Wind turbines

By setting up a permanent working platform and suspension structure below the transition parts of the wind turbine, the problems of high installation costs and complex maintenance of temporary scaffolding are solved, and the convenience and safety of array cable installation and maintenance of the wind turbine are achieved.

CN113446163BActive Publication Date: 2024-11-01SIEMENS GAMESA RENEWABLE ENERGY AS
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202110254360.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Priority Date
2020-03-09
Filing Date
2021-03-09
Publication Date
2024-11-01
Estimated Expiration
2041-03-09

AI Technical Summary

Technical Problem

Existing wind turbines have high cost, complex and inconvenient installation of temporary scaffolding during maintenance and array cable installation, especially in the proximity of switch devices within the transition parts and maintenance of the elevator.

Method used

A wind turbine including a permanent working platform was designed. By setting a transition piece between the tower and the foundation and setting a permanent working platform below it, the structure of the suspension platform is arranged using support beams and platforms to arrange the structure, reducing the additional scaffolding below. Rely on, simplifies maintenance of array cable installation and maintenance lifts.

Benefits of technology

This enables simplified array cable installation and maintenance lift maintenance throughout the life of a wind turbine, reducing costs, reducing installation complexity, and improving operational convenience and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113446163B_ABST
    Figure CN113446163B_ABST
Patent Text Reader

Abstract

A wind turbine (1) comprising: a tower (4); a foundation (14); a transition piece (15) arranged between the tower (4) and the foundation (14) and connecting the tower (4) to the foundation (14); a platform (19) arranged within the transition piece (15); a maintenance elevator (31) capable of being lowered to the platform (19); and a permanent working platform (32) arranged below the platform (19) and at a distance (d) from the platform (19). Due to the permanent working platform (32), the maintenance elevator (31) is easily accessible from below. The labor- and cost-intensive installation of temporary scaffolding below the platform (19) is expendable. Advantageously, the working platform (31) can also be used for array cable installation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a wind turbine. Background Art

[0002] The wind turbine has a tower, a nacelle arranged on top of the tower, a hub having rotor blades, the hub being rotatably supported at the nacelle, and a generator arranged in the nacelle and driven by the hub. Electrical equipment such as switchgear or a maintenance lift may be arranged in the tower, and the electrical equipment may be arranged on a switchgear platform. According to the applicant's internal knowledge, a temporary scaffold may be arranged below the switchgear platform to access the electrical equipment. Summary of the invention

[0003] It is an object of the present invention to provide an improved wind turbine.

[0004] Therefore, a wind turbine is provided, comprising: a tower; a foundation; a transition piece, which is arranged between the tower and the foundation and connects the tower to the foundation; a platform, which is arranged within the transition piece; a maintenance hoist, which can be lowered to the platform; and a permanent working platform, which is arranged below the platform and at a certain distance therefrom.

[0005] Due to the permanent working platform, the maintenance lift is easily accessible from below. The labor and cost intensive installation of temporary scaffolding below the platform is expendable. Advantageously, the working platform can also be used for array cable installation.

[0006] The wind turbine includes a nacelle mounted on or at the tower. Rotor blades are connected to a hub supported at the nacelle. A generator is placed in the nacelle. The generator is connected to the hub. The generator is coupled to a switchgear. The switchgear is supported in the transition piece.

[0007] The foundation is preferably installed in the seabed. Preferably, the tower comprises a plurality of tower sections superimposed on each other and connected to each other. The lowermost tower section is connected to the transition piece. The nacelle is supported by means of the uppermost tower section of the tower. The service elevator is movable from the transition piece to the uppermost tower section. When the service elevator is in its lowermost position, it is arranged in the transition piece.

[0008] The transition piece has a cylindrical, in particular tubular, geometry. Both the transition piece and the lowermost tower section may have flanges. The two flanges are bolted together to connect the tower to the transition piece. The longitudinal direction of the tower is oriented from the nacelle in the direction of the foundation. The maintenance lift can be moved in the longitudinal direction and vice versa. In this context, "permanent" means that the working platform is not removed for operation of the wind turbine. Preferably, the working platform stays in the transition piece throughout the life of the wind turbine.

[0009] According to one embodiment, said distance is between 2 m and 3 m, preferably 2.5 m.

[0010] The distance can be selected as desired. However, preferably, the distance is about 2.5 m.

[0011] According to another embodiment, the wind turbine further comprises a plurality of support beams extending in a longitudinal direction of the tower, wherein both the platform and the working platform are attached to the support beams.

[0012] These support beams carry both the platform and the working platform. The support beams keep the platform and the working platform separated.

[0013] According to another embodiment, the support beams are connected to the flange of the transition piece.

[0014] Preferably, these support beams are connected only to the flange.In this way, these support beams are suspended into the transition piece.

[0015] According to another embodiment, the platform is supported by means of a first supporting structure, wherein the working platform is supported by means of a second supporting structure, and wherein both the first supporting structure and the second supporting structure are connected to the supporting beams.

[0016] The support structures both comprise a plurality of beams connected together.Preferably, the support structure is annular.

[0017] According to another embodiment, the wind turbine further comprises a platform arrangement suspended in the transition piece, wherein the platform arrangement comprises the platform, the working platform and the support beams.

[0018] The platform arrangement is suspended in the transition piece in a suspended manner. In this context, "hanging suspension" preferably means that the platform arrangement is hung into the transition piece. This means that the platform arrangement is supported from above by means of the support beams. Support from below is not necessary.

[0019] According to another embodiment, the platform and the working platform are attached to a wall of the transition piece.

[0020] Attachment to the wall may be alternative or additional.The wall has a cylindrical, in particular tubular, geometry.

[0021] According to another embodiment, the wind turbine further comprises a switchgear arranged on the platform.

[0022] In this context, "switch gear" means an electrical and / or electronic component that is part of an electrical power system. The switch gear may consist of an electrical disconnect switch, fuse or circuit breaker for controlling, protecting and isolating electrical equipment. The switch gear may be used to de-energize equipment to allow work to be completed and downstream faults to be cleared. The switch gear is arranged on the platform. However, the platform preferably does not support the weight of the switch gear. The weight of the switch gear may be carried by a suspension structure that is connected to a support beam.

[0023] According to a further embodiment, the working platform has an elevated working section arranged below the switching device.

[0024] This allows easy access to the switchgear. In particular, this simplifies mounting the array cable to the switchgear.

[0025] According to another embodiment, the working section is raised above the working platform by 100 mm to 500 mm, preferably 300 mm.

[0026] Preferably, the height is adjustable as required. This allows comfortable access to the switch device.

[0027] According to another embodiment, the platform comprises a centrally arranged hatch which can be opened and closed.

[0028] The array cables can be guided through the hatch. This simplifies the installation of the array cables.

[0029] According to a further embodiment, the working platform comprises a service space for installing and / or maintaining the service lift.

[0030] The maintenance space is located below the maintenance elevator.

[0031] According to another embodiment, the working platform comprises an opening for introducing the array cables.

[0032] These openings allow good access to the array cables. This reduces installation labor.

[0033] According to another embodiment, the working platform has a circular shape.

[0034] In this context, "circular" means that the work platform has the shape of a disk.

[0035] According to another embodiment, the working platform has a semicircular shape.

[0036] In this context, "semi-circular" means that the work platform has the shape of a half disk.

[0037] Other possible implementations or alternatives of the present invention also encompass combinations of features not explicitly mentioned herein that are described above or below with respect to the embodiments. A person skilled in the art may also add individual or isolated aspects and features to the most basic form of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0038] Other embodiments, features and advantages of the present invention will become apparent from the following description and the dependent claims in conjunction with the accompanying drawings, in which:

[0039] Figure 1 shows a perspective view of a wind turbine according to one embodiment;

[0040] Figure 2 shows a perspective view of a wind turbine rotor blade according to one embodiment;

[0041] Figure 3 Shown according to Figure 1 Another perspective view of a wind turbine;

[0042] Figure 4 shows a cross-sectional view of a transition piece according to one embodiment;

[0043] Figure 5 shows a top view of a platform according to one embodiment;

[0044] Figure 6 A perspective view showing a platform arrangement according to one embodiment; and

[0045] Figure 7 A perspective view of a platform arrangement according to another embodiment is shown.

[0046] In the drawings, like reference numbers indicate identical or functionally equivalent elements unless otherwise indicated. DETAILED DESCRIPTION

[0047] Figure 1 A wind turbine 1 according to an embodiment is shown.

[0048] The wind turbine 1 comprises a rotor 2 connected to a generator (not shown) arranged in a nacelle 3. The nacelle 3 is arranged at an upper end of a tower 4 of the wind turbine 1. The tower 4 has a plurality of tower sections arranged on top of each other. The tower 4 may be referred to as a wind turbine tower.

[0049] The rotor 2 comprises three rotor blades 5. The rotor blades 5 are connected to a hub 6 of the wind turbine 1. Such a rotor 2 may have a diameter ranging, for example, from 30 to 160 meters or even larger. The rotor blades 5 are subject to high wind loads. At the same time, the rotor blades 5 need to be lightweight. For these reasons, the rotor blades 5 in modern wind turbines 1 are made of fiber-reinforced composite materials. Among them, glass fibers are generally preferred over carbon fibers for cost reasons. Glass fibers in the form of unidirectional fiber mats are often used.

[0050] Figure 2 A rotor blade 5 according to one embodiment is shown.

[0051] The rotor blade 5 comprises an aerodynamically designed part 7 shaped for optimally utilizing wind energy and a blade root 8 for connecting the rotor blade 5 to the hub 6 .

[0052] Figure 3 Again, it is shown that according to Figure 1 of wind turbines1.

[0053] As mentioned before, the tower 4 has a plurality of tower sections 9 to 13 arranged on top of each other. The number of tower sections 9 to 13 is arbitrary. The tower 4 has a lowermost tower section 9 and an uppermost tower section 13. The nacelle 3 can be attached to the uppermost tower section 13. The wind turbine 1 has a foundation 14 which can be anchored in the seabed. A transition piece 15 is arranged between the foundation 14 and the lowermost tower section 9.

[0054] The transition piece 15 is a circular or tubular piece that connects the tower 4 to the foundation 14. Thereby, the transition piece 15 forms a transition between the foundation 14 and the tower 4. An external platform (not shown) may be attached to the transition piece 15. The tower 4 has a longitudinal direction L. The longitudinal direction L is oriented from the topmost tower section 13 towards the foundation 14. However, the longitudinal direction L may also be oriented in the opposite direction.

[0055] Figure 4 An enlarged cross-sectional view of a wind turbine 1 is shown.

[0056] The lowermost tower section 9 has a flange 16 which is connected to a flange 17 of a transition piece 15. The transition piece 15 receives a platform arrangement 18. Figure 6 The platform arrangement 18 is shown in a schematic perspective view. Figure 7 A schematic perspective view of another embodiment of a platform arrangement 18 is shown.

[0057] The platform arrangement 18 has a first or lower platform 19 and a second or upper platform 20. The platforms 19, 20 are arranged parallel to each other. The platforms 19, 20 are spaced apart from each other when viewed in the longitudinal direction L. The upper platform 20 can be used to connect or bolt the flanges 16, 17 together. For this reason, the upper platform 20 can be referred to as a bolt-on platform.

[0058] The switchgear 21 is arranged on the lower platform 19. For this reason, the lower platform 19 may be referred to as a switchgear platform. In this context, "switchgear" means an electrical and / or electronic component that is part of an electrical power system. The switchgear 21 may be composed of electrical disconnect switches, fuses, or circuit breakers used to control, protect, and isolate electrical equipment. The switchgear 21 may be used to de-energize equipment to allow work to be completed and to clear downstream faults.

[0059] The platform arrangement 18 has a plurality of support beams 22 to 27. These support beams 22 to 27 (see Figure 6 and Figure 7 ) extends in the longitudinal direction L. Support beams 22 to 27 connect the platforms 19, 20 to each other. A bearing structure may be provided that carries the switchgear 21. The bearing structure may be connected to the support beams 22 to 27. In this way, the lower platform 19 does not have to bear the weight of the switchgear 21.

[0060] The number of support beams 22 to 27 is arbitrary. For example, six support beams 22 to 27 may be provided. The support beams 22 to 27 are connected to the flange 17 by means of attachment elements 28 to 30. The number of attachment elements 28 to 30 is the same as the number of support beams 22 to 27. The wind turbine 1 has a maintenance lift 31 for transporting technicians from the lower platform 19 to the nacelle 3. The maintenance lift 31 can be lowered to the lower platform 19.

[0061] The introduction of the array cables and their routing towards the switchgear 21 is quite complicated due to the rigidity of the array cables, the lack of space or unstable temporary scaffolding below the lower platform 19. This makes the work below the switchgear 21 quite difficult in the transition piece 15 or in the tower 4. In addition, the maintenance hoist 31 needs to be accessed from below for maintenance.

[0062] The design of the interior of the transition piece 15 where the switchgear 21 is located is typically a collaboration between the wind turbine manufacturer and the manufacturer of the transition piece 15. The result is therefore typically a new design that must be tested with the aid of prototypes and workshops before it is shipped offshore to ensure that it will work and that there is enough space to handle the array cables before the array cables are installed.

[0063] The solution for the maintenance lift 31 was earlier that the maintenance lift 31 stopped at the lowest platform inside the tower 4, i.e. in the lowest tower section 9. The bolted platform below the connection between the tower 4 and the transition piece 15 could then be used as a maintenance area.

[0064] Now turn back to Figure 4 In order to overcome the above-mentioned disadvantages, an additional permanent working platform 32 is provided below the lower platform 19. Figure 5 As can be seen, the working platform 32 and likewise the platforms 19, 20 are provided with support elements 33 to 38 positioned against the transition piece 15 from the interior of the transition piece 15. The support elements 33 to 38 are assigned to the support beams 22 to 27.

[0065] The working platform 32 has an installation and / or maintenance space 39 for installing and servicing the service lift 31. In addition, the working platform 32 also has openings 40, 41 for introducing array cables (not shown) and facilitating the handling of the array cables. The working platform 32 is also attached to the support beams 22 to 27. The working platform 32 is arranged parallel to the lower platform 19. When viewed in the longitudinal direction L, the working platform 32 is preferably arranged at a distance d of about 2.5 m from the lower platform 19.

[0066] By having a permanent working platform 32 below the lower platform 19 where the switchgear 21 is located, a permanent solution is provided for servicing the service lift 31 and for simplifying the routing and handling of the array cables. A preferably airtight platform is arranged below the working platform 32 and thereby the cable hang-off of the transition piece 15 is located approximately 2.5 m below the integrated working platform 32. Thus, no additional scaffolding is required in the transition piece 15 for handling and routing the array cables. The integrated working platform 32 may be suspended from an upper structure by using support beams 22 to 27 or it may be mounted directly to the wall 42 of the transition piece 15 by using struts or welded brackets.

[0067] As from Figure 6 As can be seen, the lower platform 19 has a centrally arranged hatch 43 which can be opened for the array cable entry. The lower platform 19 also has a support structure 44 that supports the lower platform 19. The support structure 44 is attached to the support beams 22 to 27. The support structure 44 can also be attached directly to the wall 42. The support structure 44 includes a plurality of beams arranged in a circular manner. For safety reasons, the lower platform 19 can have a railing 45.

[0068] The working platform 32 may also be provided with a support structure 46 that supports the working platform 32. The support structure 46 is attached to the support beams 22 to 27 and / or to the wall 42. The support structure 46 comprises a plurality of beams arranged in a circular manner. The working platform 32 also has a railing 47. The working platform 32 has an elevated working section 48 that is arranged below the switchgear 21. The elevated working section 48 is arranged above the working platform 32. The elevated working section 48 may be elevated above the working platform 32 by 100 mm to 500 mm or more, preferably 300 mm, so as to better extend towards the switchgear 21.

[0069] The advantages of this permanent working platform 32 are numerous in terms of time saved during maintenance of the maintenance hoist 31 and in installing the array cables. It is also advantageous in terms of more standardized interfaces for the transition piece 15, manufacturing and thereby saving money on workshops, rescue drills, prototypes and work instruction. For maintenance or installation of the maintenance hoist 31, there is a large amount of space on the working platform 32 below the lower platform 19 where the maintenance hoist 31 descends.

[0070] The technician can simply take the tower ladder 49 down one level to the work platform 32. There is then access to the bottom of the service lift 31, the wire tensioners, guide wires, etc. The center of the integrated work platform 32 is open, and there is space for indexing the array cables, then lowering them, coiling them (if necessary), and then routing them toward the switchgear 21 without having to erect additional scaffolding below the lower platform 19. The work platform 32 is located around the large central opening 40.

[0071] As from Figure 7 It can be seen that, alternatively, the integrated working platform 32 can be made as a smaller version located only below the maintenance lift 31. Thus, different arrangements of array cable arrangements can be made. Advantageously, there is still access to the maintenance space 39 for the maintenance lift 31.

[0072] An alternative could be a suspended platform (not shown) rather than an integrated work platform 32, especially if it is used solely for lift maintenance access. Figure 7 In the case of a smaller version of the work platform 32, it can be raised into the transition piece 15 before the rest of the structure is installed. The suspended platform can then be attached before the transition piece 15 is transported offshore. For both alternatives above, the work platform 32 can also be mounted to the wall 42 of the transition piece 15 instead of being connected to the support beams 22 to 27.

[0073] Although the invention has been described in terms of preferred embodiments, it will be apparent to those skilled in the art that modifications are possible in all embodiments.

Claims

1. A wind turbine (1), comprising: Tower (4); Basics (14); a transition piece (15) arranged between the tower (4) and the foundation (14) and connecting the tower (4) to the foundation (14); a platform (19) arranged in the transition piece (15), wherein the switchgear is arranged on the platform; a maintenance lift (31) capable of being lowered to the platform (19); and a permanent working platform (32) arranged below the platform (19) and at a distance d from the platform (19), wherein the permanent working platform is arranged within the transition piece and comprises a maintenance space positioned below the maintenance elevator for installing and maintaining the maintenance elevator and providing a passage below the maintenance elevator for accessing the bottom of the maintenance elevator.

2. The wind turbine according to claim 1, wherein: The distance d is between 2 m and 3 m.

3. The wind turbine according to claim 2, wherein: The distance d is 2.5 m.

4. The wind turbine according to any one of claims 1 to 3, further comprising a plurality of support beams (22-27), the support beams (22-27) extending in a longitudinal direction (L) of the tower (4), wherein: Both the platform (19) and the permanent working platform (32) are attached to the support beams (22-27).

5. The wind turbine according to claim 4, wherein: The support beams (22-27) are connected to the flange (17) of the transition piece (15).

6. The wind turbine according to claim 4, wherein: The platform (19) is supported by means of a first support structure (44), wherein the permanent working platform (32) is supported by means of a second support structure (46), and wherein both the first support structure (44) and the second support structure (46) are connected to the support beams (22-27).

7. The wind turbine according to claim 4, further comprising a platform arrangement (18) suspended in the transition piece (15), wherein: The platform arrangement (18) comprises the platform (19), the permanent working platform (32) and the support beams (22-27).

8. A wind turbine according to any one of claims 1 to 3, wherein: The platform (19) and the permanent working platform (32) are attached to a wall (42) of the transition piece (15).

9. The wind turbine of claim 1, wherein: The permanent working platform (32) has a raised working section (48) arranged below the switching device (21).

10. The wind turbine according to claim 9, wherein: The working section (48) is elevated 100 mm to 500 mm above the permanent working platform (32).

11. The wind turbine according to claim 10, wherein: The working section (48) is elevated 300 mm above the permanent working platform (32).

12. A wind turbine according to any one of claims 1 to 3, wherein: The platform (19) comprises a centrally arranged hatch (43) which can be opened and closed.

13. A wind turbine according to any one of claims 1 to 3, wherein: The permanent working platform (32) comprises openings (40, 41) for introducing array cables.

14. A wind turbine according to any one of claims 1 to 3, wherein: The permanent working platform (32) has a circular shape.

15. A wind turbine according to any one of claims 1 to 3, wherein: The permanent working platform (32) has a semicircular shape.