A method for testing a distributor

By combining automatic and manual testing methods, integrating vibration monitoring and user management functions, it solves the problem of manual time-consuming and labor-intensive distribution testing, improves test efficiency and data management, and realizes the integration of distribution performance testing and fault diagnosis. .

CN113534003BActive Publication Date: 2024-10-22BEIJING XINLI MACHINERY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202110698350.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-06-23
Publication Date
2024-10-22
Estimated Expiration
2041-06-23

AI Technical Summary

Technical Problem

In the functional performance testing of distributors, traditional methods require a lot of manual participation, fault recurrence and diagnosis and positioning are time-consuming and labor-intensive, and the testing process is cumbersome, making it difficult to improve efficiency.

Method used

Using a method that combines automatic and manual testing, automatic testing is used for full-state system inspection, and manual testing is used for fault location and diagnosis. It integrates vibration monitoring, data storage, alarm and user management functions, and isolates pulse detection and interruption through optocoupler. Relay testing is performed using the power-on-power-off method to simplify the test process.

Benefits of technology

It improves the efficiency of the distribution device production and debugging process, reduces manual intervention and judgment time, saves labor and time costs, realizes the integration of distribution device performance testing, vibration monitoring and fault diagnosis, and simplifies data management.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113534003B_ABST
    Figure CN113534003B_ABST
Patent Text Reader

Abstract

The present invention provides a distribution device testing method, which includes automatic testing and manual testing. The automatic test can automatically perform short-circuit point testing, resistance testing and relay testing in the distribution device function test, and the data is automatically interpreted without manual intervention throughout the process. The manual test can select one of the short-circuit point test, resistance test and relay test for overall or single-point testing, and the manual test is conducive to fault reproduction and positioning. In the method, the relay test adopts a power-off-power-on-power-off mode to perform three relay function tests, perform pulse detection on the active contacts in the relay test, and perform resistance detection on the passive contacts. The method also includes vibration process monitoring, monitoring and recording whether a momentary interruption occurs during the vibration process of the relay power-on, and can perform data query, alarm and user management.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of power distributors, and in particular to a power distributor testing technology. Background Art

[0002] Functional performance tests are required before the power distribution unit leaves the factory, mainly for testing the internal relays, which are mainly divided into short-circuit point test, resistance test and relay function test. During the test, the amount of test data is large and the process is repetitive. If a problem occurs, fault diagnosis and location need to be performed. After the traditional automated testing method finds a problem, it usually requires manual fault reproduction and diagnosis and location, which consumes manpower and wastes time. Summary of the invention

[0003] In view of the above problems, it is convenient to reproduce the fault, reduce the labor cost and time consumed by fault diagnosis and location, and at the same time, the test of the distributor before leaving the factory is centralized to reduce the test time. The present invention proposes a test method that divides the distributor test into automatic and manual. The automatic test part is used for the full-state system inspection of the distributor, and the manual test is used for fault location and diagnosis. At the same time, the whole process of vibration monitoring, data storage query alarm and user management functions are centralized.

[0004] The purpose of the present invention is to combine distributor performance testing, vibration monitoring, fault diagnosis and positioning into one, improve the efficiency of distributor production and debugging, reduce manual intervention and interpretation, facilitate data management, and save labor and time costs.

[0005] The invention discloses a method for testing a power distributor, which includes automatic testing and manual testing. The automatic test can automatically detect the short-circuit point test, resistance test and relay test of the power distributor function test in sequence, and the data can be automatically interpreted. The manual test can select at least one of the short-circuit point test, resistance test and relay test, and perform an overall (module) test on the selected test, or select a single point therein for separate testing.

[0006] Furthermore, in this method, the relay test adopts a power-off-power-on-power-off mode to perform three relay function tests. The relay test includes the detection of active contacts and passive contacts; wherein, the active contacts are detected by optocoupler isolation pulses, and the relay is normal if the three detections are high level-low level-high level; and the passive contacts are divided into normally open and normally closed. For the detection of the passive contacts, the passive contacts are first powered on and converted into active contacts (preferably, connected to 28V input), and then detected by optocoupler isolation pulses; wherein, the normally open contacts are detected three times as high level-low level-high level, which means the relay is normal, and the normally closed contacts are detected three times as low level-high level-low level, which means the relay is normal. The detection of passive contacts can also be carried out by resistance testing, and the principle is the same as the four-wire resistance measurement.

[0007] The present invention also provides a distributor testing method, which consists of the automatic test, the manual test and vibration process monitoring.

[0008] Furthermore, in addition to the normal working status of the distributor and the power supply for vibration process monitoring, the passive contacts that need to be detected are also connected to 28V input, and all monitoring points are converted into active contact monitoring. Optocoupler isolation pulse detection is used, and if there is a momentary interruption of more than 10 microseconds in the vibration monitoring, a positive pulse is detected, and the momentary interruption time of the relay is recorded.

[0009] Furthermore, the vibration process monitoring in this method can modify the monitoring time, and fully monitor and record whether there is a momentary interruption problem during the power-on vibration process of the relay with different vibration durations.

[0010] Furthermore, the method can perform a self-test before testing, and the self-test includes a self-test of a functional test module and a power supply to ensure that the equipment is in good performance, safe and reliable.

[0011] Furthermore, the test method includes recording and querying test data, comparing test data with threshold values, and displaying alarms for unqualified data. It also includes a user data management section that can add, delete, modify, and query users.

[0012] Furthermore, in the resistance test, the resistance below 1000Ω is measured using the four-wire principle, and the resistance above 1000Ω is measured using the two-wire principle. The short-circuit point test uses the two-wire measurement, and the line resistance when measuring the resistance with the two-wire system is removed through self-checking, thus reducing the short-circuit point test error.

[0013] Beneficial Effects

[0014] Compared with the prior art, the present invention provides a distribution device testing method, which can not only automatically perform distribution device short-circuit point test, resistance test, relay function test and real-time monitoring of the entire vibration process, but also perform fault reproduction and fault location through a manual test module. In the method of the present invention, users can choose automatic testing and manual testing. The individual test methods of the two are the same, but the purposes and internal logics are different. When automatic testing is selected, the three test items are automatically performed in sequence. After selecting manual testing, it is necessary to select a single overall test or a single single-point test according to demand. At the same time, it integrates user management, data comparison recording and storage functions, integrates routine testing and fault reproduction diagnosis of distribution devices, and records and stores test and fault location results for easy search. It improves the degree of test integration while saving manual judgment time.

[0015] In this method, the same relay test point uses the same test principle in the three tests. During the vibration monitoring process, the passive paths are energized. The pulse detection is isolated by optocouplers, and the pulse signal is collected to simplify the test process, reduce the time of switching the test process, and improve the test efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 This is a flow chart of the distributor testing method. DETAILED DESCRIPTION

[0017] The power distributor testing method of the present invention is described in detail below with reference to the accompanying drawings and embodiments.

[0018] like Figure 1 The present invention discloses a method for testing a power distributor, which consists of automatic testing, manual testing and vibration process monitoring. The automatic testing can automatically detect the short-circuit point test, resistance test and relay test of the power distributor function test, and automatically interpret the data. The manual testing can select a part of the short-circuit point test, resistance test and relay test for overall testing, or select a single point in a part for separate testing.

[0019] In this method, the relay test adopts the power-off-power-on-power-off mode to test the relay function three times. The relay test includes active contact and passive contact detection. The active contact uses optocoupler isolation pulse detection. The three detections of high level-low level-high level indicate that the relay is normal. The passive contacts are divided into normally open and normally closed, and a four-wire resistance test is adopted.

[0020] In addition to the normal working status of the distributor and power supply for vibration process monitoring, the passive contacts that need to be detected are also connected to 28V input, and all monitoring points are converted into active contact monitoring. Optocoupler isolation pulse detection is used. If there is a momentary interruption of more than 10 microseconds in vibration monitoring, a positive pulse is detected, and the momentary interruption time of the relay is recorded.

[0021] The vibration process monitoring in this method can modify the monitoring time, and fully monitor and record whether there is a momentary interruption problem during the power-on vibration process of the relay with different vibration durations.

[0022] This method can perform self-test before testing, including self-test of functional test modules and power supply to ensure that the equipment is in good performance, safe and reliable. This method also includes record keeping and query of test data, comparison and interpretation of test data with thresholds, alarm display of unqualified data, and user data management.

[0023] In the resistance test, the resistance below 1000Ω is measured using the four-wire principle, and the resistance above 1000Ω is measured using the two-wire principle. The short-circuit point test uses the two-wire measurement.

[0024] The specific test process example is as follows:

[0025] Step 1: Enter the correct user name and password to log in to the operation interface, select self-test, and check whether the functions of each test item are normal. If an alarm is displayed during the self-test, stop the test immediately, troubleshoot and retest.

[0026] Step 2: After the self-test passes, select automatic test or manual test. After selecting automatic test or manual test, you need to fill in the test information (test process stage, product model, product number, test location, test temperature, test humidity, time). For example, test process stage: post-aging test; product model: DSB356; product number: 202103001; test location: XX factory; test temperature: 25℃; test humidity: 42%; time: 20210520. After checking, enter the test interface.

[0027] Step 3: After entering the test interface with the automatic test function, click "Start Test" to automatically start the test; after entering the test interface with the manual test function, you need to select a single test item (short circuit point, resistor or relay), click "Start Test" to start the single item overall test. If you need to measure a single point in the test item, you need to select the single point after selecting the single item, and finally click "Start Test" to test the single point in the single item. The short circuit point test uses a two-wire measurement system. The line resistance when measuring the resistance with a two-wire system is removed through self-test to reduce the error of the short circuit point test; in the resistance test, the resistance below 1000Ω is measured using the four-wire principle, and the resistance above 1000Ω is measured using the two-wire principle. In the relay test, after the passive contact test is powered on (28V) and becomes an active contact, both the passive contact test and the active contact test use optocoupler isolation pulse detection (three relay function tests are performed in the manner of power off-power on-power off). In addition to the normal power supply of the distributor during vibration process monitoring, the passive contacts that need to be tested are also connected to 28V input, and all monitoring points are changed to active contact monitoring. Optocoupler isolation pulse detection is used. If the vibration monitoring has a momentary break of more than 10 microseconds, the positive pulse is detected as unqualified, and the momentary break time of the relay is recorded. Short-circuit point test data above 0.5Ω is unqualified, and resistance test data above 1000Ω is qualified within the range of theoretical value × (1±2%). The actual measured values ​​are recorded for both short-circuit point test and resistance test, and the relay test detects pulse changes as unqualified.

[0028] Step 4: During the test, the data is displayed in real time and automatically compared. If the threshold is exceeded, an alarm will be displayed. After the test, the data is automatically saved. Query the test record based on product number, test time or tester and submit it for printing.

[0029] Many specific details are described in this embodiment to facilitate a full understanding of the present invention. However, the present invention may also be implemented in other ways different from those described herein. Therefore, the protection scope of the present invention is not limited to the specific embodiments disclosed below.

Claims

1. A method for testing a distributor, characterized in that: The test method includes automatic test and manual test. The automatic test is to automatically detect the short-circuit point test, resistance test and relay test of the distributor function in sequence, and automatically interpret the data. The manual test can select at least one of the short-circuit point test, resistance test and relay test, and perform single-point test or overall test on the selected test; Among them, the relay test uses the power-off-power-on-power-off method to perform three relay function tests; Among them, the active contact detection in the relay test uses optocoupler isolation pulse detection. If the three detections are high level-low level-high level, the relay is normal; Among them, the passive contacts in the relay test are divided into two types: normally open and normally closed; the detection of the passive contacts is to first power on the passive contacts, convert them into active contacts, and then use optocoupler isolation pulse detection; among them, if the normally open contacts are detected three times as high level-low level-high level, the relay is normal, and if the normally closed contacts are detected three times as low level-high level-low level, the relay is normal; the passive contacts can also be tested for resistance; The method further includes vibration process monitoring, wherein the vibration process monitoring is performed after all monitoring points are converted into active contacts; Among them, in the vibration process monitoring, in addition to the normal working state of the distributor and power on, the passive contacts that need to be detected are also connected to 28V input, all monitoring points are changed to active contact monitoring, and the optical coupler is used to isolate the pulse detection. If the vibration monitoring has a momentary interruption of more than 10 microseconds, the positive pulse is detected, and the momentary interruption time of the relay is recorded; Among them, in the resistance test, the resistance below 1000Ω is measured by four-wire system, and the resistance above 1000Ω is measured by two-wire system; the short-circuit point test is measured by two-wire system, and the line resistance when measuring the resistance by two-wire system is removed through self-checking, so as to reduce the error of short-circuit point test.

2. The power distribution device testing method according to claim 1, characterized in that: The vibration process monitoring in this method can modify the monitoring time, and fully monitor and record whether there is a momentary interruption problem during the power-on vibration process of the relay with different vibration durations.

3. The power distribution device testing method according to claim 1 or 2, characterized in that: This method can perform a self-test before testing, which includes a self-test of the functional test module and the power supply to ensure that the equipment is in good performance, safe and reliable.

4. The power distribution device testing method according to claim 3, characterized in that: The test method includes the record keeping and query of test data, the comparison and interpretation of test data with threshold values, the alarm display of unqualified data, and also includes a user data management part, which can add, delete, modify and query users.