set the production process, with a low degree of intelligence and unstable production quality. To this end, in some embodiments of the present application: a collection subsystem can be deployed on the water treatment equipment, and the water treatment data generated on the water treatment equipment can be collected by the collection subsystem during the water treatment process, and the production process can be precipitated according to the water treatment data. Based on this, when the order information is received, the production process matching the order information can be conveniently and quickly determined, and the matched production process can be sent to the water treatment equipment, so that the water treatment equipment performs water treatment operations based on the production process. Accordingly, in the embodiment of the present application, the production process can be continuously precipitated during the water treatment process, and the adapted production process can be determined for the order information to be processed, so that the water treatment equipment can automatically perform water treatment operations based on the matched production process, and basically no manual intervention is required, which realizes the intelligence and standardization of the water treatment production process, and greatly reduces the labor cost.
[0052] The technical solutions provided by various embodiments of the present application are described in detail below in conjunction with the accompanying drawings.
[0053] Figure 1 The schematic diagram of a water treatment system provided by an exemplary embodiment of the present application is shown in FIG. Figure 1 As shown, the system includes: a control device 20 and at least one collection subsystem 10, the control device 20 is in communication connection with the at least one collection subsystem 10, and the at least one collection subsystem 10 is distributed on at least one water treatment device. Among them, water treatment equipment includes but is not limited to washing equipment, dehydration equipment, drying equipment and other different types of water treatment equipment, which can be used to undertake water treatment operations in different process stages. Accordingly, the water treatment process includes but is not limited to process stages such as washing, dehydration, and drying.
[0054] The water treatment system provided in this embodiment can be applied to various water treatment scenarios, such as clothing washing, fabric washing and other chemical washing scenarios. This embodiment does not limit the application scenarios. The water treatment system provided in this embodiment can promote the intelligence, digitization and standardization of these scenarios.
[0055] In terms of physical implementation, the control device 20 can be a terminal device such as a personal computer, a smart phone, a tablet computer, etc., or a server device such as a conventional server, a cloud server, a cloud host, a virtual center, etc. The server device mainly includes a processor, a hard disk, a memory, a system bus, etc., which is similar to a general computer architecture.
[0056] In this embodiment, at least one collection subsystem 10 can collect water treatment data during the water treatment process and send the water treatment data to the control device 20. In order to facilitate the description of the deployment relationship between the collection subsystem 10 and the water treatment equipment, this embodiment provides a schematic diagram of the deployment relationship between the collection subsystem and the washing equipment, wherein the washing equipment is an exemplary water treatment equipment. Figure 3 In terms of physical implementation, the acquisition subsystem 10 may include a control component and at least one sensor. The sensor may be a speed sensor, a temperature and humidity sensor, a flow meter, a water level meter, a weight sensor or a piece counter, etc., but of course, the present embodiment is not limited thereto. Different types of sensors may be installed at suitable acquisition locations in the water treatment equipment. In addition, the types of sensors deployed on different types of water treatment equipment may not be exactly the same. For example, a water level meter may be deployed on a washing device, but not on a drying device. The control component may use a programmable device such as a programmable logic controller PCL or a field-programmable gate array FPGA, but of course, the present embodiment is not limited thereto.
[0057] In this embodiment, at least one sensor in the acquisition subsystem 10 can be used to collect production monitoring data corresponding to the water treatment equipment in which it is located, and provide it to the control component in the acquisition subsystem 10. The production monitoring data includes but is not limited to rotation speed, water level, water temperature, concentration, pH, output or chemical material usage.
[0058] The control component in the acquisition subsystem 10 can be used to respond to the production configuration operation, obtain the production configuration data, and send the production monitoring data and the production configuration data as the water treatment data corresponding to the water treatment equipment to the control device 20. In actual applications, the operator can enter the equipment identification, operator identification, process stage identification, equipment operation parameters, material types and other data in the control component, and the control component can obtain these data as part of the production configuration data; the control component can also respond to the equipment control instruction and record the equipment operation parameters as part of the production configuration data, wherein the equipment operation parameters may include but are not limited to downtime, standby time, running time, etc. It is worth noting that, usually, the operator will also enter the expected values of several parameters related to process control in the control component, such as the expected temperature, the expected speed, the type and amount of chemical materials used, etc. These entered expected values may be different from the actual values collected by at least one sensor. In this embodiment, the water treatment data can record the actual value and the entered value at the same time, but in the subsequent scheme involving the precipitation of the production process, the actual value will be used instead of the entered value, of course, this embodiment does not limit this.
[0059] Figure 2 A schematic diagram of the architecture of a data processing system provided by an exemplary embodiment of the present application. Figure 1 and Figure 2 , water treatment data includes but is not limited to production configuration data such as water treatment equipment identification, order information, operator identification, process stage identification, process control expectation, equipment operation parameters, and production monitoring data such as rotation speed, water level, water temperature, and output records. Preferably, the water treatment data may also include data related to the water treatment equipment, operators, and goods involved in the water treatment process. In this way, using water treatment data as the basis for data analysis, the water treatment equipment, operators, and goods in the water treatment process can be connected, so as to manage the water treatment process more comprehensively. For example, through the water treatment equipment identification, order information, and operator identification, the correlation between the operator, water treatment equipment, and goods in the water treatment process can be clearly analyzed, and then the operator, water treatment equipment, and goods can be managed in association, thereby improving management efficiency and improving management results.
[0060] refer to Figure 2 , the control device 20 may include a storage unit and a computing unit, wherein the storage unit may be used to store the water treatment data provided by at least one acquisition subsystem 10 and the result data obtained by the computing unit through data analysis. The storage unit may be in the form of local storage or cloud storage, which is not limited in this embodiment. The computing unit may be used to perform subsequent data analysis operations. Similarly, the computing unit may be in the form of local computing or cloud computing, which is not limited in this embodiment.
[0061] refer to Figure 1 and Figure 2 For the control device 20, the production status information in at least one dimension can be generated according to the water treatment data collected by at least one acquisition subsystem 10. In this embodiment, the control device 20 can perform data analysis on the water treatment data collected by at least one acquisition subsystem 10 according to at least one dimension, and perform data transmission.
[0062] In this embodiment, the dimension of data analysis may include at least one of the device status dimension, the energy consumption status dimension, and the production capacity status dimension. Figure 2 , the control device 20 can generate at least one of the equipment status information, energy consumption status information and production capacity status information according to the water treatment data collected by at least one collection subsystem 10 as the aforementioned production status information. Of course, the present embodiment is not limited thereto. In practical applications, the dimensions of data analysis may also include other dimensions required by the manufacturer or the entrusting party of the goods, for example, the production status dimension of a single product, etc.
[0063] Among them, production status information can provide management reference for the water treatment process.
[0064] In this embodiment, the aforementioned equipment status information can be used to describe the status of the water treatment equipment. The manufacturer or the entrusting party of the goods can analyze the equipment health status, equipment utilization rate, etc. according to the equipment status information, so that the manufacturer can scientifically plan the production capacity load and realize accurate production scheduling, and the entrusting party of the goods can understand the production capacity level of the manufacturer and then reasonably allocate orders. In actual applications, the control device 20 can be connected to the automatic production scheduling APS system of the manufacturer, and provide the aforementioned production status information of at least one dimension to the APS system, so that the APS system can extract key information of production factors such as equipment load and production hours to scientifically schedule the water treatment process.
[0065] In this embodiment, the aforementioned energy consumption status information can be used to describe the energy consumption in the water treatment process. Manufacturers can analyze water, electricity, steam energy consumption, chemical energy consumption, labor time cost, etc. according to the energy consumption status information, so that manufacturers can make accurate and reasonable quotations for the water treatment process. In practical applications, the control device 20 can be connected to the quotation system of the manufacturer so that the quotation system can perform cost accounting and quotation for the water treatment process according to energy consumption and time cost.
[0066] In this embodiment, the aforementioned capacity status information can be used to describe the capacity situation in the water treatment process. The manufacturer or the entrusting party of the goods can analyze the output data of the group or the output data of the individual according to the capacity status information, so as to scientifically evaluate the output efficiency of the group / individual and provide an accurate basis for management decisions. In practical applications, the control device 20 can be connected to the enterprise resource planning ERP system so that the ERP system can pull the order progress status information between the manufacturer and the entrusting party of the goods, so that the manufacturer or the entrusting party of the goods can analyze the production progress of the water treatment process in real time, making the water treatment process more transparent.
[0067] In addition, as mentioned above, water treatment equipment can be of various types, such as washing equipment, dehydration equipment, drying equipment, etc. In this embodiment, the control device 20 can obtain the production requirements corresponding to the target production object; determine multiple target water treatment equipment participating in the water treatment process of the target production object, and there is a process order between the multiple target water treatment equipment; based on the processing results of the previous target water treatment equipment and the production requirements corresponding to the target production object, determine the production process of the subsequent target water treatment equipment. In this way, the collaborative work between different types of water treatment equipment can be achieved to ensure that the final production quality of the target production object meets the production requirements. For example, the production process of the drying equipment can use the processing results of the dehydration equipment as a reference. If the moisture content after dehydration is too high, the temperature value, drying time, etc. in the production process of the drying equipment can be increased. In actual production, the number of target production objects can be determined according to the capacity of various types of target water treatment equipment. For example, if the capacity is 100 pieces, the 100 production objects can be circulated between multiple target water treatment equipment, and the generation processes between multiple target water treatment equipment can cooperate with each other to ensure that the production quality of the target production object meets the production requirements. Of course, the number of target production objects may also be determined according to the capacity of the order to which they belong, which is not limited in this embodiment.
[0068] Accordingly, in this embodiment, the collection subsystem 10 can be deployed on the water treatment equipment. Based on this, during the water treatment process, the collection subsystem 10 can collect water treatment data corresponding to the water treatment equipment and send the water treatment data to the control device 20; the control device 20 can generate production status information in at least one dimension based on the water treatment data collected by at least one collection subsystem 10. Accordingly, in this embodiment, various water treatment data can be automatically collected during the water treatment process, and by analyzing the water treatment data, rich production status information can be revealed, thereby providing a management reference for the water treatment process and realizing the intelligence and transparency of the water treatment process.
[0069] In the above or below embodiments, the control device 20 may adopt different data analysis solutions for different management requirements. The data analysis process will be described below for several exemplary management requirements.
[0070] An example management requirement :It can be the demand of the manufacturer to perform overall management of the water treatment process. In response to this management demand, the control device 20 can perform an overall analysis of the water treatment equipment, operators and goods in the factory.
[0071] Under this management requirement, the control device 20 can perform a global analysis on the water treatment data collected by at least one collection subsystem 10 to obtain device status information:
[0072] As mentioned above, the water treatment data may include equipment identification and equipment operation parameters. Among them, a single acquisition subsystem 10 may be associated with the water treatment equipment in which it is located, so that the equipment identification of the water treatment equipment in which it is located is configured into the water treatment data. The equipment operation parameters can reflect the use of the water treatment equipment, and in actual applications, they can be entered by the operator.
[0073] Based on this, in this embodiment, the control device 20 can analyze the equipment status from the perspective of a single water treatment device. To this end, the control device 20 can determine the state index of each water treatment device in at least one equipment state in at least one acquisition subsystem 10 according to the equipment identification and equipment operation parameters contained in the water treatment data collected by at least one acquisition subsystem 10; and configure the state index of each water treatment device in at least one equipment state in at least one acquisition subsystem 10 into the equipment state information. Among them, the control device 20 can pre-configure the calculation formula of the state index under different equipment states, in which the equipment operation parameters are used as independent variables and the state index is used as dependent variable.
[0074] Among them, the state index is used to describe the state of the water treatment equipment in a certain equipment state, and the state index can be a duration. For example, the duration of machine 1 in standby state is 180 minutes, the duration in running state is 300 minutes, and the duration in shutdown state is 120 minutes. Of course, the state index can also be expressed in other forms, such as the proportion of the total working time, etc., which is not limited here.
[0075] In this embodiment, the control device 20 can also analyze the equipment status as a whole from the perspective of multiple water treatment equipment. In this regard, the control device 20 can analyze the equipment status of a single water treatment equipment separately as described above to obtain the state index of at least one water treatment equipment in at least one equipment state, on this basis, the state distribution ratio between at least one equipment state can be determined; the state distribution ratio between at least one equipment state can be configured into the equipment status information. For example, the state distribution ratio between the three equipment states can be calculated based on the state index of each of the six water treatment equipment in the three equipment states, with the six water treatment equipment as a whole. In practical applications, the state index of each of the at least one water treatment equipment in the equipment state can be integrated (for example, summed, averaged, etc.) to obtain the characterization index under the equipment state; in this way, the ratio between the characterization indexes under at least one equipment state can be calculated as the state distribution ratio between at least one equipment state.
[0076] It is worth noting that the above-mentioned angle of a single water treatment device and the angle of multiple water treatment devices are merely two exemplary angles for analyzing device status information, and this embodiment is not limited thereto.
[0077] Under this management requirement, the control device 20 may also perform a global analysis on the water treatment data collected by at least one collection subsystem 10 to obtain energy consumption status information:
[0078] As mentioned earlier, water treatment data can include production monitoring data.
[0079] Based on this, in this embodiment, the control device 20 can analyze the energy consumption status from the perspective of a single analysis period. In this regard, the control device 20 can calculate the energy consumption index under at least one type of energy consumption in at least one analysis period based on the production monitoring data contained in the water treatment data collected by at least one acquisition subsystem 10; and configure the energy consumption index under at least one type of energy consumption into the energy consumption status information. Among them, the types of energy consumption include but are not limited to water, electricity, steam, chemical materials, etc. In addition, the control device 20 can pre-configure the calculation formula of the energy consumption index under different types of energy consumption, in which the process parameters are used as independent variables and the energy consumption index is used as the dependent variable.
[0080] Among them, the energy consumption index is used to describe the degree of energy consumption, and the energy consumption index can be a fee. For example, the electricity fee during the analysis period of 2020 / 8 / 26 is 400 yuan, the steam fee is 1217 yuan, and the water fee is 2185 yuan. Of course, the energy consumption index can also be expressed in other forms, such as energy usage, etc., which are not limited here.
[0081] In this embodiment, the control device 20 can also analyze the device state as a whole from the perspective of the entire analysis period. In this regard, the control device 20 can analyze the energy consumption state of a single analysis period separately as described above to obtain the energy consumption index of at least one analysis period under at least one type of energy consumption. On this basis, the state distribution ratio between at least one type of energy consumption can be determined; the state distribution ratio between at least one type of energy consumption can be configured into the energy consumption state information. For example, the state distribution ratio between the three types of energy consumption in the entire analysis period can be calculated based on the energy consumption index of each analysis period under the three types of energy consumption in the left legend. In practical applications, the energy consumption index of all analysis periods under a single type of energy consumption can be integrated (for example, summed, averaged, etc.) to obtain a characterization index under this type of energy consumption; in this way, the ratio between the characterization indexes under at least one type of energy consumption can be calculated as the state distribution ratio between at least one type of energy consumption.
[0082] It is worth noting that the above-mentioned single analysis period angle and full analysis period angle are only two exemplary angles for analyzing energy consumption status information, and this embodiment is not limited thereto.
[0083] Under this management requirement, the control device 20 may also perform a global analysis on the water treatment data collected by at least one collection subsystem 10 to obtain production capacity status information:
[0084] As mentioned above, the water treatment data may include operator identification and output. Among them, the operator identification can be entered by the operator. For example, the operator can use his own account and password to perform a login operation on the control component in the acquisition subsystem 10 in this embodiment when starting work, and the acquisition subsystem 10 can collect the operator's account as the operator identification. In addition, the acquisition subsystem 10 can perform output statistics according to a variety of statistical ranges using the piece counters it contains. In practical applications, different statistical range labels can be associated with statistical results to reflect the output under different statistical ranges. For example, the acquisition subsystem 10 can perform output statistics according to the analysis period, according to the operator, according to the process stage, and according to the order. The results of output statistics according to a variety of statistical ranges can be configured in the output record.
[0085] Based on this, in this embodiment, the control device 20 can analyze the capacity status from the perspective of a single operator. In this regard, the control device 20 can calculate the capacity index corresponding to at least one operator in the target analysis period according to the operator identification and production record contained in the water treatment data collected by at least one acquisition subsystem 10; and configure the capacity index corresponding to at least one operator in the target analysis period into the capacity status information. Among them, this embodiment does not limit the length of the target analysis period, for example, it can be 1 day or 11 days.
[0086] The capacity index is used to describe the degree of capacity, and the capacity index can be a quantity. For example, Wang Xiaoxiao's capacity index in the target analysis period is 560 pieces. Of course, the capacity index can also be expressed in other forms, such as the proportion of total capacity, etc., which are not limited here.
[0087] In this embodiment, the control device 20 can also analyze the capacity status as a whole from the perspective of a single analysis period and all personnel. In this regard, the control device 20 can determine the capacity summary index in at least one analysis period according to the production records contained in the water treatment data collected by at least one acquisition subsystem 10; and configure the capacity summary index in at least one analysis period to the capacity status information. For example, the control device 20 can calculate the capacity of all personnel on multiple dates respectively. In actual applications, if the control device 20 has calculated the capacity index of a single operator in each analysis period, the capacity index of all operators in the analysis period can be integrated (for example, summed, averaged, etc.) in a single analysis period to obtain the capacity summary index in the analysis period.
[0088] It is worth noting that the above-mentioned single operator's perspective and single analysis period and all personnel's perspective are only two exemplary perspectives for analyzing the capacity status information, and this embodiment is not limited thereto.
[0089] Another example management requirement :It can be the demand of the manufacturer or the entrusting party of the goods to manage a single order. In response to this management demand, the control device 20 can perform local analysis on the water treatment equipment, operators and goods in the factory based on the order.
[0090] As mentioned above, water treatment data may contain order information. Order information is used to distinguish different types of goods from different clients. Order information may include, but is not limited to, order identification, client identification, required process stages, quality requirements for each process stage, or identification of production objects. In practical applications, a model number may be set for the same type of goods from the same client as order information, and one or more sub-order numbers may be branched out from the same model number. For example, the same client may initiate multiple sub-order numbers for the same type of goods. The water treatment process for the same type of goods may be the same.
[0091] Based on this, in this embodiment, the control device 20 can determine the target water treatment data containing the target order information from the water treatment data collected by at least one acquisition subsystem 10; and generate the production status information on at least one dimension corresponding to the target order based on the target water treatment data. Compared with the previous exemplary management requirement, the difference between the control device 20 performing data analysis under the current exemplary management requirement is that the basis of data analysis has changed, and it is no longer global water treatment data, but target water treatment data containing target order information. The control device 20 generates at least one of the equipment status information, energy consumption status information and production capacity status information corresponding to the target order based on the target water treatment data. Among them, the process of generating equipment status information, energy consumption status information and production capacity status information can refer to the description under the previous exemplary management requirement, and the data analysis basis can be converted. In order to save space, it will not be repeated here, but this should not cause loss of the scope of protection of this application.
[0092] In this embodiment, based on at least one production status information corresponding to the target order, a management reference for the target order can be provided to the manufacturer. For the client of the target order, the production status of the target order can be understood from at least one production status information, making the water treatment process more transparent and realizing information synchronization between the manufacturer and the client.
[0093] Another exemplary management requirement :It can be the requirement of the manufacturer or the entrusting party of the goods to manage a single order at a single process stage. In response to this management requirement, the control device 20 can use the process stage under the order as a unit to perform local analysis on the water treatment equipment, operators and goods in the factory.
[0094] As mentioned above, the water treatment data may include order information and process stage identifiers. The process stages in the water treatment process may include but are not limited to washing, dehydration or drying. Washing, dehydration and drying may be further subdivided. For example, washing may be further subdivided into desizing, water purification, softening, first fixation and other process stages. This embodiment does not limit the granularity of the process stage division, which may be set according to actual needs.
[0095] Based on this, under this management requirement, the control device 20 can determine the target water treatment data containing the target order information and the target process stage identifier from the water treatment data collected by at least one acquisition subsystem 10, and use the target water treatment data as the analysis basis to generate the production status information of the target order in at least one dimension corresponding to the target process stage. Compared with the above two exemplary management requirements, the difference between the control device 20 performing data analysis under the current exemplary management requirement is that the basis of data analysis has changed and has become the target water treatment data containing the target order information and the target process stage identifier. The control device 20 can generate at least one of the equipment status information, energy consumption status information and production capacity status information corresponding to the target order based on the target water treatment data. Among them, the process of generating equipment status information, energy consumption status information and production capacity status information can refer to the description under the above two exemplary management requirements, and the data analysis basis can be converted. In order to save space, it will not be repeated here, but this should not cause a loss to the scope of protection of this application.
[0096] In this embodiment, based on at least one production status information corresponding to the target order at the target process stage, the manufacturer can be provided with a management reference for the target process stage of the target order. For the client of the target order, the production status of the target order at the target process stage can be grasped from at least one production status information, making the water treatment process more transparent and realizing information synchronization between the manufacturer and the client.
[0097] It is worth noting that the above management requirements are only exemplary, and the present embodiment is not limited thereto. In the present embodiment, data analysis may also be performed for other types of management requirements, which are not listed here in detail.
[0098] In the above or below embodiments, the control device 20 may also precipitate the production process during the water treatment process.
[0099] In this embodiment, the control device 20 can filter the target water treatment data collected during the water treatment process of the target order from the water treatment data according to the order information of the target order; and extract the production process corresponding to the target order from the target water treatment data. Among them, at least one target acquisition subsystem can be determined from at least one acquisition subsystem, and the water treatment data provided by the target acquisition subsystem contains the order information of the target order; and the water treatment data provided by at least one target acquisition subsystem is used as the target water treatment data.
[0100] As mentioned throughout the text, the water treatment data may include order information and production monitoring data. Based on this, in this embodiment, the control device 20 may determine the production process corresponding to the target order according to the production monitoring data included in the target water treatment data.
[0101] . In this embodiment, the process parameter value can be determined based on the production monitoring data contained in the target water treatment data; the process parameter value is associated with the process stage identifier contained in the target water treatment data to construct the production process corresponding to the target order. In this way, the production process corresponding to the target order may include the process parameter value corresponding to the target order. Accordingly, in this embodiment, the production processes can be precipitated separately under at least one water treatment equipment participating in the target order processing. Different water treatment equipment may participate in different process stages, and the production processes corresponding to different water treatment equipment participating in the same process stage may not be exactly the same. This is mainly due to the different properties of different water treatment equipment such as the degree of equipment wear. In this embodiment, the production process corresponding to the target order can be accurately and comprehensively precipitated.
[0102] In actual production, manufacturers usually inspect the production results. In this embodiment, the production results can be determined on an order-by-order basis to determine whether they are qualified. If qualified, the production process in this water treatment process can be precipitated to generate the production process corresponding to the target order. In the case where the production result corresponding to the target order is unqualified, in this embodiment, the production process can also be precipitated for the target order, and the production result information corresponding to the production process can be recorded. In the case where the production result corresponding to the target order is unqualified, if the production requirements in the order information of the future order match the production result information corresponding to the target order, the future order can still be water treated according to the production process corresponding to the target order. For example, the color of the target order after water treatment does not meet its production requirements, but the color matches the color required by the future order. In this embodiment, the production process corresponding to the target order can still be used for water treatment.
[0103] In practical applications, the process parameter values in the water treatment data can be associated with the process stage identifier, and the types and values of the process parameters associated with different process stage identifiers may not be exactly the same. In this way, the control device 20 can determine at least one process stage corresponding to the target order, and precipitate the process parameter values respectively under at least one process stage to generate the production process corresponding to the target order. In addition, the water treatment data may also include the production time corresponding to the process stage identifier, so that the control device 20 can also configure the production sequence between at least one process stage corresponding to the target order in the production process.
[0104] Based on this, in this embodiment, the control device 20 can receive a return order request for the target order; import the production process corresponding to the target order into the water treatment equipment participating in the return order, so that the water treatment equipment can perform return order production for the target order according to the production process. Among them, a return order refers to the same treatment of a new batch of goods according to the historical production plan. Specifically, the control device 20 can send the production process corresponding to the target order to the control component deployed on the water treatment equipment participating in the return order, and the control component controls the water treatment equipment to perform return order production according to the production process.
[0105] Accordingly, in this embodiment, the production process in the water treatment process can be precipitated. By introducing the precipitated production process into the water treatment equipment, the water treatment equipment can be controlled to perform automatic water treatment, reduce manual intervention, improve water treatment efficiency and production quality, and realize standardization and digitization of the water treatment process, thereby improving the reproducibility of process parameters in the water treatment process.
[0106] In the above or following embodiments, reference Figure 1 The data processing system may further include a display subsystem. The control device may send production status information in at least one dimension to the display subsystem, and the display subsystem may display at least one production status information.
[0107] The manufacturer can intuitively view the production status information in at least one dimension through the display subsystem. The display subsystem can display the production status information in the form of a bar chart or a pie chart. Of course, this embodiment is not limited to this. The display subsystem can also display the production status information in other forms, such as icons, animations, etc.
[0108] Accordingly, in this embodiment, the manufacturer can view the production status information in at least one dimension of the water treatment process in real time and intuitively, so that the water treatment process can be managed more quickly and accurately, greatly improving the management intelligence and efficiency of the water treatment process.
[0109] The following introduces an application example of a data processing system.
[0110] The water treatment equipment owned by manufacturer A is equipped with a data collection subsystem, and manufacturer A can call the cloud service through an APP or website to connect the data collection subsystem in its factory to the server providing the cloud service. The cloud service is the data analysis service that the control device in the above embodiment can provide.
[0111] Operators in manufacturer A can operate the control components in the acquisition subsystem to enter process control expectations, equipment identification, operator identification, process stage identification, order information and other production parameters. The control components can reuse the original components on the water treatment equipment for controlling the equipment.
[0112] Manufacturer A receives an order from client B, which can adopt a unified water treatment solution. Therefore, a unified model number b can be configured for the goods under the order.
[0113] In the process of water treatment of this batch of goods, taking the operation process of operator C as an example, when operator C works on water treatment equipment D, he needs to log in to the production program in the control component on water treatment equipment D with his own account and password, and enter the current processing model number, process stage identification, equipment operation parameters, equipment identification, process control expected values, etc. Moreover, when these production configuration data change, they should also be updated in time, and the update time should be recorded. The control component can control the water treatment equipment to carry out the water treatment process according to the process control target value. During this process, at least one sensor deployed on water treatment equipment D can collect production monitoring data and provide it to the control component. The control component can provide the aforementioned part of the production configuration data and the received production monitoring data to the server.
[0114] In this way, the server can receive water treatment data provided by at least one acquisition subsystem deployed in manufacturer A. The server can use these water treatment data for data analysis. Of course, before this, the management personnel of manufacturer A can issue the server with the permission to use the water treatment data and verify the permission of the server to ensure data security.
[0115] Based on this, the server can perform data analysis according to management needs. Under different management needs, the server can extract part or all of the water treatment data obtained above as the basis for analysis, and analyze from various required dimensions to generate production status information. For example, the server can perform data analysis under item number b to obtain production status information under item number b, and provide management reference for manufacturer A and client B. The server can also precipitate the production process for item number b. When manufacturer A receives the water treatment commission of item number b again, it can request the server to directly import the production process of item number b into the control components of the relevant water treatment equipment to control the water treatment equipment for automatic water treatment.
[0116] This can realize the intelligent management of the water treatment process; the water treatment process becomes more transparent, and the client can view the goods processing status in real time; it can also precipitate the production process for the water treatment process, realize the standardization and digitization of the process formula, make the process formula reusable, and provide stability of process quality.
[0117] Figure 4 A schematic flow chart of a water treatment method provided by another exemplary embodiment of the present application, the method can be performed by a water treatment device, the water treatment device can be implemented as a combination of software and / or hardware, and the water treatment device can be integrated in a control device. Figure 4 , the method comprising:
[0118] Step 400: receiving a production monitoring request;
[0119] Step 401: According to a production monitoring request, during the water treatment process, the water treatment data generated on the water treatment equipment is collected using a collection subsystem deployed on the water treatment equipment;
[0120] Step 401: Generate production status information in at least one dimension based on water treatment data provided by the acquisition subsystem.
[0121] In an optional embodiment, the step of collecting water treatment data provided by the subsystem to generate production status information in at least one dimension includes:
[0122] At least one of equipment status information, energy consumption status information and production capacity status information is generated based on the water treatment data collected by at least one collection subsystem.
[0123] In an optional embodiment, the water treatment data includes production monitoring data and production configuration data. The production monitoring data is collected by at least one sensor in the collection subsystem, and the production configuration data is acquired by the control component in the collection subsystem in response to the production configuration operation.
[0124] In an optional embodiment, the production configuration data includes order information, and the method further includes:
[0125] According to the order information of the target order, the target water treatment data collected during the water treatment process of the target order is filtered from the water treatment data;
[0126] Extract the production process corresponding to the target order from the target water treatment data.
[0127] In an optional embodiment, the step of screening target water treatment data includes:
[0128] From the collection subsystems, a target collection subsystem is determined, and the water treatment data provided by the target collection subsystem includes order information of the target order;
[0129] The water treatment data provided by the target acquisition subsystem is used as the target water treatment data.
[0130] In an optional embodiment, the production configuration data also includes a process stage identifier, and the step of extracting the production process corresponding to the target order includes:
[0131] Determine process parameter values based on production monitoring data included in target water treatment data;
[0132] The process parameter values are associated with the process stage identifiers contained in the target water treatment data to construct the production process corresponding to the target order.
[0133] In an optional embodiment, the method further comprises:
[0134] Receive a return order request for a target order; import the production process corresponding to the target order into the control components of the water treatment equipment involved in the return order;
[0135] The control components on the water treatment equipment involved in the reorder are also used to control the water treatment equipment where it is located to perform reorder production for the target order according to the production process corresponding to the target order.
[0136] In an optional embodiment, the method further comprises:
[0137] The production status information of at least one dimension corresponding to the target order is provided to the client of the target order so that the client can analyze the production status of the target order.
[0138] In an optional embodiment, the method further comprises:
[0139] The production status information in at least one dimension is sent to the display subsystem, so that the display subsystem can visually display the production status information in at least one dimension.
[0140] It is worth noting that the technical details in the above-mentioned water treatment method embodiments can be referred to the relevant description in the aforementioned system embodiments. In order to save space, they will not be repeated here, but this should not cause a loss in the scope of protection of this application.
[0141] It should be noted that in some of the processes described in the above embodiments and the accompanying drawings, multiple operations appearing in a specific order are included, but it should be clearly understood that these operations may not be executed in the order in which they appear in this document or may be executed in parallel, and the sequence numbers of the operations, such as 401, 402, etc., are only used to distinguish between different operations, and the sequence numbers themselves do not represent any execution order. In addition, these processes may include more or fewer operations, and these operations may be executed in sequence or in parallel.
[0142] Figure 5 A structural diagram of a control device provided by another exemplary embodiment of the present application is shown in FIG. Figure 5 As shown, the control computing device includes: a memory 50, a processor 51 and a communication component 52.
[0143] The processor 51 is coupled to the memory 50 and the communication component 52, and is used to execute the computer program in the memory 50, so as to:
[0144] Receiving a production monitoring request via the communication component 51;
[0145] According to the production monitoring request, during the water treatment process, the water treatment data generated on the water treatment equipment is collected using the collection subsystem deployed on the water treatment equipment;
[0146] Production status information in at least one dimension is generated based on the water treatment data provided by the acquisition subsystem.
[0147] In an optional embodiment, the water treatment data includes production monitoring data and production configuration data. The production monitoring data is collected by at least one sensor in the collection subsystem, and the production configuration data is acquired by the control component in the collection subsystem in response to the production configuration operation.
[0148] In an optional embodiment, the production configuration data includes order information, and the processor 51 is further configured to:
[0149] According to the order information of the target order, the target water treatment data collected during the water treatment process of the target order is filtered from the water treatment data;
[0150] Extract the production process corresponding to the target order from the target water treatment data.
[0151] In an optional embodiment, when screening the target water treatment data, the processor 51 is used to:
[0152] From the collection subsystems, a target collection subsystem is determined, and the water treatment data provided by the target collection subsystem includes order information of the target order;
[0153] The water treatment data provided by the target acquisition subsystem is used as the target water treatment data.
[0154] In an optional embodiment, the production configuration data also includes a process stage identifier, and the processor 51, when extracting the production process corresponding to the target order, is used to:
[0155] Determine process parameter values based on production monitoring data included in target water treatment data;
[0156] The process parameter values are associated with the process stage identifiers contained in the target water treatment data to construct the production process corresponding to the target order.
[0157] In an optional embodiment, the processor 51 is further configured to:
[0158] Receive a return order request for a target order; import the production process corresponding to the target order into the control components of the water treatment equipment involved in the return order;
[0159] The control components on the water treatment equipment involved in the reorder are also used to control the water treatment equipment where it is located to perform reorder production for the target order according to the production process corresponding to the target order.
[0160] In an optional embodiment, the processor 51 is further configured to:
[0161] The production status information of at least one dimension corresponding to the target order is provided to the client of the target order so that the client can analyze the production status of the target order.
[0162] In an optional embodiment, the processor 51 is further configured to:
[0163] The production status information in at least one dimension is sent to the display subsystem, so that the display subsystem can visually display the production status information in at least one dimension.
[0164] Further, if Figure 5 As shown, the control device also includes: a power supply component 83 and other components. Figure 5 Only some components are shown schematically, and it does not mean that the computing device only includes Figure 5 Components shown.
[0165] It is worth noting that the technical details in the above-mentioned control device embodiments can be referred to the relevant description in the aforementioned system embodiments. In order to save space, they will not be repeated here, but this should not cause loss of the protection scope of this application.
[0166] Accordingly, an embodiment of the present application further provides a computer-readable storage medium storing a computer program, which, when executed, can implement each step that can be executed by the control device in the above method embodiment.
[0167] Figure 6 A schematic flow chart of another water treatment method provided as another exemplary embodiment of the present application. Figure 6 The water treatment method provided in this embodiment can be executed by a water treatment device, which can be implemented as a combination of software and / or hardware, and can be integrated in a control device. Figure 6 , the method comprising:
[0168] Step 600: receiving order information to be processed;
[0169] Step 601: Determine the production process that matches the order information;
[0170] Step 602: Send the production process to the water treatment equipment, and the water treatment equipment performs water treatment operations based on the production process.
[0171] The water treatment method provided in this embodiment can be applied to a control device that manages at least one water treatment device. In practical applications, the control device can correspond to the control device in the aforementioned water treatment system. Of course, it can also be a control device independently deployed by the manufacturer. In this case, the control device can communicate with the control device in the aforementioned water treatment system and obtain various required data from the control device.
[0172] In this embodiment, the number of water treatment equipment may be one or more, and the types of water treatment equipment may include but are not limited to washing equipment, dehydration equipment, drying equipment, etc. For other information about the water treatment equipment, please refer to the description of the water treatment equipment in the above water treatment system embodiment, which will not be repeated here.
[0173] In step 600, an order processing request may be received, and the order processing request may include order information of the order to be processed. The order information may include, but is not limited to, an order identifier, a client identifier, required process stages, quality requirements of each process stage, or an identifier of a production object, etc., but the present embodiment is not limited thereto.
[0174] As mentioned in the aforementioned water system embodiment, the production process can be precipitated for the order in advance. Based on this, in this embodiment, in step 601, the production process matching the order information can be determined. It should be understood that the production process determined to match the order information may involve at least one process stage, and the production processes corresponding to different water treatment equipment at the same process stage may not be exactly the same, which is mainly due to the different properties such as the degree of wear of different water treatment equipment. In practical applications, production processes can be stored for different water treatment equipment respectively.
[0175] In this embodiment, in step 602, the production process can be sent to the water treatment equipment, and the water treatment equipment performs water treatment operations based on the production process. If a control component, such as a PLC, is deployed on the water treatment equipment, the production process can be sent to the control component deployed on the water treatment equipment, and the control component controls the water treatment equipment to perform corresponding water treatment operations according to the production process. Of course, this embodiment is not limited to this.
[0176] Based on this, in this embodiment, the production process can be continuously precipitated during the water treatment process, and an appropriate production process can be determined for the order information to be processed. Thus, the water treatment equipment can automatically perform water treatment operations based on the matched production process, with basically no need for human intervention, thereby realizing the intelligence and standardization of the water treatment production process, greatly reducing labor costs, and improving production quality.
[0177] In the above or below embodiments, the water treatment equipment participating in the order processing may be determined from at least one water treatment equipment, wherein the water treatment equipment participating in the order processing may be one or more.
[0178] In an optional implementation, the production requirements of the pending orders may be determined based on the order information of the pending orders;
[0179] Obtain the production status information corresponding to each water treatment equipment;
[0180] The water treatment equipment is scheduled according to the production requirements and the corresponding production status information of each water treatment equipment to determine the water treatment equipment involved in the order processing.
[0181] Among them, the production status information may include but is not limited to equipment status information, energy consumption status information or production capacity status information. The process of determining the production status information can refer to the relevant description in the aforementioned water treatment system, which will not be repeated here. Based on the production status information of at least one water treatment equipment owned by the manufacturer, the at least one water treatment equipment can be scientifically scheduled according to the quality requirements, construction period requirements and other production requirements of the pending order, so as to more reasonably determine at least one water treatment equipment involved in the water treatment process of the pending order.
[0182] Of course, in this embodiment, other implementation methods may also be used to determine the water treatment equipment involved in order processing, for example, selecting currently idle water treatment equipment, etc. This embodiment does not limit this.
[0183] The pending order may involve at least one process stage. In this regard, in this embodiment, the water treatment equipment involved in order processing may be determined in at least one process stage included in the pending order. The solution of determining the water treatment equipment involved in order processing in a single process stage may also adopt the aforementioned implementation method.
[0184] On the basis of determining the water treatment equipment involved in the order processing, the production process matching the order information can be determined from the production processes that have been processed by the water treatment equipment involved in the order processing. Among them, the processed production process can be the production process precipitated for the processed order. For a water treatment equipment, it may have processed several historical orders, and the production processes precipitated under different historical orders may be different. For the same historical order, the production processes precipitated under different water treatment equipment participating in the same process stage may not be exactly the same.
[0185] Based on this, taking the first water treatment equipment among the water treatment equipment participating in the order processing as an example, the solution for determining the production process matching the order information may be:
[0186] Obtain historical order records corresponding to each production process that has been processed by the first water treatment equipment;
[0187] From the historical order records, search for the target historical order that matches the order information;
[0188] According to the production process under the target historical order, determine the production process that matches the order information.
[0189] In this way, a production process matching the order information can be determined for each water treatment equipment involved in the order processing.
[0190] In actual applications, the water treatment equipment determined to participate in order processing may not have processed historical orders that are completely consistent with the pending orders. In this case, the production process that matches the order information under this type of water treatment equipment may not be accurate enough. Of course, there are other factors that may cause the determined production process to be inaccurate. In this regard, in this embodiment, the production process found can be displayed, for example, the production process under the target historical order; in response to the production process modification operation, this type of production process is modified; and the modified production process is used as the production process that matches the order information. In this way, the operator can adjust the production process in a timely manner to ensure the processing quality of the pending orders.
[0191] In addition, a production process confirmation control can also be displayed, and the operator can perform the production process confirmation operation through the production process confirmation control. Based on this, in this embodiment, in response to the production process confirmation operation, the water treatment equipment can be controlled to start the water treatment operation according to the confirmed production process. In this way, accurate control of the water treatment equipment can be achieved to ensure the processing quality of the pending orders.
[0192] Optionally, in this embodiment, there may be multiple water treatment equipment involved in order processing, and there is a process sequence between the multiple water treatment equipment. Based on this, the production requirements of the pending order can be obtained; based on the processing results of the previous water treatment equipment and the production requirements of the pending order, the production process of the subsequent water treatment equipment is determined. In this way, the collaborative work between different water treatment equipment can be achieved to ensure that the final production quality of the target production object meets the production requirements. For example, the production process of the drying equipment can use the processing results of the dehydration equipment as a reference. If the moisture content after dehydration is too high, the temperature value, drying time, etc. in the production process of the drying equipment can be increased.
[0193] Figure 7 A schematic flow chart of another water treatment method is provided for another exemplary embodiment of the present application. Figure 7 , the method comprising:
[0194] Step 700: Obtain order information to be processed;
[0195] Step 707: Determine a production process that matches the order information from the production processes that have been processed by the water treatment equipment;
[0196] Step 702: Perform water treatment on the production object of the order based on the matched production process.
[0197] The order information may include, but is not limited to, order identification, client identification, required process stages, quality requirements for each process stage, or identification of the production object.
[0198] The water treatment method provided in this embodiment can be applied to water treatment equipment. In this embodiment, the water treatment equipment can keep the production process that has been processed in advance. Among them, the water treatment equipment can pull the production process that has been processed by the water treatment equipment from the control equipment in the aforementioned water treatment system. Of course, in this embodiment, the water treatment equipment can also precipitate the production process according to the production monitoring data collected by itself. The precipitation scheme of the production process can refer to the scheme of the control equipment for precipitation of the production process in the aforementioned water system embodiment, which will not be described in detail again. In this way, the water treatment equipment can precipitate the production process under the processed historical orders. Therefore, in this embodiment, the water treatment equipment can obtain the production process corresponding to at least one historical order that it has processed.
[0199] Based on this, in this embodiment, an exemplary solution for determining a production process that matches the order information may be:
[0200] Obtain the historical order records corresponding to each production process that has been processed by the water treatment equipment;
[0201] From the historical order records, search for the target historical order that matches the order information;
[0202] The production process under the target historical order is used as the production process that matches the order information.
[0203] In actual applications, the water treatment equipment may not have processed historical orders that are completely consistent with the pending orders. In this case, the production process matched by the determined order information may not be accurate enough. Of course, there are other factors that may cause the determined production process to be inaccurate. In this regard, in this embodiment, the determined production process can be displayed, for example, the production process under the target historical order; in response to the production process modification operation, the determined production process is modified; and the modified production process is used as the production process that matches the order information. In this way, the operator can adjust the production process in a timely manner to ensure the processing quality of the pending orders.
[0204] In addition, a production process confirmation control can also be displayed, and the operator can perform the production process confirmation operation through the production process confirmation control. Based on this, in this embodiment, in response to the production process confirmation operation, the water treatment equipment can be controlled to start the water treatment operation according to the confirmed production process. In this way, accurate control of the water treatment equipment can be achieved to ensure the processing quality of the pending orders.
[0205] Figure 8A structural diagram of a control device provided by another exemplary embodiment of the present application. Figure 8 The control device may include: a memory 80, a processor 81 and a communication component 82.
[0206] The processor 81 is coupled to the memory 80 and the communication component 82, and is used to execute the computer program in the memory 80 to:
[0207] Receiving order information to be processed through the communication component 82;
[0208] Determine the production process that matches the order information;
[0209] The production process is sent to the water treatment equipment through the communication component 82, and the water treatment equipment performs water treatment operations based on the production process.
[0210] In an optional embodiment, when determining the production process matching the order information, the processor 81 is configured to:
[0211] Identify the water treatment equipment involved in order processing;
[0212] From the production processes that have been processed by the water treatment equipment involved in the order processing, determine the production process that matches the order information.
[0213] In an optional embodiment, when the processor 81 determines the production process that matches the order information from the production processes that have been processed by the water treatment equipment involved in the order processing, it is configured to:
[0214] Obtain historical order records corresponding to each production process that has been processed by the first water treatment equipment;
[0215] From the historical order records, search for the target historical order that matches the order information;
[0216] According to the production process under the target historical order, determine the production process that matches the order information;
[0217] The first water treatment equipment is any one of the water treatment equipments involved in order processing.
[0218] In an optional embodiment, when the processor 81 determines the production process matching the order information according to the production process under the target historical order, it is configured to:
[0219] Demonstrate the production process under the target historical orders;
[0220] In response to the production process modification operation, modify the production process under the target historical order;
[0221] The modified production process is used as the production process that matches the order information.
[0222] In an optional embodiment, the water treatment operation includes at least one processing step, and the processor 81, when determining the water treatment equipment involved in the order processing, is used to:
[0223] In at least one processing link, water treatment equipment involved in order processing is determined respectively.
[0224] In an optional embodiment, when determining the water treatment equipment involved in order processing, the processor 81 is used to:
[0225] Determine the production requirements for pending orders based on order information;
[0226] Obtain the production status information corresponding to each water treatment equipment;
[0227] The water treatment equipment is scheduled according to the production requirements and the corresponding production status information of each water treatment equipment to determine the water treatment equipment involved in the order processing.
[0228] In an optional embodiment, the production status information includes one or more of equipment status information, energy consumption status information and production capacity status information.
[0229] In an optional embodiment, when the processor 81 sends the production process to the water treatment equipment, it is used to:
[0230] Display the production process that matches the order information;
[0231] In response to the production process confirmation operation, the production process is issued to the water treatment equipment.
[0232] Further, if Figure 8 As shown, the control device also includes: a power supply component 83 and other components. Figure 8 Only some components are shown schematically, which does not mean that the control device only includes Figure 8 Components shown.
[0233] It is worth noting that the technical details in the above-mentioned control device embodiments can be referred to the relevant description in the aforementioned water treatment method embodiment. In order to save space, they will not be repeated here, but this should not cause a loss in the scope of protection of this application.
[0234] Accordingly, an embodiment of the present application further provides a computer-readable storage medium storing a computer program, which, when executed, can implement each step that can be executed by the control device in the above method embodiment.
[0235] Fig. 9 A schematic diagram of the structure of a water treatment device provided by another exemplary embodiment of the present application. Fig. 9The water treatment device may include: a memory 90, a processor 91 and a communication component 92.
[0236] The processor 91 is coupled to the memory 90 and the communication component 92, and is used to execute the computer program in the memory 90, so as to:
[0237] Obtaining order information to be processed through the communication component 92;
[0238] Determine the production process that matches the order information from the production processes that have been processed by the water treatment equipment;
[0239] Water treatment is performed on the production objects of the order based on the matching production process.
[0240] In an optional embodiment, when the processor 91 determines the production process that matches the order information from the production processes that have been processed by the water treatment equipment, it is configured to:
[0241] Obtain the historical order records corresponding to each production process that has been processed by the water treatment equipment;
[0242] From the historical order records, search for the target historical order that matches the order information;
[0243] The production process under the target historical order is used as the production process that matches the order information.
[0244] In an optional embodiment, the order information includes one or more information of order information, client identification, required process stages, quality requirements of each process stage, and identification of the production object.
[0245] Further, if Fig. 9 As shown, the water treatment equipment also includes: a power supply component 93 and other components. Fig. 9 Only some components are shown schematically, which does not mean that the water treatment equipment only includes Fig. 9 It is worth noting that the technical details of the above-mentioned water treatment equipment in each embodiment can refer to the relevant description of the above-mentioned water treatment method embodiment, and will not be repeated here to save space, but this should not cause loss of the protection scope of this application.
[0246] Accordingly, an embodiment of the present application further provides a computer-readable storage medium storing a computer program, which, when executed, can implement each step that can be performed by the water treatment device in the above method embodiment.
[0247] Above Figure 5 , 8, 9, for storing computer programs, and can be configured to store various other data to support operations on the computing platform. Examples of such data include instructions for any application or method operating on the computing platform, contact data, phone book data, messages, pictures, videos, etc. The memory can be implemented by any type of volatile or non-volatile storage device or a combination thereof, such as static random access memory (SRAM), electrically erasable programmable read-only memory (EEPROM), erasable programmable read-only memory (EPROM), programmable read-only memory (PROM), read-only memory (ROM), magnetic memory, flash memory, magnetic disk or optical disk.
[0248] Above Figure 5 , 8 , The communication component in 9 is configured to facilitate wired or wireless communication between the device where the communication component is located and other devices. The device where the communication component is located can access a wireless network based on a communication standard, such as WiFi, 2G, 3G, 4G / LTE, 5G and other mobile communication networks, or a combination thereof. In an exemplary embodiment, the communication component receives a broadcast signal or broadcast-related information from an external broadcast management system via a broadcast channel. In an exemplary embodiment, the communication component also includes a near field communication (NFC) module to facilitate short-range communication. For example, the NFC module can be implemented based on radio frequency identification (RFID) technology, infrared data association (IrDA) technology, ultra-wideband (UWB) technology, Bluetooth (BT) technology and other technologies.
[0249] Above Figure 5 , 8 , 9, provides power to various components of the device where the power supply component is located. The power supply component may include a power management system, one or more power supplies, and other components associated with generating, managing, and distributing power to the device where the power supply component is located.
[0250] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.
[0251] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0252] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0253] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0254] In a typical configuration, a computing device includes one or more processors (CPU), input / output interfaces, network interfaces, and memory.
[0255] The memory may include non-permanent storage in a computer-readable medium, random access memory (RAM) and / or non-volatile memory in the form of read-only memory (ROM) or flash RAM. The memory is an example of a computer-readable medium.
[0256] Computer readable media include permanent and non-permanent, removable and non-removable media that can be implemented by any method or technology to store information. Information can be computer readable instructions, data structures, program modules or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, compact disk read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, magnetic cassettes, magnetic tape magnetic disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device. As defined herein, computer readable media does not include temporary computer readable media (transitory media), such as modulated data signals and carrier waves.
[0257] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.
[0258] The above is only the embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various changes and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included in the protection scope of the present application.
Claims
1. A water treatment method, suitable for controlling a device, characterized in that: include: Receive pending order information; Under at least one process stage included in the order to be processed, respectively determine the water treatment equipment involved in the order processing; Searching for a production process matching the order information from the production processes of the water treatment equipment involved in the order processing for the processed order sediments; Sending the production process to water treatment equipment, and having the water treatment equipment perform water treatment operations based on the production process; Among them, the process of precipitating the production process for processed orders includes: Filtering target water treatment data collected during the water treatment process of the processed order from water treatment data provided by at least one water treatment device that is communicatively connected to the water treatment device; Determining process parameter values according to the production monitoring data included in the target water treatment data; Associating the process parameter value with the process stage identifier contained in the target water treatment data to construct a production process corresponding to the processed order; Separately precipitate production processes under at least one water treatment device participating in said processed order.
2. The method according to claim 1, characterized in that The step of determining a production process matching the order information from the production process of the water treatment equipment involved in the order processing for the processed order precipitation comprises: Obtain historical order records corresponding to each production process that has been processed by the first water treatment equipment; Searching the historical order records for a target historical order that matches the order information; Determine, according to the production process under the target historical order, a production process that matches the order information; Wherein, the first water treatment equipment is any one of the water treatment equipment involved in order processing.
3. The method according to claim 2, characterized in that The step of determining the production process matching the order information according to the production process under the target historical order includes: Demonstrate the production process under the target historical order; In response to the production process modification operation, modify the production process under the target historical order; The modified production process is used as the production process matching the order information.
4. The method according to claim 1, characterized in that: The water treatment equipment involved in order processing is determined to include: Determine production requirements for pending orders based on the order information; Obtaining production status information corresponding to each of the water treatment equipment; The water treatment equipment is scheduled for production according to the production requirements and the production status information corresponding to each of the water treatment equipment to determine the water treatment equipment involved in order processing.
5. The method according to claim 4, characterized in that The production status information includes one or more of equipment status information, energy consumption status information and production capacity status information.
6. The method according to claim 1, characterized in that The step of sending the production process to the water treatment equipment comprises: Displaying the production process matching the order information; In response to the production process confirmation operation, the production process is issued to the water treatment equipment.
7. The method according to claim 1, characterized in that There are multiple water treatment equipments involved in the order processing, and there is a process sequence between the multiple water treatment equipments, and the method further includes: Obtaining production requirements for the pending order; Based on the processing result of the previous water treatment equipment and the production requirements of the pending order, the production process of the subsequent water treatment equipment is determined.
8. A water treatment method, applicable to a water treatment device, characterized in that: include: Get pending order information; Pulling the production process deposited for the processed order from the control device, and searching for a production process matching the order information from the pulled production processes; Performing water treatment on the production object of the order based on the matched production process; The process of the control device settling the production process for the processed order includes: Filtering target water treatment data collected during the water treatment process of the processed order from water treatment data provided by at least one water treatment device that is communicatively connected to the water treatment device; Determining process parameter values according to the production monitoring data included in the target water treatment data; Associating the process parameter value with the process stage identifier contained in the target water treatment data to construct a production process corresponding to the processed order; Separately precipitate production processes under at least one water treatment device participating in said processed order.
9. The method according to claim 8, characterized in that The step of pulling the production process deposited for the processed order from the control device to search for a production process matching the order information from the pulled production processes includes: Obtain historical order records corresponding to each production process that has been processed by the water treatment equipment; Searching the historical order records for a target historical order that matches the order information; The production process under the target historical order is used as the production process matching the order information.
10. The method according to claim 8, characterized in that The order information includes one or more of order information, client identification, required process stages, quality requirements for each process stage, and identification of a production object.
11. A control device, characterized in that: Includes memory, processor, and communication components; The memory is used to store one or more computer instructions; The processor is coupled to the memory and the communication component and is configured to execute the one or more computer instructions for: receiving order information to be processed through the communication component; Under at least one process stage included in the order to be processed, respectively determine the water treatment equipment involved in the order processing; Querying the production process matching the order information from the production processes of the water treatment equipment involved in the order processing for the processed order sediment; The production process is sent to the water treatment equipment through the communication component, and the water treatment equipment performs water treatment operations based on the production process; Among them, the process of precipitating the production process for processed orders includes: Filtering target water treatment data collected during the water treatment process of the processed order from water treatment data provided by at least one water treatment device that is communicatively connected to the water treatment device; Determining process parameter values according to the production monitoring data included in the target water treatment data; Associating the process parameter value with the process stage identifier contained in the target water treatment data to construct a production process corresponding to the processed order; Separately precipitate production processes under at least one water treatment device participating in said processed order.
12. A water treatment device, characterized in that: Includes memory, processor, and communication components; The memory is used to store one or more computer instructions; The processor is coupled to the memory and the communication component and is configured to execute the one or more computer instructions for: Get pending order information; Pulling the production process deposited for the processed order from the control device, and searching for a production process matching the order information from the pulled production processes; Performing water treatment on the production object of the order based on the matched production process; The process of the control device settling the production process for the processed order includes: Filtering target water treatment data collected during the water treatment process of the processed order from water treatment data provided by at least one water treatment device that is communicatively connected to the water treatment device; Determining process parameter values according to the production monitoring data included in the target water treatment data; Associating the process parameter value with the process stage identifier contained in the target water treatment data to construct a production process corresponding to the processed order; Separately precipitate production processes under at least one water treatment device participating in said processed order.
13. A water treatment system, characterized in that: It includes a control device and a collection subsystem deployed on the water treatment device, and the control device is communicatively connected with the collection subsystem; The acquisition subsystem is used to collect water treatment data generated by the water treatment device in which it is located during the water treatment process, and provide the water treatment data to the control device; The control device is used to generate production status information in at least one dimension based on the water treatment data provided by the acquisition subsystem; The control device is also used to precipitate the production process for the processed order, and the precipitation process includes: Filter target water treatment data collected during the water treatment process of the processed order from water treatment data provided by at least one water treatment device that is communicatively connected to itself; determine process parameter values based on production monitoring data contained in the target water treatment data; associate the process parameter values with process stage identifiers contained in the target water treatment data to construct a production process corresponding to the processed order; and precipitate the production processes separately under at least one water treatment device involved in the processed order.
14. The system according to claim 13, characterized in that The acquisition subsystem includes a control component and at least one sensor, wherein the control component is communicatively connected with the control device and the at least one sensor respectively; The sensor is used to collect production monitoring data corresponding to the water treatment equipment where it is located, and provide the production monitoring data to the control component; The control component is used to obtain production configuration data in response to the production configuration operation; The production configuration data and the production configuration data provided by the at least one sensor are used as the water treatment data; and the water treatment data is provided to the control device.
15. The system according to claim 14, characterized in that The production monitoring data includes one or more of rotation speed, water level, water temperature, pH value and chemical material usage.
16. The system according to claim 13, characterized in that When screening target water treatment data, the control device is used to: Determine a target acquisition subsystem from among the acquisition subsystems, wherein the water treatment data provided by the target acquisition subsystem includes order information of the target order; The water treatment data provided by the target acquisition subsystem is used as the target water treatment data.
17. The system according to claim 13, characterized in that The control device is also used for: Receive a return order request for the target order; import the production process corresponding to the target order into the control component of the water treatment equipment involved in the return order; The control component on the water treatment equipment involved in the reorder is also used to control the water treatment equipment where it is located to perform reorder production on the target order according to the production process corresponding to the target order.
18. The system according to claim 13, characterized in that The control device is also used for: The production status information of at least one dimension corresponding to the target order is provided to the client of the target order so that the client can analyze the production status of the target order.
19. The system according to claim 13, characterized in that The production status information includes at least one of equipment status information, energy consumption status information and production capacity status information.
20. The system according to claim 13, characterized in that It also includes a display subsystem, the display subsystem is communicatively connected with the control device; The display subsystem is used to display the production status information in the at least one dimension.
21. The system according to claim 13, characterized in that The control device is also used for: Obtain the production requirements corresponding to the target production object; Determining a plurality of target water treatment equipments participating in the water treatment process of the target production object, wherein there is a process sequence between the plurality of target water treatment equipments; Based on the treatment result of the previous target water treatment equipment and the production requirements corresponding to the target production object, the production process of the subsequent target water treatment equipment is determined.
22. A water treatment method, characterized in that: Suitable for control equipment including: Receive production monitoring requests; According to the production monitoring request, during the water treatment process, using a collection subsystem deployed on the water treatment equipment, water treatment data generated on the water treatment equipment is collected; generating production status information in at least one dimension according to the water treatment data provided by the acquisition subsystem; Wherein, the method further comprises: Filtering target water treatment data collected during the water treatment process of the processed order from water treatment data provided by at least one water treatment device that is communicatively connected to the water treatment device; Determining process parameter values according to the production monitoring data included in the target water treatment data; Associating the process parameter value with the process stage identifier contained in the target water treatment data to construct a production process corresponding to the processed order; Separately precipitate production processes under at least one water treatment device participating in said processed order.
23. A control device, characterized in that: Includes memory, processor, and communication components; The memory is used to store one or more computer instructions; The processor is coupled to the memory and the communication component and is configured to execute the one or more computer instructions for: receiving a production monitoring request via the communication component; According to the production monitoring request, during the water treatment process, using a collection subsystem deployed on the water treatment equipment, water treatment data generated on the water treatment equipment is collected; generating production status information in at least one dimension according to the water treatment data provided by the acquisition subsystem; The control device is also used for: Filtering target water treatment data collected during the water treatment process of the processed order from water treatment data provided by at least one water treatment device that is communicatively connected to the water treatment device; Determining process parameter values according to the production monitoring data included in the target water treatment data; Associating the process parameter value with the process stage identifier contained in the target water treatment data to construct a production process corresponding to the processed order; Separately precipitate production processes under at least one water treatment device participating in said processed order.
24. A computer-readable storage medium storing computer instructions, characterized in that: When the computer instructions are executed by one or more processors, the one or more processors are caused to execute the water treatment method according to any one of claims 1-10 or 22.