A fully automatic intelligent maintenance device for vertical wall components

By designing a fully automatic intelligent maintenance device for vertical wall components including edge plates, cross beams, water collection pipes and spray heads, the problem of excessively rapid water evaporation in concrete curing is solved, and automatic water supply and spray curing is realized. Ensures the strength and stability of the concrete.

CN113503050BActive Publication Date: 2025-02-14THE FIRST COMPARY OF CHINA EIGHTH ENG BUREAU LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202110939827.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-08-17
Publication Date
2025-02-14
Estimated Expiration
2041-08-17

AI Technical Summary

Technical Problem

After concrete is poured, if the curing is not carried out in time, it will cause the moisture to evaporate too quickly, causing dehydration and dry shrinkage cracks, affecting the strength and stability of the concrete. Especially in the case of complex modern building structures, it is difficult for the existing technology to achieve timing Quantitative maintenance.

Method used

A fully automatic intelligent maintenance device for vertical wall components is designed, including two sets of edge plates and cross beams. Through the combination of water collection pipe, spray head, winding drive and hoisting parts, automatic water supply and spray maintenance are realized. The angle and spacing of the water collector pipe are adjusted through the design of metal shrapnel and connecting hose to facilitate equipment storage.

Benefits of technology

It realizes fully automatic and intelligent maintenance of vertical wall components, ensures moisture replenishment and surface protection of concrete, avoids the occurrence of dehydration and dry shrinkage cracks, and is suitable for the timing and quantitative maintenance of modern complex building structures.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113503050B_ABST
    Figure CN113503050B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of wall maintenance devices, and specifically to a fully automatic intelligent maintenance device for vertical wall components, comprising two groups of edge plates and cross beams, the surfaces of the edge plates are provided with connecting pieces, a plurality of water collecting pipes are provided between the connecting pieces of the two groups of edge plates, a connecting piece is provided between two adjacent water collecting pipes, a winding drive piece is provided on the top surface of the cross beam, and a lifting piece is provided between the winding drive piece and the edge plates; the beneficial effects are as follows: the fully automatic intelligent maintenance device for vertical wall components proposed by the present invention installs a plurality of groups of water collecting pipes between the two groups of edge plates, and the two adjacent water collecting pipes are connected by a connecting hose, so that the distance between the two edge plates is adjusted as needed, which is convenient for reducing the space occupied when the equipment is stored, and a metal spring is inserted into the connecting hose to avoid wrinkles and flow obstruction when the connecting hose is bent.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of wall maintenance devices, and particularly to a fully automatic intelligent maintenance device for vertical wall components. Background Art

[0002] After concrete is poured, if the climate is hot and the air is dry, and it is not maintained in time, the water in the concrete will evaporate too quickly, forming a dehydration phenomenon. This will cause the cement particles that have formed a gel to not be fully hydrated and cannot be transformed into stable crystals, lacking sufficient bonding force, resulting in flaky or powdery peeling on the concrete surface. In addition, when the concrete does not have sufficient strength, premature evaporation of water will also cause large shrinkage deformation and dry shrinkage cracks. In the construction process of modern reinforced concrete buildings, concrete maintenance is a key factor in whether the later concrete strength meets the design requirements.

[0003] In the prior art, the current concrete maintenance methods are mainly divided into two types: natural maintenance and spraying maintenance. However, modern building structures are complex and have many floors, making it difficult to achieve regular and quantitative completion during maintenance. Summary of the Invention

[0004] The purpose of the present invention is to provide a fully automatic intelligent maintenance device for vertical wall components to solve the problems raised in the above background art.

[0005] To achieve the above purpose, the present invention provides the following technical solution: A fully automatic intelligent maintenance device for vertical wall components includes two groups of edge plates and a cross beam. A connecting piece is provided on the surface of the edge plate. A plurality of water collecting pipes are provided between the connecting pieces of the two groups of edge plates. An elastic connecting piece is provided between adjacent two water collecting pipes. A winding driving piece is provided on the top surface of the cross beam. A hoisting piece is provided between the winding driving piece and the edge plate.

[0006] Preferably, the connecting piece includes a connecting frame and a swinging block. The connecting frame has a "C" - shaped structure. A cross bar is provided between the two parallel side plates of the connecting frame. The cross bar passes through the swinging block, and the connecting frame is fixed on the surface of the edge plate.

[0007] Preferably, two groups of nozzles are provided on the surface of the water collecting pipe. The multiple groups of water collecting pipes are arranged in a "W" - shaped distribution, and an elastic connecting piece is provided between adjacent two water collecting pipes.

[0008] Preferably, the elastic connecting piece includes a metal spring piece, and the metal spring piece has a circular arc plate - like structure.

[0009] Preferably, the connecting piece includes a connecting hose and a metal spring piece inserted inside the connecting hose. The connecting hose connects the two groups of water collecting pipes.

[0010] Preferably, the winding driving member includes a driving motor and a winding handle fixed on the shaft body of the driving motor. The driving motor is installed on the side plate of the mounting frame, and the mounting frame is installed on the top surface of the cross beam. The mounting frame is in a "C" - shaped structure, and the winding handle is located between the two side plates of the mounting frame.

[0011] Preferably, the winding handle is in a "I" - shaped cylindrical structure, and a rotating handle is arranged on the surface of the winding handle. The rotating handle is in a "T" - shaped cylindrical structure and penetrates through the side plate of the mounting frame.

[0012] Preferably, the hoisting member includes a traction rope body and a lifting ring bolted to the bottom end of the traction rope body. The lifting ring is fixed on the top surface of the edge plate, and the top end of the traction rope body is bolted to the surface of the winding handle. A guiding member is arranged between the traction rope body and the cross beam.

[0013] Preferably, the guiding member includes a fixed pulley, and the fixed pulley is rotatably connected in the side groove. The side groove is opened at the end of the cross beam.

[0014] Preferably, through holes are opened on the surface of the edge plate, and a water delivery hose is inserted into the inside of the through holes. The water delivery hose is inserted on the surface of the water collecting pipe at the edge.

[0015] Compared with the prior art, the beneficial effects of the present invention are as follows: The structure of the present invention is reasonably arranged and has strong functionality, with the following advantages:

[0016] 1. In the full - automatic intelligent curing device for vertical wall components proposed by the present invention, multiple groups of water collecting pipes are installed between two groups of edge plates, and adjacent two water collecting pipes are connected by a connecting hose. Thus, the distance between the two edge plates can be adjusted as needed, which is convenient for reducing the space occupied when the device is stored. Moreover, a metal elastic sheet is inserted into the connecting hose to prevent the connecting hose from being blocked by wrinkles when it is bent.

[0017] 2. In the full - automatic intelligent curing device for vertical wall components proposed by the present invention, a metal elastic sheet is added between adjacent two groups of water collecting pipes for connection. The metal elastic sheet pushes the two groups of water collecting pipes apart. When the distance between the two groups of edge plates is reduced, the metal elastic sheet is compressed and bent, realizing the reduction of the included angle between adjacent two groups of water collecting pipes.

[0018] 3. In the full - automatic intelligent curing device for vertical wall components proposed by the present invention, a winding mechanism is installed above the cross beam to drive the traction rope body to wind and unwind, so as to realize the hoisting and regulation of the edge plate, enabling the spraying device to spray along the wall surface, and a side groove is added at the end of the cross beam to limit the traction rope body. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 is a schematic structural diagram of the present invention;

[0020] Figure 2 is Figure 1 an enlarged schematic diagram of the structure at A in

[0021] Figure 3 Schematic diagram of the connection structure between the connecting part and the swinging block of the present invention;

[0022] Figure 4 Schematic diagram of the internal structure of the connecting hose of the present invention;

[0023] Figure 5 Schematic diagram of the mounting bracket structure of the present invention.

[0024] In the figure: edge rib plate 1, connecting frame 2, cross bar 3, swinging block 4, water collecting pipe 5, nozzle 6, connecting hose 7, flexible anti-crease skeleton 8, metal spring piece 9, hanging ring 10, fixed pulley 11, edge groove 12, cross beam 13, mounting bracket 14, driving motor 15, winding handle 16, rotating handle 17, traction rope body 18, water conveying hose 19, through hole 20. Detailed implementation manners

[0025] Next, the technical solutions in the embodiments of the present invention will be clearly and completely described in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.

[0026] Please refer to Figures 1 to 5 , the present invention provides a technical solution: a fully automatic intelligent maintenance device for vertical components of a wall, including two groups of edge rib plates 1 and a cross beam 13. An adapter is provided on the surface of the edge rib plate 1. The adapter includes a connecting frame 2 and a swinging block 4. The connecting frame 2 has a "C" - shaped structure. A cross bar 3 is arranged between the two parallel side plates of the connecting frame 2. The cross bar 3 penetrates through the swinging block 4, and the connecting frame 2 is fixed on the surface of the edge rib plate 1;

[0027] A plurality of water collecting pipes 5 are arranged between the adapters of the two groups of edge rib plates 1. Two groups of nozzles 6 are arranged on the surface of the water collecting pipe 5. The multiple groups of water collecting pipes 5 are arranged in a "W" - shaped distribution. An elastic connecting member is arranged between adjacent two water collecting pipes 5. The elastic connecting member includes a metal spring piece 9. The metal spring piece 9 has a circular arc - shaped plate structure. A connecting member is arranged between adjacent two water collecting pipes 5. The connecting member includes a connecting hose 7 and a metal spring piece 9 inserted into the inside of the connecting hose 7. The connecting hose 7 connects the two groups of water collecting pipes 5. A through hole 20 is opened on the surface of the edge rib plate 1. A water conveying hose 19 is inserted into the inside of the through hole 20. The water conveying hose 19 is inserted on the surface of the edge water collecting pipe 5;

[0028] A winding drive member is provided on the top surface of the cross beam 13. The winding drive member includes a drive motor 15 and a winding handle 16 fixed on the shaft body of the drive motor 15. The drive motor 15 is installed on the side plate of the mounting frame 14. The mounting frame 14 is installed on the top surface of the cross beam 13. The mounting frame 14 is in a "C" - shaped structure. The winding handle 16 is located between the two side plates of the mounting frame 14. The winding handle 16 is in a "I" - shaped cylindrical structure. A rotating handle 17 is provided on the surface of the winding handle 16. The rotating handle 17 is in a "T" - shaped cylindrical structure. The rotating handle 17 penetrates through the side plate of the mounting frame 14;

[0029] A hoisting member is provided between the winding drive member and the edge plate 1. The hoisting member includes a traction rope body 18 and a lifting ring 10 bolted to the bottom end of the traction rope body 18. The lifting ring 10 is fixed on the top surface of the edge plate 1. The top end of the traction rope body 18 is bolted to the surface of the winding handle 16. A guiding member is provided between the traction rope body 18 and the cross beam 13. The guiding member includes a fixed pulley 11. The fixed pulley 11 is rotatably connected in the side groove 12. The side groove 12 is opened at the end of the cross beam 13.

[0030] Working principle: In actual use, the water delivery hose 19 is connected to the water delivery pipeline, and the water delivery hose 19 injects water into the water collecting pipe 5. Since adjacent two groups of water collecting pipes 5 are connected by the connecting hose 7, the water sources of multiple groups of water collecting pipes 5 are interconnected. Start the drive motor 15 to drive the winding handle 16 to rotate for wire releasing. The traction rope body 18 slides down along the fixed pulley 11. At this time, the edge plate 1 moves downwards, and the nozzles 6 on the surfaces of multiple groups of water collecting pipes 5 between the two edge plates 1 face the wall for spraying. Since the metal elastic sheet 9 is inserted into the connecting hose 7, it avoids the folding and blocking of the connecting hose 7 at the bending part. When the spraying is over and the equipment needs to be stored, push the two edge plates 1 closer. At this time, the metal elastic sheet 9 between adjacent two groups of water collecting pipes 5 is squeezed and bent. With the help of rope bundling, or pre - drilling holes at the bottom and using bolts to connect the two edge plates 1. In this way, the distance between the two edge plates 1 is reduced, and the space occupied during the storage of the equipment is reduced.

[0031] Although the embodiments of the present invention have been shown and described, for those of ordinary skill in the art, it can be understood that various changes, modifications, substitutions, and variations can be made to these embodiments without departing from the principles and spirit of the present invention. The scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A fully automatic intelligent maintenance device for vertical wall components, comprising two sets of edge plates (1) and a crossbeam (13), characterized in that: The surface of the edge plate (1) is provided with connecting pieces. A plurality of water collecting pipes (5) are arranged between the connecting pieces of the two groups of edge plates (1). A connecting piece is arranged between two adjacent water collecting pipes (5). A winding driving piece is arranged on the top surface of the cross beam (13). A hoisting piece is arranged between the winding driving piece and the edge plate (1). Two groups of spray heads (6) are arranged on the surface of the water collecting pipe (5). The multiple groups of water collecting pipes (5) are arranged in a "W" shape. An elastic connecting piece is arranged between two adjacent water collecting pipes (5). The elastic connecting piece includes a metal elastic sheet (9), and the metal elastic sheet (9) is in an arc-shaped plate structure. The connecting piece includes a connecting hose (7) and a metal elastic sheet (9) inserted inside the connecting hose (7). The connecting hose (7) connects the two groups of water collecting pipes (5).

2. According to claim 1, a fully automatic intelligent maintenance device for vertical wall components is characterized by: The connecting piece includes a connecting frame (2) and a swinging block (4). The connecting frame (2) is in a "C" shape. A cross bar (3) is arranged between the two parallel side plates of the connecting frame (2). The cross bar (3) penetrates through the swinging block (4), and the connecting frame (2) is fixed on the surface of the edge plate (1).

3. The fully automatic intelligent maintenance device for vertical wall components according to claim 1 is characterized in that: The winding driving piece includes a driving motor (15) and a winding handle (16) fixed on the shaft body of the driving motor (15). The driving motor (15) is installed on the side plate of the mounting frame (14). The mounting frame (14) is installed on the top surface of the cross beam (13). The mounting frame (14) is in a "C" shape. The winding handle (16) is located between the two side plates of the mounting frame (14).

4. The fully automatic intelligent maintenance device for vertical wall components according to claim 3 is characterized in that: The winding handle (16) is in an "I" shaped cylindrical structure. A rotating handle (17) is arranged on the surface of the winding handle (16). The rotating handle (17) is in a "T" shaped cylindrical structure. The rotating handle (17) penetrates through the side plate of the mounting frame (14).

5. The fully automatic intelligent maintenance device for vertical wall components according to claim 3 is characterized in that: The hoisting piece includes a traction rope body (18) and a hanging ring (10) bolted to the bottom end of the traction rope body (18). The hanging ring (10) is fixed on the top surface of the edge plate (1). The top end of the traction rope body (18) is bolted to the surface of the winding handle (16). A guiding piece is arranged between the traction rope body (18) and the cross beam (13).

6. The fully automatic intelligent maintenance device for vertical wall components according to claim 5 is characterized in that: The guiding piece includes a fixed pulley (11). The fixed pulley (11) is rotatably connected in a side groove (12). The side groove (12) is opened at the end of the cross beam (13).

7. The fully automatic intelligent maintenance device for vertical wall components according to claim 3 is characterized by: A through hole (20) is opened on the surface of the edge plate (1). A water conveying hose (19) is inserted inside the through hole (20). The water conveying hose (19) is inserted on the surface of the edge water collecting pipe (5).

Citation Information

Patent Citations

  • Concrete outer wall spraying maintenance device

    CN208073019U

  • Full-automatic intelligent maintenance device for wall vertical component

    CN216042766U