A drilling and blasting platform frame
By designing a drilling and blasting platform frame with a rotating bracket, the problem of unreasonable design of the drilling and blasting platform frame in the prior art is solved, and the organic combination of the passage of the lower main frame and the operation platform in the middle of the tunnel section is realized, which improves the Work efficiency and adaptability.
Patent Information
- Application Number
- CN202111081299.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-09-15
- Publication Date
- 2025-02-18
- Estimated Expiration
- 2041-09-15
AI Technical Summary
The existing drilling and explosion platform frame is unreasonable, and it is impossible to take into account the need for temporary installation of operating platforms in the lower part of the main frame and the middle part of the tunnel section, resulting in a long process, increased cost and inability to meet the construction requirements of tunnel section expansion.
A drilling and explosion platform frame including the main frame, the working platform and the rotating bracket is designed. The rotating bracket can switch between the give way state and the working state, realizing the organic combination of the moving space of the platform frame and the simultaneous drilling and explosion of the entire section.
It solves the problem that the drilling and explosion platform frame cannot take into account both the passage of mechanical equipment and the installation of operating platforms, improves operating efficiency, adapts to the needs of changes in tunnel sections, and reduces costs and process time.
Smart Images

Figure CN113622940B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of supporting platforms, and in particular to a drilling and blasting platform frame. Background Art
[0002] The construction of water diversion hydropower station projects often involves the drilling and blasting of water diversion tunnels of different cross-sectional sizes, and the tunnel drilling and blasting construction is often the key to the construction period. For small-section tunnels, it is usually necessary to set up a drilling and blasting platform in front of the work surface every time, dismantle it after drilling, and re-set it for the next drilling and blasting cycle; for large-section tunnels, it is usually preferred to use single-arm, double-arm or multi-arm hydraulic rock drilling rigs to drill holes to improve work efficiency; in engineering practice, there are more medium-sized tunnels (cross-sectional area 30-50m 2 ), it is more economical to use the drilling and blasting method for construction. The general handheld pneumatic drill blasting platform frame has a single function, a small number of working platforms, and no working platform inside the platform frame. It is impossible to drill holes in the entire section of multiple drilling rigs at the same time, resulting in a long drilling process; some platform main frames are not equipped with hand-held pneumatic drill high-pressure air supply pipes and water supply pipes, which makes drilling inconvenient and the pipelines entangled; some platform frames cannot extend the outer bracket when encountering weak soft interlayers or broken zones, which cannot meet the construction requirements of tunnel section expansion, and need to make a larger platform frame, which increases the cost investment. At the same time, the common drilling and blasting platform frame only considers the space needs of the loader mobile platform frame. The working platform is generally set on the outside of the main frame, and no fixed working platform is set in the "door" frame. Therefore, each time drilling and blasting is performed, it is necessary to temporarily set up an operating platform in the middle of the "door" frame, which not only delays the hole making time but also increases the cost, and fails to solve the contradiction between "platform frame mobile space" and "full section simultaneous drilling and blasting". In addition, when the common drilling and blasting platform is used for spray anchor support, especially when drilling holes with long anchor rods on the top of the cave, the working platform is too close to the rock surface on the top of the cave, making it difficult to drill vertically on the rock surface and the quality cannot be guaranteed. Therefore, the drilling and blasting platform in the prior art has problems such as unreasonable design, more preparation work before drilling, less hand pneumatic drills that can be used for drilling at the same time, and long excavation cycle time. Summary of the invention
[0003] Therefore, the technical problem to be solved by the present invention is to overcome the defects of unreasonable design of drilling and blasting platforms in the prior art, thereby providing a drilling and blasting platform frame with reasonable structure and complete functions.
[0004] In order to solve the above technical problems, the present invention provides a drilling and blasting platform frame, comprising:
[0005] Main frame;
[0006] A working platform, at least partially formed on the main frame and suitable for supporting working personnel and / or working equipment;
[0007] A rotating bracket, one end of which is rotatably connected to the main frame and the other end of which is supported and arranged on the ground, wherein the rotating bracket includes a yielding state parallel to the extension direction of the main frame and an operating state arranged at an angle to the extension direction of the main frame;
[0008] The working platform comprises: a supporting part and an extension part arranged on the supporting part; the supporting part is directly or indirectly arranged on the main frame and supports the extension part; the extension part is suitable for increasing the area of the working area under the supporting state of the supporting part;
[0009] The support portion includes an outrigger beam disposed outside the main frame and a sleeve beam movably connected to the outrigger beam; correspondingly, the extension portion includes a folding mesh plate selectively switchable between a folded state and an unfolded state;
[0010] The sleeve beam is sleeved inside and / or outside the outrigger beam, and the sleeve beam is suitable for selectively extending and retracting along the length direction of the outrigger beam;
[0011] The folding mesh plate rotates around a folding axis and is adapted to be unfolded when the sleeve beam extends relative to the outrigger beam, and folded when the sleeve beam contracts relative to the outrigger beam;
[0012] The support portion includes the upper surface of the rotating bracket, and correspondingly, the extension portion includes a movable mesh plate arranged on the upper surface of the rotating bracket;
[0013] The main frame comprises a door-shaped frame, and the door-shaped frame comprises a frame top beam arranged at the top, and frame columns arranged opposite to each other on both sides of the frame top beam;
[0014] The frame top beam cooperates with the mesh plate to form the working platform;
[0015] The rotating bracket is movably mounted on the frame column.
[0016] The door-type frame further comprises: a frame middle beam, and the frame middle beam is arranged below the frame top beam in the height direction.
[0017] The drilling and blasting platform frame further comprises: a joist, which is arranged at the bottom of the frame top beam and / or the frame middle beam and is suitable for lifting the drilling and blasting platform frame off the ground under the lifting action of the working vehicle;
[0018] When the rotating bracket is in the yielding state, a movable passage is formed under the main frame, which is convenient for loaders and dump trucks to pass under the drilling and blasting platform frame. When the device moves or the dump truck is unloading, the rotating bracket is retracted to meet the passage space requirements of mechanical equipment under the main frame; and when in the working state, the rotating bracket is extended to form a support, which is convenient for forming a working platform, thereby supporting the operating personnel and / or operating equipment;
[0019] The frame middle beam is arranged at the upper position of the rotating bracket in the height direction. The rotating bracket forms a third working platform S3 in the working state. By being made into a plane rotating type, the rotating bracket is pulled open when drilling and blasting is required. After drilling and blasting is completed, the rotating bracket is retracted and fixed to form a traffic space.
[0020] The main frame is also provided with a bracket latch, which is suitable for locking the rotating bracket in a yielding state or an operating state, so as to position the rotating bracket and avoid movement caused by accidental touch.
[0021] Optionally, a mesh hook is further provided on the main frame at a position corresponding to the rotating bracket, and the mesh hook is suitable for hanging a movable mesh that is movably arranged on the upper surface of the rotating bracket.
[0022] Optionally, the drilling and blasting platform frame also includes: an air supply pipe and / or a water supply pipe, which is installed on the main frame and extends from a relative bottom position to a relative top position of the main frame, and the air supply pipe is also provided with an air supply pipe inlet and a plurality of air drill air supply interfaces, and the water supply pipe is also provided with a water supply pipe inlet and a plurality of air drill water supply interfaces.
[0023] The technical solution of the present invention has the following advantages:
[0024] 1. The drilling and blasting platform frame provided by the present invention realizes an organic combination of the two functions of "platform frame moving space" and "full-section simultaneous drilling and blasting" by movably arranging a rotating bracket on the main frame and switching the rotating bracket between a yielding state and an operating state, thereby solving the contradiction and defect of the common drilling and blasting platform frame that cannot simultaneously take into account the passage of mechanical equipment under the main frame and the need to temporarily set up an operating platform in the middle of the tunnel section; and improving the operating efficiency.
[0025] 2. The drilling and blasting platform frame provided by the present invention forms a second working platform S2 by arranging a frame middle beam under the frame top beam, so that the second working platform S2 can also serve as a shotcrete support working platform, which can adapt to rock anchoring construction at any angle within the range of the cave top, especially long anchor drilling construction, so as to achieve multiple uses of one frame and avoid repeated production of working platforms with different functions, resulting in waste and mutual interference.
[0026] 3. The drilling and blasting platform frame provided by the present invention has a support beam arranged at the bottom of the frame top beam and / or the frame middle beam, so that when the working vehicle moves the drilling and blasting platform frame, it directly contacts the support beam and receives force, thereby avoiding damage to other components, improving the overall contact strength, and ensuring structural safety.
[0027] 4. The drilling and blasting platform frame provided by the present invention enables the sleeve beam to be sleeved inside and / or outside the outrigger beam, and the sleeve beam is suitable for selective extension and retraction along the length direction of the outrigger beam. The sleeve connection form facilitates flexible adjustment of the working platform width to adapt to the requirements of changes in tunnel cross-section.
[0028] 5. The drilling and blasting platform frame provided by the present invention realizes unfolding and folding by setting a folding mesh plate and rotating the folding mesh plate around a folding axis. Therefore, the folding mesh plate is made to be foldable around the folding axis, spread out when in use, and folded up when not in use. Therefore, when the drilling and blasting platform frame moves, it is retracted inward with the sleeve beam to avoid collision with the cave wall facilities, thereby improving the overall flexibility. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0030] Figure 1 It is a schematic diagram of the unfolded state of the rotating bracket of the drilling and blasting platform frame of the present invention;
[0031] Figure 2 It is a schematic diagram of the swivel bracket of the drilling and blasting platform frame of the present invention in the retracted state;
[0032] Figure 3 This is a schematic diagram of the drilling state of the long drill rod of the present invention;
[0033] Figure 4 It is a side view of the drilling and blasting platform frame of the present invention.
[0034] Description of reference numerals:
[0035] 1-frame column, 2-frame top beam, 3-frame bottom beam, 4-ladder, 5-air supply pipe, 6-water supply pipe, 7-rotating bracket, 8-bracket latch, 9-mesh hook, 10-support beam, 11-top beam and middle beam connecting column, 12-frame middle beam, 13-reinforced beam, 14-folding mesh plate, 15-folding axis, 16-movable mesh plate, 17-column connecting beam, 18-diagonal bracing beam, 21-extending beam, 22-sleeve beam, 31-air supply pipe inlet, 32-water supply pipe inlet, 33-air drill air supply interface, 34-air drill water supply interface, 70-rock wall, 80-operating vehicle, 90-air drill, 91-long drill rod. DETAILED DESCRIPTION
[0036] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0037] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0038] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0039] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.
[0040] Combination Figure 1-Figure 4 As shown, the drilling and blasting platform frame provided in this embodiment includes:
[0041] Main frame;
[0042] A working platform, at least partially formed on the main frame and suitable for supporting working personnel and / or working equipment;
[0043] The rotating bracket 7 has one end rotatably connected to the main frame and the other end supported on the ground. The rotating bracket 7 includes a yielding state parallel to the extension direction of the main frame and an operating state set at an angle to the extension direction of the main frame.
[0044] Preferably, the working platform is suitable for supporting working personnel and / or working equipment, wherein the working equipment includes a pneumatic drill 90 .
[0045] A rotatable rotating bracket 7 is arranged at the lower part of the main frame, and the rotating bracket 7 is rotatably connected to the main frame, and in the yielding state, a movable passage is formed under the main frame, which is convenient for loaders and dump trucks to pass under the drilling and blasting platform frame. When the device moves or the dump truck is unloading, the rotating bracket 7 is retracted to meet the passage space requirements of mechanical equipment under the main frame; and in the working state, the rotating bracket 7 is extended to form a support, which is convenient for forming a working platform, thereby supporting the operating personnel and / or operating equipment. By switching the working state, the problems of unreasonable design of the drilling and blasting platform in the existing water diversion tunnel drilling and blasting method excavation, more preparation work before drilling, less hand pneumatic drills that can be used for drilling at the same time, and long excavation cycle are solved.
[0046] The drilling and blasting platform frame provided in this embodiment realizes the organic combination of the two functions of "platform frame moving space" and "full-section simultaneous drilling and blasting" by movably arranging the rotating bracket 7 on the main frame and switching the rotating bracket 7 between the yielding state and the working state, thereby solving the contradiction and defect of the common drilling and blasting platform frame between the inability to simultaneously take into account the passage of mechanical equipment under the main frame and the need to temporarily set up an operating platform in the middle of the tunnel section, and improving the working efficiency.
[0047] Preferably, the drilling and blasting platform frame provided in this embodiment is mainly used in tunnels, and is particularly suitable for use in medium-section water diversion tunnels. When the drilling and blasting platform frame is in an operating environment, the length direction of the main frame is parallel to the extension direction of the tunnel, and the width direction of the main frame is perpendicular to the extension direction of the tunnel and parallel to the horizontal plane. Among them, the length direction of the main frame is the extension direction of the main frame.
[0048] Specifically, the main frame includes a door-type frame, and the door-type frame includes a frame top beam 2 arranged at the top, and frame columns 1 arranged opposite to each other on both sides of the frame top beam 2;
[0049] The frame top beam 2 cooperates with the mesh plate to form the working platform;
[0050] The rotating bracket 7 is movably mounted on the frame column 1 .
[0051] Preferably, a steel mesh is laid on the upper part of the frame top beam 2 to form a first working platform S1. The steel mesh is welded into multiple pieces to facilitate manual movement and paving, and the meshes are tied tightly with lead wire.
[0052] Specifically, the portal frame further includes: a frame middle beam 12 , and the frame middle beam 12 is arranged below the frame top beam 2 along the height direction.
[0053] A frame middle beam 12 is arranged directly below the frame top beam 2 of the drilling and blasting platform frame to form a second working platform S2. The frame top beam 2 and the frame middle beam 12 are welded and connected via a top beam middle beam connecting column 11. Preferably, reinforcing beams 13 are welded at both ends of the lower part of the frame middle beam 12 to improve the structural strength.
[0054] Additionally, by arranging a pneumatic drill 90 with a long drill rod 91 on the second working platform S2, the second working platform S2 can also serve as a long anchor hole making working platform on the cave roof.
[0055] In the prior art, when the drilling and blasting platform is generally used for drilling holes with long anchor rods on the top of the cave, the top working platform is too close to the rock wall 70, making it impossible to drill holes vertically and the quality is difficult to guarantee. Figure 3 As shown, the drilling and blasting platform frame provided in this embodiment can also be used as a sprayed anchor support work platform. The focus of the sprayed anchor support is the 120-degree range of the cave roof arch. When long anchor rods need to be installed on the cave roof for support, since the first working platform S1 is too close to the rock wall, it is difficult to implement anchor rod drilling and it is also difficult to ensure the quality. At this time, the staff can drill holes on the second working platform S2, and the first working platform S1 can also play a protective role.
[0056] The drilling and blasting platform frame provided in this embodiment forms a second working platform S2 by setting a frame middle beam 12 under the frame top beam 2, so that the second working platform S2 can also serve as a sprayed anchor support working platform, which can adapt to rock anchoring construction at any angle within 120 degrees of the cave top, especially long anchor drilling construction, so as to achieve multiple uses of one frame and avoid repeated production of working platforms with different functions, resulting in waste and mutual interference.
[0057] Preferably, the frame middle beam 12 is arranged above the rotating bracket 7 in the height direction. The rotating bracket 7 forms a third working platform S3 in the working state. By being made into a plane rotating type, the rotating bracket 7 is pulled open when drilling and blasting are required. After the drilling and blasting are completed, the rotating bracket 7 is retracted and fixed to form a traffic space.
[0058] Preferably, a bracket latch 8 is also provided on the main frame, and the bracket latch 8 is suitable for locking the rotating bracket 7 in a yielding state or an operating state, so as to position the rotating bracket 7 and avoid movement caused by accidental touch.
[0059] Preferably, in this embodiment, a frame bottom beam 3 is welded to the bottom of each of the four frame columns 1 on both sides of the portal frame, and the frame bottom beam 3 is in contact with the ground to bear force. A total of three longitudinal beams are welded to the middle and upper parts of the frame columns 1, and the bottom beam, longitudinal beams and portal frame together form a main frame.
[0060] Preferably, in this embodiment, the rotating bracket 7 is made of 4 pairs of 8 pieces, and after being pulled apart, every 2 pieces are butt-connected, and the 4 pairs of brackets are longitudinally connected and reinforced into a whole to form a working platform, and the bracket bottom is leveled with square wood. The bracket latch 8 is welded to the inner side of the frame column 1 of the door-shaped frame, and a total of 4 pairs of 8 pieces of devices are set. The columns and top beams on both sides of the rotating bracket 7 are welded by channel steel.
[0061] Specifically, the drilling and blasting platform frame further includes: a support beam 10, which is arranged at the bottom of the frame top beam 2 and / or the frame middle beam 12, and is suitable for lifting the drilling and blasting platform frame off the ground under the jacking action of the work vehicle 80.
[0062] Preferably, in this embodiment, the support beam 10 is welded to the bottom of the frame center beam 12 .
[0063] The drilling and blasting platform frame provided in this embodiment is provided with a support beam 10 at the bottom of the frame top beam 2 and / or the frame middle beam 12, so that when the working vehicle 80 moves the drilling and blasting platform frame, it is directly in contact with the support beam 10 and receives force, thereby avoiding damage to other components, improving the overall contact strength, and ensuring the safety of the structure.
[0064] Preferably, the working vehicle 80 may be a loader.
[0065] Specifically, the working platform includes: a supporting part and an extension part arranged on the supporting part; the supporting part is directly or indirectly arranged on the main frame and supports the extension part; the extension part is suitable for increasing the area of the working area under the supporting state of the supporting part.
[0066] Preferably, the support portion can be formed by structural beams such as the frame top beam 2 and the frame middle beam 12, can be formed by the upper surface of the rotating bracket 7, and can also be formed by an extension beam additionally provided on the main frame. The extension portion is formed by a mesh plate, a straight plate, etc. provided on the support portion, and its specific material can be a steel plate, a wooden board, etc. Preferably, the extension portion can be fixed or movably provided on the support portion by welding, riveting, bolting, clamping, etc.
[0067] Specifically, the support portion includes an outrigger beam 21 disposed outside the main frame and a sleeve beam 22 movably connected to the outrigger beam 21; correspondingly, the extension portion includes a folding mesh plate 14 that selectively switches between a folded state and an unfolded state.
[0068] Specifically, the sleeve beam 22 is sleeved inside and / or outside the outrigger beam 21 , and the sleeve beam 22 is suitable for selectively extending and retracting along the length direction of the outrigger beam 21 .
[0069] In this embodiment, upper, middle and lower three-layer steel pipe extension beams 21 are welded on the outer sides of the four frame columns 1 respectively to serve as support parts for the first working platform S1, the second working platform S2 and the third working platform S3.
[0070] The drilling and blasting platform frame provided in this embodiment enables the sleeve beam 22 to be sleeved inside and / or outside the outrigger beam 21, and the sleeve beam 22 is suitable for selective extension and contraction along the length direction of the outrigger beam 21. The sleeve connection form facilitates flexible adjustment of the working platform width to adapt to the requirements of changes in tunnel section.
[0071] Preferably, the lower part of each outrigger beam 21 is welded with angle steel to strengthen the diagonal brace of the beam 13, and the outrigger beams 21 are longitudinally connected by angle steel welding.
[0072] Specifically, the folding mesh plate 14 rotates around the folding axis 15 and is suitable for being unfolded when the sleeve beam 22 extends relative to the outrigger beam 21 , and being folded when the sleeve beam 22 contracts relative to the outrigger beam 21 .
[0073] The drilling and blasting platform frame provided in this embodiment is unfolded and folded by providing a folding mesh plate 14 and rotating the folding mesh plate 14 around a folding axis 15. Therefore, the folding mesh plate 14 is made to be foldable around the folding axis 15, spread out when in use, and folded up when not in use. Therefore, when the drilling and blasting platform frame moves, it is retracted inwardly along with the sleeve beam to avoid collision with cave wall facilities, thereby improving overall flexibility.
[0074] Preferably, the upper parts of the first, second and third working platforms are paved with steel mesh plates. A single steel mesh plate is welded by round steel with a diameter of 6-8 mm and angle steel. It is made into multiple pieces according to the size of the frame top beam 2 and the size of the cantilever beam. The steel mesh plates are tied tightly with lead wire.
[0075] Specifically, the supporting portion includes the upper surface of the rotating bracket 7 , and correspondingly, the extending portion includes a movable mesh plate 16 arranged on the upper surface of the rotating bracket 7 .
[0076] Specifically, a mesh hook 9 is further provided on the main frame at a position corresponding to the rotating bracket 7 , and the mesh hook 9 is suitable for hanging a movable mesh 16 movably provided on the upper surface of the rotating bracket 7 .
[0077] A steel mesh is laid on the upper part of the rotating bracket 7 to form a third working platform S3, and mesh hooks 9 are welded on the columns on both sides of the working platform. When the rotating bracket 7 is folded up, the movable mesh 16 is hung and fixed on the mesh hooks 9, which is convenient for storage and does not interfere with the traffic space.
[0078] Preferably, the drilling and blasting platform frame provided in this embodiment needs to be designed in comprehensive consideration of the driller's height and the tunnel section size / height, including forming a first working platform S1 on the upper part of the frame top beam 2, forming a second working platform S2 on the frame middle beam 12, and forming a first working platform S1, a second working platform S2, a third working platform S3, and a ground working platform S4 on the outrigger beams on both sides of the frame. A four-layer working platform is formed according to the cross-sectional size of the medium-sized water diversion tunnel, and more than 10 hand drills can be organized to drill holes in the entire section at the same time, which greatly improves work efficiency and reduces the drilling and blasting cycle time.
[0079] The drilling and blasting platform frame is provided with four layers of working platforms in total, so as to increase the number of pneumatic drills drilling at the same time and meet the requirements of full-section drilling and blasting.
[0080] Specifically, the drilling and blasting platform frame also includes: an air supply pipe 5 and / or a water supply pipe 6, which is installed on the main frame and extends from a relative bottom position to a relative top position of the main frame. The air supply pipe 5 is also provided with an air supply pipe inlet 31 and a plurality of air drill air supply interfaces 33, and the water supply pipe 6 is also provided with a water supply pipe inlet 32 and a plurality of air drill water supply interfaces 34.
[0081] Preferably, high-pressure air supply pipes 5 and water supply pipes 6 are respectively arranged around the frame columns 1 and the frame top beams 2 on both sides of the first main frame of the drilling and blasting platform frame; high-pressure air supply pipes with a diameter of 100 mm and high-pressure water supply pipes with a diameter of 50 mm are respectively welded around the columns and the top beams on both sides of the first portal frame in the direction of entering the cave for supplying air and water to the pneumatic drill, which are supplied by the main air supply and water supply pipes extending to the vicinity of the platform frame.
[0082] Preferably, ladders 4 are arranged around the columns on both sides of the first portal frame in the direction of the drilling and blasting platform frame entering the hole, so as to facilitate the operators to go up and down.
[0083] The nodes between the four portal frames of the drilling and blasting platform frame and each column connecting beam 17 are all connected obliquely by diagonal bracing beams 18 to meet the structural force requirements.
[0084] In addition, the drilling and blasting platform frame provided in this embodiment can be generally used for drilling and blasting platform frames for excavating medium-section water diversion tunnels and drilling and blasting platform frames for excavating large-section tunnels.
[0085] Obviously, the above embodiments are merely examples for the purpose of clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived therefrom are still within the scope of protection of the invention.
Claims
1. A drilling and blasting platform frame, characterized in that: include: Main frame; A working platform, at least partially formed on the main frame and suitable for supporting working personnel and / or working equipment; a rotating bracket (7), one end of which is rotatably connected to the main frame, and the other end of which is supported and arranged on the ground, the rotating bracket (7) comprising a yielding state parallel to the extension direction of the main frame, and an operating state arranged at an angle to the extension direction of the main frame; The working platform comprises: a supporting part and an extension part arranged on the supporting part; the supporting part is directly or indirectly arranged on the main frame and supports the extension part; the extension part is suitable for increasing the area of the working area under the supporting state of the supporting part; The support portion comprises an outrigger beam (21) arranged outside the main frame and a sleeve beam (22) movably connected to the outrigger beam (21); correspondingly, the extension portion comprises a folding mesh plate (14) that selectively switches between a folded state and an unfolded state; The sleeve beam (22) is sleeved inside and / or outside the outrigger beam (21), and the sleeve beam (22) is suitable for selectively extending and retracting along the length direction of the outrigger beam (21); The folding mesh plate (14) rotates around a folding axis (15) and is suitable for unfolding when the sleeve beam (22) extends relative to the cantilever beam (21), and folding when the sleeve beam (22) contracts relative to the cantilever beam (21); The support portion comprises an upper surface of the rotating bracket (7), and correspondingly, the extension portion comprises a movable mesh plate (16) mounted on the upper surface of the rotating bracket (7); The main frame comprises a door-shaped frame, and the door-shaped frame comprises a frame top beam (2) arranged at the top, and frame columns (1) arranged opposite to each other on both sides of the frame top beam (2); The frame top beam (2) cooperates with the mesh plate to form the working platform; The rotating bracket (7) is movably mounted on the frame column (1); The door-shaped frame further comprises: a frame middle beam (12), the frame middle beam (12) being arranged at a position below the frame top beam (2) in the height direction; The drilling and blasting platform frame further comprises: a joist (10), the joist (10) being arranged at the bottom of the frame top beam (2) and / or the frame middle beam (12), and being suitable for lifting the drilling and blasting platform frame off the ground under the lifting action of the working vehicle (80); When the rotating bracket (7) is in the yielding state, a movable passage is formed under the main frame, which facilitates the loader and the dump truck to pass under the drilling and blasting platform frame. When the device is moving or the dump truck is unloading, the rotating bracket (7) is retracted to meet the passage space requirements of mechanical equipment under the main frame. When in the working state, the rotating bracket (7) is extended to form a support, which facilitates the formation of a working platform, thereby supporting the operating personnel and / or the operating equipment. The frame middle beam (12) is arranged at a position above the rotating bracket (7) in the height direction. The rotating bracket (7) forms a third working platform (S3) in the working state. By being made into a plane rotating type, the rotating bracket (7) is pulled open when drilling and blasting are required. After the drilling and blasting are completed, the rotating bracket (7) is retracted and fixed to form a traffic space. The main frame is also provided with a bracket latch (8), and the bracket latch (8) is suitable for locking the rotating bracket (7) in a yielding state or an operating state, thereby positioning the rotating bracket (7) to avoid movement caused by accidental contact.
2. The drilling and blasting platform frame according to claim 1, characterized in that: A mesh hook (9) is also provided on the main frame at a position corresponding to the rotating bracket (7), and the mesh hook (9) is suitable for hanging a movable mesh (16) movably arranged on the upper surface of the rotating bracket (7).
3. The drilling and blasting platform frame according to claim 1, characterized in that: The drilling and blasting platform frame further comprises: an air supply pipe (5) and / or a water supply pipe (6), wherein the air supply pipe (5) and / or the water supply pipe (6) are mounted on the main frame and extend from a relative bottom position to a relative top position of the main frame, the air supply pipe (5) is further provided with an air supply pipe inlet (31) and a plurality of air drill air supply interfaces (33), and the water supply pipe (6) is further provided with a water supply pipe inlet (32) and a plurality of air drill water supply interfaces (34).
Citation Information
Patent Citations
Self -adaptation tunnel excavation bores and explodes platform truck
CN208633832U
Drilling and blasting platform frame
CN215672224U