Printing management device, recording medium, and computer program product
By using a printing management device and recording media, and employing a processor and paper counter to calculate the amount of paper wastage when printing is interrupted, the problem of managing paper wastage after continuous paper production is interrupted is solved, and accurate calculation and simplified management of paper wastage per work unit are achieved.
Patent Information
- Application Number
- CN202010904516.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Priority Date
- 2020-03-13
- Filing Date
- 2020-09-01
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2040-09-01
AI Technical Summary
When continuous paper printing operations are interrupted, existing technologies struggle to accurately measure paper waste per operation, especially when the operation is divided into multiple parts, making it difficult to effectively manage the cost of paper waste.
By using a printing management device and recording media, the processor outputs the amount of paper wastage before and after the interruption when the printing device is interrupted, and the length is measured by a paper counter. The total amount of paper wastage of the operation is calculated, and the correspondence between the operation parts is established to ensure the accurate calculation of paper wastage.
It enables accurate tracking of paper waste per job even after printing is interrupted, simplifying cost management and avoiding complex paper waste allocation issues.
Smart Images

Figure CN113391772B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to a printing management device and a recording medium. Background Art
[0002] For example, Patent Document 1 describes a printing order determination device that determines the printing order of multiple printing jobs for one unit of printing paper in a printing system having multiple printing settings or multiple post-processing settings. The printing order determination device includes: a paper waste amount storage unit that stores in advance the paper waste amount that is the amount of paper waste generated when each printing setting is changed to another printing setting, or the amount of paper waste generated when each post-processing setting is changed to another post-processing setting; and an input data storage unit that stores multiple input data including printing paper types, printing specifications, post-processing specifications, and printing image data. In addition, the printing order determination device includes a calculation unit, which performs steps a), b), and c) on multiple paper universal input data with the same printing paper type among multiple input data, thereby determining the printing order of multiple printing jobs generated from the multiple paper universal input data, wherein the step a) is a step of acquiring the amount of damaged paper from a damaged paper amount storage unit according to the printing settings of the printing system corresponding to the printing specifications of each of the two paper universal input data adjacent to each other, or the post-processing settings of the printing system corresponding to the post-processing specifications of each of the two paper universal input data, for one printing order of the multiple paper universal input data, the step b) is a step of calculating the total amount of damaged paper which is the sum of the amounts of damaged paper in the multiple paper universal input data, and the step c) is a step of performing steps a) and b) on multiple printing orders of the multiple paper universal input data to calculate a printing order with the smallest total amount of damaged paper.
[0003] In addition, Patent Document 2 describes an image forming apparatus that provides information related to the use plan of continuous paper accompanying the execution of a job. The image forming apparatus includes: a conveying unit that conveys the continuous paper; an image forming unit that forms an image on the continuous paper conveyed by the conveying unit; a job selection unit that selects a job to be executed; and a control unit that calculates an image forming distance that is the length of the continuous paper in the conveying direction required for the execution of the selected job, and displays the calculated image forming distance on a display unit.
[0004] [Prior art literature]
[0005] [Patent Document]
[0006] [Patent Document 1] Japanese Patent No. 5770580
[0007] [Patent Document 2] Japanese Patent Application Publication No. 2017-207597 Summary of the invention
[0008] [Problems to be solved by the invention]
[0009] In addition, when the printing of a job on continuous paper is interrupted, the job is divided due to the interruption, and the amount of damaged paper can only be grasped in each divided part. Therefore, it is desired to grasp the amount of damaged paper generated in units of jobs even when the printing of the job is interrupted.
[0010] An object of the present invention is to provide a printing management device and a recording medium that can grasp the amount of paper waste generated in units of jobs even when printing of a job on continuous paper is interrupted.
[0011] [Technical means to solve the problem]
[0012] In order to achieve the above-mentioned purpose, the printing management device of the first embodiment includes a processor, which outputs the amount of damaged paper corresponding to a first part of the job as a part before the interruption when the printing is interrupted while a printing device that prints on continuous paper is printing the continuous paper, and the job has been divided into multiple parts. When the second part of the job as a part after the interruption has been printed, the processor outputs the total amount of damaged paper corresponding to the second part and the amount of damaged paper corresponding to the first part as the amount of damaged paper of the job.
[0013] Furthermore, the printing management device of the second embodiment is the printing management device of the first embodiment, wherein the interruption is caused by the interruption of another job.
[0014] In addition, the printing management device of the third embodiment is that in the printing management device of the second embodiment, the amount of waste paper corresponding to the first part is expressed as the following length: the length obtained by subtracting the portion used for printing the first part from the length determined by the first conveyance start point as the place where the conveyance of the continuous paper starts, and the first conveyance end point as the place where the conveyance of the continuous paper ends, and the amount of waste paper corresponding to the second part is expressed as the length obtained by proportionally allocating the following length between the other jobs: the length obtained by subtracting the portion used for printing the other jobs and the second part from the length determined by the second conveyance start point as the place where the conveyance of the continuous paper starts again, and the second conveyance end point as the place where the conveyance of the continuous paper ends.
[0015] In addition, the printing management device of the fourth embodiment is that in the printing management device of the second embodiment, the amount of paper waste corresponding to the first part is expressed as the following length: a length obtained by excluding a portion used for printing the first part from a length determined by a first conveyance start point as a point where conveyance of the continuous paper is started, and a first conveyance end point as a point where conveyance of the continuous paper is ended, and the amount of paper waste corresponding to the second part is expressed as the following length: a length obtained by excluding a portion used for printing the other jobs and the second part from a length determined by a second conveyance start point as a point where conveyance of the continuous paper is restarted, and a second conveyance end point as a point where conveyance of the continuous paper is ended, and a length determined by the second conveyance end point and a printing end point as a point where printing of the second part is ended.
[0016] In addition, the printing management device of the fifth embodiment is the printing management device of the first embodiment, wherein the interruption is caused by any one of the user's operation on the printing device, the exhaustion of consumables of the printing device, the exhaustion of paper of the printing device, and an error of the printing device.
[0017] In addition, the printing management device of the sixth embodiment is the printing management device of the fifth embodiment, wherein the amount of waste paper corresponding to the first part is expressed as the following length: a length obtained by subtracting a portion used in printing the first part from a length determined by a first conveyance start point as a place where conveyance of the continuous paper is started, and a first conveyance end point as a place where conveyance of the continuous paper is ended, and the amount of waste paper corresponding to the second part is expressed as the following length: a length obtained by subtracting a portion used in printing the second part from a length determined by a second conveyance start point as a place where conveyance of the continuous paper is restarted, and a second conveyance end point as a place where conveyance of the continuous paper is ended.
[0018] In addition, the printing management device of the seventh embodiment is a printing management device of any one of the first embodiment to the sixth embodiment, wherein the processor establishes a correspondence between the first part and the second part when the identification information of the job managed by the host device is consistent with the identification information respectively possessed by the first part and the second part.
[0019] Furthermore, in order to achieve the above-mentioned purpose, the recording medium of the eighth embodiment records a printing management program, and the printing management program causes the computer to execute the following function: when the printing is interrupted while the printing device that prints on the continuous paper is printing the continuous paper, and the job has been divided into multiple parts, the amount of waste paper corresponding to the first part of the job, which is the part before the interruption, is output; when the second part of the job, which is the part after the interruption, is printed, the total amount of waste paper corresponding to the second part and the amount of waste paper corresponding to the first part is output as the amount of waste paper of the job.
[0020] [Effects of the Invention]
[0021] According to the first and eighth embodiments, there is an effect that even when printing of a job on continuous paper is interrupted, the amount of paper waste generated in units of jobs can be grasped.
[0022] According to the second embodiment, there is an effect that the amount of damaged paper generated in units of jobs can be grasped even when the job is interrupted due to the interruption of another job.
[0023] According to the third embodiment, there is an effect that the amount of broken paper generated in units of jobs can be appropriately grasped compared to a case where the amount of broken paper corresponding to the second part is not proportionally distributed among other jobs.
[0024] According to the fourth embodiment, the amount of waste paper generated in units of jobs can be appropriately grasped, compared with a case where the length determined by the second conveyance end point and the second part printing end point is not considered as the amount of waste paper corresponding to the second part.
[0025] According to the fifth embodiment, the following effect is achieved: even if the operation is interrupted due to any of user operation, exhaustion of consumables, exhaustion of paper, and error, the amount of paper waste generated in units of jobs can be grasped.
[0026] According to the sixth embodiment, the amount of broken paper generated in units of jobs can be appropriately grasped, compared with a case where the length obtained by subtracting the second portion from the length determined by the second conveyance start point and the second conveyance end point is not considered as the amount of broken paper corresponding to the second portion.
[0027] According to the seventh embodiment, there is an effect that even when one job is divided into a plurality of parts, the plurality of parts can be associated with each other. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1This is a diagram showing an example of the configuration of the print management system according to the first embodiment.
[0029] Figure 2 This is a block diagram showing an example of the electrical configuration of the print management device according to the first embodiment.
[0030] Figure 3 It is a figure which shows the user interface (UI) display of the paper waste amount of a comparative example.
[0031] Figure 4 This is a block diagram showing an example of the functional configuration of the print management device according to the first embodiment.
[0032] Figure 5 It is a diagram showing an example of UI display of the damaged paper amount according to the embodiment.
[0033] Figure 6 It is a diagram showing another example of UI display of the damaged paper amount according to the embodiment.
[0034] Figure 7 This is a flowchart showing an example of the flow of processing performed by the print management program according to the first embodiment.
[0035] Figure 8 It is a diagram showing an example of a job management screen according to an embodiment.
[0036] Fig. 9 This is a diagram for explaining the job correspondence establishment processing of the implementation method.
[0037] Fig.10 This is a flowchart showing an example of the flow of processing performed by the print management program according to the second embodiment.
[0038] [Explanation of Symbols]
[0039] 10: Printing management device
[0040] 11: CPU
[0041] 11A: Operation Input Department
[0042] 11B: Device control unit
[0043] 11C: Operations Management Department
[0044] 12: ROM
[0045] 13: RAM
[0046] 14: I / O
[0047] 15: Storage
[0048] 15A: Printing Management Procedure
[0049] 16: Display unit
[0050] 17: Operation Department
[0051] 18: Ministry of Communications
[0052] 20: Printing control device
[0053] 30: Printing device
[0054] 31: Paper counter
[0055] 40: Post-processing device
[0056] 50: Host device
[0057] 90: Printing Management System DETAILED DESCRIPTION
[0058] Hereinafter, an example of an embodiment for implementing the present invention will be described in detail with reference to the drawings.
[0059] [First embodiment]
[0060] Figure 1 This is a diagram showing an example of the configuration of the print management system 90 according to the first embodiment.
[0061] like Figure 1 As shown, the print management system 90 of the present embodiment includes a print management device 10 , a print control device 20 , a printing device 30 , a post-processing device 40 , and a host device 50 .
[0062] The printing management device 10 is connected to the printing control device 20 via a network. In addition, as an example, the network applies the Internet, a local area network (LAN), a wide area network (WAN), etc. The printing management device 10 accepts the input of a job and instructs the printing control device 20 to print the accepted job. The job described here represents a printing processing unit. For example, a job represents the printing data when printing a file. The number of pages contained in a file is more than one page and is arbitrary. That is, a file corresponding to a job may contain, for example, one page or 1,000 pages. The number of pages contained in a file can be set in advance or can be set appropriately by the user.
[0063] The print control device 20 is connected to the printing device 30 via a network. The connected printing device 30 may be one or more. The print control device 20 has a function of controlling the operation of the printing process of the printing device 30.
[0064] The printing device 30 is a so-called continuous form printer that prints on continuous paper such as roll paper. The printing device 30 includes a paper counter 31. When the continuous paper is conveyed in the paper conveying direction, the paper counter 31 measures the distance from the conveying start point using the conveying start point as a reference (count value = 0m). In addition, in the present embodiment, the printing control device 20 and the printing device 30 are configured separately, but the printing control device 20 and the printing device 30 may also be configured integrally.
[0065] In addition, in order to ensure stable image quality, the printing device 30 waits until the conveying speed of the continuous paper reaches a predetermined speed at the start of printing, and then starts printing the job. Therefore, a portion of the continuous paper that is not used for printing and becomes lost is generated. In addition, when printing is stopped, the continuous paper is also conveyed a predetermined distance due to inertia after the stop instruction. Therefore, a portion that becomes lost is also generated. That is, in the printing device 30, due to the structure, a portion that becomes lost is generated before and after printing.
[0066] The printing control device 20 is connected to the post-processing device 40 via a network. The connected post-processing device 40 may be one or more. The printing control device 20 has a function of controlling the operation of the post-processing process of the post-processing device 40.
[0067] The post-processing device 40 includes, for example, a processing device, a post-processing device, and a cutting device. The processing device is, for example, a device that performs the following processing: in order to suppress defects or dirt adhesion, varnish is applied to the printed surface of the recording medium such as paper (hereinafter referred to as "sheet") printed by the printing device 30. The post-processing device is, for example, a device that performs the following processing: binding together the sheets of text folded in a page order and attaching a book cover to form an embodiment of a booklet. The cutting device is, for example, a device that performs the following processing: cutting off the blank part of the bound booklet and processing it into a predetermined size. In addition, the post-processing device 40 can also be connected to the printing device 30 via a network.
[0068] The print control device 20 is connected to a host device 50 via a network. The host device 50 manages all jobs inputted by the print management device 10 .
[0069] The printing management device 10 receives various information related to the operation of the printing device 30 via the printing control device 20, and manages the operation status and processing capacity of the printing device 30. In addition, the printing management device 10 sends various instructions such as an operation instruction of the printing device 30, a stop instruction, and a setting instruction for setting the operation of the printing device 30 to the printing device 30 via the printing control device 20.
[0070] In addition, the printing management device 10 receives various information related to the operation of the post-processing device 40 via the printing control device 20, and manages the operation status and processing capacity of the post-processing device 40. In addition, the printing management device 10 sends various instructions such as an operation instruction of the post-processing device 40, a stop instruction, and a setting instruction for setting the operation of the post-processing device 40 to the post-processing device 40 via the printing control device 20.
[0071] Figure 2 This is a block diagram showing an example of the electrical configuration of the print management device 10 according to the first embodiment.
[0072] like Figure 2 As shown, the printing management device 10 of this embodiment includes: a central processing unit (CPU) 11, a read-only memory (ROM) 12, a random access memory (RAM) 13, an input / output interface (I / O) 14, a storage unit 15, a display unit 16, an operation unit 17, and a communication unit 18.
[0073] The print management device 10 of the present embodiment is a general-purpose computer device such as an application server computer or a personal computer (PC).
[0074] The CPU 11, ROM 12, RAM 13, and I / O 14 are connected to each other via a bus. Functional units including a storage unit 15, a display unit 16, an operation unit 17, and a communication unit 18 are connected to the I / O 14. The functional units can communicate with the CPU 11 via the I / O 14.
[0075] The control unit is composed of a CPU 11, a ROM 12, a RAM 13, and an I / O 14. The control unit can be configured as a sub-control unit that controls the operation of a part of the printing management device 10, or can be configured as a part of the main control unit that controls the operation of the entire printing management device 10. For example, a part or all of the blocks of the control unit can use an integrated circuit such as a large-scale integrated circuit (LSI) or an integrated circuit (IC) chipset. Each of the blocks can use an individual circuit, or a circuit that integrates a part or all of the blocks can be used. The blocks can be set as a whole, or a part of the blocks can be set separately. In addition, in each of the blocks, a part of it can be set separately. The integration of the control unit is not limited to LSI, and a dedicated circuit or a general-purpose processor can also be used.
[0076] As the storage unit 15, for example, a hard disk drive (HDD), a solid state drive (SSD), a flash memory, etc. can be used. The storage unit 15 stores a printing management program 15A for realizing the printing management function of this embodiment. In addition, the printing management program 15A can also be stored in the ROM 12.
[0077] The printing management program 15A may be installed in advance in the printing management device 10, for example. The printing management program 15A may also be implemented by being stored in a non-volatile, non-temporary storage medium, or distributed via a network, and appropriately installed in the printing management device 10. In addition, as examples of non-volatile, non-temporary storage media, there are conceivable compact disc read only memory (CD-ROM), magneto-optical disk, HDD, digital versatile disc read only memory (DVD-ROM), flash memory, memory card, etc.
[0078] The display unit 16 may use, for example, a liquid crystal display (LCD), an organic electroluminescence (EL) display, or the like. The display unit 16 may also have a touch screen integrally therewith. The operation unit 17 may be provided with elements for operation input, such as a keyboard and a mouse. The display unit 16 and the operation unit 17 receive various instructions from the user of the printing management device 10. The display unit 16 displays various information, such as the result of the processing executed in accordance with the instruction received from the user and notification of the processing.
[0079] The communication unit 18 is connected to a network such as the Internet, a LAN, or a WAN, and can communicate with the print control device 20 via the network. The communication via the network may be wired communication or wireless communication.
[0080] In addition, as described above, when the printing of a job on continuous paper is interrupted, the job is divided due to the interruption, and the damaged paper can only be grasped in each divided part. Figure 3 The following specifically describes the UI (user interface) display of the amount of paper waste when printing of a job has been interrupted.
[0081] Figure 3 It is a diagram showing a UI display of the damaged paper amount in a comparative example.
[0082] In (S1), if there is an interrupted printing during the printing of job A on continuous paper P, the printing of job A is interrupted. When the printing of job A is interrupted, the conveyance of continuous paper P is temporarily stopped. At this time, the part before the interruption of job A is represented as job A1. Broken paper L1 and broken paper L2 are generated in job A1. Broken paper L1 is broken paper generated before the printing of job A1, and broken paper L2 is broken paper generated after the printing of job A1. Figure 3 In the comparative example, the paper counter 31 is used to calculate the total length of the damaged paper L1 and the length of the damaged paper L2 as w(m).
[0083] In (S2), job B and job C are inserted and printed on continuous paper P, and then job A2 is printed immediately after job C. Job A2 represents the portion of job A after the interruption. That is, job A is divided into job A1 and job A2 due to the inserted printing of job B and job C. Broken paper L3 and broken paper L4 are generated in job B, job C, and job A2. Broken paper L3 is broken paper generated before the printing of job B, and broken paper L4 is broken paper generated after the printing of job A2. Figure 3 In the comparative example of , when calculating the amount of broken paper, job A1 and job A2 are regarded as independent jobs, and the sum of the length of broken paper L3 and the length of broken paper L4 is proportionally distributed between job B, job C, and job A2. As a result, the amount of broken paper of job B is calculated as x(m), the amount of broken paper of job C is calculated as y(m), and the amount of broken paper of job A2 is calculated as z(m).
[0084] exist Figure 3 The UI display 60 shows the amount of broken paper for each of job A1, job B, job C, and job A2, but can only grasp the amount of broken paper for job A in each part. In this case, it is difficult to grasp the amount of broken paper for job A at a glance, and cost management becomes complicated. Therefore, it is desired to grasp the amount of broken paper generated in units of jobs at a glance.
[0085] The CPU 11 of the printing management device 10 of this embodiment writes the printing management program 15A stored in the storage unit 15 into the RAM 13 for execution, thereby serving as a Figure 4 Each unit shown in FIG. 1 functions. The CPU 11 is an example of a processor.
[0086] Figure 4 This is a block diagram showing an example of the functional configuration of the print management device 10 according to the first embodiment.
[0087] like Figure 4 As shown, the CPU 11 of the print management device 10 of the present embodiment functions as a job input unit 11A, a device control unit 11B, and a job management unit 11C.
[0088] The work input unit 11A according to the present embodiment inputs work received from a person in charge of work (operator).
[0089] The device control unit 11B of the present embodiment communicates with the print control device 20 to control the operation of the print control device 20 . The device control unit 11B acquires the count value of the paper counter 31 from the print control device 20 .
[0090] The job management unit 11C of this embodiment outputs the amount of damaged paper corresponding to the first part of the job as the part before the interruption when the printing device 30 is printing a continuous paper job, and the job has been divided into multiple parts. In addition, when the second part of the job as the part after the interruption has been printed, the job management unit 11C outputs the total amount of damaged paper corresponding to the second part and the amount of damaged paper corresponding to the first part as the amount of damaged paper of the job. The damaged paper mentioned here refers to the part that is not used for printing and becomes a loss, also known as torn paper. In addition, the amount of damaged paper is expressed as the length (or area) of the part that becomes a loss. The amount of damaged paper varies according to the printing conditions of the job (such as color, black and white, printing speed, presence or absence of post-processing, etc.), and is therefore not uniform in each job. In addition, the so-called interruption of printing refers to, for example, an interruption caused by the insertion of other jobs.
[0091] Here, refer to Figure 5 The following specifically describes the UI display of the amount of paper waste when printing of a job is interrupted due to the interruption of another job.
[0092] Figure 5 It is a diagram showing an example of UI display of the damaged paper amount according to the present embodiment.
[0093] In (S11), with Figure 3 Similarly, if there is an interrupt printing during the printing of job A on continuous paper P, the printing of job A is interrupted. When the printing of job A is interrupted, the conveyance of continuous paper P is temporarily stopped. The first part of job A before the interruption is represented as job A1. The amount of paper waste corresponding to job A1 is represented as the length determined by the first conveyance start point T1 and the first conveyance end point T4, minus the part used in the printing of job A1.
[0094] In addition, the first conveyance start point T1 is the point where the conveyance of the continuous paper P is started, and the first conveyance end point T4 is the point where the conveyance of the continuous paper P is ended. The length of the portion used in the printing of the job A1 is determined by the first printing start point T2 and the first printing end point T3. The first printing start point T2 is the point where the printing of the job A1 is started, and the first printing end point T3 is the point where the printing of the job A1 is ended. The first conveyance start point T1, the first conveyance end point T4, the first printing start point T2, and the first printing end point T3 are measured using the paper counter 31.
[0095] That is, the amount of broken paper corresponding to job A1 is set to the total length of broken paper L1 and broken paper L2. Broken paper L1 is broken paper generated before printing of job A1, and broken paper L2 is broken paper generated after printing of job A1. Figure 5 In the example of , the paper counter 31 is used to calculate the total length of the damaged paper L1 and the length of the damaged paper L2 as w(m).
[0096] In (S12), with Figure 3 Comparative example Similarly, job B and job C are inserted and printed on continuous paper P, and then job A2 is printed immediately after job C. Job A2 represents the portion of job A after the interruption. That is, job A is divided into job A1 and job A2 due to the inserted printing of job B and job C. Job B and job C are examples of other jobs, but the number of other jobs is not limited to two, as long as it is one or more. The second part of job A after the interruption is represented as job A2. The amount of paper waste corresponding to job A2 is represented as the length obtained by proportionally allocating the following length between job B, job C, and job A2: the length determined by the second conveyance start point T5 and the second conveyance end point T8, minus the length used in the printing of job B, job C, and job A2.
[0097] In addition, the second conveyance start point T5 is a point where the conveyance of the continuous paper P is restarted, and the second conveyance end point T8 is a point where the conveyance of the continuous paper P is ended. The length of the portion used in the printing of job B, job C, and job A2 is determined by the second print start point T6 and the second print end point T7. The second print start point T6 is a point where the printing of job B is started, and the second print end point T7 is a point where the printing of job A2 is ended. The second conveyance start point T5, the second conveyance end point T8, the second print start point T6, and the second print end point T7 are measured using the paper counter 31.
[0098] That is, the amount of broken paper corresponding to job B, job C, and job A2 is set to the total length of the length of broken paper L3 and the length of broken paper L4. Broken paper L3 is broken paper generated before printing of job B, and broken paper L4 is broken paper generated after printing of job A2. Figure 5 In the example of , when calculating the amount of broken paper, the sum of the length of broken paper L3 and the length of broken paper L4 is proportionally distributed between job B, job C, and job A2. As a result, the amount of broken paper of job B is calculated as x(m), the amount of broken paper of job C is calculated as y(m), and the amount of broken paper of job A2 is calculated as z(m).
[0099] exist Figure 5 The UI display 61 shows the amount of broken paper for job A1, and the UI display 62 shows the amount of broken paper for each of job A, job B, and job C. Here, the total length of w(m) which is the amount of broken paper for job A1 and z(m) which is the amount of broken paper for job A2 is shown for the amount of broken paper for job A. Thus, the amount of broken paper generated in each job can be understood at a glance.
[0100] In addition, the correspondence between job A1 and job A2 is established based on, for example, the job name, page number, etc. That is, if the job name of job A1 is the same as the job name of job A2, the correspondence is established as the same job A. In addition, if the last page number of job A1 and the first page number of job A2 are consecutive, the correspondence is established as the same job A. In addition, job A1 and job A2 may be associated as the same job A through user operation.
[0101] In addition, the amount of broken paper corresponding to job A2 can also be expressed as the length determined by the second conveyance end point T8 and the second printing end point T7, from the length determined by the second conveyance start point T5 and the second conveyance end point T8, minus the portion used for printing of job B, job C, and job A2. That is, the amount of broken paper corresponding to job A2 can also be expressed as the length of broken paper L4. In addition, with regard to broken paper L3, for example, it is proportionally distributed between job B and job C, and the amount of broken paper corresponding to each of job B and job C is calculated.
[0102] Then, refer to Figure 6, a specific description is given of the UI display of the amount of paper loss when the printing of a job has been interrupted due to reasons other than the insertion of other jobs. The interruption in this case is caused by any one of the user's operation on the printing device 30, the exhaustion of consumables of the printing device 30, the exhaustion of paper in the printing device 30, and an error in the printing device 30. In addition, the interruption may also be an interruption caused by adjustment printing. The adjustment printing mentioned here refers to the printing of the adjustment of the printing control device 20 for adjusting the printing device 30 or controlling the operation of the printing device 30. In the adjustment printing, for example, a test pattern containing each color of four-color separation (Cyan Magenta Yellow Black, CMYK) is printed. In the following, the interruption is described as an interruption caused by the user's operation, etc.
[0103] Figure 6 It is a diagram showing another example of UI display of the damaged paper amount according to the present embodiment.
[0104] In (S21), if there is any user operation during the printing of the continuous paper P, Figure 5 Similarly to the example, the printing of job A is interrupted. When the printing of job A is interrupted, the conveyance of continuous paper P is temporarily stopped. The amount of paper waste corresponding to job A1 representing the first part is expressed as the length obtained by excluding the portion used for printing job A1 from the length determined by the first conveyance start point T11 and the first conveyance end point T14.
[0105] In addition, the first conveyance start point T11 is the point where the conveyance of the continuous paper P is started, and the first conveyance end point T14 is the point where the conveyance of the continuous paper P is ended. The length of the portion used in the printing of the job A1 is determined by the first printing start point T12 and the first printing end point T13. The first printing start point T12 is the point where the printing of the job A1 is started, and the first printing end point T13 is the point where the printing of the job A1 is ended. The first conveyance start point T11, the first conveyance end point T14, the first printing start point T12, and the first printing end point T13 are measured using the paper counter 31.
[0106] That is, the amount of broken paper corresponding to job A1 is set to the total length of broken paper L1 and broken paper L2. Broken paper L1 is broken paper generated before printing of job A1, and broken paper L2 is broken paper generated after printing of job A1. Figure 6 In the example of , the paper counter 31 is used to calculate the total length of the damaged paper L1 and the length of the damaged paper L2 as w(m).
[0107] In (S22), the printing of job A is restarted on the continuous paper P, and the remaining job A2 is printed. Job A2 represents the interrupted portion of job A. That is, job A is divided into job A1 and job A2 due to user operation or the like. The amount of paper waste corresponding to job A2 representing the second portion is represented as the length determined by the second conveyance start point T15 and the second conveyance end point T18, minus the portion used for printing job A2.
[0108] In addition, the second conveyance start point T15 is a point where the conveyance of the continuous paper P is restarted, and the second conveyance end point T18 is a point where the conveyance of the continuous paper P is ended. The length of the portion used in the printing of the job A2 is determined by the second printing start point T16 and the second printing end point T17. The second printing start point T16 is a point where the printing of the job A2 is started, and the second printing end point T17 is a point where the printing of the job A2 is ended. The second conveyance start point T15, the second conveyance end point T18, the second printing start point T16, and the second printing end point T17 are measured using the paper counter 31.
[0109] That is, the amount of broken paper corresponding to job A2 is set to the sum of the length of broken paper L3 and the length of broken paper L4. Broken paper L3 is broken paper generated before printing of job A2, and broken paper L4 is broken paper generated after printing of job A2. Figure 6 In the example of , the amount of broken paper of job A2 is calculated as z(m).
[0110] exist Figure 6 The UI display 63 shows the amount of broken paper for job A1, and the UI display 64 shows the amount of broken paper for job A. Here, the total length of w(m) which is the amount of broken paper for job A1 and z(m) which is the amount of broken paper for job A2 is shown for the amount of broken paper for job A. Thus, the amount of broken paper generated in units of jobs can be understood at a glance.
[0111] Then, refer to Figure 7 The operation of the print management device 10 according to the first embodiment will be described.
[0112] Figure 7 This is a flowchart showing an example of the flow of processing performed by the print management program 15A according to the first embodiment.
[0113] First, when an instruction is given to the print management device 10 to output the amount of damaged paper for each job, the print management program 15A is activated to execute the following steps.
[0114] exist Figure 7In step 100, the operation input unit 11A inputs the operation to the operation management unit 11C. Here, as an example, the inputted operation is Figure 8 The job management screen shown in .
[0115] Figure 8 It is a diagram showing an example of a job management screen according to the present embodiment.
[0116] exist Figure 8 In the job management screen shown in , the job input by the job input unit 11A is registered, and its status is managed until the job is completed.
[0117] In step 101 , the job input unit 11A notifies the job management unit 11C of a print instruction for the job input in step 100 .
[0118] In step 102, the job management unit 11C determines via the device control unit 11B whether printing by the printing device 30 has been interrupted. If it is determined that printing has been interrupted (affirmative determination), the process proceeds to step 103, and if it is determined that printing has not been interrupted (negative determination), the process proceeds to step 110.
[0119] In step 103, as an example, as described in reference Figure 5 or Figure 6 As described above, the job management unit 11C calculates the amount of broken paper in the first portion before the job is interrupted. The amount of broken paper in the first portion is calculated as w(m), for example.
[0120] In step 104, as an example, as described Figure 5 The UI shows 61 or Figure 6 As shown in the UI display 63 of , the job management unit 11C outputs the amount of damaged paper in the first part calculated in step 103 to the display unit 16 , for example.
[0121] In step 105, the job management unit 11C determines via the device control unit 11B whether printing has been resumed by the printing device 30. If it is determined that printing has been resumed (affirmative determination), the process proceeds to step 106, and if it is determined that printing has not been resumed (negative determination), the process enters standby in step 105.
[0122] In step 106, the job management unit 11C determines via the device control unit 11B whether printing by the printing device 30 has been completed. If it is determined that printing has been completed (affirmative determination), the process proceeds to step 107, and if it is determined that printing has not been completed (negative determination), the process waits in step 106.
[0123] In step 107, as an example, as described in reference Figure 5 or Figure 6 As described above, the job management unit 11C calculates the amount of broken paper in the second portion after the job is interrupted. The amount of broken paper in the second portion is calculated as z(m), for example.
[0124] In step 108, the job management unit 11C adds up the first portion of broken paper amount calculated in step 103 and the second portion of broken paper amount calculated in step 107. The added broken paper amount is expressed as, for example, w+z(m).
[0125] In step 109, as an example, as described Figure 5 The UI shows 62 or Figure 6 As shown in the UI display 64 of , the job management unit 11C outputs the amount of damaged paper counted in step 108 to, for example, the display unit 16 , and ends a series of processes performed by the print management program 15A.
[0126] On the other hand, in step 110, the job management unit 11C determines via the device control unit 11B whether printing by the printing device 30 has been completed. If it is determined that printing has been completed (in the case of positive determination), the process moves to step 111, and if it is determined that printing has not been completed (in the case of negative determination), the process returns to step 102 and repeats the process.
[0127] In step 111 , the job management unit 11C calculates the amount of paper waste generated before and after printing of the job, and then moves to step 109 .
[0128] As described above, according to the present embodiment, even when printing of a job on continuous paper has been interrupted, the amount of paper waste generated in units of jobs can be understood at a glance.
[0129] [Second Embodiment]
[0130] In the present embodiment, when printing of a job is interrupted and the job has been divided into a plurality of parts, an example is described in which the plurality of divided parts are associated with each other using host information managed by the host device.
[0131] In this embodiment, the device structure of the printing management device 10 described in the first embodiment is also applied. The job management unit 11C of this embodiment establishes a correspondence between the first part and the second part when the identification information of the job managed by the host device 50 is consistent with the identification information of the first part and the second part obtained by dividing the job. Fig. 9 The job correspondence establishment process is described in detail.
[0132] Fig. 9 This is a diagram for explaining the job correspondence establishment processing of this embodiment.
[0133] like Fig. 9 As shown in FIG. 1 , the host device 50 manages the host information. The host information includes identification marks (IDs) for each of job A and job B. The identification ID is an example of identification information. Even when a job has been divided due to insertion, etc., the host device 50 manages the parts of the job by assigning the same identification ID to each part of the job. Fig. 9 In the example, when job A is divided into job A1 (first part) and job A2 (second part) due to the insertion of job B, the same identification ID "host job A" is assigned to job A1 and job A2. In addition, the identification ID "host job B" is assigned to job B.
[0134] Meanwhile, the print control device 20 controls job A1 and job A2 as different jobs. At this time, if the identification IDs of job A1 and job A2 match the identification IDs of jobs managed by the host device 50, job A1 and job A2 are associated with each other.
[0135] Then, refer to Fig.10 The operation of the print management device 10 according to the second embodiment will be described.
[0136] Fig.10 This is a flowchart showing an example of the flow of processing performed by the print management program 15A according to the second embodiment.
[0137] exist Fig.10 In step 120, as an example, the operation management unit 11C obtains the Fig. 9 The identification IDs of job A1 and job A2 shown in FIG.
[0138] In step 121 , the job management unit 11C refers to the host information managed by the host device 50 based on the identification IDs of the jobs A1 and A2 acquired in step 120 .
[0139] In step 122, the job management unit 11C determines whether the identification IDs of job A1 and job A2 are consistent with the identification ID of the job included in the host information. If it is determined that the identification IDs are consistent (affirmative determination), the process moves to step 123. If it is determined that the identification IDs are inconsistent (negative determination), the series of processes performed by the print management program 15A are terminated.
[0140] In step 123 , the job management unit 11C associates job A1 with job A2 , and then ends a series of processes performed by the print management program 15A.
[0141] Thus, according to the present embodiment, even when one job is divided into a plurality of parts due to interruption of printing, the plurality of parts are associated with each other. Therefore, the amount of damaged paper can be managed in units of jobs.
[0142] In addition, in each of the above embodiments, the so-called processor refers to a processor in a broad sense, including a general-purpose processor (for example, a CPU: central processing unit, etc.) or a special-purpose processor (for example, a graphics processor (Graphics Processing Unit, GPU), an application-specific integrated circuit (Application Specific Integrated Circuit, ASIC), a field programmable gate array (Field Programmable Gate Array, FPGA), a programmable logic element, etc.).
[0143] In addition, the actions of the processors in the above-mentioned embodiments can be completed not only by one processor, but also by the cooperation of multiple processors located in physically separated positions. In addition, the order of the actions of the processors is not limited to the order described in the above-mentioned embodiments, and can also be changed appropriately.
[0144] The print management device according to the embodiment has been described above. The embodiment may be a program for causing a computer to execute the functions of each unit included in the print management device. The embodiment may be a computer-readable storage medium storing the program.
[0145] Furthermore, the configuration of the print management device described in the above embodiment is an example, and may be changed according to circumstances without departing from the spirit and scope of the invention.
[0146] Furthermore, the process flow of the program described in the above-mentioned embodiment is also an example, and unnecessary steps may be deleted, new steps may be added, or the process order may be changed without departing from the scope of the invention.
[0147] In addition, in the above-mentioned embodiments, the processing of the embodiments is implemented by a software structure using a computer by executing a program, but the present invention is not limited to this. The embodiments may be implemented by a hardware structure, or a combination of a hardware structure and a software structure.
Claims
1. A printing management device, comprising a processor, The processor outputs an amount of wasted paper corresponding to a first part of the job that is a part before the interruption, when printing is interrupted while a printing device that prints on the continuous paper is printing the continuous paper and the job has been divided into a plurality of parts. When a second part as the interrupted part of the job has been printed, a total amount of the damaged paper corresponding to the second part and the damaged paper corresponding to the first part is output as the damaged paper amount of the job, wherein The interruption is caused by the insertion of other jobs, wherein The amount of paper waste corresponding to the first portion is expressed as a length obtained by excluding a portion used for printing the first portion from a length determined by a first conveyance start point, which is a point where conveyance of the continuous paper is started, and a first conveyance end point, which is a point where conveyance of the continuous paper is ended. The amount of paper waste corresponding to the second part is expressed as a length obtained by proportionally allocating the following length between the other jobs: the length determined by the second conveyance start point as the place where the conveyance of the continuous paper is restarted, and the second conveyance end point as the place where the conveyance of the continuous paper is ended, minus the length used in the other jobs and printing of the second part.
2. A printing management device, comprising a processor, The processor outputs an amount of wasted paper corresponding to a first part of the job that is a part before the interruption, when printing is interrupted while a printing device that prints on the continuous paper is printing the continuous paper and the job has been divided into a plurality of parts. When a second part as the interrupted part of the job has been printed, a total amount of the damaged paper corresponding to the second part and the damaged paper corresponding to the first part is output as the damaged paper amount of the job, wherein The interruption is caused by the insertion of other jobs, wherein The amount of paper waste corresponding to the first portion is expressed as a length obtained by excluding a portion used for printing the first portion from a length determined by a first conveyance start point, which is a point where conveyance of the continuous paper is started, and a first conveyance end point, which is a point where conveyance of the continuous paper is ended. The amount of damaged paper corresponding to the second part is expressed as the following length: from the length determined by the second conveyance start point as the place where the conveyance of the continuous paper is restarted, and the second conveyance end point as the place where the conveyance of the continuous paper is ended, excluding the part used for the other operations and the printing of the second part, the length determined by the second conveyance end point and the printing end point as the place where the printing of the second part is ended.
3. A printing management device, comprising a processor, The processor outputs an amount of wasted paper corresponding to a first part of the job that is a part before the interruption, when printing is interrupted while a printing device that prints on the continuous paper is printing the continuous paper and the job has been divided into a plurality of parts. When a second part as the interrupted part of the job has been printed, a total amount of the damaged paper corresponding to the second part and the damaged paper corresponding to the first part is output as the damaged paper amount of the job, wherein The interruption is caused by any one of an operation of the printing device by a user, exhaustion of consumables of the printing device, exhaustion of paper of the printing device, and an error of the printing device, wherein The amount of paper waste corresponding to the first portion is expressed as a length obtained by excluding a portion used for printing the first portion from a length determined by a first conveyance start point, which is a point where conveyance of the continuous paper is started, and a first conveyance end point, which is a point where conveyance of the continuous paper is ended. The amount of paper waste corresponding to the second part is expressed as the following length: the length obtained by excluding the portion used for printing the second part from the length determined by the second conveyance start point as the point where the conveyance of the continuous paper is restarted and the second conveyance end point as the point where the conveyance of the continuous paper is ended.
4. The printing management device according to any one of claims 1 to 3, wherein The processor associates the first part with the second part when identification information of the job managed by the host device matches identification information of each of the first part and the second part.
5. A recording medium having a printing management program recorded thereon, wherein the printing management program is used to cause a computer to execute the following functions: When a printing device that prints on continuous paper is printing a job on the continuous paper and printing is interrupted, and the job has been divided into a plurality of parts, outputting an amount of wasted paper corresponding to a first part of the job that is a part before the interruption, When a second part as the interrupted part of the job has been printed, a total amount of the damaged paper corresponding to the second part and the damaged paper corresponding to the first part is output as the damaged paper amount of the job, wherein The interruption is caused by the insertion of other jobs, wherein The amount of paper waste corresponding to the first portion is expressed as a length obtained by excluding a portion used for printing the first portion from a length determined by a first conveyance start point, which is a point where conveyance of the continuous paper is started, and a first conveyance end point, which is a point where conveyance of the continuous paper is ended. The amount of paper waste corresponding to the second part is expressed as a length obtained by proportionally allocating the following length between the other jobs: the length determined by the second conveyance start point as the place where the conveyance of the continuous paper is restarted, and the second conveyance end point as the place where the conveyance of the continuous paper is ended, minus the length used in the other jobs and printing of the second part.
6. A computer program product, comprising a printing management program, wherein the printing management program is used to enable a computer to perform the following functions: When a printing device that prints on continuous paper is printing a job on the continuous paper and printing is interrupted, and the job has been divided into a plurality of parts, outputting an amount of wasted paper corresponding to a first part of the job that is a part before the interruption, When a second part as the interrupted part of the job has been printed, a total amount of the damaged paper corresponding to the second part and the damaged paper corresponding to the first part is output as the damaged paper amount of the job, wherein The interruption is caused by the insertion of other jobs, wherein The amount of paper waste corresponding to the first portion is expressed as a length obtained by excluding a portion used for printing the first portion from a length determined by a first conveyance start point, which is a point where conveyance of the continuous paper is started, and a first conveyance end point, which is a point where conveyance of the continuous paper is ended. The amount of paper waste corresponding to the second part is expressed as a length obtained by proportionally allocating the following length between the other jobs: the length determined by the second conveyance start point as the place where the conveyance of the continuous paper is restarted, and the second conveyance end point as the place where the conveyance of the continuous paper is ended, minus the length used in the other jobs and printing of the second part.